rate comparision with DSR 2023
rate comparision with DSR 2023
Construction of Type-III Quarter (No. of Unit -8) and Boundary wall at Ghazipur Ghat between Ghazipur City – Yusufpur section in connection
with Mau-Tarighat New B.G. Line Project.
SN Item Description Qty Unit Rate in Rs. Total (in Rs.) Rate in Rs. Total (in Rs.)
Rate as per budgetary
A Building Rate as per DAR
quotations
Building Construction (G+1) including
plaster of celling, inside and outside wall,
1 and bottom slab casting. Note: i) Rate is 819.00 sqm 3302.00 27,04,338.00 4,280.02 35,05,335.54
inclusive of supply and fixing of
shuttering material.
B Boundary Wall
1 Construction of boundary
2 Brick Work with 1:6 or 1:4 mortar 66.00 Cum 1400.00 92,400.00 2,117.39 1,39,747.65
4 Supply and fixing of shuttering 186 Sqm 450.00 83,700.00 639.80 1,19,003.32
Saving 9,45,937.04
Note: