Professional Documents
Culture Documents
PVC Drainage Pipes Arrangement of EL.323.50
PVC Drainage Pipes Arrangement of EL.323.50
PVC Drainage Pipes Arrangement of EL.323.50
4 5 D8 6 7
19000 14000 17000 14000 17000 14000 5500
950 9501200 1200 1200 1200 1200
10000 1200 4700 8350 1900 4350 8350 1900 4350
V
D6 2300 7700
V
V
300
300
300
300
300
300
A
150
A
V
V
V
2300
D6 D6 D6
V
400 400 400 400
V
D6
V
V
D6
V
D7
V
V
10000
V
D7 D7
El.323.50
V
12100
V
V
V
15000
10700
V
D7
150
V
V
V
6500 D7
9500 2650 6500
V
D7
V
900 2850 4000 1800 3500 6900 2150 5450 1800 3500 6900 2150 5450 1800 3500
300
300
300
G B 4300
V
150
B
V
D6
V
V
400
2000
2000
2000
300
400 400
V
V
B B
V
V
Q Q Q
2000
D6
V
D6 D6
V
V
5500
V
6440
6440
V
V
2768
2768
2768
R9950
R9950
R9950
V
800
V
J
V
12500
V
6300 6300
900
900
900
V
3100
V
2100 2078 2078 2078
Q F Q F Q M
V
D7
V
N
V
BA
V
6060
6060
900 3000
V
2680
V
V
78
78
78
°
°
V
V
C J C
V
V
U20 U19 U18
V
V
10400
G D5
BB BB
V
V
7720
V
8570
V
V
V
V
500
V
13500
V
V
15500
D
V
V
2800
V
BA
V
D5
V
V
El.323.50
V
D5
V
6930
V
V
V
V
Z K
V
400
V
1650
V
D D
V
2000
V
3000
2800
V
900 1900 3450
L
4400
4400
V
4350 2800
V
1200 750
V
150
H Y Y Z
V
V
K
9600
V
D5
V
V
D5
V
V
El.323.50 El.323.50 El.323.50
V
1500 17500
V
6700
V
18500
V
C
V
V
V
13850
V
H
V
V
D5
V
V
9500
V
V
V
V
V
V
V
L
250
V
V
V
D7 D7
7200 6800 4150 9850 6800 7
V
V
Notes 6
2 3 4 5
1, This set of drawing has six pieces.
2, The elevations are in meters while the dimensions are in milimeters. D P Title
2023-9-23 Cao Jing See cloud line.
3, After the installation of the pipeline, use pressure gas purge to ensure that nothing else is left in the pipe. D8
Consultants Drainage Pipes Arrangement
4, Drainage pipes can be minor adjusted at site when needed. D7 2023-9-19 Cao Jing See cloud line.
Mott MacDonald House
5, Test drainage pipes with connections partly by partly on pressure 3m with 15min. Drainage trench is ~1%. Pipe D6 2023-8-5 Cao Jing See cloud line. 8-10 Sydenham Road of EL.323.50 and Stator
D5 Croydon, CR0 2EE
slope is about ~1%.
D6 D5 2023-7-14 Cao Jing See cloud line. United Kingdom
Foundation
6, Cover grating is made at site with flat bar or finished product. Cover grating load capacity is not less than
4KN/m2 except item 37 & 38. Item 37 & 38 load capacity is not less than 10KN/m2. Fix angle steel(item 29) along D7 2023-5-31 Cao Jing See cloud line.
