Professional Documents
Culture Documents
3 TB MARTHA MAJU
3 TB MARTHA MAJU
Best Regards 🙏 Noted : Eta Jetty Paramartha, January 04th 2023 - 15.00
Best Regards 🙏
Daily report ya
Dear
Best Regards 🙏
Dear Thursday report,January 04th 2024
Update Report January 2024
TB.Martha Maju/BG.Sentana Lestari 09.00 : S.B.E, prepare cast off from mooring
09.10 : Connect 2nd towing P.O.L : Jetty BSW (Bojonegara)
09.25 : Cast off from mooring, Full away to Jetty P.O.D : Jetty Banyung lincir (Sei lalan)
Paramartha Ttl.Cargo : On discharge
Cargo type : Basecourse
Best Regards 🙏
Revisi report ya bass
Dear
14.30 : Passing at Teluk anang area, connect assist tug Baik bass 🙏🏻
TB.Agunegerah, continue full away to Jetty Paramartha contoh: bongkar 50% estimasi selesai tgl 06/01/2024
15.45 : Arrival at Jetty Paramartha area, process sore
berthing
16.10 : BG.Sentana Lestari in position at Jetty Dear
Paramartha Update Report January 2024
16.15 : Disconnect assist tug TB.Martha Maju/BG.Sentana Lestari
16.20 : Vessel tied at barge =================================
16.30 : F.W.E
P.O.L : Jetty BSW (Bojonegara) Friday report,January 05th 2024
P.O.D : Jetty Banyung lincir (Sei lalan)
Ttl.Cargo : 4,490.10 m³ 08.00 : Continue discharge cargo
Cargo type : Basecourse 17.00 : Stop discharge cargo
19.00 : Continue discharge
Noted : Stand by tied at barge, waiting info start 23.00 : Stop discharge
discharge cargo
Saturday report,January 06th 2024
Best Regards 🙏
03.20 : Try to towing from mooring
04.00 : Barge agrounded from mooring, cannot moving
Noted : Stand by moored barge & waiting info along Sunday report,January 07th 2024
side at Jetty SBL tomorrow morning
09.40 : Start loading cargo
Best Regards 🙏
15.00 : S.B.E, shifting push stern
15.05 : Start shifting
Malam bass 🙏🏻
15.25 : Clear shifting
15.30 : F.W.E
Update report ya
Monday report,January 08th 2024 Dear
Update Report January 2024
05.45 : Completed loading cargo TB.Martha Maju/BG.Sentana Lestari
06.20 : Final draught survey TC = 7.576,460 MT =================================
06.30 : S.B.E, prepare cast off from jetty SBL
06.45 : Connect assist tug TB.Indo Power Tuesday report,January 09th 2024
07.00 : BG.Sentana Lestari cast off from jetty SBL
Manual 01.30 : Arrive at Parit 6 bridge, connect assist tug
07.10 : Disconnect assist tug, move to Mooring area TB.Sultan
08.30 : Arrive at mooring area, process moored barge 01.45 : Clear passing Parit 6 bridge
08.45 : Clear moored barge at Pondok cinta mooring 01.50 : Disconnect assist tug, continue move to Parit 5
area mooring area
08.55 : Vessel tied at barge 02.30 : Arrive at Parit 5 mooring area, process moored
09.00 : F.W.E vessel
P.O.L : Jetty SBL (Sei Lalan) 02.50 : Clear moored vessel
P.O.D : PLTU Jawa 7 (Bojonegara) 03.00 : F.W.E
Ttl.Cargo : 7,576.460 MT P.O.L : Jetty SBL (Sei Lalan)
P.O.D : PLTU Jawa 7 (Bojonegara)
Noted : Stand by moored barge, waiting Low tide for Ttl.Cargo : 7,576.460 MT
sailing to syahbandar KR.Agung
Noted : Stand by moored vessel waiting low tide for
Best Regards 🙏
sailing to syahbandar KR.Agung
Best Regards 🙏
Noted : Eta Syahbandar KR. Agung, January 09th 2023 -
12.00 pm
Best Regards 🙏
22.15 : F.W.E
P.O.L : Jetty SBL (Sei Lalan)
P.O.D : PLTU Jawa 7 (Bojonegara) Dear
Ttl.Cargo : 7,576.460 MT Update Report January 2024
TB.Martha Maju/BG.Sentana Lestari
Noted : Stand by Anchorage, waiting low tide tomorrow ====================================
morning
Thursday Report,January 11th 2024
Best Regards 🙏 Note : Eta OB-PLTU Jawa 7,January 13th 2024 - 23.20 LT
Status : Sailing
Pos : 21 NM from Tg.Tawar (Java Sea) P.O.D : PLTU Jawa 7 (Bojonegara)
Gps : 04°14'016"S/106⁰11'227"E Ttl.Cargo : 7.576,460 MT
Rpm : 1000x2
Weather condt : Cloudy Note : Eta OB-PLTU Jawa 7,January 13th 2024 - 18.00 LT
Wind.direct : N.W - 10.2 kt
Best Regards 🙏
Sea Condt : Slight sea
Dist run : 285 nm
Best Regards 🙏
18.25 : Arrive at Buoy Nawaf, process moored barge
18.50 : Clear moored barge
Best Regards 🙏
====================================
14.00 : F.W.E
Best Regards 🙏
16.00 : S.B.E, prepare cast off from jetty PLTU Jawa 7
Selamat pagi bas 🙏🏻
16.05 : Vessel move to barge Update report ya
16.20 : Clear connect 2nd towing, steaming waiting Update Report January 2024
17.35 : Connect assist tug TB.Tesco Dayat ednesday Report, January 17th 2024
W
18.15 : In clear area, process pick up crew Pos : 12 nm From TG.Keman (Java Sea)
19.40 : Passing OB-Bojo, process long towing line Weather condt : Cloudy
20.00 : Clear long towing line, full away to OB- Wind.direct : N.W- 11 kt
Next P.OL:
. Jetty SBL (Sei Lalan) Dist run : 285 nm
Noted : Eta OB-Banyuasin, January 19th 2023 - 06.00 LT Ttl steaming hrs : 12 Hrs
Ttl.Cargo : NIHIL
Dear
Update Report January 2024 Note : Eta OB-Banyuasin,January 19th 2024 - 06.00 LT
D ear
R p m : 1000x 2
Wind.direct : N.W- 11 kt
Next P.O.L : Jetty SBL (Sei Lalan) Ttl steaming hrs : 60 Hrs
Ttl.Cargo : NIHIL
D ear
Update Report January 2024 Note : Eta OB-Banyuasin,January 19th 2024 - 14.00 LT
D ear
R p m : 1000x 2
20.10 : Arrival at Muntok clear area, process short 03.25 : Arrive at Parit 1,process moored vessel
20.35 : Clear short towing line, continue move to OB- 03.45 : F.W.E
Ttl.Cargo : NIHIL
Update report ya
D ear =================================
=================================
02.45 : Document off board & SPOG not ready, move Ttl.Cargo : NIHIL
to Parit 1
Noted : Stand by moored vessel,waiting SPOG on board Best Regards 🙏
Update report ya
=================================
TB.Martha Maju/BG.Sentana Lestari 20.30 : Arrival at Parit 6 bridge area, steaming waiting
Saturday report,January 20th 2024 22.25 : Connect assist tug TB.Sultan, process passing
bridge
17.00 : SPOG on board & pilot on board 22.35 : Clear passing Parit 6 bridge
17.30 : S.B.E prepare unmoored 22.40 : Disconnect assist tug, continue full away to
17.45 : Cast off from mooring, full away to Parit 6 Jetty SBL
bridge
Next P.O.L : Jetty SBL (Sei Lalan) Next P.O.L : Jetty SBL (Sei Lalan)
P .O .D : - P .O .D : -
Noted : Eta Parit 6 bridge, January 20th 2024 - 21.00 PM Noted : Eta Jetty SBL, January 21th 2024 - 10.00 AM
Best Regards 🙏 Update report ya
Sunday report,January 21th 2024 08.00 : Stand by moored barge at Jetty SBL mooring
area (Kp.Bangsa)
09.00 : Arrival at Jetty SBL mooring area,process drop Next P.O.L : Jetty SBL (Sei Lalan)
crew to barge P .O .D : -
09.25 : Vessel tied at barge Noted : Stand by moored barge at Jetty SBL mooring area, waiting
Next P.O.L : Jetty SBL (Sei Lalan) Noted : Est berthing from master jetty on Wednesday 24th 2024
P .O .D : -
