Declaration: By submitting this assessment (Parts 1 – 4) for marking I declare that it is entirely my own work. I understand that falsely claiming that
the work is my own is malpractice and can lead to NEBOSH imposing severe penalties (see the NEBOSH Malpractice Policy for further information).
Important note: You must refer to the document ‘Unit IG2: risk assessment – Guidance and information for learners and Learning Partners’ while
completing all parts of this assessment. Your Learning Partner should provide you with a copy, but it can also be downloaded from the relevant
resources section for this qualification on the NEBOSH website.
Part 1: Background
Hazard category Who might be harmed What are you already doing? What further controls/actions are Timescales for Responsible
and hazard and how? required? further actions person’s job
to be title
completed
(within …)
1-Work at height Two workers, site 1. Monitoring and 1- Must provide new 1 month Project
supervisor and scaffolder supervision were mobile scaffolding to manager
Two employees might be at high risks provided to the workers the workers which must
were painting during working. during working hours by have proper guard rail
from the exterior site supervisor. system and fully
wall while Without wearing PPEs 2. Emergency qualified inspected.
utilising a like safety harness, first aider was available 2- Only trained, 2 weeks HR admin
damaged workers were using at the site. experienced, and
Work at height job with broken standard at the height of 13m when workers were painting the wall of
building, the job was unsafe not comply with safety standards so, company contravene above
mentioned legal arguments.
Consideration of likelihood AND severity Likelihood level for this hazard is high in that unsafe work at height job when workers were painting
the front wall of the building by the support of damaged standard scaffolding. This unsafe operation
• types of injury or ill health
cause falling off workers from the height as there was chances of collapse of scaffolding and this will
• number of workers at risk cause height falling accident and there was no use of PPEs and any safety harness condition as a
• how often the activity is carried out safety preventive in this case. So, the risk level of this hazard is also high.
• how widespread the risk is
Severity consequences for work at height hazard are high which are classified in negligible to
catastrophic class for further explanation as listed below in which workers will be suffered from
different health injuries such as head and neck injuries, bone breakage, organ damage, abrasions
Wire that conducts high voltage current to grinder equipment for its operating as was damage with
random placing on the ground, so this is the violation of safety standards, that’s why the worksite did
not have compliance with above mentioned legal arguments.
Consideration of likelihood AND severity Likelihood level of the electric shock hazard is very high as there was damage wire of grinder
equipment that was placed on the ground randomly without safety measures. Wire with high voltage
• types of injury or ill health
current conduction in case of getting touched with any worker, he will have severe electric shock from
• number of workers at risk this hazard. So, the risk level of this hazard is very high.
• how often the activity is carried out
• how widespread the risk is
Severity consequences for this hazard at the workplace are very high in which there will be different
health consequences the workers will face such as skin burn, cardiac arrest, damage to nervous
system, paralysis etc. and even death of worker. Severity of this hazard lies in between minor to
catastrophic case and there will be catastrophic severity for this hazard which is described as.
Minor: There will first aid demanding injuries such as cuts or abrasions as secondary effects.
Major: In this case, there will be serious injuries like skin burn, cardiac arrest and will need hospital
care.
Catastrophic: The workers' death will be happened in this electric shock.
In case of this electric shock hazard, 23 workers will get harmed including operator, helper, nearby
workers, safety officer, site supervisor, visitors etc. In case of this hazard, the grinding work I =is
performed on daily basis about 3-4 hours in a working day. Risk of this hazard is confined with the
damaged wire placed random on the ground for conducting high voltage current to the grinder
equipment for its operating.
Minor: Small injuries like abrasions or scrapes (secondary effects) tackled by first aid.
Major: A worker may experience a serious-physical harm, skin burn, respiratory disorders, lungs
infection, or others, in which situation medical attention in a hospital would be required.
In the event of a fire in the storage room, 32 personnel will be injured, including operators, workers,
the storage room's in-charge, a safety officer, and visitors. This welding action is a daily activity of
welder during working hours, and this risk is prevalent throughout the storage room area, putting the
entire space at risk of a fire mishap.
How effective the action is likely to be in A new separate storage room will be constructed to store flammable materials like petrol containers
controlling the risk. This should include: away from the work site. Because fuel sources will be turned off owing to new area development, the
• the intended impact of the action; risk level will be zero, and there will be no chance of a fire breaking out on the land. So, there will be
• justification for the timescale that no risk of fire accident occurrence as because of welding activity in which welding sparks will act as
you indicated in your risk ignition source and hence, this safety control is very effective in control the risk of this hazard from
assessment; and the workplace.
• whether you think the action will
Within two months, the project manager will construct a separate storage place for a safe home away
fully control the risk
from the job site. He will communicate with the site manager and the HSE manager before deciding
on an appropriate site for the storage facility. Then he'd buy a material and hire workers to construct