BERTH COMPLETION

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

NOTE:

June 29, 2024

BLOCK 7 DRAWING STATUS


A: APPROVED-CONSTRUCTION MAY PROCEED
B: APPROVED-SUBMIT FINAL DRAWINGS-CONSTRUCTION
MAY PROCEED
C: APPROVED EXCEPT AS NOTED
-MAKE CHANGES AND SUBMITE FINAL DRAWINGS
-CONSTRUCTION MAY PROCEED AS APPROVED
D: NOT APPROVED-CORRECT AND RESUBMIT
E: REVIEW NOT REQUIRED-CONSTRUCTION MAY PROCEED

June 29, 2024 SUBMISSION FOR APPROVAL


DATE DESCRIPTION ENGINEER STATUS
REVISIONS

REFERENCE
DRAWINGS

DWG NO. TITLE

Approved By:

Senior Port Engineer

KHANG DUC INVESTMENT AND CONSTRUCTION JSC

SAV8-06.05 The Sun Avenue, 28 Mai Chi Tho


St, An Phu Ward, Thu Duc City, HCMC
Tel : +84 28 2200 3377
Web : http://khangducconst.com

Issued By:

Project Manager
Signature Date

Checked By :

Designd By :

Drawn By :
DRAWING TITLE:

DRAWING NO.:PR-1 REV.00

RELATED ORINGINAL DRAWING No.

BERTH COMPLETION (BLOCK 7) A 1

You might also like