Noted : Stand by moored barge at Jetty SBL mooring area, waiting TB.Martha Maju/BG.Sentana Lestari
Best Regards 🙏
P .O .D : - D ear
Noted : Stand by moored barge at Jetty SBL mooring area, waiting =================================
Noted : Est berthing from master jetty on Wednesday 24th 2024 Wednesday report,January 24th 2024
08.00 : Stand by moored barge at Jetty SBL mooring 20.30 : Finish bunker F.W = 50 KL
area (Kp.Bangsa)
Next P.O.L : Jetty SBL (Sei Lalan) Thursday report,January 25th 2024
P .O .D : -
along side
P .O .D : -
Ttl.Cargo : NIHIL
Next P.O.L : Jetty SBL (Sei Lalan)
P.O.D : -
Ttl.Cargo : NIHIL
Noted : Est berthing from master jetty waiting for the cargo
Best Regards 🙏
Update Report January 2024
TB.Martha Maju/BG.Sentana Lestari
Best Regards 🙏
Tuesday report,January 30th 2024
Noted : Stand by moored barge at Jetty SBL mooring Update Report February 2024
area, waiting info along side at jetty SBL TB.Martha Maju/BG.Sentana Lestari
Noted : Est berthing from master jetty waiting for the =================================
cargo stock file to be ready
Saturday report,February 03rd 2024
Best Regards 🙏
08.00 : Stand by moored at pulau gading, waiting info
along side
Dear
Update Report February 2024
TB.Martha Maju/BG.Sentana Lestari
================================= ------------------------------------------------------------------------
Next P.O.L : Jetty SBL (Sei Lalan)
P.O.D : -
Ttl.Cargo : NIHIL Sunday report,February 04th 2024
Noted : Stand by moored barge at Jetty SBL mooring 08.00 : Stand by moored at pulau gading, waiting info
area, waiting info along side at jetty SBL along side
Noted : Est berthing from master jetty waiting for the
cargo stock file to be ready
Best Regards 🙏
------------------------------------------------------------------------
Next P.O.L : Jetty SBL (Sei Lalan)
Best Regards 🙏
=================================
08.00 : Stand by moored at pulau gading, waiting info Daily report ya bass
along side Dear
Update Report February 2024
TB.Martha Maju/BG.Sentana Lestari
=================================
Best Regards 🙏
Ttl.Cargo : NIHIL
Best Regards 🙏
area, waiting info along side at jetty SBL
Noted : Est berthing from master jetty waiting for the
Siang bass 🙏🏻
cargo stock file to be ready
Best Regards 🙏
------------------------------------------------------------------------
P.O.L : Jetty SBL (Sei Lalan)
Best Regards 🙏
19.25 : clear shifting
19.30 : F.W.E
Best Regards 🙏
15.05 : Start shifting
15.25 : Clear shifting
Update report ya
------------------------------------------------------------------------ Dear
P.O.L : Jetty SBL (Sei Lalan) Update Report February 2024
P.O.D : PLTU Jawa 7 (Bojonegara) TB.Martha Maju/BG.Sentana Lestari
Ttl.Cargo : Cargo on board 60% =================================
Noted : Stand by tied at barge, est completed loading at Saturday report,February 10th 2024
22.00 pm
08.00 : S.B.E, prepare cast off from jetty BLC1
08.05 : Connect 2nd towing
Best Regards 🙏
08.15 : BG.Sentana Lestari cast off from Jetty, move to
clear area
Best Regards 🙏
Best Regards 🙏
01.30 : arrive at Parit 6 bridge
01.45 : Connect assist tug TB.Sultan, process passing the
Best Regards 🙏
Best Regards 🙏
Sunday report,February 11th 2024
Best Regards 🙏
mooring area
12.40 : Arrive at mooring area, process moored barge
Best Regards 🙏
12.55 : Vessel tied at barge
13.00 : F.W.E
15.10 : Barge Drigging again Dear
15.15 : S.B.E, prepare up anchore Update Report February 2024
15.50 : Anchore up, move to reposition TB.Martha Maju/BG.Sentana Lestari
18.00 : Barge and vessel drifting away to TG.api- =================================
api,move towing barge in safe area
18.50 : in clear area barge agrounded Tuesday report,February 13th 2024
18.55 : Vessel tied at barge
15.00 : Progress repair the engine 17.00 : Spare part ready for using in the engine, process
22.00 : Stop repair engine take a rest repair the engine
22.00 : Finish repair the engine, All good
Wednesday report,February 14th 2024 22.30 : S.B.E, prepare up anchore
22.35 : Heave up anchore
08.00 : Technical Superintendent on board 23.00 : Anchore up, full away to Jawa 7 ( Bojonegara)
08.20 : Continue repair the engine
23.20 : Finish Repair the engine
23.30 : Running test engine port side
23.50 : Running test is good ------------------------------------------------------------------------
23.55 : Crew take a rest P.O.L : Jetty SBL (Sei Lalan)
P.O.D : PLTU Jawa 7 (Bojonegara)
Thursday report,February 15th 2024 Ttl.Cargo : 7.503,985 MT
06.00 : S.B.E, running test engine again Noted : Eta OB-PLTU Jawa7,February 17th 2024 - 08.25
06.30 : Running test is good PT
06.35 : F.W.E
08.10 : Technical Superintendent off board
Best Regards 🙏
08.30 : S.B.E, prepare Cast off from mooring
08.45 : Cast off from mooring, process pick up crew
09.00 : Clear pick up crew, full away to OB-Banyuasin Ini report yang dikirim ke PLTU dan Agent
Dear
Update Report February 2024
TB.Martha Maju/BG.Sentana Lestari
------------------------------------------------------------------------ ====================================
P.O.L : Jetty SBL (Sei Lalan)
P.O.D : PLTU Jawa 7 (Bojonegara) Friday Report,February 16th 2024
Ttl.Cargo : 7.503,985 MT
Daily report at 08.00 am
Noted : Eta OB-Banyuasin, February 15th 2024 - 16.00
LT Status : Sailing
Pos : 3 nm From TG.Tapa
Gps : 02°38'695"S/105⁰48'659"E
Best Regards 🙏
Rpm : 1000x2
Weather condt : Cloudy
Bass ini real reportnya ya Wind.direct : N.E - 3.5 kt
Dear Sea Condt : Smooth sea
Update Report February 2024 Dist run : 285 nm
TB.Martha Maju/BG.Sentana Lestari Ttl.dist.run : 64 nm
================================= Dist to go : 221 nm
Steaming hrs : 82 Hrs
Tuesday report,February 13th 2024 Ttl steaming hrs : 13 Hrs 50 Minute
Averrage speed (24 hrs): 4.0 kt
08.00 : S.B.E, barge free from agrounded Speed Now : 3.9 Kt
08.15 : Full away to OB-Musi P.O.L : Jetty SBL (Sei Lalan)
12.00 : TROUBLE Engine port side, move to safe area P.O.D : PLTU Jawa 7 ( Bojonegara)
12.20 : In safe area, clear drop anchore, Ttl.Cargo : 7.503,985 MT
12.25 : Vessel tied at barge
12.30 : F.W.E / Maintenance engine Note : Eta OB-PLTU Jawa 7 ,February 18th 2024 - 22.40
14.00 : Repair of engine spare part in the work shop LT
Best Regards 🙏
Rpm : 1000x2
Weather condt : Cloudy
Status : Sailing Note : Eta OB-PLTU Jawa 7 ,February 18th 2024 - 16.00
Pos : 17 nm From TG.Menjangan LT
Gps : 03°57'456"S/106⁰14'025"E
Best Regards 🙏
Rpm : 1000x2
Weather condt : Cloudy
Best Regards 🙏
Ttl.Cargo : 7.503,985 MT
Daily report ya
Best Regards 🙏
Dear
Update Report February 2024
