Professional Documents
Culture Documents
Saf-Vdr (Abaja Version 1)
Saf-Vdr (Abaja Version 1)
: 6511124684
GENERAL DOCUMENTS
JSA#125 SURVEY JOB SURVEY ANALYSIS ABAJA/SAFANIYAH-
0 17-Sep-2023
T00001
CV & CERTIFICATES - SHAKIR AYAZ ( HSEO ) ABAJA/SAFANIYAH-
0 17-Sep-2023
T00001
ABJ-HSE-HIP-001 HIP HPOF CABLE REPLACEMENT PROJECT ABAJA/SAFANIYAH-
18-Oct-2023
T00002
ABJ-HSE-HIP-001 HIP HPOF CABLE REPLACEMENT PROJECT ABAJA/SAFANIYAH-
FOR REVIEW & APPROVAL 0 29-Oct-2023
T00003
ABJ-SAF-JSA - 001 JSA - HPOF CABLE REPLACEMENT ABAJA/SAFANIYAH-
A 30-Oct-2023
T00004
ABJ-HSE-HIP-001 HIP HPOF CABLE REPLACEMENT PROJECT ABAJA/SAFANIYAH-
FOR REVIEW & APPROVAL A 5-Nov-2023
T00005
METHOD STATEMENT FOR GEOTECHNICAL INVESTIGATION ABAJA/SAFANIYAH-
FOR REVIEW & APPROVAL 12-Nov-2023
T00006
METHOD STATEMENT FOR GROUND PENETRATING RADAR ABAJA/SAFANIYAH-
FOR REVIEW & APPROVAL 12-Nov-2023
T00007
FOR APPROVAL ACC-PQP-QSP-001 PROJECT QUALITY PLAN A 26-Dec-2023 ABAJA-SAF- T-008
FOR REVIEW & APPROVAL ACC-CV-QCI-002 CV QCI CIVIL 25-Jan-2024 ABAJA-SAF- T-010
APPROVED WITH COMMENTS ACC-CV-QCI-003 CV QCI ELECTRICAL 25-Jan-2024 ABAJA-SAF- T-011 5-Feb-2024 ABAJA-SAF- T-011
APPROVED WITH COMMENTS ACC-CV-QCI-003 CV QCI ELECTRICAL 30-Jan-2024 ABAJA-SAF- T-012 5-Feb-2024 ABAJA-SAF- T-011
FOR REVIEW & APPROVAL ACC-TDS-LINK BOXES-001 VENDOR AL SHAHRANI GROUP & PTTEF TDS FOR LINK BOXES 7-Feb-2024 ABAJA-SAF- T-014
FOR REVIEW & APPROVAL ACC-TDS-FOC-001 VENDOR MEFC FOC 7-Feb-2024 ABAJA-SAF- T-015
FOR REVIEW & APPROVAL ACC-KEY ROUTE PLAN-FOC-001 CABLE - KEY ROUTE PLAN 10-Feb-2024 ABAJA-SAF- T-016
APPROVED CV - QCI - CIVIL -004 CV - CREDENTIALS QCI CIVIL 7-Apr-2024 ABAJA-SAF- T-020 26-Apr-2024
FOR REVIEW & APPROVAL CV - QCI - ELECTRICAL -005 CV - CREDENTIALS QCI ELECTRICAL 7-Apr-2024 ABAJA-SAF- T-021
FOR RE EVALUATION CV-QCI-ELECTRICAL CV-CREDENTIALS- QCI - ELECTRICAL RE EVALUATION 7-May-2024 ABAJA-SAF- T-022
FOR REVIEW & APPROVAL Initial Survey for Batch Plant-01 Initial Survey For Proposed Batch Plant 3-Jun-2024 ABAJA-SAF- T-024
APPROVED CONCRETE MIX DESIGN-01 CONCRETE MIX DESIGN 10-Jun-2024 ABAJA-SAF- T-026 01 4-Jul-2024 ABAJA-SAF- T-026 6-Jul-2024 Approved with comments
FOR REVIEW & APPROVAL Pre Qualification of Al Faisal Stee-01 Pre QUALIFICATION DOCUMENTS of AL FAISAL STEEL 12-Jun-2024 ABAJA-SAF- T-027
Pre Qualification Doc for Earthing & M/S SADAF ELECTRIC INDUSTRIES CO. - Pre Qualification Document for Earthing & Cadweld
FOR REVIEW & APPROVAL
Cadweld Accessories 01 Accessories 9-Jul-2024 ABAJA-SAF- T-031
Page 1 of 9
CONTRACT No.: 6511124684
Page 2 of 9
SN STAGE DOCUMENT # DOCUMENT TITLE
1 601 ACE-SA/OHPL 003 DESIGN PACKAGE - OHTL
2 601 ACE JSA - 126 JOB SAFETY ANALYSIS
3 601 ACE-SA/OHPL 001 SUB VENDOR LIST
601 ACE-OHPL-MS-001 METHOD STATEMENT FOR OHPL WORKS
4 601 MSAC028-PO-727-MTO-001 13.8KV OHPL MATERIAL TAKE OFF
SUSPENSION, HORIZONTAL & VERTICAL
5 601 MSAC028-PO-727-EDT-003
INSULATOR
ONAL STEEL
APPROVED
D POWER LINES
N & ACSR/AW
REJECTED
