Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

TUV Rheinland Bangladesh Pvt. Ltd.

Document Number-00
Document Checklist (BSCI Audit) Version No-Demo (0.1)
Issue Date-DD/MM/YY

SL. Documents to be Checked SL. Documents to be Checked


No. No.
1 Original Certificate/ License/ Permission Sub-Contractor/ Sub supplier Policy & Procedure
and Monitoring Record
Incorporation Certificate Capacity Planning, Contingency Plan
Factory License Company’s Mission & Vision, Long Term Goal
Trade License Trade Union/ PC/ WWA/ WWC Formation Record,
Meeting Minutes
Fire License Grievance Procedure, Grievance Record, Survey
Record on Grievance Procedure
EPZ Permission (Only for EPZ Area) 6 Documents – PA5 to PA6
Boiler License Attendance Summary, Wage Sheet, Time Card,
Generator Waiver/ License Pay Slip
Environment Clearance Certificate Fair Remuneration or Living Wage Template
Acid Using License (Only for Textile & Washing Resign or Terminate Workers List and Files
Plant)
Group Insurance Certificate/ Updated Evidence of Maternity Register and Files
Biometric System/ Group Insurance Premium Copy
Bond License, EPB Certificate, TIN Certificate Annual Leave Encashment Record
Export & Import Registration Certificate (ERC/IRC) Festival Bonus Record
BGMEA/ BKMEA/ LFMEAB Membership Certificate Increment Record
Fire Insurance Copy (If any) Provident Fund Record (If any)
2 Building Approval & Layout Production Record & Piece Rate Calculation for
Piece Rate Workers
Building Approval Plan Leave Register
Floor/ Machine Layout Approval 7 Documents – PA7 and Others
Accord/Alliance Report or any other assessment Risk Assessment and Internal Audit Report,
report related to building Workers Health Checkup Record
3 Test Report Safety Committee Record and Meeting Minutes
Drinking Water, Waste Water, Stack Air Emission, Training Record: First Aid, PPE, H&S, Chemical
Air Quality, Noise Level, Temperature & Humidity Safety, Fire Fighting (Internal & External), Fire Drill
Level etc. (Internal & External)
Environmental Impact Assessment (EIA), Energy Firefighting Equipment List, Fire Team Allocation,
Survey/ Assessment (Water Consumption, Gas & First Aider List, Machine List, Chemical List, Toilet
Electricity Consumption etc.) List
4 Policy & Procedures: Child Labor & Child Labor Accident Register & Investigation Records, Hospital
Remediation, Young Labor, Recruitment, Prohibition Agreement
of Forced Labor, Harassment or Abuse, Maintenance Schedule and Record: Fire Fighting
Compensation and Benefits, Leave, Maternity Equipment, Electrical Equipment & Machineries,
Benefit, Working Hour, Working Hour Approval, Compressor, Boiler & Generator Maintenance,
Prohibition of Discrimination, Disciplinary Action House Keeping Record, Wastage Agreement and
Procedure, Health and Safety, Emergency Disposal Record, PPE Issue Register
Preparedness Procedures, Freedom of Association Others Training: Orientation, BSCI CoC, Mid-
and Collective Bargaining, Environment, Wastage Level Management, Local Law, Grievance
Management Procedure, Anti-Corruption or Anti Procedure, Disciplinary Action Procedure, Risk
Bribery Policy Assessment Awareness, Injury Analysis
Awareness, Environmental Awareness, Anti-
5 Documents – PA1 to PA4
Corruption or Anti Bribery Mapping and Training
Company Organogram and Job Responsibilities Personal File: Fire Safety Officer, Welfare Officer,
according to Organogram, Authorization Letter of Doctor, Nurse, Boiler Operator, Generator
BSCI MR Operator, Electricians, Security Guard, Workers
Supply Chain Mapping, Stake Holder Mapping
Contract Agreement with Service Provider (Security,
Cleaning, Food, Transport etc.)

[Prepared by Maruf]

You might also like