Monday report,February 19th 2024 Next P.O.L : Jetty Bukit Asam (Tarahan)
P.O.D : PLTU Tg.Awar-awar (Tuban)
01.35 : Complete discharge cargo Ttl.Cargo : NIHIL
02.05 : Final draught survey
02.10 : S.B.E, prepare cast off from PLTU Jawa 7 Noted : Estimasi berthing on February 23th 2024
02.15 : Move to barge Noted : 05°31'811"S/105°19'150"E
02.20 : vessel tied at barge, connect 2nd towing
02.25 : Connect assist tug TB.Martha Green/pilot on Dear
board Update Report February 2024
02.35 : BG.Sentana Lestari cast off from PLTU Jawa 7 TB.Martha Maju/BG.Sentana Lestari
02.40 : Disconnect assist tug/pilot off board =================================
02.45 : Move to clear area
03.05 : In clear area, process pick up crew Wednesday report,February 21th 2024
03.10 : Clear pick up crew, full away to OB-Bojonegara
04.00 : Passing OB-Bojonegara,Co… 08.00 : Stand by Anchorage at Tarahan, waiting info
Best Regards 🙏
P.O.D : PLTU Tg.Awar-awar (Tuban)
Ttl.Cargo : NIHIL
Dear
Update Report February 2024
Best Regards 🙏
TB.Martha Maju/BG.Sentana Lestari
=================================
Noted : Estimasi berthing on February 23th 2024 08.00 : Stand by Anchorage at Tarahan, waiting info
Noted : 05°31'811"S/105°19'150"E along side at Jetty Bukit asam / good & safe
Best Regards 🙏
Best Regards 🙏
Wednesday report,February 21th 2024
-------------------------------------------------------------------
------------------------------------------------------------------- 16.20 : In position, process drop anchore
Next P.O.L : Jetty Bukit Asam (Tarahan) 16.45 : Clear drop anchore
P.O.D : PLTU Tg.Awar-awar (Tuban) 16.50 : F.W.E
Ttl.Cargo : NIHIL
Best Regards 🙏
Noted : Estimasi berthing on this night at 22.00 PM
Noted : 05°31'671"S/105°19'212"E
Best Regards 🙏
Dear
Update Report February 2024
TB.Martha Maju/BG.Sentana Lestari Dear
============================== Update Report February 2024
TB.Martha Maju/BG.Sentana Lestari
Sunday report,February 25th 2024 ==============================
08.00 : Stand by Anchorage at Tarahan, waiting info Sunday report,February 25th 2024
along side at Jetty Bukit asam / good & safe
18.05 : Vessel drigging wind 15 knot
18.10 : S.B.E, prepare up anchore
18.15 : heave up anchore
------------------------------------------------------------------- 18.45 : Anchore up, move to reposition
Next P.O.L : Jetty Bukit Asam (Tarahan) 19.50 : In position, process drop anchore
P.O.D : PLTU Tg.Awar-awar (Tuban) 20.25 : Clear drop anchore
Ttl.Cargo : NIHIL 20.30 : F.W.E
22.00 : Vessel drigging again
Noted : Estimasi berthing on February 27th 2024 22.05 : S.B.E, prepare up anchore
Noted : 05°31'671"S/105°19'212"E 22.10 : heave up anchore
22.35 : Anchore up, move to reposition
23.00 : In position, process drop anchore
23.30 : Clear drop anchore vessel
Best Regards 🙏
23.35 : F.W.E
Update report ya
Dear -------------------------------------------------------------------
Update Report February 2024 P.O.L : Jetty Bukit Asam (Tarahan)
TB.Martha Maju/BG.Sentana Lestari P.O.D : PLTU Tg.Awar-awar (Tuban)
============================== Ttl.Cargo : 7.590,036 MT
Best Regards 🙏
04.20 : Start bunker F.W
06.00 : Finish bunker F. W = 40 KL
06.05 : S.B.E, prepare back to barge
06.20 : Clear tied at barge
06.25 : F.W.E Dear
08.00 : Stand by tied at barge, waiting completed Update Report February 2024
loading cargo TB.Martha Maju/BG.Sentana Lestari
==============================
Best Regards 🙏
Best Regards 🙏
Gps : 05°31'651"S/105⁰55'945"E
Rpm : 1000x2
Best Regards 🙏
Sea Condt : Smooth sea
Dist run : 440 nm
Ttl.dist.run : 44.5 nm Selamat pagi bass, daily report ya
Dist to go : 395.5nm
Steaming hrs : 126 Hrs Tq Capt update laporanya🙏
Anytime bas 🙏
Ttl steaming hrs : 16 Hrs
Averrage speed (24 hrs): 2.7 kt
Speed Now : 1.8 Kt Dear
Update Report February 2024
-------------------------------------------------------------------------- TB.Martha Maju/BG.Sentana Lestari
- ====================================
P.O.L : Jetty Bukit Asam (Tarahan)
P.O.D : PLTU TG.Awar-Awar (Tuban) Wednesday Report,February 28th 2024
Ttl.Cargo : 7.590,036 MT
Daily report at 08.00 am
Note : Eta OB- PLTU Tuban ,March 02nd 2024 - 22.00 LT
Status : Sailing
Best Regards 🙏
Pos : 15 nm From Sedari Island
Gps : 05°41'804"S/107⁰19'023"E
Rpm : 1000x2
Weather condt : Squally
Dear Wind.direct : W - 9.9 kt
Update Report February 2024 Sea Condt : Slight sea
TB.Martha Maju/BG.Sentana Lestari Dist run : 440 nm
==================================== Ttl.dist.run : 128.9nm
Dist to go : 311,1 nm
Tuesday Report,February 27th 2024 Steaming hrs : 126 Hrs
Ttl steaming hrs : 40 Hrs
Daily report at 08.00 am Averrage speed (24 hrs): 3.5 kt
Speed Now : 3.5 Kt Daily report at 08.00 am
Best Regards 🙏
Ttl.dist.run : 297.9 nm
Dist to go : 142.1 nm
Dear Steaming hrs : 126 Hrs
Update Report February 2024 Ttl steaming hrs : 88 Hrs
TB.Martha Maju/BG.Sentana Lestari Averrage speed (24 hrs): 3.6 kt
==================================== Speed Now : 4.0 Kt
Best Regards 🙏
Weather condt : Fine
Wind.direct : W - 4.6 kt
Note : Eta OB- PLTU Tuban ,March 02nd 2024 - 22.00 LT Daily report at 08.00 am
Best Regards 🙏
Status : Sailing
Pos : 12 nm From Rembang
Dear Gps : 06°25'262"S/111⁰31'878"E
Update Report March 2024 Rpm : 1000x2
TB.Martha Maju/BG.Sentana Lestari Weather condt : Drizzle
==================================== Wind.direct : W - 4.5 kt
Sea Condt : Smooth sea
Friday Report,March 01st 2024 Dist run : 440 nm
Ttl.dist.run : 382.6 nm
Dist to go : 57.4 nm
Steaming hrs : 126 Hrs 08.00 : S.B.E,Heave up anchore prepare along side
Ttl steaming hrs : 93 Hrs
Averrage speed (24 hrs): 3.5 kt
Speed Now : 4.2 Kt
-------------------------------------------------------------------------- -------------------------------------------------------------------
- P.O.L : Jetty Bukit Asam (Tarahan)
P.O.L : Jetty Bukit Asam (Tarahan) P.O.D : PLTU Tg.Awar-awar (Tuban)
P.O.D : PLTU TG.Awar-Awar (Tuban) Ttl.Cargo : 7.590,036 MT
Ttl.Cargo : 7.590,036 MT
Noted : prepare along side
Note : Eta OB- PLTU Tuban ,March 02nd 2024 - 18.00 LT
Best Regards 🙏
Best Regards 🙏
Selamat pagi bass 🙏🏻
Selamat pagi bass 🙏🏻 Daily report ya
Daily report ya Dear
Dear Update Report March 2024
Update Report March 2024 TB.Martha Maju/BG.Sentana Lestari
TB.Martha Maju/BG.Sentana Lestari ====================================
====================================
Sunday report,March 03rd 2024
Saturday report,March 02nd 2024
08.00 : S.B.E,prepare along side
17.45 : Arrival at OB-Tg.Awar-awar, process short 08.05 : Heave up anchore
towing line 08.40 : Anchore up, process drop crew to barge and