onducator
ONAL STEEL
APPROVED FOR APROVAL
D POWER LINES
OVERHEAD
APPROVED FOR APROVAL
NES
SNCL-SAK-P-727-Abaja-005
SNCL-SAK-P-727-Abaja-005
SNCL-SAK-P-727-Abaja-005
MSAC028-P727-K-SA-T-1314
MSAC028-P727-K-SA-T-1314
MSAC028-P727-K-SA-T-1314
NMR Code (NMR 601 / 601 / 603) NMR code shall be filled against each document, as per the P.O.
Saipem Document No. Saipem Document Number as per the Document Control and Correspondence Procedure 35-Z-Z-00-CO-P-PC-00-0001.
Aramco Approval Required Yes - If Aramco approval required. No - If Aramco approval not required
Functional Unit 1 letter facility code ( B ) as per the Saipem Document Control and Correspondence Procedure
Facility 1 letter facility code ( C ) as per the Saipem Document Control and Correspondence Procedure
Area 2 number area code ( DD ) as per the Saipem Document Control and Correspondence Procedure
Originator Code 2 letter Originator code as assigned by Saipem. All vendor document shall use the same Originator code.
Discipline 2 letter discipline code ( GG ) as per the Saipem Document Control and Correspondence Procedure
Document Type 1 letter document type code ( F ) as per the Saipem Document Control and Correspondence Procedure
VDR Update Info After VDR approval, all subsequent updates must be marked in the VDR column "VDR Update Info" as below :
N - New (For all new documents added to the VDR since last update)
M - Modified (Any modification in the title. Document Number cannot be modified of the documents already issued)
C - Cancelled (To cancel the document, already issued. Document shall remain in VDR in subsequent issues and same number cannot
be used)
D - Deleted (To delete any document, not yet issued, such documents shall not appear in subsequen VDR issues
S - Superseded (Issue as superseded and mention the document number by which it is superseded).
Planned Date of 1st Submission Date of first submission in DD-MMM-YYYY format. e.g. 01-Jan-2020 (VDR columns are already formatted).
Planned Date of 2nd Submission Date of second submission DD-MMM-YYYY format. e.g. 01-Jan-2020 (VDR columns are already formatted).
Planned Date of 3rd Submission Date of third submission in DD-MMM-YYYY format. e.g. 01-Jan-2020 (VDR columns are already formatted).
Planned Date of 4th Submission Date of fourth submission DD-MMM-YYYY format. e.g. 01-Jan-2020 (VDR columns are already formatted).
REVIEW CODES
Review Code
APP - Approved
REJ - Rejected
Certified as Final
CODES
Action Expected from Contractor
Change the status, change the revision code and submit a new revision.
Change the status, incorporate COMPANY comments and update the document, change
the revision code and submit a new revision.
DO NOT change the status, incorporate COMPANY comments and update the document,
change the revision code and submit the document in the same status.
Submit the document in conformity with COMPANY requirements, change the revision
code and re submit in the same status.