SECTION [#]
[Note: #, and ## denote section number and type of installation of this Particular
Requirements.
Some typical installations in building projects may include but not limited to:
Air Conditioning, Refrigeration, Ventilation and Central
Monitoring & Control System Installation
Catering Equipment Installation
Electrical Installation
Low Voltage Cubicle Switchboard Installation
Fire Service Installation
Lift, Escalator and Passenger Conveyor Installation
Liquefied Petroleum Gas Installation
Burglar Alarm and Security Installation
Gas Installation
Broadcast Reception Installation
Diesel Generating Set Installation
Mechanical Handling and Lifting Installation
Plumbing and Drainage System Installation
Electronic Systems other than Burglar Alarm and Security
System
[PROFORMA]
EMPLOYER’S REQUIREMENTS
PART [#] – BUILDING SERVICES REQUIREMENTS
SECTION [##]
PARTICULAR REQUIREMENTS FOR
[###] INSTALLATION
[Note: #, ##, and ### denote part number, section number and type of installation]
CONTENTS
Sub- Description:
section:
A Scope and General Requirements
A1 Scope and Execution of Works
A2 Design Criteria
A3 Design Calculations, Computer Modeling and Simulation
A4 Performance and Quality Requirements
A5 Reliability and Maintainability
B Technical Requirements
[PROFORMA]
SECTION [#]
PARTICULAR REQUIREMENTS FOR
[##] INSTALLATION
[Note: #, and ## denote section number and type of installation of this Particular
Requirements.]
[Note: Project officer to describe the scope and general requirements of this
section of the PR, parts to be read in conjunction with this PR, the
interpretation in case of conflict, and etc.]
[Note: Project officer to describe the scope and execution of work for
the installation in this PR, examples of which include design,
supply, installation, testing, adjustments, commissioning and
maintenance, co-ordination with other contractors employed
by the Employer, liaison with relevant authority, statutory
requirements for the contractor to execute the works and etc.
Project officer should define the scope of the installation and
also demarcate clearly the works and the interfacing between
different type of installations.]
A2 Design Criteria
[Note: Project officer should provide detail of the design intent for the
installation in this PR. Examples of which include the criteria
for sizing the system / equipment, spare capacity, location of
equipment, separation of water carrying services from the
E&M installation, structural considerations, IEQ requirements,
green building considerations, specific design conditions and
requirements as in the respective Room Data Sheets,
Functional Briefs and etc.
B Technical Requirements
[Note: Project officer should list the systems in the installation in this
PR and provide particular technical requirements for each of
the systems. Besides providing particular technical
requirements, project officer should also provide particular
requirements for performance of the system specified such as
fire service requirements, radio or power frequency
interference, noise and vibration control, and etc. as
appropriate.
Electrical Installations:
Main Supply
Sub-main Power Distribution
Final Circuit Distribution
Lighting System
Building Energy Management System (BEMS)
Earthing System
Lightning Protection System
Renewable Energy System
Provisions for Other System (such as Extra Low Voltage
System, I.T. System, Telecommunication System etc.)
Electrical Appliances
Interfacing to Central Control & Monitoring System
(CCMS)
LV Switchboard Installations:
Switchboard cubicle
Protection System
Metering Requirement
Power Factor Correction Equipment
Provision of Facilities of LV switchboard
Mechanical Installation:
Crane and Hoist
Mobile Elevating Platform
Gondola
Mobile Gantry
Sewage Pumping System
Rainwater Pumping System
Drop Arm Barriers
Central Control & Monitoring System
Fuel Supply System
Garage Equipment for Fuel Filling Station
Electric Winch
Gas Installation:
Incoming Supply
Water Heater
Catering Equipment
Laundry Equipment
C4 Maintenance Requirements