PVC Drainage Pipes Arrangement of EL.323.50

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

2 3 D8

4 5 D8 6 7
19000 14000 17000 14000 17000 14000 5500
950 9501200 1200 1200 1200 1200
10000 1200 4700 8350 1900 4350 8350 1900 4350
V

D6 2300 7700

V
V

N F 3700 8000 2300 F 3700 8000 2300

300

300

300

300

300

300
A

150
A

V
V

V
2300
D6 D6 D6
V
400 400 400 400

V
D6
V

V
D6
V

D7

V
V

10000

V
D7 D7
El.323.50
V

12100

V
V

V
15000
10700

300 11850 6850 14000 10400 6600 14000 10400 6600


V

V
D7
150
V

V
V

6500 D7
9500 2650 6500

V
D7

2000 1500 1500


D7 1050 1050
1050 1050
V

V
900 2850 4000 1800 3500 6900 2150 5450 1800 3500 6900 2150 5450 1800 3500

300

300

300
G B 4300
V

150
B

V
D6
V

V
400
2000

2000

2000
300
400 400
V

V
B B
V

V
Q Q Q

2000
D6
V

D6 D6

V
V
5500

V
6440

6440
V

V
2768

2768

2768
R9950

R9950

R9950
V

800

V
J
V
12500

V
6300 6300

900

900

900
V
3100

V
2100 2078 2078 2078
Q F Q F Q M
V

D7

V
N
V

BA

V
6060

6060
900 3000

V
2680
V

V
78

78
78
°

°
V

V
C J C
V

V
U20 U19 U18
V

V
10400
G D5
BB BB
V

V
7720
V

8570

V
V

V
V

500

V
13500
V

V
15500

D
V

V
2800
V

BA

V
D5
V

V
El.323.50
V

D5

V
6930
V

V
V

V
Z K
V

400

V
1650
V

D D

V
2000
V

3000

2800

V
900 1900 3450
L
4400

4400
V

4350 2800

V
1200 750
V

150
H Y Y Z

V
V

K
9600

V
D5
V

4350 12650 4150

V
D5
V

V
El.323.50 El.323.50 El.323.50
V

1500 17500

V
6700
V
18500

V
C
V

V
V

13850

V
H
V

V
D5
V

V
9500
V

V
V

V
V

V
V

L
250

V
V

V
D7 D7
7200 6800 4150 9850 6800 7
V

V
Notes 6
2 3 4 5
1, This set of drawing has six pieces.
2, The elevations are in meters while the dimensions are in milimeters. D P Title
2023-9-23 Cao Jing See cloud line.
3, After the installation of the pipeline, use pressure gas purge to ensure that nothing else is left in the pipe. D8
Consultants Drainage Pipes Arrangement
4, Drainage pipes can be minor adjusted at site when needed. D7 2023-9-19 Cao Jing See cloud line.
Mott MacDonald House
5, Test drainage pipes with connections partly by partly on pressure 3m with 15min. Drainage trench is ~1%. Pipe D6 2023-8-5 Cao Jing See cloud line. 8-10 Sydenham Road of EL.323.50 and Stator
D5 Croydon, CR0 2EE
slope is about ~1%.
D6 D5 2023-7-14 Cao Jing See cloud line. United Kingdom
Foundation
6, Cover grating is made at site with flat bar or finished product. Cover grating load capacity is not less than
4KN/m2 except item 37 & 38. Item 37 & 38 load capacity is not less than 10KN/m2. Fix angle steel(item 29) along D7 2023-5-31 Cao Jing See cloud line.
D4 T +44 (0)20 8774 2000 Drawn By Cao Jing Reviewed Chen Hong Chuan
wall with bolts to support cover grating(item 21,22). Other drainage trench cover grating load capacity is not less D3 2023-5-10 Cao Jing Add check well and modify relevant sections. MM Pakistan (Pvt.) Ltd. F +44 (0)20 8681 5706
than 4KN/m2. Top of cover grating will be the same elevation with floors. Cover grating calculation and detail IN ASSOCIATION WITH W mottmac.com Dwg check Cao Jing Approved Ding Kuang
D2 2023-4-14 Cao Jing Modify section J-J and add reference.
design will be supplied by manufacture later. Movable handrail design will be supplied by manufacture later. Scale at A1 CAD
Client
If cover grating is made at site, do capacity test at site before installation. 2023-2-24 Cao Jing File
See drawing on separate documents submitted later.
D1
Pakistan Water and Power Development Authority See drawing PT5C-10-EDS-T28-001
Rev Date Drawn Description Tarbela 5th Extension Hydropower Project
7, Reference: Contractor Tarbela Dam Colony, Tarbela Project Drawing Number
PT5C-10-EDS-T30-001 Floor drainage System Diagram
PT5C-10-EDS-W30-001 Floor Drainage System Calculation Sheet of TARBELA 5th POWER CONSTRUCTION Project
T5HP-T5C-PHXX-DRG-GN-000015
PT5C-10-EDS-T28-003 CORPORATION OF CHINA LTD. Tarbela 5th Extension Hydropower Project PT5C-10-EDS-T28-001 1/6
D8
D7
D6

