DOCUMENTATION TRANSMITTAL

Transmittal Number:
LOCATION : 4300-TCMS-NSH-P4-T-
PLANT: BOROUGE-4 PROJECT
RUWAIS - U.A.E.
1218,1309,1320
Abu Dhabi Polymers Company Limited (Borouge) Date: February 9, 2024
Sheet 1 of 2

From: To:
Tecnimont S.p.A. Nasser Saeed Al Hajri Contracting Co. (NSH)
Mr. Matteo Perrini Mr. C. Venkatachalapathi
Site Manager, Borouge 4 – PO Project Manager, Borouge 4 PO
Tecnimont S.p.A. Nasser Saeed Al Hajri Contracting Co. (NSH)
BOROUGE 4 PROJECT P. O. Box 42085,
Ruwais, Abu Dhabi, UAE Abu Dhabi, UAE

Distribution also to:


Copy to: Reason Media Type
Alampi Pietro I - For Information SharePoint Link
Sreekumar Pillai I - For Information SharePoint Link
Mustafa Karabudak I - For Information SharePoint Link
Massimo Benassati I - For Information SharePoint Link
Sawant Ketan I - For Information SharePoint Link
Attar Raffik Ahmad I - For Information SharePoint Link
Viola Mauro I - For Information SharePoint Link

LIFTING PLAN - 1-HEXENE DRYER 131-VC-246 A/B / 1-BUTENE DRYER 131-VC-242 A/B / COMONOMER
COLUMN OVHD CONDENSER PE6 & PE7 (HE-503B) / COMONOMER COLUMN OVHD CONDENSER PE6 & PE7 (HE-
Subject: 503A) / OLIGOMER REMOVAL COLUMN PE6 & PE7 (VT-564) / HP FLARE KO DRUM 131-VV-014 / PROPANE
KNOCK-OUT DRUM 131-VV-016 / GLYCOL WATER COOLER 131-HE-003 / GLYCOL WATER STORAGE TANK 131-VV-
013
Remarks:

Best regards, Receipt Acknowledgment


For 4300-TCMS-NSH-P4-T-1320

Name:
Title
Tecnimont S.p.A. Signature:
Matteo Perrini
Site Manager Date:

DOCUMENT LIST
Status
S/N Client Doc. No. TCM Doc. No. Description Rev
Code

4300-LZ-VD-
1 P4-SY-273-L1400192 LIFTING PLAN FOR 1-HEXENE DRYER 131-VC-246 A/B L A
PLP4P40000L1401323

4300-LZ-VD-
2 P4-SY-273-L1400197 LIFTING PLAN FOR 1-BUTENE DRYER 131-VC-242 A/B L A
PLP4P40000L1401328
4300-LZ-VD- LIFTING PLAN FOR COMONOMER COLUMN OVHD
3 P4-SY-203-L1400004 L A
PLP4P40000L1401368 CONDENSER PE6 & PE7 (HE-503B)
4300-LZ-VD- LIFTING PLAN FOR COMONOMER COLUMN OVHD
4 P4-SY-203-L1400005 L A
PLP4P40000L1401370 CONDENSER PE6 & PE7 (HE-503A)
4300-LZ-VD- LIFTING PLAN FOR OLIGOMER REMOVAL COLUMN PE6
5 P4-SY-203-L1400006 L A
PLP4P40000L1401371 & PE7 (VT-564)

This Document is Maire Tecnimont Group property and cannot be used by others for any purpose without prior written consent
DOCUMENTATION TRANSMITTAL
Transmittal Number:
LOCATION : 4300-TCMS-NSH-P4-T-
PLANT: BOROUGE-4 PROJECT
RUWAIS - U.A.E.
1218,1309,1320
Abu Dhabi Polymers Company Limited (Borouge) Date: February 9, 2024
Sheet 2 of 2

Status
S/N Client Doc. No. TCM Doc. No. Description Rev
Code
4300-LZ-VD-
6 P4-SY-203-L1400009 LIFTING PLAN FOR HP FLARE KO DRUM 131-VV-014 L A
PLP4P40000L1401375
4300-LZ-VD- LIFTING PLAN FOR PROPANE KNOCK-OUT DRUM 131-
7 P4-SY-203-L1400010 L A
PLP4P40000L1401376 VV-016
4300-LZ-VD-
8 P4-SY-203-L1400011 LIFTING PLAN FOR GLYCOL WATER COOLER 131-HE-003 L A
PLP4P40000L1401377
4300-LZ-VD- LIFTING PLAN FOR GLYCOL WATER STORAGE TANK
9 P4-SY-203-L1400012 L A
PLP4P40000L1401378 131-VV-013

Document Acceptance Status Code (By TCM):


A Accepted
AC Accepted with Comments, Resubmit
AH Accepted with Holds
NA Not Accepted, Resubmit
IFI For Information

This Document is Maire Tecnimont Group property and cannot be used by others for any purpose without prior written consent