Professional Documents
Culture Documents
Proforma BSER_General Requirements_12_12_2011
Proforma BSER_General Requirements_12_12_2011
SECTION BS1
GENERAL REQUIREMENTS
[PROFORMA]
EMPLOYER’S REQUIREMENTS for
BUILDING SERVICES REQUIREMENTS
SECTION BS1
GENERAL REQUIREMENTS
TABLE OF CONTENTS
Sub- Description:
section:
A Scope and General Requirements
A1 Scope and Execution of Works
A2 Abbreviations and Terminologies used
A3 Employment of Specialist Contractors for Building Services,
Electrical and Mechanical Installations
A4 Employment of Designer for Building Services Installations
A5 Employment of Design Checker for Building Services
Installations
A6 Employment of Resident Building Services Engineers / Resident
Senior Building Services Engineer
A7 Employment of Building Services Co-ordinator for Building
Services Installations
A8 Employment of Inspector(s) for Building Services Installations
[Note: Project officer to insert other requirements as
appropriate.]
D Contractor’s Submission
D1 Programme of Works and Monthly Progress Reports
D2 Design Submission and Programme
D3 Equipment and Material Submission
D4 Sample and Sample Board Submission
D5 Equipment Order and Delivery Documents
D6 Installation Drawings and Method Statement Submission
D7 Testing and Commissioning Procedures
D8 Design Report Submission for Project Quality and Design Vetting
Committee (PQDVC)
D9 Project Environmental Design Checklist
D10 Statutory Compliance Checklist
D11 Work Activity Checklist
D12 Data Collection Form for Environmental Targets
D13 Life Cycle Cost Analysis and Cost Benefit Analysis
D14 Computer Modelling and Simulation Study Report
D15 Compliance to Buildings Energy Efficiency Ordinance (Cap.610)
D16 Environmental Assessment for New Building Developments
D17 Indoor Air Quality Certification Scheme for Office and Public
Places
D18 Operation and Maintenance (O&M) Manuals and User Manuals
D19 As-built Drawings
[Note: Project officer to insert other requirements as
appropriate.]
SECTION BS1
GENERAL REQUIREMENTS
B5 Service Conditions
B6 Case of Conflict
C1 Electricity Supply
C2 Water Supply
C3 Gas Supply
D Contractor’s Submission
[Note: The following submissions are for building services installations,
project officer should ensure that submissions of all associated
works in the project are specified in their respective sections of the
ER. ]
[Note: Project officer to specify the requirements for carrying out life
cycle cost analysis of building services works to substantiate
that considerations have been given on life cycle cost in the
design proposals and in the material selection.]
[Note: Project officer to specify the requirements for the REA from
the Building Services Designer to prepare and make all
necessary submission to EMSD for complying the Building
Energy Efficiency Ordinance, Cap. 610 and for obtaining the
“Certificate of Compliance Registration (COCR)”. Project
officer should note that all submissions should be carried out
by the Registered Energy Assessor (REA), who is registered
under the Buildings Energy Efficiency (Registered Energy
Assessors) Regulation, Cap 610B.
Project officer should also note that the REA should submit
the Stage One and Stage Two Declaration to the EMSD within
2 months after obtaining the “Order to Commence Work” and
within 4 months after obtaining the “Building Hand-Over
Certificate” from the S.O. respectively.]
Project officer shall also note that the requirement for project
to achieve the second highest grade or higher is only
applicable to project with CFA > 10,000m2.]
D17 Indoor Air Quality Certification Scheme for Office and Public Places
[Note: Project officer to specify the design requirements for indoor air
quality of the project. Project officer may make reference to
“A Guide on Indoor Air Quality Certification Scheme for
Offices and Public Places” published by the Indoor Air Quality
Management Group of the Hong Kong SAR Government.]
F3 Silence of Operation
F4 Vibration Control
[Insert Contract Number] ER/BS1/14
[Insert Contract Name]
ER Part [Note: Insert Part No.] - BS
Section BS1 – General Requirements
F6 As-built Drawings
[Note: Project officer should refer to the latest requirements for POE exercise
in specifying the requirements. ]
-End-