250
7700 1200 300 650 650 300 1200 4700 14000 8350 1200 350 650 650 1200 4350

300

300

395
300

300
400400 150

363
392

396
700

700
300

300
300

300
9850 6850 10400 6600

4
2 3

400 250
3700 8000 2300 7950 1200 350 650 650 1200 4350 3700 8000 2300
300

300

300
395
300

300
150

396
700
300

300
6600
14000 17000 14000

4 5 6 7
D7
D5 D5

see supplier drawing


650

359
10400 100

100
421
1000

323.50

300
200 10000 200

100
900 3000 3100 5500
D8 2023-9-23 Cao Jing See cloud line.

D7 2023-9-19 Cao Jing See cloud line.

D6 2023-8-5 Cao Jing See cloud line.

D5 2023-7-14 Cao Jing See cloud line.


12500
D4 2023-5-31 Cao Jing See cloud line.

D3 2023-5-10 Cao Jing Add check well and modify relevant sections.
C B
D2 2023-4-14 Cao Jing Modify section J-J and add reference.
D5
D1 2023-2-24 Cao Jing

Rev Date Drawn Description


D5 Contractor

see supplier drawing


POWER CONSTRUCTION
CORPORATION OF CHINA LTD.
Consultants
100 2800 Mott MacDonald House
8-10 Sydenham Road
Croydon, CR0 2EE
United Kingdom
500
323.50 T +44 (0)20 8774 2000

100
100 MM Pakistan (Pvt.) Ltd. F +44 (0)20 8681 5706
IN ASSOCIATION WITH W mottmac.com
El.321.50
200 2500 200 Client
400
350

Pakistan Water and Power Development Authority


Tarbela 5th Extension Hydropower Project
~320.85 Tarbela Dam Colony, Tarbela
Project

Tarbela 5th Extension Hydropower Project


Title
D5 D5
BC
Drainage Pipes Arrangement
of EL.323.50 and Stator
Foundation

100
Drawn By Cao Jing Reviewed Chen Hong Chuan

100 Dwg check Cao Jing Approved Ding Kuang


BC
0 Scale at A1 CAD
10 File
PT5C-10-EDS-T28-001

50
See drawing

Project Drawing Number

PT5C-10-EDS-T28-001 2/6
D8
D7

2 3 4

400
2050 650 650 1200 1200 6900 2150 300 750 750 300 4250 1200 1200 600 3500

323.50 323.50

300 300

300 300

300 300
1% 1% 1% 1%

1000

1000
1% 1% 1%

300
900 2850 4000 1800 3500 2150 1050 1050 5450 1800 3500

400
6900 2150 300 750 750 300 4250 1200 1200 600 3500 D5

950
323.50

300 300
1%

1000

300
300

400 3900 250 ~300 ~80

50
2150 1050 1050 5450 1800 3500
50

50
80

25
5 6 7
D5
D5
D5

X 50
400

50
50
323.50
300

323.50

650

750

80
~300 ~80
600

25
50

300
X 500 50 300 50 D8

D7
2023-9-23

2023-9-19
Cao Jing

Cao Jing
See cloud line.

See cloud line.

D6 2023-8-5 Cao Jing See cloud line.

D5 2023-7-14 Cao Jing See cloud line.

D4 2023-5-31 Cao Jing See cloud line.

