Revision:
DG-BUJ-
00
1 04-0000-MRC-WI R-AV-000035
gfJL.
Date: 26 Jun e 2024 MARCO
Page: 2of2
Review Comments:
1. WCL-01 to be finished by concealing the embedded operable screen box as per approved shop drawing design.
lnspection Clearance:
Site Mechanical Electrical Structural Architectural HSE
Role lnspector
Surveyor CM
Engr. Engr. Engr. Engr. Engr.
Signature:
\J+ [r ,[t In \[ft \&P-
Date:
)il( ilIl fi l )h +h/L rLl;
QA/QC S ig natu re
Consultant
Signature
Representative
General Provisions: Checking and approval by Construction Supevisor and F+G shall not relive the Contractor from his obligations to pertorm the work in accordance
with the Contrcct Documents, Work Specifications, rcquirement of Safety, and Local Authoity Regulations
Signature:
r
WIR No:
Revision:
DG-
00
B U J- 1 04-0000-M RC-wt R-AV-000037
g-sJI* I
Date: 04 July 2024 MARCO
Page: 2of2
Review Comments:
lnspection Clearance:
Site Mechanical Electrical Structura! Architectural HSE
Role lnspector Surveyor CM
Engr. Engr. Engr. Engr. Engr.
Signature:
t[[, t[L IIn m I
il,P,
"il,\tt
I tlt
Date:
rll fi il, ?L l ,l]*
QA/QC S ig natu re
Consultant
Signature
Representative
Genera! Provisions: Checking and approvat by Construction Supervisor and F+G shatt not retive the Contractor from his obligations to peiorm the work in accodance
with the Contract Documents, Work Specifications, requirement of Safety, and Local AuthotU Regutations
SCHIATTARELLA
SAUD' ET]NSULT,NE
ASSOCIAT, SERVIEES
ENGINEERING CO NS
EO.
U LTANTS
Signature:
[r^.i,4
?
WlR No:
Revision:
DG-B UJ- 1 04-0000-M RC-WI R-AV-000038
00
g-sJ L. ,,
Date: 04 July 2024 MARCO
Page: 2of2
Review Comments:
lnspection Clearance:
Site Mechanical Electrical Structural Architectural HSE
Role lnspector
Surveyor CM
Engr. Engr. Engr. Engr. Engr.
Signature:
\l,r. [?, \[P, r[fl If
Date:
( rll,., lL 1q L ,Ll I Ir tl,' I t, Llt
QA/QC S ig natu re
General Prcvisions: Checking and approval by Construction Supevisor and F+G shall not retive the Contractorfrom his obligations to pertorm the work in accordance
with the Contract Documents, Work Specifications, requirement of Safety, and Local Authorv Regulations
signature:
ILr\?, rlrltl
DOC No: DG-BUJ- 1 04-0000-SCT-RPT-QL-000 111
Revision: 00
Date: 03 J uly 2023
Page: 5of5
Signature
b Date 06-07-2A24
01. MDF installed is still only for interiors with finishing coating of interiors.
02. Panels of the canopy are cracking the paint on the joints.
03. Floor joint is directly attached to the paving instead with necessary detach.
*
Disposition. Accepted X Rejected
07-07-2024
07-07-2024
- Action/s for the Non-Conformance has been veified and closed. tr YES tr NO
- Further action rs required tr YES tr NO
CM ICS Head:
(Contractor)
Namg Amro Salha
Accepted [- nelected *
Verified by:
(Discipline Engr.)
- Action/s for the Non-Conformance has been veified and c/osed. tr YES trNo
- Further action rs required tr YES EruO
Signatu re: