Professional Documents
Culture Documents
Agreement
Agreement
Agreement
Where as the client is desirous that the contractor execute the work of “Proposed
construction of residential building at ,no 171, F BLOCK Thanikachalam Nagar
(west), 3rd Main Road, Ponniammanmedu, Chennai – 600 110. (Here in after called
the works) and the client has accepted the offer by the construction in their quotation
dated 03.07.2022 for the execution and completion of such work therein at a cost of
Rs.21,50,000/- (Rupees Twenty One Lakhs and Fifty Thousand only).
In this Agreement, words and expression shall have the same meaning as are
respectively assigned to them in the conditions of contract herein after referred to
and they shall be deemed to form and be read and construct as part of Agreement.
The contractor shall construct and install the work in accordance with the
specification and drawing at the quote accepted as per the schedule attached with
agreement.
The contractor shall be responsible for the safety of all material and other all
activities on the site.
The contractor should use only good quality of materials
The client shall check the contractor’s work and notify the contractor responsibilities.
The client may instruct the contractor to search for a defect and to uncover and test
any work that the client considers may have a defect.
In construction,
1. In Ground floor, utility area will to be provided and the staircase has to be
reworked according to the plan.
2. In First floor, all the places mentioned in the plan will be provided.
3. In Second floor, all the places mentioned in the plan will be provided.
4. MS ladder will be provided in the second-floor open terrace to access the
upper terrace.
5. Grills(square tube) will be provided in the utility areas.
6. The Sub structure and Super structure works will be followed according to the
structural design provided by contractor.
7. The all above things will come under contractor scope and the building key
will be handed over within Five months from the date of signing the
Agreement.
8. Guarantee for the building construction – 1 year.
The contractor is not entitled any extra rate other than the rate provided in the
agreement.
Payments:- Payments will be made as per the stage rate other than the rate
provided in the agreement for the work executed.
The following documents shall be deemed to form and read and constructed as part
of this agreement:-
Schedule – I
1. Foundation
i). Earth Work excavation min size 4’0” x 4’0” x 6’0”
ii) Sand Filling in foundation 4’0” x 4’0” x3”
iii) P.C.C. 1:5:10 for foundation 4’0” x 4’0” x 4”
iv) R.C.C 1:2:4 for footing 4’0” x 4’0” x 15 tk
v) R.C.C. 1:2:4 for column 9”x9” grade beam
vi) Back Filling excavated sand + filling sand
2. Basement
i) P.C.C. with 1:4:8 for Grade beam bottom
ii) R.C.C 1:2:4 for Grade beam concrete
iii) Brick work with cm 1:5 of 9” thick wall
iv) Filling by ordinary filling sand
v) Height of basement from NGL of site
vi) Chamber burnt bricks will be used
3. Super Structure
i) Brick Work with Cm 1:5 of 9” thick for outer wall
ii) Brick Work with Cm 1:5 of 4 ½” thick for inner wall
4. Lintel:
Windows
Inner Plastering cm 1:5 for outer walls with 12mm thick and
cement slurry finish.
Outer Plastering cm 1:5 for outer walls with 12mm thick and
sponge finish
12. Electrification
i). Light, Fan, 6A Plug points in all rooms & necessary 15A plug
points
iii) Litaski modular switches and ISI wire cable will be provided
14. Parapet Wall : Brick work of 3’ – 0” height using cm 1:5 around the building
15. Weathering Course
i). Cooling tiles laid over the water proofing course.
17. Dadoing
i) Wall tiles will laid for 7’0” height in all toilets (Rs.45/- Sft)
18.Wardrobe
i) Inner Walls – One coat primer, Tractor emulsion paint (Asian) with Two
coats of wall putty finish
iii) Outer Walls with one coat primer, two coats Asian ace emulsion paint finish
iv)Doors with two coats of enamel paint over one coat primer
Note:
Material Specification:
Plumbing – Finolex
Timber – Ghana Teak 2nd Quality
In case river sand price is reduced to the cost of m sand at the time of plastering
outer side plastering will be made using river sand.
Schedule – II
TOTAL 2207100
TOTAL PRICE AFTER DISOUNT 21,50,000
Schedule – III
Payment Schedule
Witnesses
1)
2)