D3 2023-5-10 Cao Jing Add check well and modify relevant sections.

D2 2023-4-14 Cao Jing Modify section J-J and add reference.

D1 2023-2-24 Cao Jing

Rev Date Drawn Description


Contractor
D5

D
POWER CONSTRUCTION
D5 CORPORATION OF CHINA LTD.
Consultants
D E Mott MacDonald House
8-10 Sydenham Road
Croydon, CR0 2EE
United Kingdom
1100 900
321.50 T +44 (0)20 8774 2000
MM Pakistan (Pvt.) Ltd. F +44 (0)20 8681 5706
IN ASSOCIATION WITH W mottmac.com
250

250
Client
Pakistan Water and Power Development Authority
323.50 Tarbela 5th Extension Hydropower Project
Tarbela Dam Colony, Tarbela
750

Project

9750 Tarbela 5th Extension Hydropower Project


320.85 Title

Drainage Pipes Arrangement


of EL.323.50 and Stator

100
400
6930 18500 Foundation
308.00
Drawn By Cao Jing Reviewed Chen Hong Chuan

Dwg check Cao Jing Approved Ding Kuang

Scale at A1 CAD
File
See drawing PT5C-10-EDS-T28-001
Project Drawing Number

PT5C-10-EDS-T28-001 3/6
Plan of 1# check well D7
D8
D7
D7
SCALE-1:10

600
S
500

422
13000 900

323.50 323.50 323.50

700

850
~1700
550

~1700
500

D7
1500 1500

~300
S

Section S-S Section SS-SS


SCALE-1:10 SCALE-1:10 Plan of 5# check well
SCALE-1:10
400 400
SS

~250
700 400

~250
550 650 308.00 600
308.00
323.50 323.50

~450
308.00
500 600 350
50 50 350
50
50

350

650
600
850
D7
750
700

800

D5
D7 D7 AB

SS
AB

D8 2023-9-23 Cao Jing See cloud line.


D5 D7 2023-9-19 Cao Jing See cloud line.
D5
D6 2023-8-5 Cao Jing See cloud line.
4
D5 2023-7-14 Cao Jing See cloud line.

D4 2023-5-31 Cao Jing See cloud line.

D3 2023-5-10 Cao Jing Add check well and modify relevant sections.
12650 4150
D2 2023-4-14 Cao Jing Modify section J-J and add reference.

323.50 D1 2023-2-24 Cao Jing


~24220 250

500
Rev Date Drawn Description
Contractor
323.50
POWER CONSTRUCTION
CORPORATION OF CHINA LTD.
Consultants
Mott MacDonald House
8-10 Sydenham Road
Croydon, CR0 2EE
United Kingdom

T +44 (0)20 8774 2000


MM Pakistan (Pvt.) Ltd. F +44 (0)20 8681 5706
IN ASSOCIATION WITH W mottmac.com
Client
Pakistan Water and Power Development Authority
E D5 Tarbela 5th Extension Hydropower Project
Tarbela Dam Colony, Tarbela

D5 D5 Project

Tarbela 5th Extension Hydropower Project


Title

550
Drainage Pipes Arrangement
4400 13850 250
50 of EL.323.50 and Stator
308.00
80
50 Foundation

50
Drawn By Cao Jing Reviewed Chen Hong Chuan
323.50
50

~323.50 50 350
500

Dwg check Cao Jing Approved Ding Kuang


50
600 Scale at A1 CAD
File
See drawing PT5C-10-EDS-T28-001
Project Drawing Number

E
PT5C-10-EDS-T28-001 4/6
D6
D6 D6
D6 D5 D6
D6
D6

6 7
2 3 F 4 5
N F M
D6
AA 2100 2078
D6

11922 El.308.00
AA 6300 2078
D6

11922 10700 AA 6300 2078 11922 800 700 D6

2500

400
AA N AA F6750 AA F6750 M
5000 3700 14000 2000 2500 5000 14000 2000 2500 5000 14000 1500

6060
1080 750 750

C C
U20 U19 U18

11000
D6 D5 D7
D8 D6

D7 D7

4500
~324.50
13000 10440
K
323.50 323.50 D
700

1650

400
1500 350

7900
9000
K D5

~316.00

D8 2023-9-23 Cao Jing See cloud line.