18.15 : Clear short towing line, move to anchorage area take a photo of cargo
18.40 : Arrive at Anchorage area, process drop anchore 09.10 : Clear take a picture, move to buoy 2
18.55 : Clear drop anchore vessel 10.00 : Arrive at buoy 2,steaming waiting info pilot for
19.00 : F.W.E come inside jetty area
11.10 : Full away to Jetty
12.15 : Connect assist tug TB.Carrol, process along side
------------------------------------------------------------------- 13.15 : BG.Sentana Lestari in position at PLTU Tg.awar-
P.O.L : Jetty Bukit Asam (Tarahan) Awar
P.O.D : PLTU Tg.Awar-awar (Tuban) 13.20 : Disconnect assist tug
Ttl.Cargo : 7.590,036 MT 13.25 : Vessel tied at barge, drop 2nd towing
13.35 : Clear drop 2nd towing, move to safe jetty
Noted : Stand by anchore at Red Buoy no.2 east area 13.45 : Vessel tied at safe jetty
Noted : Est berthing tomorrow morning 14.00 : F.W.E
Best Regards 🙏
-------------------------------------------------------------------
P.O.L : Jetty Bukit Asam (Tarahan)
Best Regards 🙏
====================================
Best Regards 🙏
Gps : 06°16'803"S/111⁰59'619"E
Rpm : 1000x2
Best Regards 🙏
Gps : 05°59'956"S/109⁰35'360"E
Rpm : 1000x2
Weather condt : Cloudy Dear
Wind.direct : W - 11 kt Update Report March 2024
Sea Condt : Slight sea TB.Martha Maju/BG.Sentana Lestari
Dist run : 440 nm ====================================
Ttl.dist.run : 165.8 nm
Dist to go : 274,2 nm Friday report,March 08th 2024
Steaming hrs : 97 Hrs
Ttl steaming hrs : 41 Hrs 45 minute 21.00 : (BAD WEATHER) , Going to Cirebon Hourber for
Averrage speed (24 hrs): 3.4 kt shelter from bad weather
Speed Now : 4.0 Kt
Best Regards 🙏
Next P.O.L : Jetty Sei Dua (Batu Licin)
P.O.D : -
Dear Ttl.Cargo : NIL
Update Report March 2024
TB.Martha Maju/BG.Sentana Lestari Noted : Deviasi loading port to Batu Licin
==================================== Noted : Eta Batu Licin, March 12th 2024 - 22.00 PT
Best Regards 🙏
Friday Report,March 08th 2024
Next P.O.L : Jetty Sei Dua (Batu Licin) Next P.O.L : Jetty Sei Dua (Batu Licin)
P.O.D : - P.O.D : -
Ttl.Cargo : NIL Ttl.Cargo : NIL
Note : Move to karimun Jawa, shelter from bad weather Noted : Eta OB-Selat Laut,March 13th 2024 - 23.30 LT
Best Regards 🙏
Dist to go : 218.3 nm
Steaming hrs : 85 Hrs
Best Regards 🙏
Speed Now : 5.1 Kt
Pagi bass 🙏
Next P.O.L : Jetty Sei Dua (Batu Licin)
P.O.D : -
Ttl.Cargo : NIL Daily reoort ya
Best Regards 🙏
TB.Martha Maju/BG.Sentana Lestari
====================================
Wednesday Report,March 13th 2024 Next P.O.L : Jetty Sei Dua (Batu Licin)
P.O.D : PLTU TG.Awar-Awar (Tuban)
Utc+8 Ttl.Cargo : NIL
Daily Report at 08.00 am
Noted : Stand by Anchorage sei dua outher buoy
Status : Sailing Noted : 06°19'662" S/116°03'947" E
Pos : 11 nm From Bunati station
Best Regards 🙏
06.45 : Clear connect stern 2nd towing, process cast off
from mooring
Utc+8
P.O.L : Jetty Sei Dua (Batu Licin)
07.00 : S.B.E, prepare up anchore P.O.D : PLTU TG.Awar-Awar (Tuban)
07.05 : Heave up anchore Ttl.Cargo : NIL
07.35 : anchore up, steaming waiting TB.Jhony V come
out Noted : Stand by tied at barge, waiting info completed
08.30 : Process entrance to mooring iwak bawah loading cargo
08.50 : Passing Sulaiman mooring area
Best Regards 🙏
10.25 : Arrive at mooring area, process moored barge
10.45 : Clear moored barge
10.55 : Vessel tied at barge
11.00 : F.W.E
Dear
Next P.O.L : Jetty Sei Dua (Batu Licin) Update Report March 2024
P.O.D : PLTU TG.Awar-Awar (Tuban) TB.Martha Maju/BG.Sentana Lestari
Ttl.Cargo : NIL ====================================
Noted : Stand by moored barge at iwak bawah (sei dua), Wednesday report,March 13th 2024
waiting info along side at jetty Sei dua
Utc+8
Best Regards 🙏
06.35 : Arrive at barge, process connect stern 2nd
towing
Selamat malam bass 🙏🏻
06.35 : Arrive at barge, process connect stern 2nd
towing
Update report ya bass 06.45 : Clear connect stern 2nd towing, process cast off
Dear from mooring
Update Report March 2024 06.50 : Cast off from mooring move to jetty V
TB.Martha Maju/BG.Sentana Lestari 07.25 : Connect assist tug TB.Jhony III, continue move to
==================================== jetty
07.50 : Arrive at jetty V process along side
Thursday report,March 14th 2024 08.10 : BG.Sentana Lestari in position at jetty V Sei
dua/disconnect assist tug
Utc+8 08.15 : Vessel tied at barge/initial draft survey
08.20 : Commenced loading cargo
07.00 : S.B.E, prepare up anchore 08.30 : F.W.E
07.05 : Heave up anchore
07.35 : anchore up, steaming waiting TB.Jhony V come P.O.L : Jetty Sei Dua (Batu Licin)
out P.O.D : PLTU TG.Awar-Awar (Tuban)
08.30 : Process entrance to mooring iwak bawah Ttl.Cargo : NIL
08.50 : Passing Sulaiman mooring area
10.25 : Arrive at mooring area, process moored barge Noted : Stand by tied at barge, waiting info completed
10.45 : Clear moored barge loading cargo
10.55 : Vessel tied at barge
Best Regards 🙏
11.00 : F.W.E
Noted : Stand by moored barge at iwak bawah (sei dua), Tq Capt update laporanya🙏
Best Regards 🙏
Dear
Update Report March 2024
Best Regards 🙏
P.O.L : Jetty Sei Dua (Batu Licin)
P.O.D : PLTU TG.Awar-Awar (Tuban)
Update report ya bass Noted : Eta OB-Selat Laut, March 17th 2024 - 12.00
Dear
Best Regards 🙏
Update Report March 2024
TB.Martha Maju/BG.Sentana Lestari
Best Regards 🙏
Wind.direct : W - 9.3 kt
Sea Condt : Slight sea
Dist run : 315 nm
Ttl.dist.run : 148.6 nm
Dear Dist to go : 166.4 nm
Update Report March 2024 Steaming hrs : 95 Hrs
TB.Martha Maju/BG.Sentana Lestari Ttl steaming hrs : 48 Hrs
==================================== Averrage speed (24 hrs): 2.6 kt
Speed Now : 2.9 Kt
Monday Report,March 18th 2024
Best Regards 🙏
Weather condt : Cloudy
Wind.direct : N - 8.7 kt
Sea Condt : Smooth sea Dear
Dist run : 315 nm Update Report March 2024
Ttl.dist.run : 84.1 nm TB.Martha Maju/BG.Sentana Lestari
Dist to go : 230.9 nm ====================================
Steaming hrs : 95 Hrs
Ttl steaming hrs : 24 Hrs Wednesday Report,March 20th 2024
Averrage speed (24 hrs): 3.5 kt
Speed Now : 3.5 Kt Utc+7
Daily Report at 08.00 am
P.O.L : Jetty Sei Dua (Batu Licin)
P.O.D : PLTU Tg.Awar-awar (Tuban) Status : Sailing
Ttl.Cargo : 7.610,320 MT Pos : 14 nm From Bawean island
Gps : 05°56'555"S/112⁰56'241"E
Note : Eta OB-PLTU Tg.Awar-awar, march 21th 2024 - Rpm : 1000x2
09.00 LT Weather condt : Fine
Wind.direct : W - 9.3 kt
Best Regards 🙏
Sea Condt : Slight sea
Dist run : 315 nm
Dear Ttl.dist.run : 227.7 nm
Update Report March 2024 Dist to go : 87.3 nm
TB.Martha Maju/BG.Sentana Lestari Steaming hrs : 95 Hrs
Ttl steaming hrs : 72 Hrs TB.Martha Maju/BG.Sentana Lestari