D4 T +44 (0)20 8774 2000 Drawn By Cao Jing Reviewed Chen Hong Chuan
wall with bolts to support cover grating(item 21,22). Other drainage trench cover grating load capacity is not less D3 2023-5-10 Cao Jing Add check well and modify relevant sections. MM Pakistan (Pvt.) Ltd. F +44 (0)20 8681 5706
than 4KN/m2. Top of cover grating will be the same elevation with floors. Cover grating calculation and detail IN ASSOCIATION WITH W mottmac.com Dwg check Cao Jing Approved Ding Kuang
D2 2023-4-14 Cao Jing Modify section J-J and add reference.
design will be supplied by manufacture later. Movable handrail design will be supplied by manufacture later. Scale at A1 CAD
Client
If cover grating is made at site, do capacity test at site before installation. 2023-2-24 Cao Jing File
See drawing on separate documents submitted later.
D1
Pakistan Water and Power Development Authority See drawing PT5C-10-EDS-T28-001
Rev Date Drawn Description Tarbela 5th Extension Hydropower Project
7, Reference: Contractor Tarbela Dam Colony, Tarbela Project Drawing Number
PT5C-10-EDS-T30-001 Floor drainage System Diagram
PT5C-10-EDS-W30-001 Floor Drainage System Calculation Sheet of TARBELA 5th POWER CONSTRUCTION Project
T5HP-T5C-PHXX-DRG-GN-000015
PT5C-10-EDS-T28-003 CORPORATION OF CHINA LTD. Tarbela 5th Extension Hydropower Project PT5C-10-EDS-T28-001 1/6
D8
D7
D6
250
7700 1200 300 650 650 300 1200 4700 14000 8350 1200 350 650 650 1200 4350
300
300
395
300
300
400400 150
363
392
396
700
700
300
300
300
300
9850 6850 10400 6600
4
2 3
400 250
3700 8000 2300 7950 1200 350 650 650 1200 4350 3700 8000 2300
300
300
300
395
300
300
150
396
700
300
300
6600
14000 17000 14000
4 5 6 7
D7
D5 D5
359
10400 100
100
421
1000
323.50
300
200 10000 200
100
900 3000 3100 5500
D8 2023-9-23 Cao Jing See cloud line.
D3 2023-5-10 Cao Jing Add check well and modify relevant sections.
C B
D2 2023-4-14 Cao Jing Modify section J-J and add reference.
D5
D1 2023-2-24 Cao Jing
100
100 MM Pakistan (Pvt.) Ltd. F +44 (0)20 8681 5706
IN ASSOCIATION WITH W mottmac.com
El.321.50
200 2500 200 Client
400
350
100
Drawn By Cao Jing Reviewed Chen Hong Chuan
50
See drawing
PT5C-10-EDS-T28-001 2/6
D8
D7
2 3 4
400
2050 650 650 1200 1200 6900 2150 300 750 750 300 4250 1200 1200 600 3500
323.50 323.50
300 300
300 300
300 300
1% 1% 1% 1%
1000
1000
1% 1% 1%
300
900 2850 4000 1800 3500 2150 1050 1050 5450 1800 3500
400
6900 2150 300 750 750 300 4250 1200 1200 600 3500 D5
950
323.50
300 300
1%
1000
300
300
50
2150 1050 1050 5450 1800 3500
50
50
80
25
5 6 7
D5
D5
D5
X 50
400
50
50
323.50
300
323.50
650
750
80
~300 ~80
600
25
50
300
X 500 50 300 50 D8
D7
2023-9-23
2023-9-19
Cao Jing
Cao Jing
See cloud line.
D3 2023-5-10 Cao Jing Add check well and modify relevant sections.
D
POWER CONSTRUCTION
D5 CORPORATION OF CHINA LTD.
