Transmittal Number:
LOCATION : 4300-TCMS-NSH-P4-T-
PLANT: BOROUGE-4 PROJECT
RUWAIS - U.A.E.
1218,1309,1320
Abu Dhabi Polymers Company Limited (Borouge) Date: February 9, 2024
Sheet 1 of 2
From: To:
Tecnimont S.p.A. Nasser Saeed Al Hajri Contracting Co. (NSH)
Mr. Matteo Perrini Mr. C. Venkatachalapathi
Site Manager, Borouge 4 – PO Project Manager, Borouge 4 PO
Tecnimont S.p.A. Nasser Saeed Al Hajri Contracting Co. (NSH)
BOROUGE 4 PROJECT P. O. Box 42085,
Ruwais, Abu Dhabi, UAE Abu Dhabi, UAE
LIFTING PLAN - 1-HEXENE DRYER 131-VC-246 A/B / 1-BUTENE DRYER 131-VC-242 A/B / COMONOMER
COLUMN OVHD CONDENSER PE6 & PE7 (HE-503B) / COMONOMER COLUMN OVHD CONDENSER PE6 & PE7 (HE-
Subject: 503A) / OLIGOMER REMOVAL COLUMN PE6 & PE7 (VT-564) / HP FLARE KO DRUM 131-VV-014 / PROPANE
KNOCK-OUT DRUM 131-VV-016 / GLYCOL WATER COOLER 131-HE-003 / GLYCOL WATER STORAGE TANK 131-VV-
013
Remarks:
Name:
Title
Tecnimont S.p.A. Signature:
Matteo Perrini
Site Manager Date:
DOCUMENT LIST
Status
S/N Client Doc. No. TCM Doc. No. Description Rev
Code
4300-LZ-VD-
1 P4-SY-273-L1400192 LIFTING PLAN FOR 1-HEXENE DRYER 131-VC-246 A/B L A
PLP4P40000L1401323
4300-LZ-VD-
2 P4-SY-273-L1400197 LIFTING PLAN FOR 1-BUTENE DRYER 131-VC-242 A/B L A
PLP4P40000L1401328
4300-LZ-VD- LIFTING PLAN FOR COMONOMER COLUMN OVHD
3 P4-SY-203-L1400004 L A
PLP4P40000L1401368 CONDENSER PE6 & PE7 (HE-503B)
4300-LZ-VD- LIFTING PLAN FOR COMONOMER COLUMN OVHD
4 P4-SY-203-L1400005 L A
PLP4P40000L1401370 CONDENSER PE6 & PE7 (HE-503A)
4300-LZ-VD- LIFTING PLAN FOR OLIGOMER REMOVAL COLUMN PE6
5 P4-SY-203-L1400006 L A
PLP4P40000L1401371 & PE7 (VT-564)
This Document is Maire Tecnimont Group property and cannot be used by others for any purpose without prior written consent
DOCUMENTATION TRANSMITTAL
Transmittal Number:
LOCATION : 4300-TCMS-NSH-P4-T-
PLANT: BOROUGE-4 PROJECT
RUWAIS - U.A.E.
1218,1309,1320
Abu Dhabi Polymers Company Limited (Borouge) Date: February 9, 2024
Sheet 2 of 2
Status
S/N Client Doc. No. TCM Doc. No. Description Rev
Code
4300-LZ-VD-
6 P4-SY-203-L1400009 LIFTING PLAN FOR HP FLARE KO DRUM 131-VV-014 L A
PLP4P40000L1401375
4300-LZ-VD- LIFTING PLAN FOR PROPANE KNOCK-OUT DRUM 131-
7 P4-SY-203-L1400010 L A
PLP4P40000L1401376 VV-016
4300-LZ-VD-
8 P4-SY-203-L1400011 LIFTING PLAN FOR GLYCOL WATER COOLER 131-HE-003 L A
PLP4P40000L1401377
4300-LZ-VD- LIFTING PLAN FOR GLYCOL WATER STORAGE TANK
9 P4-SY-203-L1400012 L A
PLP4P40000L1401378 131-VV-013