Averrage speed (24 hrs): 3.3 kt ====================================
Speed Now : 2.6 Kt
Friday report,March 22th 2024
--------------------------------------------------------------------------
- 01.30 : S.B.E, prepare shifting barge for tenderred at
jetty
P.O.L : Jetty Sei Dua (Batu Licin) 01.35 : Move to barge
P.O.D : PLTU Tg.Awar-awar (Tuban) 01.45 : Connect line, start shifting, BG.Apol 3011
Ttl.Cargo : 7.610,320 MT process cast off
02.40 : BG.Apol 3011 cast off, process tenderred at jetty
Note : Eta OB-PLTU Tg.Awar-awar, march 21th 2024 - 03.10 : BG.Sentana Lestari in position berthing at jetty
09.00 LT PLTU
03.20 : Clear shifting tied at barge
Best Regards 🙏
03.30 : F.W.E
P.O.L : Jetty Sei Dua (Batu Licin) P.O.L : Jetty Sei Dua (Batu Licin)
P.O.D : PLTU TG.Awar-Awar (Tuban) P.O.D : PLTU TG.Awar-Awar (Tuban)
Ttl.Cargo : 7.610,320 MT Ttl.Cargo : 7.610,320 MT
Noted : Stand by tied at safe jetty, waiting tenderred at Noted : Stand by tied at barge, waiting doc for start
jetty on 04.00 am discharge cargo
Friday report,March 22th 2024 Noted : Stand by Anchorage at Red buoy No. 2 area,
waiting document on board
17.00 : Start discharge cargo Noted : 06°47'421" E/112°01'128" E
Best Regards 🙏
Saturday report,March 23th 2024
Best Regards 🙏
P.O.D : -
Ttl.Cargo : NIL
Best Regards 🙏
TB.Martha Maju/BG.Sentana Lestari
====================================
Best Regards 🙏
Steaming hrs : 89 Hrs
Ttl steaming hrs : 12 Hrs 30 Minute
Averrage speed (24 hrs): 5.6 kt Dear
Speed Now : 5.1 Kt Update Report March 2024
TB.Martha Maju/BG.Sentana Lestari
-------------------------------------------------------------------------- ====================================
-
Wednesday Report,March 27th 2024
Next P.O.L : Tarahan (Lampung)
P.O.D : - Daily Report at 08.00 am
Ttl.Cargo : Nil
Status : Sailing
Note : Eta OB-Tarahan march 27th 2024 - 19.00 LT Pos : 6 nm From Tidung Island
Gps : 05°47'884"S/106⁰41'943"E
Best Regards 🙏
Rpm : 1000x2
Weather condt : Fine
Best Regards 🙏
Sea Condt : Smooth sea
Dist run : 440 nm
Best Regards 🙏
23.20 : Arrive at Anchorage area, process drop anchore
vessel
-------------------------------------------------------------------
Best Regards 🙏
Best Regards 🙏
Selamat pagi bass 🙏🏻
Update report ya Selamat pagi bass 🙏🏻
Dear Daily report ya
Update Report March 2024 Dear
TB.Martha Maju/BG.Sentana Lestari Update Report March 2024
==================================== TB.Martha Maju/BG.Sentana Lestari
====================================
Thursday report,March 28th 2024
Thursday report,March 28th 2024
08.00 : Stand by Anchorage, waiting info along side at
Jetty Bukit Asam (Tarahan) 18.00 : SPOB Blue ocean tenderred at vessel
18.20 : Start bunker F.O
19.50 : Finish bunker F.O = 30 KL
20.00 : SPOB. Blue ocean cast off from vessel
Best Regards 🙏
08.00 : Stand by anchorage, waiting info along side at Daily report ya bass
Jetty Bukit Asam (Tarahan) Dear
Update Report March 2024
TB.Martha Maju/BG.Sentana Lestari
====================================
Best Regards 🙏
Best Regards 🙏
Ttl.Cargo : NIL
Best Regards 🙏
====================================
20.50 : Start Bunker F.W Noted : Stand by anchore, waiting document cargo on
21.45 : Commence loading cargo board
22.15 : Finish Bunker F.W = 40 KL
Best Regards 🙏
22.30 : S.B.E, back to barge
22.50 : Clear tied at barge, stand by
-------------------------------------------------------------------
-------------------------------------------------------------------
P.O.L : Tarahan (Lampung)
P.O.L : Tarahan (Lampung) Tuesday Report,April 02nd 2024
P.O.D : PLTU Rembang
Ttl.Cargo : 7.539,924 MT Daily Report at 08.00 am
Noted : Eta PLTU Rembang, April 06th 2024 - 10.00 LT Status : Sailing
Pos : 2.5 nm From Tg.Tua
Best Regards 🙏
Gps : 05°55'864"S/105⁰45'147"E
Rpm : 1000x2
Siang bass 🙏🏻
Weather condt : Fine
Wind.direct : W - 10 kt
Update report ya bass Sea Condt : Smooth sea
Dist run : 395 nm
Dear Ttl.dist.run : 37.9 nm
Update Report April 2024 Dist to go : 357,1 nm
TB.Martha Maju/BG.Sentana Lestari Steaming hrs : 113 Hrs
==================================== Ttl steaming hrs : 17Hrs 30 Minute
Averrage speed (24 hrs): 2.2 kt
Tuesday Report,April 2024 Speed Now : 1.2 Kt
Best Regards 🙏
Sea Condt : Smooth sea
Dist run : 395 nm
Ttl.dist.run : 37.9 nm Dear
Dist to go : 357,1 nm Update Report April 2024
Steaming hrs : 113 Hrs TB.Martha Maju/BG.Sentana Lestari
Ttl steaming hrs : 17Hrs 30 Minute ====================================
Averrage speed (24 hrs): 2.2 kt
Speed Now : 1.2 Kt Wednesday Report,April 03rd 2024
Best Regards 🙏
Sea Condt : Smooth sea
Dist run : 395 nm
Ttl.dist.run : 100.3 nm
Dist to go : 294.7 nm
Dear Steaming hrs : 113 Hrs
Update Report April 2024 Ttl steaming hrs : 41 Hrs 30 Minute
TB.Martha Maju/BG.Sentana Lestari Averrage speed (24 hrs): 3.0 kt
==================================== Speed Now : 2.4 Kt
Ttl steaming hrs : 65 Hrs 30 Minute
--------------------------------------------------------------------------
TB.Martha Maju/BG.Sentana Lestari Note : Eta OB-PLTU Rembang April 06th 2024 - 20.00 LT
=================================
Best Regards 🙏
=================================
Status : Sailing
Gps : 05°43'701"S/107⁰50'200"E
Ttl.dist.run : 340 nm
Dist to go : 55 nm
TB.Martha Maju/BG.Sentana Lestari Note : Eta OB-PLTU Rembang April 06th 2024 - 20.00 LT
=================================
Best Regards 🙏
Daily Report at 08.00 am Mohon maaf atas keterlambatan report bass, dikarnakan
Update report ua
Ttl.Cargo : 7.539,924 MT Noted : Stand by Anchorage, waiting info along side at PLTU
Rembang
Noted : Stand by Anchorage, waiting info along side at PLTU Noted : Est berthing on Monday, april 08th 2024 - 07.00 am
Rembang
Best Regards 🙏 Daily report ya
Anchorage position :
06°37'790" S/111°27'349" E
Ttl.Cargo : 7.539,924 MT
Noted : Stand by Anchorage, waiting info along side at PLTU
Rembang
Noted : Stand by Anchorage, waiting info along side at PLTU
Noted : Est berthing on Today, april 08th 2024 - 20.00 pm
Rembang
Best Regards 🙏
Best Regards 🙏
Selamat pagi bass 🙏🏻
Selamat pagi bass 🙏🏻
Daily report ya P.O.D : PLTU Rembang
Ttl.Cargo : 7.539,924 MT
11.25 : Connect assist tug TB.Nusantara, process 12.30 : Vessel move to Jetty PRTR / Start discharge
berthing cargo
12.00 : Disconnect assist tug 13.10 : F.W.E / Process decrease in goods (Genset)
12.05 : Vessel tied at barge, drop 2nd towing 14.00 : Clear all in good / Stand by Ch10-16
Ttl.Cargo : 7.539,924 MT
TB.Martha Maju/BG.Sentana Lestari 09.00 : S.B.E, prepare cast off from PLTU Rembang
tug
Wednesday report,April 10th 2024 09.40 : Connect assist tug TB.Nusantara, process cast