Consultants
D E Mott MacDonald House
8-10 Sydenham Road
Croydon, CR0 2EE
United Kingdom
1100 900
321.50 T +44 (0)20 8774 2000
MM Pakistan (Pvt.) Ltd. F +44 (0)20 8681 5706
IN ASSOCIATION WITH W mottmac.com
250
250
Client
Pakistan Water and Power Development Authority
323.50 Tarbela 5th Extension Hydropower Project
Tarbela Dam Colony, Tarbela
750
Project
100
400
6930 18500 Foundation
308.00
Drawn By Cao Jing Reviewed Chen Hong Chuan
Scale at A1 CAD
File
See drawing PT5C-10-EDS-T28-001
Project Drawing Number
PT5C-10-EDS-T28-001 3/6
Plan of 1# check well D7
D8
D7
D7
SCALE-1:10
600
S
500
422
13000 900
700
850
~1700
550
~1700
500
D7
1500 1500
~300
S
~250
700 400
~250
550 650 308.00 600
308.00
323.50 323.50
~450
308.00
500 600 350
50 50 350
50
50
350
650
600
850
D7
750
700
800
D5
D7 D7 AB
SS
AB
D3 2023-5-10 Cao Jing Add check well and modify relevant sections.
12650 4150
D2 2023-4-14 Cao Jing Modify section J-J and add reference.
500
Rev Date Drawn Description
Contractor
323.50
POWER CONSTRUCTION
CORPORATION OF CHINA LTD.
Consultants
Mott MacDonald House
8-10 Sydenham Road
Croydon, CR0 2EE
United Kingdom
D5 D5 Project
550
Drainage Pipes Arrangement
4400 13850 250
50 of EL.323.50 and Stator
308.00
80
50 Foundation
50
Drawn By Cao Jing Reviewed Chen Hong Chuan
323.50
50
~323.50 50 350
500
E
PT5C-10-EDS-T28-001 4/6
D6
D6 D6
D6 D5 D6
D6
D6
6 7
2 3 F 4 5
N F M
D6
AA 2100 2078
D6
11922 El.308.00
AA 6300 2078
D6
2500
400
AA N AA F6750 AA F6750 M
5000 3700 14000 2000 2500 5000 14000 2000 2500 5000 14000 1500
6060
1080 750 750
C C
U20 U19 U18
11000
D6 D5 D7
D8 D6
D7 D7
4500
~324.50
13000 10440
K
323.50 323.50 D
700
1650
400
1500 350
7900
9000
K D5
~316.00
600
T D4 2023-5-31 Cao Jing See cloud line.
308.00
200
400 D3 2023-5-10 Cao Jing Add check well and modify relevant sections.
POWER CONSTRUCTION
500
Foundation
450
Scale at A1 CAD
File
D7 See drawing PT5C-10-EDS-T28-001
Project Drawing Number
PT5C-10-EDS-T28-001 5/6
Plan of 2# check well Plan of 4# check well
SCALE-1:10 SCALE-1:10
D5
2 6
800 W U
4 650
600
700
B D5
D7
750
700
650
600
D7
U U
450
350
16
25
80
25
Ø20 00
AC AC
Ø1
W U
000
99
Ø1
12°
30° 18°
98 25
00
Section W-W Section U-U
°
30
30
°
SCALE-1:10 SCALE-1:10
30°
30°
750 650
U20,U19,U18
C 323.50 323.50
50 600
30°
30°
700 D5
50
50
50
D7
°
30
30
°
30° 30°
800
D7
4 48
4 48
100
100
950
80 110 80 4
R 270
20
El.340.00
R
Ø20000 D3 2023-5-10 Cao Jing Add check well and modify relevant sections.
350 D2 2023-4-14 Cao Jing Modify section J-J and add reference.
50
D1 2023-2-24 Cao Jing
El. 323.50
Rev Date Drawn Description
Contractor
VARIES
POWER CONSTRUCTION
AD 340.00
CORPORATION OF CHINA LTD.
340.00 Consultants
300 Mott MacDonald House
8-10 Sydenham Road
Croydon, CR0 2EE
12°
30° 18° United Kingdom
30
30
W mottmac.com
, ,
°
IN ASSOCIATION WITH
D5 Client
Pakistan Water and Power Development Authority
Tarbela 5th Extension Hydropower Project
30°
30°
Ø19800
30°
30°
25
30
70
Title
°
30
30
100
Foundation
°
PT5C-10-EDS-T28-001 6/6