3668
D7 2023-9-19 Cao Jing See cloud line.
Plan of 3# check well 400 D7 D6 2023-8-5 Cao Jing See cloud line.
SCALE-1:10 2023-7-14 Cao Jing See cloud line.
D5

600
T D4 2023-5-31 Cao Jing See cloud line.
308.00
200

400 D3 2023-5-10 Cao Jing Add check well and modify relevant sections.

D2 2023-4-14 Cao Jing Modify section J-J and add reference.

D1 2023-2-24 Cao Jing


350
Rev Date Drawn Description
Contractor
500 308.00
200
550

POWER CONSTRUCTION
500

CORPORATION OF CHINA LTD.


350 Consultants
Mott MacDonald House
8-10 Sydenham Road
Croydon, CR0 2EE
D6
D7 United Kingdom

T MM Pakistan (Pvt.) Ltd.


T +44 (0)20 8774 2000
F +44 (0)20 8681 5706
IN ASSOCIATION WITH W mottmac.com
Client
D6 Pakistan Water and Power Development Authority
Section T-T Tarbela 5th Extension Hydropower Project
D7 Tarbela Dam Colony, Tarbela
SCALE-1:10
Project

D6 Tarbela 5th Extension Hydropower Project


D7
550
Title

323.50 Drainage Pipes Arrangement


500 of EL.323.50 and Stator
50
50

Foundation
450

Drawn By Cao Jing Reviewed Chen Hong Chuan


D5 Dwg check Cao Jing Approved Ding Kuang

Scale at A1 CAD
File
D7 See drawing PT5C-10-EDS-T28-001
Project Drawing Number

PT5C-10-EDS-T28-001 5/6
Plan of 2# check well Plan of 4# check well
SCALE-1:10 SCALE-1:10
D5

2 6
800 W U
4 650
600
700

B D5
D7

750
700

650
600
D7

U U

450
350

16
25

80
25
Ø20 00
AC AC

Ø1
W U

000
99
Ø1
12°
30° 18°
98 25
00
Section W-W Section U-U
°

30
30

°
SCALE-1:10 SCALE-1:10
30°

30°
750 650
U20,U19,U18
C 323.50 323.50
50 600

30°
30°

700 D5
50

50
50
D7
°
30

30
°

30° 30°

800
D7

4 48

4 48
100

100
950
80 110 80 4
R 270
20

El.340.00
R

D8 2023-9-23 Cao Jing See cloud line.

D7 2023-9-19 Cao Jing See cloud line.


D5 D6 2023-8-5 Cao Jing See cloud line.
D5
D5 2023-7-14 Cao Jing See cloud line.

D5 D4 2023-5-31 Cao Jing See cloud line.

Ø20000 D3 2023-5-10 Cao Jing Add check well and modify relevant sections.

350 D2 2023-4-14 Cao Jing Modify section J-J and add reference.

50
D1 2023-2-24 Cao Jing
El. 323.50
Rev Date Drawn Description
Contractor

VARIES
POWER CONSTRUCTION
AD 340.00
CORPORATION OF CHINA LTD.
340.00 Consultants
300 Mott MacDonald House
8-10 Sydenham Road
Croydon, CR0 2EE
12°
30° 18° United Kingdom

AD MM Pakistan (Pvt.) Ltd.


T +44 (0)20 8774 2000
F +44 (0)20 8681 5706
°

30
30

W mottmac.com
, ,
°

IN ASSOCIATION WITH

D5 Client
Pakistan Water and Power Development Authority
Tarbela 5th Extension Hydropower Project
30°

30°

Tarbela Dam Colony, Tarbela


758
U20,U19,U18 Project

Tarbela 5th Extension Hydropower Project

Ø19800
30°
30°

25
30
70

Title

Drainage Pipes Arrangement


450 of EL.323.50 and Stator
130

°
30
30

100
Foundation
°

30° 30° Drawn By Cao Jing Reviewed Chen Hong Chuan


70

Dwg check Cao Jing Approved Ding Kuang

48 4 340.00 48 4 Scale at A1 CAD


File
100 100 See drawing PT5C-10-EDS-T28-001
760
Project Drawing Number

PT5C-10-EDS-T28-001 6/6