Proforma Spec - EE (Draft 1)
Proforma Spec - EE (Draft 1)
Proforma Spec - EE (Draft 1)
PARTICULAR SPECIFICATION
FOR
ELECTRICAL INSTALLATION
(Brief title description of work in brackets to be inserted, if necessary, to better reflect the scope of
installation in addition to the above description of work category. For example, insert ‘Stage
Lighting Installation’ if only such is involved in the Electrical Installation.)
FOR
[PROJECT TITLE]
[PROGRAMME NO. ]
FOR
CONTRACT NO. /
NOMINATED SUB-CONTRACT TO CONTRACT NO.**
Electrical Installation
(Brief title description of work in brackets to be inserted, if necessary.)
for
[Project Title ]
1.1 Installations/Systems
All equipment, materials and workmanship shall fully comply with the
specifications as stated in the Preliminaries and all current amendments
thereto, unless otherwise specified on the Drawings or in this Particular
Specification.
[Note: The 7 systems listed below are core items and if any item is not
applicable in this contract, its heading of such item shall be retained with
"Not Used” to be remarked under the heading. Include material
specification as Section 1, 2, 3, etc as per the standard format. This proforma
specification is a general guidance and is not exhaustive, the project
engineer/officer should exercise their expertise professional judgement to
specify the requirements to meet the project specific needs.]
[Note: Project Engineer shall check with PQS on the list of drawings to be
included in the Preliminaries or to include the drawing list in this
Particular Specification]
*Not Used
*Not Used
*Not Used
1.1.4 *Luminaires
*Not Used
*Not Used
*Not Used
*Not Used
[Note: Project Engineer shall add specific items, which are not included in
the core items above. For example:-]
[Note: Project Engineer shall list out specific items which require
Contractor’s/Sub-contractor’s design input. The Project Engineer should
discuss with Project Quantity Surveyor in the drafting of this section as there
is a Clause relating to the Design Responsibility of the Contractor/Sub-
contractor in the Special Conditions of Contract, and refer to the
1.2.1 Luminaires
1.4 Others
[Note: This is a section allowed for the addition of any particular project
information or supplementary technical requirements, etc., which may not
be covered in either section 1.1 to 1.2. In case this section is not applicable,
"Not Used” shall be inserted instead of deleting this section.]
*Not Used
[Note: Project Engineer shall list out particular constraints to this installation
work. In case this section is not applicable, "Not Used” shall be inserted instead of
deleting this section. Examples are:-]
*Not Used
[Note: Project Engineer shall list out special items not being covered by
either existing Testing and Commissioning Procedures for which the
relevant applicable particular testing and commissioning requirements
shall be specified under this section. In case this section is not applicable,
"Not Used” shall be inserted instead of deleting this section.]
*Not Used
For example:
3.4 Others
Not Used
*Not Used
*Not Used
4.3 Others
EQUIPMENT/MATERIAL SPECIFIED
Switch, disconnector, fuse-switch and switch- G.S. Clause C5.2
fuse
Manufacturer
Fuse G.S. Clause C5.8
Manufacturer
Busbar chamber G.S. Clause C5.9
Manufacturer
Busbar trunking system G.S. Clause C6
Manufacturer
M.C.B. distribution board G.S. Clause C5.12
Manufacturer
Miniature circuit breaker (MCB) G.S. Clause C5.6
Manufacturer
MCCB distribution board G.S. Clause C5.11
Manufacturer
Moulded case circuit breaker (MCCB) G.S. Clause C5.5
Manufacturer
Residual current-operated circuit breaker G.S. Clause C5.7
