NABARAD RIDF 2024-25 Bridge details

span
Tentative Condition of the Remarks
Length of length
Sl. No of estimated Existing existing structure UTM petition/ Flood
Block Name of the Work the bridge (centre Priority
No spans Amount structure Good/ damaged/ damaged/ Any
(m) to
(Lakhs) To be repaired Representation
centre)

Construction of High Level The level of Proposed Bridge is


Bridge across Koraiyar river 4 m above ODR Road. The
along the Malayankulam - Minor Bridge Longitudinal gradient cannot be
padapillayar koil road at Ch. with Bed maintained with respect to the
0 m at Cheranmahadevi Level ODR. This Proposal may be
162 Cheranmahadevi Block in Tirunelveli District 111.6 6 17.1 929.57 Causeway Good 4 omitted
Flood Damage. The
Construction of High Level Bridge Connects Pottal
Bridge across Uppathu and Kamarajarpuram
Oodai between Pottal and habitations.
Kamarajarpuram habitations Kamarajarpuram
at Cheranmahadevi Block in Vented habitation is disconnected
163 Cheranmahadevi Tirunelveli District 50.5 5 8.6 469.12 Causeway Damaged 3 during flood
Construction of High Level
Bridge across
Oorkavalankulam Surplus
channel along
Srinivasapuram - Mela
alangulam Road at Ch. 700
m at Kalakkad Block in Bed level
164 Kalakkad Tirunelveli District 40.4 4 8.6 374.21 Causeway Damaged 2
Construction of High Level
Bridge across Chittar river
along the
Venkatachalapuram to
Pirancheri Road at Ch. 672
m at Pirancheri Panchayat
at Manur Block in Tirunelveli Piped UTM Petition & Flood
165 Manur District 129.6 6 20.1 1100.7 Causeway Damaged 1 Damaged
Construction of High Level
Bridge across Chittar river
along the Melapillayarkulam
Agragaram Road to B.G
Road at Ch. 1022 m at
Pillayarkulam Panchayat at High Voltage Transmission Line
Manur Block in Tirunelveli crossing. This Proposal may be
166 Manur District 129.6 6 20.1 1143.35 New proposal 5 omitted