off
03.00 : S.B.E, prepare cast off from Jetty PRTS 09.55 : BG.Sentana Lestari cast off from PLTU
03.30 : arrive at barge, process shifting 10.00 : Disconnect assist tug, move to clear area
03.55 : Clear shifting 10.15 : In clear area, process long towing line
04.00 : F.W.E 10.30 : Clear long towing line, full away to OB-
Tarahan
P.O.D : -
Noted : Stand by tied at barge, waiting completed discharge cargo Ttl.Cargo : Nihil
R p m : 1000x 2
الَّس َالُم َع َلْي ُك ْم َو َر ْح َم ُة ِهللا َو َبَر َك اُته
Wind.direct : W - 4.6 kt
𝔪𝔢𝔫𝔤𝔲𝔠𝔞𝔭𝔨𝔞𝔫
𝔖𝔢𝔩𝔞𝔪𝔞𝔱 ℌ𝔞𝔯𝔦 ℜ𝔞𝔶𝔞
Ttl.dist.run : 117.6 nm
Dist to go : 277.4 nm
َت َقَّبَل ُهّللا ِم َن ا َو ِم ْنُك ْم ِص يا منا َو ِص َي امكم ُك ُّل َع اٍم َو َأْنُتْم ِبَخ ْي ٍر
𝔖𝔢𝔪𝔬𝔤𝔞 𝔄𝔩𝔩𝔞𝔥 𝔰𝔴𝔱 𝔪𝔢𝔪𝔟𝔢𝔯𝔦𝔨𝔞𝔫 𝔨𝔦𝔱𝔞 𝔲𝔪𝔲𝔯 𝔭𝔞𝔫𝔧𝔞𝔫𝔤 Steaming hrs : 78 Hrs
𝔶𝔞𝔫𝔤 𝔟𝔞𝔯𝔬𝔨𝔞𝔥 & 𝔨𝔢𝔰𝔢𝔥𝔞𝔱𝔞𝔫 𝔰𝔢𝔥𝔦𝔫𝔤𝔤𝔞 𝔟𝔦𝔰𝔞 𝔟𝔢𝔯𝔱𝔢𝔪𝔲 Ttl steaming hrs : 21 Hrs 30 Minute
𝔨𝔢𝔪𝔟𝔞𝔩𝔦 𝔡𝔢𝔫𝔤𝔞𝔫 ℜ𝔞𝔪𝔞𝔡𝔥𝔞𝔫 𝔶𝔞𝔫𝔤 𝔞𝔨𝔞𝔫 𝔡𝔞𝔱𝔞𝔫𝔤. Averrage speed (24 hrs): 5.5 kt
D ear
Note : Eta OB-Tarahan,April 13th 2024 - 20.00 LT
Update Report April 2024
Best Regards 🙏
Wind.direct : W - 5.7 kt
Dist to go : 154.9 nm
Ttl steaming hrs : 45 Hrs 30 Minute Pos : 1.5 nm From Sebuku Island
--------------------------------------------------------- Wind.direct : W - 11 kt
Anchorage Coordinates :
Ttl.Cargo : Nihil
Ttl.Cargo : Nihil
Best Regards 🙏
Selamat pagi bass 🙏🏻 Noted : Stand by Anchorage At Tarahan, waiting info along side at
D ear
D ear
line
13.45 : Clear short towing line, continue move to Sunday report,April 14th 2024
anchorage area
14.30 : Arrive at Anchorage area, process drop anchore 06.00 : S.B.E, prepare along side
06.05 : Heave up anchore D ear
06.35 : Anchore up, process drop crew to barge Update Report April 2024
06.40 : Clear drop crew, move to jetty 1 Bukit asam TB.Martha Maju/BG.Sentana Lestari
process berthing
07.55 : BG.Sentana Lestari in position at Jetty 1 Bukit Sunday report,April 14th 2024
asam
08.00 : Disconnect assist tug/Vessel tied drop 2nd 12.35 : Complete loading cargo
08.10 : Initial draught survey/Start loading cargo 13.00 : S.B.E, prepare cast off
08.15 : Vessel move to jetty bunker F.W 13.05 : Connect 2nd towing
08.25 : Clear tied at jetty bunker 13.10 : Connect assist tug TB.Citra
08.30 : F.W.E 13.20 : BG.Sentana Lestari cast off from jetty 1 Bukit
Asam
Ttl.Cargo : On Loading
--------------------------------------------------------
Best Regards 🙏
TB.Martha Maju/BG.Sentana Lestari 21.10 : passing OB-Tarahan, process long towing line
TG.Awar-Awar
Ttl.Cargo : 7.524,642 MT
Best Regards 🙏
Best Regards 🙏
Status : Sailing
Wind.direct : W - 8.2 kt
Dist to go : 416 nm
Ttl steaming hrs : 10 Hrs 15 Minute Pos : 7.5 nm From Tidung Island
Ttl.dist.run : 149.2 nm
Note : Eta OB-PLTU TG.Awar-Awar, April 21th 2024 - 06.00 LT Speed Now : 3.2 Kt
=================================
Best Regards 🙏
Best Regards 🙏
Gps : 05°47'630"S/108⁰39'645"E
Dist to go : 143 nm
Wind.direct : E - 9.7 kt
Dist to go : 73.1 nm
Note : Eta OB-PLTU TG.Awar-Awar, April 22th 2024 - 05.00 LT Steaming hrs : 126 Hrs
bass
=================================
Best Regards 🙏
Monday report,April 22th 2024 08.00 : Stand by Anchorage, waiting info along side at
PLTU TG.Awar-awar
02.40 : Clear short towing line, move to Anchorage P.O.D : PLTU TG.Awar-Awar
03.55 : Clear drop anchore vessel Noted : Stand by Anchorage at Red Buoy No.2
D ear
Update Report April 2024 08.00 : Stand by Anchorage, waiting info along side at
=================================
Noted : Est Berthing on this morning at 10.00 am
Daily report ya
D ear
D ear
08.00 : Stand by Anchorage, waiting info along side at continue entrance to PLTU area
BG.William
P.O.L : Tarahan (Lampung) 10.35 : Disconnect assist tug / pilot off board
P.O.D : PLTU TG.Awar-Awar 10.40 : vessel tied at barge, drop 2nd towing
11.00 : F.W.E
=================================
14.10 : Clear tied Noted : Stand by tied at barge, est completed discharge around
================================= P.O.D : -
Ttl.Cargo : NiL
10.10 : Connect 2nd towing, steaming waiting info Update Report April 2024
12.30 : F.W.E
15.30 : Anchore up, process long towing line Sea Condt : Smooth sea
16.00 : Clear long towing line, full away to OB- Dist run : 258 nm
Dist to go : 175.5 nm
Steaming hrs : 53 Hrs Gps : 04°25'657"S/114⁰01'002"E
Dist to go : 56.7 nm
Ttl.Cargo : Nil
D ear
Update Report April 2024 Note : Eta OB-Taboneo April 27th 2024 - 20.00 LT
D ear
21.45 : Clear short towing line, continue full away 09.00 : Clear moored barge at Barito mooring area
off board
P.O.D : -
Ttl.Cargo : NiL
Noted : Eta Alak-alak mooring area, Sunday 28th 2024 - 08.00 P.O.D : -
am Ttl.Cargo : NiL
D ear D ear
================================= =================================
Monday report,April 29th 2024 15.20 : Arrival at Royong Mooring area, process drop
crew to barge
puting
Next P.OL:
. Jetty Hasnur (Sungai Puting)
Ttl.Cargo : NiL
Noted : W
aiting info master jetty for Berthing at Jetty Hasnur
Best Regards 🙏
Utc+8
Next P.OL:
. Jetty Hasnur (Sungai Puting)
Ttl.Cargo : NiL
Next P.OL:
. Jetty Hasnur (Sungai Puting) Noted : W
aiting info master jetty for Berthing at Jetty Hasnur
Ttl.Cargo : NiL
Best Regards 🙏
Noted : W
aiting info master jetty for Berthing at Jetty Hasnur D ear
Noted : Est berthing on April 30th 2024 Update Report May 2024
=================================
P.O.D : -
Noted : W
aiting info master jetty for Berthing at Jetty Hasnur 11.30 : Initial draught survey
ay 02nd 2024
Noted : Est berthing on M 11.40 : Clear drop 2nd towing, move astern barge
P.O.D : -
Ttl.Cargo : NiL
D ear
Update Report May 2024 Noted : Stand by tied at barge, waiting info start loading cargo
D ear
09.15 : Cast off from mooring Royong, full away to Thursday report,May 02nd 2024
Jetty Hasnur
11.20 : BG.Sentana Lestari in position at jetty J Hasnur 16.00 : Stop loading cargo / waiting resume
Friday report,May 03rd 2024 Friday report,May 03rd 2024
08.00 : Still waiting resume load 08.00 : Still waiting resume load
Ttl.Cargo : on loading
D ear
Thursday report,May 02nd 2024 Noted : Stand by tied at barge, waiting info completed loading
cargo
=================================
Saturday report,May 04th 2024 08.00 : Std by, waiting info resumed load
Utc+8
Noted : W
aiting cargo get ready to continue load est on tommorow TB.Martha Maju/BG.Sentana Lestari
afternoon =================================
D ear
Update Report May 2024 12.30 : S.B.E, prepare going to Bunker FW Station
12.35 : unmoored vessel, move to Bunker station
13.00 : F.W.E
P.O.D : -
Noted : W
aiting Resumed load TB.Martha Maju/BG.Sentana Lestari