Manufacturer
Electromechanical contactors G.S. Clause C5.14
* Delete if not applicable
** Denote for nominated Sub-contract
- 7-
Manufacturer
Motor starters G.S. Clause C5.26.4
Manufacturer
Solid state soft motor starter G.S. Clause C5.18
Manufacturer
EQUIPMENT/MATERIAL SPECIFIED
Cable, PVC insulated G.S. Clause C2.1
Manufacturer
Cable, thermosetting insulated (low smoke, zero G.S. Clause C2.1
halogen)
Manufacturer
Cable, PVC insulated & sheathed G.S. Clause C2.1
Manufacturer
Cable, PVC insulated & sheathed, flexible G.S. Clause C2.1
Manufacturer
Cable, fire resistant & accessories G.S. Clause C2.1 and
C3.2 & C3.6
Manufacturer
Cable, XLPE SWA & PVCS G.S. Clause C3.2
Manufacturer
Cable, MICS & accessories G.S. Clause C3.2, C3.7
and C3.8
Manufacturer
Cable, PVC SWA & PVCS G.S. Clause C3.2
Manufacturer
EQUIPMENT/MATERIAL SPECIFIED
Metal box for switch/socket, galvanised, G.S. Clause C2.2.4
surface/flush pattern
Manufacturer
Dome cover, cast iron G.S. Clause C2.2.3
Manufacturer
PVC conduit & accessories, heavy duty G.S. Clause C2.3
Manufacturer
PVC box for switch/socket, surface/flush pattern G.S. Clause C2.3.3
EQUIPMENT/MATERIAL SPECIFIED
Steel trunking & accessories G.S. Clause C2.4
Manufacturer
Metal cable tray G.S. Clause C3.10
Manufacturer
Galvanised floor duct & accessories G.S. Clause C2.4
Manufacturer
Cable Ladder G.S. Clause C3.11
Manufacturer
EQUIPMENT/MATERIAL SPECIFIED
Lighting switch, bakelite/metalclad G.S. Clause C4.2
Manufacturer
Double pole switch with pilot light, G.S. Clause C4.2
bakelite/metalclad
Manufacturer
Socket-outlet, Switched socket-outlet, Switched G.S. Clause C4.3
socket-outlet w/pilot light, shuttered type,
* Delete if not applicable
** Denote for nominated Sub-contract
- 10-
bakelite/metalclad
Manufacturer
Fused connector unit, bakelite/metalclad G.S. Clause C4.4
Manufacturer
Cooker control unit, bakelite G.S. Clause B5.8 and
P.S. Clause
Manufacturer
Moulded plastic pattress, surface pattern G.S. Clause C4.1
Manufacturer
Shaver supply unit G.S. Clause C4.3.2
Manufacturer
Lighting switch, watertight G.S. Clause C4.2.1
Manufacturer
Lighting switch, sparkless G.S. Clause C4.2.4
Manufacturer
Socket-outlet with plug, Switchsocket-outlet G.S. Clause C4.3.1
with plug, watertight
Manufacturer
Cartridge fuse for 13A plug/ fused G.S. Clause C5.8.5
spur/connection unit
Manufacturer
EQUIPMENT/MATERIAL SPECIFIED
Lampholder, batten type G.S. Clause C4.6.4
Manufacturer
Lampholder, cordgrip type G.S. Clause C4.6.4
Manufacturer
Ceiling rose, cordgrip type G.S. Clause C4.6.3
EQUIPMENT/MATERIAL SPECIFIED
Copper tape G.S. Clause B7.4 and
P.S. Clause
Manufacturer
PVC covered copper tape P.S. Clause
Manufacturer
Copper tape clip/saddle G.S. Clause B8.5.8 and
* Delete if not applicable
** Denote for nominated Sub-contract
- 12-
P.S. Clause
Manufacturer
Earth copper rod G.S. Clause B7.3 and
P.S. Clause
Manufacturer
Earth plate G.S. Clause B7.3.4 and
P.S. Clause
Manufacturer
5.8 Others
EQUIPMENT/MATERIAL SPECIFIED
Note:
Project Engineer shall review the above list and add/delete items applicable to the project.
[Standard Format]
The following appliances / equipment shall be supplied by the Employer, but collected,
installed and connected as and when required by the Contractor/Sub-contractor** except
otherwise specified. The Contractor/Sub-contractor** shall be responsible for the
returning of any surplus material to the designated Government / Employer’s store as and
when required.
[Note: Project Engineer shall check with the Supplies Section for the items
available as allocated store. Otherwise they have to be supplied by the contractor.]
Item Quantity
Etc