GOVERNMENT OF INDIA
DEPARTMENT OF ATOMIC ENERGY
HEAVY WATER PLANT
TUTICORIN
FOR
ON
AT
1
NIT NO : HWPT/INST/DCS-TIS/2024R
PART – II ( PRICE / COMMERCIAL BID DOCUMENT )
COMMERCIAL CONDITIONS
2
NIT NO : HWPT/INST/DCS-TIS/2024R
10.0 Income tax, Surcharge on IT, EC on IT & SC and Sales Tax shall be deducted from running bills and
final bills as per the prevailing rates. The service tax shall be reimbursed on production of proof that the
same has been paid by the party. TDS will be effected as per rules.
11.0 Defect Liability Period/Performance Guarantee period:
Responsibility of entire work i.e. procurement, fabrication and erection of all the items under schedule of
quantity lies on the contractor. The contractor shall stand Guarantee for workmanship and material
supplied for a minimum period of 12 months from the date of mechanical completion & acceptance of
the same by the department.
12.0 Liquidated Damages:
If contractor fails to maintain the required progress on or before the time schedule or extended date of
completion , he shall without prejudice to any other right or remedy available under the law to the
government on account of such breach , pay as agreed compensation the amount calculated at the rates
stipulated below as the authority specified in schedule “F”. The compensation for the delay shall be
1.5% of the related items per month of delay to be computed on per day basis, beyond that has been
indicated in the tender subject to a maximum of 10% of cost of the tendered value of the work .
13.0 Compliance of Terms & Conditions:
The bidder shall comply with all the technical as well as General Terms & Conditions of this Work
without any reservation, except those which have been specified/agreed to and mentioned herein.
14.0 Performance Gurantee
The contractor shall deposit an amount equal to 5 % of the tendered and accepted value of the work as
performance guarantee under performance security bank guarantee bond within a period of ranging 4 to
7 days of issue of Letter of Acceptance. For further details General Conditions of Contract shall be
referred.
15.0 Security Deposit
The security deposit of the work is 2.5% of the tendered and accepted value of the work. The same
amount will be recovered from the running bill (stage payment) at the rate of 5% of each bill amount till
complete deduction of security deposit is made. The security deposit will be returned after guarantee
period of 06 months after mechanical completion.
16.0 Payment:
Payment shall be released pro-rata basis but limited to maximum of two bills (One Running Account Bill
& One Final Bill). Further, payment against items with supply & installation scope shall be release after
supply, installation, testing and acceptance by department.