D ear
Utc+8 P.O.D : -
Ttl.Cargo : Process 17.35 : Disconnect assist tug, Move to Mooring area
Noted : W
aiting Resumed load 18.45 : Clear moored barge
19.00 : F.W.E
Best Regards 🙏
Best Regards 🙏
Update report ya
17.10 : Connect assist tug TB.Bintang Ara 08.00 : Stand by moored at royong mooring area
Daily report ya
D ear
P.O.L : Jetty J Hasnur (Sungai Puting) Noted : Stand by moored barge, waiting Document cargo on board
Noted : Stand by moored barge, waiting Document cargo on board Daily report ya bass
D ear Utc+8
TB.Martha Maju/BG.Sentana Lestari 02.00 : S.B.E, shifting barge, the mooring line is
================================= broken
Ttl.Cargo : 7.253,444 MT
Best Regards 🙏
=================================
08.00 : Stand by tied at mooring Noted : Stand by moored barge, waiting Document cargo on board
Best Regards 🙏
D ear
Ttl.Cargo : 7.253,444 MT
=================================
Utc+8
Ttl.Cargo : 7.253,444 MT
P.O.D : Merak Mas Port Noted : Stand by moored barge, waiting Document cargo on board
Ttl.Cargo : 7.253,444 MT
Best Regards 🙏
D ear
D ear =================================
=================================
P.O.L : Jetty J Hasnur (Sungai Puting) P.O.L : Jetty J Hasnur (Sungai Puting)
Noted : Stand by moored barge, waiting Document cargo on board Noted : Stand by moored barge, waiting Document cargo on board
D ear D ear
================================= =================================
Utc+8 Utc+8
08.00 : Stand by tied at mooring royong sungai puting 16.00 : S.B.E, prepare going to bunker f.w station
16.30 : F.W.E
19.30 : F.W.E Noted : Stand by moored barge, waiting Document cargo on board
Update report ya
=================================
=================================
D ear
================================= Utc+8
Wednesday report,May 22th 2024 08.00 : Stand by tied at mooring royong sungai puting
Utc+8
Ttl.Cargo : 7.253,444 MT
P.O.D : Merak Mas Port Noted : Stand by moored barge, waiting Document cargo on board
Ttl.Cargo : 7.253,444 MT
Best Regards 🙏
Noted : Stand by moored barge, waiting Document cargo on board Selamat pagi bass 🙏🏻
Daily report ya
================================= D ear
=================================
Utc+8
18.00 : BG.Sentana Lestari cast off, Full away to OB- 19.00 : Passing Kp.Sei Salai
off board
---------------------------------------------------------
P.O.D : Merak Mas Port 01.25 : Passing Alak Alak mooring area
--------------------------------------------------------- Marunda
line
Status : Sailing
Pos : 54 nm From Bawean
Ttl.dist.run : 159.7 nm
Ttl.dist.run : 252.6 nm
arunda, 31th M
Note : Eta OB-M ay 2024 - 00.00 LT Speed Now : 3.7 Kt
D ear
arunda, 31th M
Note : Eta OB-M ay 2024 - 00.00 LT Speed Now : 3.6 Kt
D ear
UTC+8
D ear
Ttl.dist.run : 74.1 nm
Ttl.dist.run : 342.8 nm
Ttl.dist.run : 440.6 nm
arunda, 30th M
Note : Eta OB-M ay 2024 - 05.00 LT Speed Now : 3.8 Kt
D ear
Mohon maaf atas keterlambatan report bass baru dpt P.O.L : Jetty J Hasnur (Sungai Puting)
TB.Martha Maju/BG.Sentana Lestari Noted : Stand by tied at Buoy No. 2, waiting info along side at
line D ear
04.30 : Clear short towing line, continue entrance to Update Report May 2024
05.30 : F.W.E
23.20 : Pilot on board / Connect assist tug TB.Catalya, Friday report,May 31th 2024
23.55 : BG.Sentana Lestari in position at Jetty MCT 02.10 : Process open Ramdoor
00.30 : F.W.E
--------------------------------------------------------- ---------------------------------------------------------
P.O.L : Jetty J Hasnur (Sungai Puting) P.O.L : Jetty J Hasnur (Sungai Puting)
Noted : Stand by tied at barge, waiting start discharge cargo Noted : Stand by tied at barge, waiting info complete discharge
cargo
Best Regards 🙏
08.00 : Continue dicharge cargo 13.20 : Pilot on board & connect assist tug
--------------------------------------------------------- 13.35 : Pilot off board & disconnect assist tug, move to
buoy no. 2
P.O.L : Jetty J Hasnur (Sungai Puting) 14.20 : Arrive at buoy, process tied
P.O.D : Marunda Port 14.45 : Clear tied at buoy no.2,drop 2nd towing
Ttl.Cargo : 7.253,444 MT 14.55 : Clear drop 2nd towing, move to bunker Station
(KCN)
Noted : Stand by tied at barge, waiting info complete discharge 16.20 : Arrive at bunker station
Best Regards 🙏
Daily report ya
D ear
D ear
Update Report June 2024 Noted : Eta OB-Cirebon, June 4th 2024 - 14.30 LT
D ear
20.00 : Bunker cars coming, process connect bunker Update Report June 2024
move to OB-Marunda
Dist to go : 133.3 nm
Status : Sailing
Gps : 06°30'199"S/108⁰49'300"E
P.OD:
. IKN Wind.direct : S.E- 11 kt
Note : Eta OB-Cirebon,June 03rd 2024 - 12.00 LT Ttl .dist .run : 155.2 nm
Dist to go : 19.8 nm
Maaf atas keterlambatan report bass karna baru dpt Speed Now : 5.2 Kt
sinyal
---------------------------------------------------------
P.OD:
. IKN 12.15 : Clear short towing line, move to Anchorage
Note : Eta OB-Cirebon,June 03rd 2024 - 12.00 LT 12.50 : Clear drop anchore vessel
13.00 : F.W.E
Best Regards 🙏
Rencana kita muat Batu split bass bawa ke IKN Anchorage Coordinates :
Saya masih menunggu info dari agent bass, smntara belum ada Next P.O.L : Cirebon
================================= D ear
=================================
barge
again
16.00 : F.W.E
P.OD:
. -
Noted : Stand by anchorage, waiting info along side at Jetty 08.00 : Stand by Anchorage at Red Buoy area
Pelindo cirebon
from pilot
06°42'318" E /108°36'052" S 10.40 : Pilot on board & connect assist tug continue to
jetty
P.OD:
. - 11.40 : Pilot off board & disconnect assist tug
Noted : Stand by anchorage, waiting info along side at Jetty 12.20 : Clear tied at safe jetty,
---------------------------------------------------------
Best Regards 🙏
D ear P.OL:
. Cirebon
=================================
================================= =================================
Tuesday report, June 04th 2024 Tuesday report, June 04th 2024
--------------------------------------------------------- ---------------------------------------------------------
P.OL:
. Jetty pelindo (Cirebon) P.OL:
. Jetty pelindo (Cirebon)
P.OD:
. Jetty Intipratama (Sepinggan) P.OD:
. Jetty Intipratama (Sepinggan)
Noted : Stand by tied at safe jetty, waiting info completed Noted : Stand by tied at safe jetty, waiting info completed
D ear
=================================
D ear
TB.Legundi
P.OL:
. Jetty pelindo (Cirebon) 20.00 : BG.Sentana Lestari Cast off from Jetty Pelindo
P.OD:
. Jetty Intipratama (Sepinggan) Cirebon
Ttl .Cargo : On loading 20.10 : Pilot off board & disconnect assist tug, move to
OB-Cirebon
