Professional Documents
Culture Documents
proforma_spec_lpg_20_12_2004
proforma_spec_lpg_20_12_2004
proforma_spec_lpg_20_12_2004
PARTICULAR SPECIFICATION
FOR
FOR
[PROJECT TITLE]
[PROGRAMME NO. ]
(Note: Brief title description of work in bracket to be inserted, if necessary, to better reflect the scope of
installation in addition to the above description of work category.)
FOR
*CONTRACT NO. /
*NOMINATED SUB-CONTRACT TO CONTRACT NO.
1.1 Installations/Systems
All equipment, materials and workmanship shall fully comply with the
specifications as stated in the Preliminaries and all current amendments
thereto, unless otherwise specified on the Drawings or in this Particular
Specification.
The Works shall include the design*, supply, *(except those equipment
listed in the Schedule of Appliances/Equipment supplied by the
Employer), installation, adjustments, testing and commissioning of
Liquefied Petroleum Gas (LPG) Installation including the temporary
provision and loan of necessary liquefied petroleum gas bottles for
testing purpose.
[Note: The systems listed below shall be the complete core systems as
stipulated in this Proforma Particular Specification. If any of such
systems is not applicable for the contract, its heading shall be retained
with “Not Used” marked underneath. Project Engineer shall also add
the requirements of specific systems, which are not included in this
Proforma Particular Specification.]
(a) General
(a) General
-1-
* Delete if not applicable.
# For sections marked with # are not applicable, the words “Not Used” shall be inserted underneath.
(iii) [Provide description to system capacity,
performance requirements and material
standards].
1.1.3 Vaporizers
(a) General
(a) General
-2-
* Delete if not applicable.
# For sections marked with # are not applicable, the words “Not Used” shall be inserted underneath.
(b) Technical and Performance Requirements
(a) General
-3-
* Delete if not applicable.
# For sections marked with # are not applicable, the words “Not Used” shall be inserted underneath.
(c) Compliance with specification, standards, obligations and
regulations
1.2 Others#
4.1 General
-4-
* Delete if not applicable.
# For sections marked with # are not applicable, the words “Not Used” shall be inserted underneath.
In addition, the Contractor/Sub-contractor* shall test and commission the
LPG Installation in accordance with the requirements stated in the Code of
Practice for HKLPG Industry Module 1.
[List out special items not covered by the Testing and Commissioning
Procedures]
-5-
* Delete if not applicable.
# For sections marked with # are not applicable, the words “Not Used” shall be inserted underneath.
4.3.3 The Contractor/Sub-Contractor* shall co-ordinate with relevant
parties to check that the Liquefied Petroleum Gas Installation will
be completed in such good time to the satisfaction of the
Architect/Supervising Officer* and will be inspected to meet all
the requirements before arranging inspection with Gas Authority.
4.4 Others
[List out explicitly other particular training requirements for users and
management staff.]
4.3 Others#
-6-
* Delete if not applicable.
# For sections marked with # are not applicable, the words “Not Used” shall be inserted underneath.
5. Equipment Schedules included in Particular Specification [ES(PS)]
EQUIPMENT/MATERIAL SPECIFIED
Item Quantity
-7-
* Delete if not applicable.
# For sections marked with # are not applicable, the words “Not Used” shall be inserted underneath.