Stuvia

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Started on Monday, December 13, 2021, 4:39 PM

State Finished
Completed on Monday, December 13, 2021, 4:54 PM
Time taken 14 mins 35 secs
Grade 25.00 out of 25.00 (100%)
Feedback A minimum of 19 correct answers is required to pass.
Congratulations, you passed the quiz for the SAP HANA on Power Level 1!

Question 1 Which of the following public cloud platforms is *NOT* certified to run SAP HAN

Correct
Select one:
1.00 points out
of 1.00 Google Cloud Platform

Oracle Cloud
Microsoft Azure

IBM Cloud

Question 2 SAP addresses the needs within organizations for line of business solutions. Wh

Correct
of its LoB offerings?

1.00 points out


of 1.00 Select one:
Information Technology

Procurement
Mergers & Acquisition

Sustainability

Question 3 What is the largest memory(RAM) that is certified for BW in a single POWER serv

Correct
Select one:
1.00 points out
of 1.00 16TB
64TB
24TB
Question 5 The customer you are about to visit has had issues with availability of their exist
discussion will you have with this customer?
Correct

1.00 points out


of 1.00 Select one:
POWER systems are equipped with Cores on Demand (COD) and PowerVM,
deallocate defective CPU cores and allocate spare CPU cores to take over, a
HANA instance to a new partition (LPAR) to prevent downtime in server com
POWER systems can use Live Partition Mobility (LPM) to failover to another
failure

POWER Systems have a track record of 99.999% uptime with built-in desig
failures, dynamic component de-allocation and on the fly repair and fault is

With the better RAM to core ratio for POWER systems, there will be less CPU
reduce the likelihood of a system failure

Question 6 SAP's product portfolio is very extensive and covers many Industry Solutions,
Banking, Life Sciences, etc. How many industry solutions are there in the portf
Correct

1.00 points out


Select one:
of 1.00
30
15
11
25

Question 7 What is the largest memory(RAM) that is certified for S/4 in a single POWER serv

Correct
Select one:
1.00 points out
of 1.00 64TB
16TB
32TB

24TB

Question 8 What is one of the benefits of S/4 over "legacy" ERP

Correct
Select one:
1.00 points out
Powered by TCPDF (www.tcpdf.org)
of 1.00 Smaller database servers are required

You might also like