Upcoming Maintenances of Plant Equipments Date:21-01-23

Description Present R/Hours Previous R/Hours Diff. k Coming Maint. Hrs Remaing Hrs Last Activty perfored Performed Date Inspection Date
1 Wartsila-01 22731 22731 0 24k 24000 1269 20K 44393
2 Wartsila-02 19492 19480 12 20K 20000 508 16K 44247
3 CAT- Engine #01 2135 2135 0 2k 2470 335 2470 44728
4 CAT- Engine#02 1880 1880 0 2210 330 2210 44728
5 CAT- Engine #03 1207 1207 0 1501 294 1501 44728
6 Inst.Air compressor-1 Total 10227 10207 20 10531 304 3000hrs 44243
7 Inst.Air compressor-2 Total 9669 9669 0 10095 426 4500Hrs 44021
8 Start.Air Compressor-1 842 842 0 903 61 538 44050
9 Start.Air Compressor-2 969 969 0 1076 107 724 43868
10 LO Purifier-1 22116 22116 0 24000 1884 New Feed pump motor bearing replaced 44067
10 LO Purifier-1 Heater 22116 20192 1924 24000 1884 44862
11 LO Purifier-2 18485 18473 12 20000 1515 Main motor bearing replaced. 43936
11 LO Purifier-2 Heater 18485 17756 729 20000 1515 44822
12 HFO Purifier 8811 8811 0 10257 1446 44515
12 HFO Purifier Heater 8811 8305 506 10257 1446 44526
13 LPG Air compressor Total 19858 19847 11 20173 315 14K 44175
14 NG Compressor 01 20280 20125 155 22000 1040 44330
15 NG Compressor 02 15568 15555 13 16000 432 16K 44181 44466
16 LSG-1 (Zone-9) 26.2 26.2 0 50 23.8 Murtaza/Hassnain 44428
17 LSG-2 (Zone-2) 17.4 17.4 0 50 32.6 Murtaza/Hassnain 44428
18 LSG-3 (Zone-3) 25.5 25.5 0 50 24.5 Murtaza/Hassnain 44428
19 LSG-4 (Zone-7) 26.4 26.4 0 50 23.6 Affan /Aoun 44428
20 BEY-901 Batteries 44696 44576 44602
21 BEY-902 Batteries 44696 44576 44602
22 CAT-1 Engine Batteries 44852 44576 44518
23 CAT-2 Engine Batteries 44852 44576 44518
24 CAT-3 Engine Batteries 44852 44576 44518
25 CAT-1 Panel Batteries 43803 44356
26 CAT-2 Panel Batteries 43803 44356
27 CAT-3 Panel Batteries 43802 44356
25 CAT-1 Panel HMI 44616 44616 44616
26 CAT-2 Panel HMI 44616 44616 44616
27 CAT-3 Panel HMI 44616 44616 44616
28 Pilot Fan Cooler - - 44489
28 WOIS CPU 1,2 Cleaning 44616 44616 44616
29 WOIS UPS Cleaning 44616 44616 44616
30 WISE CPU Cleaning 44616 44616 44616
31 CAT CPU Cleaning 44616 44616 44616
32 Engine Hall Overhead Crane 44790
Maintenance Record Updated Dated: 6/11/2022
1K 2K 3K 4K 5K 6K 7K 8K 9K 10K 11K 12K 13K 14K 15K 16K 17K 18K 19K 20K 21K 22K 23K 24K
R/H 1053 2089 3058 4049 5069 6011 7002 8216 9045 10152 11033 12031 14049 15047 16056 17061.86 18067.71 19073.57 20079.43
Wartsila-01
Date 11-01-18 14-05-18 29-09-18 11-12-18 09-03-19 02-05-19 29-06-19 18-09-19 31-10-19 01-01-20 14-02-20 24-07-20 28-09-20 24-11-20 18-07-21 24-07-20 28-09-20 24-11-20 18-07-21 24-07-20
R/H 1027 1227 3082 4035 5033 6010 7008 7966 9064 10018 11016 12310
Wartsila-02
Date 27-11-17 18-08-18 09-01-19 19-03-19 13-05-19 03-07-19 21-08-19 12-10-19 22-04-20 20-06-20 01-09-20 16-11-20
R/H
CAT- Engine #01
Date
R/H
CAT- Engine#02
Date
R/H
CAT- Engine #03
Date
R/H
Inst.Air compressor-1
Date
R/H
Inst.Air compressor-2
Date
R/H
Start.Air Compressor-1
Date
R/H
Start.Air Compressor-2
Date
R/H
LO Purifier-1
Date
R/H
LO Purifier-2
Date
R/H
HFO Purifier
Date
R/H
LPG Air compressor
Date
R/H 8861
NG Compressor 01
Date 20-06-19 28-03-20
R/H
NG Compressor 02
Date
R/H
LSG-1 (Zone-9)
Date
R/H
LSG-2 (Zone-2)
Date
R/H
LSG-3 (Zone-3)
Date
R/H
LSG-4 (Zone-7)
Date
WOIS CPU 1 Cleaning Date
WOIS CPU 2 Cleaning Date
WOIS UPS Cleaning Date
WISE CPU Cleaning Date
CAT CPU Cleaning Date
Sr. # Equipment Detail Instrument Current R/H Stock

1 Instrumnt Air Compressor #01 SOV 7531


2 LPG Air compressor SOV 7531