a) Area description:
HILL TERRAIN
b) Nalla: Nala
e) Design Proposal:
Span arrangement 1 X 30.0
Outer carriageway width 12.0 m
Type of structure PSC I GIRDER
f) Geotech:
NOT AVAILABLE
g) Hydrology:
HFL 603.85 m
Design Discharge 219.19 cumec
Project: Hydraulic Calculation of High Level Bridge AT (BRIDGE 04)
Design discharge
Percentage of Reduction = 0%
(Due to Attenuation or Flood routng)
Design Discharge
BED SLOPE
Bed level
Flood Estimation
I Emperical formula
` Rational formula
Q = 0.028*A*P*Ic*f
Catchment Area = 906 hectares
L = Distance from critical point to bridge in Km. = 5.75 Km.
H= Fall in level from the critical point to the bridge = 20 m
Time of concentration, tc= 2.25 hrs. (eq. 4.9 of SP 13)
Co-efficient of runoff, P = 0.60 (Table. 4.1 of SP 13)
Spread fraction, f = 1.00 (Fig. 4.2 of SP 13)
Max. Daily Rainfall, F = 30.00 cm/day As Per Isopluvial Maps
S.No. H.F.L Length (m) Bed Level D.O.F A.D.O.F Distance Area W.P
1 605.581 15.0 605.574 0.007 0.000 0.000 0.000 0.000
2 605.581 12.0 603.364 2.217 1.112 3.000 3.335 3.726
3 605.581 9.0 603.140 2.441 2.329 3.000 6.986 3.008
4 605.581 6.0 602.871 2.709 2.575 3.000 7.725 3.012
5 605.581 3.0 602.751 2.830 2.769 3.000 8.308 3.002
6 605.581 0.0 602.619 2.962 2.896 3.000 8.687 3.003
7 605.581 3.0 602.744 2.837 2.899 3.000 8.697 3.003
8 605.581 6.0 602.834 2.747 2.792 3.000 8.375 3.001
9 605.581 9.0 603.404 2.176 2.461 3.000 7.384 3.054
10 605.581 12.0 603.971 1.609 1.893 3.000 5.678 3.053
11 605.581 15.0 605.492 0.088 0.849 3.000 2.547 3.364
Total (Cross sectional Area, A) = 67.721 sq. m
Wetted Perimeter, R in m = 31.226
Abbreviations
Hydraulic Radius, R=A/P= 2.169 m H.F.L. - High Flood Level
Velocity, V = 1
R
2 1
Ref:-(IRC SP-13.2014 cl.no.-(5.4))
3
V 2
n
606.000 HFL
605.500
605.000
604.500
Bed Level
604.000
603.500
603.000
602.500
602.000
601.500
601.000
15.0 12.0 9.0 6.0 3.0 0.0 3.0 6.0 9.0 12.0 15.0
Series1 605.581 605.581 605.581 605.581 605.581 605.581 605.581 605.581 605.581 605.581 605.581
Series2 605.574 603.364 603.140 602.871 602.751 602.619 602.744 602.834 603.404 603.971 605.492
Chainage in m
Project: Hydraulic Calculation of High Level Bridge AT (BRIDGE 04)
S.No. H.F.L Length (m) Bed Level D.O.F A.D.O.F Distance Area W.P
1 603.848 15.0 603.473 0.375 0.375 0.000 0.000 0.000
2 603.848 12.0 602.619 1.229 0.802 3.000 2.406 3.119
3 603.848 9.0 601.619 2.229 1.729 3.000 5.187 3.162
4 603.848 6.0 601.550 2.298 2.263 3.000 6.790 3.001
5 603.848 3.0 600.619 3.229 2.763 3.000 8.290 3.141
6 603.848 0.0 600.098 3.750 3.490 3.000 10.469 3.045
7 603.848 3.0 600.619 3.229 3.490 3.000 10.469 3.045
8 603.848 6.0 601.619 2.229 2.729 3.000 8.187 3.162
9 603.848 9.0 601.843 2.005 2.117 3.000 6.351 3.008
10 603.848 12.0 602.083 1.765 1.885 3.000 5.655 3.010
11 603.848 15.0 602.937 0.911 1.338 3.000 4.014 3.119
HFL
605.0
604.0
603.0
Bed Level
602.0
601.0
600.0
599.0
598.0
15.0 12.0 9.0 6.0 3.0 0.0 3.0 6.0 9.0 12.0 15.0
Series1 603.848 603.848 603.848 603.848 603.848 603.848 603.848 603.848 603.848 603.848 603.848
Series2 603.473 602.619 601.619 601.550 600.619 600.098 600.619 601.619 601.843 602.083 602.937
Chainage in m
Project: Hydraulic Calculation of High Level Bridge AT (BRIDGE 04)
S.No. H.F.L Length (m) Bed Level D.O.F A.D.O.F Distance Area W.P
1 602.124 15.0 605.062 0.000 0.000 0.000 0.00 0.000
2 602.124 12.0 602.847 0.000 0.000 0.000 0.00 0.000
3 602.124 9.0 600.835 1.289 0.645 3.000 1.93 3.265
4 602.124 6.0 599.090 3.034 2.162 3.000 6.49 3.471
5 602.124 3.0 598.078 4.046 3.540 3.000 10.62 3.166
6 602.124 0.0 597.557 4.567 4.307 3.000 12.92 3.045
7 602.124 3.0 597.808 4.316 4.442 3.000 13.33 3.010
8 602.124 6.0 599.682 2.442 3.379 3.000 10.14 3.537
9 602.124 9.0 600.302 1.822 2.132 3.000 6.40 3.063
10 602.124 12.0 601.302 0.822 1.322 3.000 3.97 3.162
11 602.124 15.0 602.922 0.000 0.411 3.000 1.23 3.111
Total (Cross sectional Area, A) = 67.025 sq. m
Wetted Perimeter, R in m = 28.831
Abbreviations
Hydraulic Radius, R=A/P= 2.325 m H.F.L. - High Flood Level
Velocity, V = 1 2 1
Ref:-(IRC SP-13.2014 cl.no.-(5.4))
R 3
V 2
n
606.0
603.0
HFL
Bed Level
600.0
597.0
594.0
591.0
15.0 12.0 9.0 6.0 3.0 0.0 3.0 6.0 9.0 12.0 15.0
Series1 602.124 602.124 602.124 602.124 602.124 602.124 602.124 602.124 602.124 602.124 602.124
Series2 605.062 602.847 600.835 599.090 598.078 597.557 597.808 599.682 600.302 601.302 602.922
Chainage in m
Project: Hydraulic Calculation of High Level Bridge AT (BRIDGE 04)
1 Afflux Calculations
Au
2
V 2
Afflux = 0.015 1
17.89 Ae
Afflux = ((4.4308^2)/17.89)+0.015)x(((67.818/63.41)^2)-1)
1 Scour Depth:
3
Design discharge 219.2 m /s
3
Design discharge for foundation 219.2 m /s
Clear ventway 30.00 m
HFL 603.848 m
LBL 600.098 m
Max. depth of scour for Abutment = 1.27 x dsm = 5.685 m IRC 78 - 2014
Below HFL of IRC 78 - 2014