Noted : Est completed on today at 16.00 LT 21.20 : Passing OB-Cirebon, process pick up crew
Status : Sailing
Gps : 06°29'091"S/108⁰10'144"E
P.OL:
. Jetty pelindo (Cirebon) Weather condt : Fine
P.OD:
. Jetty Intipratama (Sepinggan) Wind.direct : S.E- 11 kt
Tq capt
D ear
D ear
Best Regards 🙏
UTC+7
D ear
Dist to go : 490.3 nm
Wind.direct : S.E- 13 kt
P.OL
. :Jetty Pelindo (Cirebon) Ttl .dist .run : 250 nm
P.OD:
. Jetty Intipratama (Sepinggan) Dist to go : 430 nm
Note : Eta OB-Sepinggan, June 16th 2024 - 00.00LT Speed Now : 3.1 Kt
D ear
D ear
Best Regards 🙏
UTC+8 D ear
Pos : 88 nmfromTGSelatan
. =================================
Gps : 04°52'006"S/113⁰19'671"E
Wind.direct : S.E- 15 kt
Dist to go : 368.8 nm
Dist to go : 302.2 nm
Wind.direct : E- 13 kt
P.OL
. :Jetty Pelindo (Cirebon) Sea Condt : Slight sea
P.OD:
. Jetty Intipratama (Sepinggan) Dist run : 680 nm
Note : Eta OB-Sepinggan, June 17th 2024 - 11.00 LT Ttl steaming hrs : 154 hours
P.OL
. :Jetty Pelindo (Cirebon)
D ear P.OD:
. Jetty Intipratama (Sepinggan)
=================================
P.OL
. :Jetty Pelindo (Cirebon)
D ear P.OD:
. Jetty Intipratama (Sepinggan)
=================================
Best Regards 🙏
UTC+8 D ear
Gps : 02°54'349"S/116⁰34'609"E
Wind.direct : S.E - 11 kt
Sea Condt : Calm Sea 08.00 : Arrival at OB-Sepinggan, process short towing
Ttl .dist .run : 572.9 nm 08.25 : Clear short towing line, continue full away to
P.OL:
. Jetty pelindo (Cirebon) 14.30 : Arrival at Jetty KKT area, process drop crew to
P.OD:
. Jetty Intipratama (Sepinggan) barge
Selamat pagi bass 🙏🏻 15.40 : Clear drop 2nd towing, move astern barge
=================================
P.OD:
. Jetty Intipratama (Sepinggan)
P.OL:
. Jetty pelindo (Cirebon) Cargo type : Base Coarse
P.OD:
. Jetty Intipratama (Sepinggan)
Best Regards 🙏
Noted : Est Start Discharge on Tuesday at June 17th 2024 Selamat pagi bass 🙏🏻
Best Regards 🙏
=================================
GMT+8
GMT+8
08.00 : Stand by tied at Jetty KKT, waiting info start discharge cargo
discharge cargo
P.OL:
. Jetty pelindo (Cirebon)
P.OD:
. Jetty Intipratama (Sepinggan)
P.OL:
. Jetty pelindo (Cirebon) Noted : Cargo discharge 70%
P.OD:
. Jetty Intipratama (Sepinggan) Noted : Est completed on today at 23.00 PM
D ear
P.OL:
. Jetty pelindo (Cirebon) 08.35 : Connect assist tug TB.Semar 18
P.OD:
. Jetty Intipratama (Sepinggan) 08.53 : BG.Sentana Lestari Cast off from Jetty KKT,
Noted : Cargo discharge 85% 09.30 : Clear pick up crew, full away to OB-
Best Regards 🙏
D ear ---------------------------------------------------------
================================= P.OD:
. -
21.00 : Process pararel cleaning Noted : Eta OB-Balikpapan, June 22th 2024 - 14.00 pm
Best Regards 🙏
Update report ya
=================================
Mahkota 2 Bridge
2 brodge
Next P.OL:
. Samarinda
P.OD:
. -
P.OD:
. -
08.00 : F.W.E
GMT+8 ---------------------------------------------------------
line P.OD:
. -
TB.Martha Maju/BG.Sentana Lestari 02.25 : Cast off, steaming waiting BG.Camar 86 cast
================================= off
04.00 : F.W.E
20.35 : Cast off vessel, move to barge Noted : Stand by M ahkota 2 bride area, waiting
oored barge at M
21.30 : F.W.E
Best Regards 🙏
=================================
12.25 : Cast off from mooring, full away to Mahkota 2 08.10 : Start bunker F. O
14.45 : Arrive at Mahkota 2 bridge, steaming waiting 11.00 : Clear Cleaning cargo
Queue for passing 12.00 : S.B.E, prepare cast off from mooring
Bridge
Next P.OL:
. Jetty Royog M
elak (Samarinda) 16.30 : Open Entrance Mahkota 2 bridge
P.OD:
. - 16.40 : full away & clear passing Mahkota 2 bridge
away to Jetty M
oris
Tuesday report, June 25th 2024
GMT+8
sailing to Jetty
11.30 : F.W.E
Next P.OL:
. Jetty Royog M
elak (Samarinda)
P.OD:
. -
Ttl.Cargo : NIHIL
Best Regards 🙏 Noted : Stand by tied at barge, waiting info start loading cargo
D ear
=================================
GMT+8
GMT+8
P.OL:
. Jetty M
oris (Samarinda) D ear
P.OD:
. Transhipment Update Report June 2024
Noted : COB2.400 M
T GMT+8
18.30 : F.W.E
D ear
=================================
cargo GMT+8
P.OL:
. Jetty M
oris (Samarinda) Thursday report, June 27th 2024
P.OD:
. Transhipment
Noted : COB4.600 M
T 14.00 : F.W.E
16.45 : Rainy pass away Update Report June 2024
18.30 : F.W.E
P.OL:
. Jetty M
oris (Samarinda) 00.00 : Stand by at jetty
P.OD:
. Transhipment
Noted : COB4.600 M
T 08.00 : Stand by, waiting info cast off
Best Regards 🙏
D ear P.OD:
. Transhipment
Ttl .Cargo : 7.592, 210 M
T Ttl .Cargo : 7.592, 210 M
T
Noted : Stand by tied at barge, waiting info cast off Noted : Eta Harapan Baru mooring area, June 30th 2024 - 07.00
Am
Best Regards 🙏
=================================
GMT+8
GMT+8
15.10 : Steaming waiting the next info cast off 03.00 : Clear moored at Berhala mooring area / F.W.E
P.OD:
. Transhipment
P.OL:
. Jetty M
oris (Samarinda) Ttl .Cargo : 7.592, 210 M
T
P.OD:
. Transhipment Cargo type : Coal in bulk
Best Regards 🙏
Noted : W
aiting Thick fog disappear D ear
D ear =================================
=================================
GMT+8
08.00 : S.B.E, prepare cast of from mooring 13.55 : Vessel tied at barge
08.15 : Cast off, continue full away to Harapan Baru 14.00 : F.W.E
mooring area
P.OL:
. Jetty M
oris (Samarinda)
P.OL:
. Jetty M
oris (Samarinda) P.OD:
. Transhipment
P.OD:
. Transhipment Ttl .Cargo : 7.592, 210 M
T
Noted : Eta Harapan Baru mooring area, June 30th 2024 - 14.00 Big M
all City
pm
Best Regards 🙏
D ear
board
P.OL:
. Jetty M
oris (Samarinda)
P.OL:
. Jetty M
oris (Samarinda) Noted : Stand by Tied at harapan Baru mooring area, waiting
P.OD:
. Transhipment Document cargo
D ear
board
P.OL:
. Jetty M
oris (Samarinda) --------------------------------------------------------------------
P.OD:
. Transhipment ----
P.OD:
. Transhipment
Noted : Stand by Tied at harapan Baru mooring area, waiting Ttl .Cargo : 7.592, 210 M
T
Best Regards 🙏 Noted : Stand by Tied at harapan Baru mooring area, waiting
Document cargo
D ear
=================================== D ear
===================================
GMT+8
board
board
--------------------------------------------------------------------
----
P.OL:
. Jetty M
oris (Samarinda)
P.OD:
. Transhipment --------------------------------------------------------------------
P.OL:
. Jetty M
oris (Samarinda)
Best Regards 🙏
selamat pagi bass 🙏🏻 Noted : Stand by Tied at harapan Baru mooring area, waiting
D ear
===================================
GMT+8
board
--------------------------------------------------------------------
----
P.OL:
. Jetty M
oris (Samarinda)
P.OD:
. Transhipment
Document cargo
Best Regards 🙏