IMG_0001

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

WIR No:

Revision:
DG-BUJ-
00
1 04-0000-MRC-WI R-AV-000035
gfJL.
Date: 26 Jun e 2024 MARCO
Page: 2of2

Review Comments:

1. WCL-01 to be finished by concealing the embedded operable screen box as per approved shop drawing design.

lnspection Clearance:
Site Mechanical Electrical Structural Architectural HSE
Role lnspector
Surveyor CM
Engr. Engr. Engr. Engr. Engr.

Signature:
\J+ [r ,[t In \[ft \&P-
Date:
)il( ilIl fi l )h +h/L rLl;

QA/QC S ig natu re

Consultant
Signature
Representative

General Provisions: Checking and approval by Construction Supevisor and F+G shall not relive the Contractor from his obligations to pertorm the work in accordance
with the Contrcct Documents, Work Specifications, rcquirement of Safety, and Local Authoity Regulations

f- A Approried 17 B. Approrcd with Comments [- C. Revise and Resubmit T D. Rejected

Stamp: Construction Supervision (Submitted)

SCH IAT TA RELL A SAUDT EENSULTTNESERVTEESEo.


A S S O C IAT I ENGtNEERtNGcoNsuLrANrs

DIRIYAH ART FUTURES


Name: Vincent Pepe
Role: Project Manager / Resident Engineer

Signature:

r
WIR No:
Revision:
DG-
00
B U J- 1 04-0000-M RC-wt R-AV-000037
g-sJI* I
Date: 04 July 2024 MARCO
Page: 2of2

Review Comments:

1 MIR and Shop drawing is approved.


2 1 I 1 equipment is installed.
3 Door is open during day shifts.
4 Works are ongoing in the room.
1 Final approval of the equipment is subject to the test to be done by AV Consultant.

lnspection Clearance:
Site Mechanical Electrical Structura! Architectural HSE
Role lnspector Surveyor CM
Engr. Engr. Engr. Engr. Engr.

Signature:
t[[, t[L IIn m I
il,P,
"il,\tt
I tlt
Date:
rll fi il, ?L l ,l]*

QA/QC S ig natu re

Consultant
Signature
Representative

Genera! Provisions: Checking and approvat by Construction Supervisor and F+G shatt not retive the Contractor from his obligations to peiorm the work in accodance
with the Contract Documents, Work Specifications, requirement of Safety, and Local AuthotU Regutations

[- A Approved 17 B. Appror,ed with Comments [._ C. Revise and Resubmit f D. Rejected

Stamp: Construction Supervision (Submitted)

SCHIATTARELLA
SAUD' ET]NSULT,NE
ASSOCIAT, SERVIEES
ENGINEERING CO NS
EO.
U LTANTS

DIRIYAH ART FUTURES


Name: Vincent Pepe
Role: Project Manager / Resident Engineer

Signature:
[r^.i,4
?
WlR No:
Revision:
DG-B UJ- 1 04-0000-M RC-WI R-AV-000038
00
g-sJ L. ,,
Date: 04 July 2024 MARCO
Page: 2of2

Review Comments:

1. Shop drawing is not approved.


1. The items are still in the boxes / not installed.

lnspection Clearance:
Site Mechanical Electrical Structural Architectural HSE
Role lnspector
Surveyor CM
Engr. Engr. Engr. Engr. Engr.

Signature:
\l,r. [?, \[P, r[fl If
Date:
( rll,., lL 1q L ,Ll I Ir tl,' I t, Llt

QA/QC S ig natu re

I nS pgcti() n 1As /c;:iiccoie;


Consultant
Signature
Representative

General Prcvisions: Checking and approval by Construction Supevisor and F+G shall not retive the Contractorfrom his obligations to pertorm the work in accordance
with the Contract Documents, Work Specifications, requirement of Safety, and Local Authorv Regulations

[- A Approved r-' B. Approled with Comments Revise and Resubmit T D. Rejected


fC.
Stamp: Construction Supervision (Submitted)

5 c HI AT TA RELL A sAUDI EENsuLTINEsERVIEESEo.


A S S O C IAT I ENGtNEERtNEcoNsuLrANrs

DIRIYAH ART FUTURES

Name: Vincent Pepe


Role: Project Manager / Resident Engineer

signature:
ILr\?, rlrltl
DOC No: DG-BUJ- 1 04-0000-SCT-RPT-QL-000 111

Revision: 00
Date: 03 J uly 2023
Page: 5of5

(To be verified by the Consu/tont)

Contractor Confi rmation

-All of the above comments are done and rectified.

-Work already done at site

-See attached photos

Name (Contractor) Amro Salha

Signature
b Date 06-07-2A24

Construction Su pervision Verification

01. MDF installed is still only for interiors with finishing coating of interiors.
02. Panels of the canopy are cracking the paint on the joints.
03. Floor joint is directly attached to the paving instead with necessary detach.

*
Disposition. Accepted X Rejected

07-07-2024

07-07-2024

- Action/s for the Non-Conformance has been veified and closed. tr YES tr NO
- Further action rs required tr YES tr NO

CM ICS Head:

Stamp: Construction Supervisor (lssuer)

SCHI AT TA REL LA sAUDt EENSULTTNESERVTEESEo.


ASSOC IAT I ENctNEERtNGcoNsuLrANrs

DIRIYAH ART FUTURES


Name: Vincent Emidio Giovanni Pepe
Role. PROJECT MANAGER
Signature.
DOC No: DG-B UJ- 1 04-0000-3CT-RpT-QL-000377
Revision: 00
Date: 23 January 2024
Page: 4of4

(To be verified by the Consu/f ont)

C ontra ctor C onfi rmation

Door is painted same tone as mud plaster

See attached photos

(Contractor)
Namg Amro Salha

Signature Date 03-07-2024

Gonstruction Supervision Verification

Accepted [- nelected *

Verified by:
(Discipline Engr.)

- Action/s for the Non-Conformance has been veified and c/osed. tr YES trNo
- Further action rs required tr YES EruO

QA/QC Head: CM ICS Head:

Stamp: Construction Superuisor (lssuer)

SCH IATTA REL LA SAUDI EONSULTINESERVIEESEO.


A S S O C IAT I ENGlNEERlNEcoNsuLrANrs

Name: "\[MCdnt Erfrl&i6 Gidv'aHn'iP"epe


Role: PROJECT I_IIANAGER

Signatu re:

You might also like