Revised GAD for Launching Appron-10.1m

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PROJECT :

EASTERN DEDICATED FREIGHT


CORRIDOR (PACKAGE - 201)
TITLE :
GENERAL ARRANGEMENT DRAWING
IMPORTANT BRIDGE AT KM 250/557.335 (NO. 427)
SPAN 1x60.830+5x49.240+1x60.830 (SHEET 01 OF 01)
DRAWING NO. SIZE REV SCALE
P 2 IMB 1 0 0 0 A1 C AS SHOWN
REVIEWS
REV DATE REMARKS
A 26.05.2016 FOR APPROVAL
B 18.08.2016 REVISED AS PER IR COMMENTS
C 01.12.2016 INCORPORATED AS PER PMC COMMENTS
D 05.06.2018 REVISED AS MARKED
DRAWING STAGE
FOR APPROVAL

GOOD FOR CONSTRUCTION

FEASIBILITY HAS BEEN CHECKED AT SITE AND FOUND CORRECT

ADEN/MZP SSE/W/MZP
THE STRUCTURAL DRAWINGS AND DESIGN WILL
BE SUBMITTED SEPARATELY FOR APPROVAL

NCR HQ

GGM/CIVIL/
DFCCIL CBE/NCR Dy. CE/BR/NCR XEN/BD/NCR

ALLAHABAD DIVISION

S.K.PANKAJ SUNIL KR. GUPTA ANSHOO PANDEY V.K.SINGH


DRM/ALD Sr. DEN/Co/ALD Sr. DOM/ALD Sr. DEE/TR-D/ALD
TOEL
TOEL

TOEL
TOEL SACHIN VERMA SANJEEV DIXIT NEERAJ YADAV
TOEL Sr. DEN-I/ALD Sr. DSTE/ALD Sr. DSTE/Co/ALD

EL
TO

TO
EL

EMPLOYER :

BH

BH
BH
BH

BH
BH
BH
DEDICATED FREIGHT CORRIDOR
BH

BH
BH BH CORPORATION OF INDIA LTD.

IR-TOE
TOEL TOEL
L TOEL TOEL

IR-TOE
TOEL TOE
A. HAQUE S.K.SINGH DINESH VERMA AKHILESH KR.
CPM/ALD(E) Dy.CPM/Engg/ALD(E)Dy.CPM/S&T/ALD(E)Dy.CPM/Elect/ALD(E)

APM/Engg/ALD(E)

STUP Consultants Pvt. Ltd.

DATE NAME SIGN.


DRAWN
CHKD.
APPD.
SUBMITTED BY GIL-SIL JV
DATE NAME SIGN.
CHKD. SUKANTA MONDAL
APPD. RAMPAL SAINI
PMC:
SYSTRA - Mott MacDonald JV
DATE NAME SIGN.
CHKD.
NOC
GIL - SIL JV

You might also like