L01-2510-ECIV-DD-0007_0A

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

M

A
P

B
L

C
J

I
DET. 5

PLANT DET. 15
DET. 6 1540 5 ESP.@260=1300 115
NORTH 5 6 6 FIRE WALL
01 01
8

8
72 HANDRAIL
°
TRUE 3310 1290 (REF.) FRP GRATING FIRE WALL AIL
SETTLER PLATFORM DR

445
NORTH - 38mm N
L70 L70x70x6(TIP.) HA

IPE200
700

975
FRP GRATING
BP-01 BP-01 EL.+4.675 38mm
290 EL.+4.637
FRP GRATING EL.+4637 T.O.G. T.O.S.
T.C. W.P.
IPE200 IPE200 IPE200 38mm
EL.+3.633

975
UPE160

UPE160
A T.O.G.

5 ESP.@175=875
HANDRAIL
UPE160
01

UPE160
(REF.)
440

720

UPE160

UPE160
1042
B UPE160

1042
A
IPE200 EL.+4675
7

UPE160 UPE160 EL.+3.633 W.P. 7


DET. 18 700
T.O.G.
T.O.G.
EL.+3.595

167
T.O.S.
290
DET. 3 DET. 17 (REF.)

100
BASE PLATE LAYOUT EL. +0.625 (B.O.B.P.)

1000
IPE200 IPE200
Esc. 1 : 25 STAIR PROFILE ACCORDING TO STANDAR
100
6 DET. 19
DET. 4 L01-1100-EEST-DT-0002
C 01 C
UPE160 UPE160 SECTION B
FRP GRATING HANDRAIL
STRUCTURE PLAN EL.+4.637 (T.O.S.)

5760
FRP 38mm HANDRAIL
Esc. 1 : 25 DIAG. L70x70x7 (-75)
HANDRAIL

1010
DET. 2
5 6
6

6
UPE160 UPE160
01 01
HANDRAIL
HANDRAIL
ACCORDING TO L01-1100-EEST-DT-0003

DET. 7
A

IPE200

IPE200

IPE200
IPE200
DET. 1

1000
FRP GRATING
38mm SETTLER

100
STAIRS SEE DRAWING N° EL.+4.637 PLATFORM
L01-2510-ECIV-DD-0020 T.O.S.
FRP GRATING
UPE160 UPE160 38mm

IPE200 UPE160
EL.+3.595
BASE PLATE BP-01 SECTION A T.O.S.

UPE160
1042

100
L
1055

C FIRE WALL

UPE160
5

5
EL.+3.595 IPE200 IPE200

(REF.)
555
T.O.S.

x7

L7

0
IPE200

L7
IPE200

70
900

0
A

0x
L7
01
DET. 16
850 1230 1230 DET. 9 DET. 25
SECTION C 820
(SIM.)
3310 840

2970
5 6 DET. 8
01 01

HEA160

HEA160
STRUCTURE PLAN EL.+3.595 (T.O.S.)
4

4
Esc. 1 : 25 DIAG. L70x70x7 (-75)

A A EL.+0.625
B.O.B.P.
01 01
HANDRAIL HANDRAIL
ACCORDING TO L01-1100-EEST-DT-0003 ACCORDING TO L01-1100-EEST-DT-0003 ELEVATION AXIS A
Esc. 1 : 25 01
NOTES
1. DIMENSIONS IN MILIMETERS (U.N.O.).
3

2. ELEVATIONS AND COORDINATES IN METERS. 3


FRP GRATING FRP GRATING
38mm 38mm 3. FRP GRATING SHALL BE MOLDED 38x38x38 mm.
4. CORROSION PROTECTION OF STEEL STRUCTURE SHALL BE ACCORDING TO SPEC: L01-0000-EMEC-ET-0035.
EL.+3.595 EL.+3.595 5. CONNECTION DETAILS ARE REFERENTIAL. THEIR VERIFICATION MUST BE RESPONSIBILITY OF STEEL MANUFACTURER.
T.O.S. T.O.S. 6. STRUCTURAL STEEL S235JR.
100

100

REFERENCES
IPE200 IPE200 L01-2510-ECIV-DD0026 STEEL GENERAL NOTES
7
7

L01-1100-EEST-DT-0002 ACERO ESTRUCTURAL


0x
0x

7
7
900

900

L01-2510-ECIV-DD-0009 PRIMARY AND SECONDARY PLATFORM DETAILS


0x
0x

L7
L7

DET. 10 DET. 10 L01-1100-EEST-DT-0003 ACERO ESTRUCTURAL


2

2
820 820
0A ISSUED FOR COMMENTS 11.03.20 MCR NBS RCM
2970

2970

A ISSUED FOR INTERNAL CIRCULATION 28.02.20 MCR NBS RCM


Rev. DESCRIPTION Date Written Verified Approved
HEA160

HEA160

FIRE WALL
DET. 24 FIRE WALL DET. 24

N° PLANO P&A CENTENARIO LITHIUM PROJECT


3983-PC03-015

EPS-004 UNIT 2510


BORON SOLVENT EXTRACTION
Scale: INDICADAS
EL.+0.625 EL.+0.625
B.O.B.P. B.O.B.P.
PRIMARY PLATFORM 2510-TA-02 TANK PLAN VIEWS AND ELEVATIONS 1
1

ERAMINE RESERVES THE PROPERTY OF THIS


DOCUMENT, WITH PROHIBITION OF REPRODUCE
IT, MODIFY IT, OR DOWNLOAD IT, ANY PART OR
WHOLE FOR OTHER COMPANY OR PERSON
ELEVATION AXIS 5 ELEVATION AXIS 6 WITHOUT PREVIOUS WRITTEN AUTHORIZATION
Document Number: Date: 14.02.2020 A2
Esc. 1 : 25 01 Esc. 1 : 25 01 Rev.
L01-2510-ECIV-DD-0007
0A

P O N M L K J I H G F E D C B A Format A1

You might also like