PARTICULAR SPECIFICATION
FOR
(Brief title description of work in brackets to be inserted, if necessary, to better reflect the
scope of installation in addition to the above description of work category. For example insert
‘ SMATV Installation’ if only such is involved in the Broadcast Reception Installation.)
FOR
[PROJECT TITLE]
[PROGRAMME NO. ]
FOR
CONTRACT NO. /
NOMINATED SUB-CONTRACT TO CONTRACT NO.**
[Note: Drawings - Project Engineer to liaise with PQS on the list of drawings
to be included in the Preliminaries. Arch.S.D. Operating Instruction 5/96 -
Requirements of As-built Drawings, Manuals and Documents prior to Issue
of Maintenance Certificate will be included in the Preliminaries of Tender
Document by PQS. Project Engineer shall check the adequacy of the
provisions in the above operating instruction and include any additional
requirements in the Preliminaries.]
1.1 Installations/Systems
The Broadcast Reception Installation shall include the whole of the materials
and labour necessary for the design, supply, installation, testing, commissioning
and maintenance of the Works in accordance with the Specifications and
Drawings, which comprise of the following systems.
1.1.1 The Terrestrial Master Antenna Television System shall include, but
not limited to the followings: -
*1.1.2 The Satellite Master Antenna Television System shall include, but not
limited to, the followings for satisfactory performance: -
-1-
* Delete if not applicable
** Denote for nominated Sub-contract
[Note: Select 4 metre antenna dish for receiving programmes
from 1 or 2 satellites and select 6 metre antenna dish for
receiving programmes from 3 satellites.]
(3) Intended signal level (r.m.s.) at the input and output of each unit
(in dBV).
[Note: Project Engineer shall list out specific items which require
contractor’s design input. The Project Engineer should discuss with Project
Quantity Surveyor on specifying this section as there is a Clause on Design
Responsibility in the Special Conditions of Contract.]
1.3.1 All materials and workmanship shall comply with the latest edition of
"General Specification for Broadcast Reception Installation in
Government Buildings of the Hong Kong Special Administrative
Region” issued by Architectural Services Department and any
corrigendum issued thereafter (hereinafter referred to as the BRI
General Specification or G.S.) unless otherwise specified on the
Drawings or in this Particular Specification.
[Note: Project Engineer shall list out specific items which require
contractor’s attention. For example:-]
-3-
* Delete if not applicable
** Denote for nominated Sub-contract
1.3.3 State the standards or code of practice to be complied with other than
those already listed out in the G.S. if any.
1.4 Others
[Note: This is a section allowed for the addition of any particular project
information or supplementary technical requirements, etc., which may not be
covered in either section 1.1 to 1.3. In case this section is not applicable,
“Not Used” shall be inserted instead of deleting this section.]
[Note: Project Engineer shall list out particular constraints to this installation
work. In case this section is not applicable, “Not Used” shall be inserted instead of
deleting this section. Examples are:-]
The following conditions shall be complied with in the execution of the work:
[Note: Project Engineer shall list out special items not being covered by
existing Testing and Commissioning Procedures for which the relevant
applicable particular testing and commissioning requirements shall be
specified under this section. In case this section is not applicable, “Not
Used” shall be inserted instead of deleting this section. Examples are:-]
-4-
* Delete if not applicable
** Denote for nominated Sub-contract
[Note: Project Engineer to specify any particular project requirements in
connection with testing and commissioning procedures. Examples are:- ]
3.4 Others
[Note: This is a section allowed for the addition of any particular project
information or supplementary technical requirements, etc., which may not
be covered in either section 3.1 to 3.3. In case this section is not applicable,
“Not Used” shall be inserted instead of deleting this section.]
4.3 Others
The Contractor/Sub-contractor** shall complete the following ES(PS) and submit for
the approval of the Architect according to the timing and sequence as stipulated in the
-5-
* Delete if not applicable
** Denote for nominated Sub-contract
approved programme pursuant to Clause 16 of the General Conditions of Contract.
The equipment and materials in the following ES(PS) shall not be delivered to site
without the prior approval of the Architect.
[Note: Project Engineer shall refer to Clause 7(5) of the Special Condition of
Contract for 1999 GCC and BSB Circular 14 of 2003 on the detailed requirements
for submission of technical information of the equipment/material for the
Approval of the Architect.]
EQUIPMENT/MATERIAL SPECIFIED
Terrestrial Aerials for both TV and FM G.S.C2.1/P.S. C(*)
reception
Preamplifier G.S.C2.2/P.S. C(*)
Bandpass Filter G.S.C2.2/P.S. C(*)
Amplifier G.S.C2.3/P.S. C(*)
Frequency Converter G.S.C2.4/P.S. C(*)
UHF Modulator G.S.C2.5/P.S. C(*)
Splitter/Tee Units G.S.C2.6/P.S. C(*)
Co-axial Cable G.S.C2.7/P.S. C(*)
FM/TV/Data Triplex Outlet G.S.C2.8/P.S. C(*)
Fiber Optical Transmitter G.S.C2.9/P.S. C(*)
Fiber Optical Transceiver G.S.C2.10/P.S. C(*)
Fiber Optical Splitter G.S.C2.11/P.S. C(*)
Fiber Optical cable G.S.C2.12/P.S. C(*)
Cable Trunking G.S. C4.1/P.S. C(*)
Conduit and Accessories G.S. C4.2/P.S. C(*)
Others (please specify) G.S. and/or P.S.
Clause(s)
(If SMATV System is installed, include
the following items.)
AMATV Antenna G.S. C3.2/P.S. C(*)
Feedhorn G.S. C3.2.4/P.S. C(*)
Low-noise Amplifier G.S. C3.2.5/P.S. C(*)
Low-noise Block Down Converter G.S. C3.2.5/P.S. C(*)
Satellite Receiver G.S. C3.3/P.S. C(*)
Satellite Amplifier G.S. C3.4/P.S. C(*)
-6-
* Delete if not applicable