Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

Three areas have been included in the It is intended that the District Centre Zone

Central Melbourne 6 Zone, replacing Special will not be delegated to councils until a local
Use Zones. These areas are in Drummond development scheme providing for the
Street, Carlton; Albert Street and Jolimont. detailed development of each centre has
Office, retail and residential development been certified and approved.
which is in keeping with the character of the
area is encouraged. Provisions allow a wide
range of uses for historic buildings in order to 4.3
assist their continued maintenance and Office Development
effective use. Office development will be encouraged to
locate according to a hierarchy comprising
The Central Melbourne Residential and Central Melbourne, district centres, other
Service Zone replaces the Commercial and commercial centres and industrial zones.
Industrial, Light and General Industrial Zones
north of the central business district. The In the Central Melbourne 1, 2 and 3 Zones
new zone provides for a mixture of there is no floor area limitation of office
commercial, industrial and residential uses development in Amendment 150. In district
which support the functions of Central centres and other parts of Central Melbourne
Melbourne. In particular, the development office development having a floor area of up
and retention of housing is encouraged. to 4 0 0 0 square metres can locate without a
planning permit subject to approval of layout
The Central Melbourne Commercial and plans. Office development greater than this
Industrial Zone extends south from the river floor area requires a permit.
Yarra to the F9 (West Gate) Freeway and Office development in commercial areas
replaces the Commercial and industrial Zone. other than district centres and Central
It provides a mixture of commercial, light Melbourne will be limited to a floor area of
industrial and residential uses to support the 2 500 square metres. A permit is required
functions of Central Melbourne. The open from the council for office development
character of the river Yarra frontage should having a floor area of between 1 000 and
be enhanced. A unique opportunity for high 2 500 square metres in these centres. The
density housing exists in the vicinity. Detailed present provisions of the Scheme will
design w h i c h w i l l improve the urban continue to apply to office development
environment and character of the area is having a floor area of up to 1 000 square
required. metres.
Portion of theSpecial Use 10 Zone adjacent In industrial zones office development can
to the Domain and Albert Road is renamed establish without a planning permit provided
Special Use 10A and is intended to ensure the office is directly associated w i t h an
that the development of the area is of industrial operation. W h e r e the office
appropriate scale and character. provides services to industries in the area a
permit will be required. All other office
development is prohibited.

4.2 4.4
District Centre Zone Residential Zones
The District Centre Zone replaces the In the past. Residential 'A' and 'B' and ' C
District Business Zone and is used for all Zones reflected varying site densities of flat
designated suburban centres. The new zone development. Various amendments have
expresses the intention for district centres to removed the essential differences, and
be more than just business centres. provisions for the three zones are now largely
the same. Residential 'A' and 'B' Zones are
Provisions for the District Centre Zone are
therefore deleted from the Scheme and
modified from those for the District Business
replaced with Residential ' C Zone.
Zone. Control of buildings and works has
been replaced by a condition requiring Strategic objectives indicate the broad
building layout for certain uses to be to the intent within residential areas. The Board will
satisfaction of the responsible authority. This further clarity its intent w i t h respect to
removes the need for a permit under the particular areas in consultation w i t h each
Metropolitan Scheme for these uses. It is council and will take account of the combined
intended that local development schemes emphasis plan in Chapter 5. Where
will provide positive requirements for layout, necessary it w i l l provide a lead by
parking, landscaping and access without amendment of the Metropolitan Scheme.
need for further consent. The objectives for Local detail will generally be reflected in a
the zone reflect this intent. local development scheme.

19
•b

Existing dwelling Existing dwelling Existing dwelling w i t h Existing dwelling w i t h Two new dwellings on
divided into two added to and divided second dwelling a detached second the same allotment
into two attached dwelling

Examples of Dual Occupancy Existing dwelling

4.5 New dwelling


Dual Occupancy
Fence
Building new houses or converting existing
houses to provide t w o dwellings on a single Entrance
lot could satisfy a need in the community for
rental accommodation, for extended family
units and for smaller dwellings. It would also
allow a more intensive use of otherwise
under-used buildings and space.
Single lots of adequate size may be
developed with two self-contained dwellings.
These can take various forms including:
e division of an existing house into t w o
dwellings
• division of a house w i t h building additions
• construction of a new dwelling attached to
a house
• construction of a new detached dwelling
on the same
lot as the existing dwelling
• construction of a pair of attached or
detached
dwellings on a vacant lot.
To ensure that dual occupancy results in a
pleasing and functional layout for both
o c c u p i e r s and n e i g h b o u r s t h e r e are
requirements as to the open area available to
each dwelling, privacy for residents and a
limitation of t w o storeys for any new building.
No planning permit is needed where these
requirements are met but where variations
are necessary a permit can be sought.

20
4.6 • Melton and Keilor, between which the
Home Business existing Corridor Zone is included in the
General Farming B Zone, minimum lot size
New electronic technology together with a 80 hectares
general contraction of job opportunity mean
that home based work will continue as an • Whittlesea, around which the existing
important aspect of economic activity and Corridor Zone is included in the Corridor B
help to meet the demand for part-time work. Zone, minimum lot size 40 hectares.
A great many work tasks can be done These changes to General Farming and
conveniently and unobtrusively at home. A Corridor Zones necessitate changes to some
more flexible approach to such activity in adjoining areas where the remaining large
residential areas should be possible, provided holdings are also used for broad-scale
it is suitable to the area and will not adversely farming. These are:
affect the neighbourhood. • the existing W o o d s t o c k / W o l lert
This work pattern will foster economies in Landscape Interest Zone is included in the
use of the transport system, particularly by General Farming B Zone, minimum lotsize
road vehicles. 80 hectares
• north and west of Whittlesea, the existing
Landscape Interest Zone is included in the
4.7 General Farming A Zone, minimum lotsize
40 hectares.
Four N e w Zones in the
Land at Clyde is part of the Intensive
Metropolitan Countryside Agriculture B Zone, minimum lot size 40
Amendment 150 to the Metropolitan hectares, which recognises land suitable for
Scheme includes certain changes to refine large-scale market gardening. The minimum
existing Board policies for the metropolitan lot size here could be reduced to say 30
countryside. hectares w h e n an assured source of
These changes include the creation of four irrigation water is available.
new zones, in which the allowable minimum As well as these changes to zoning and
new lot size is larger than now applies; they m i n i m u m a l l o w a b l e n e w lot s i z e s .
affect areas mainly to the north and west of Amendment 1 50 also sets out statements of
Melbourne. These changes are needed to specific objectives for all existing and
discourage subdivision into lots below a size proposed non-urban zones. For existing
suited to broad-scale farming. Changes are z o n e s , t h e s e o b j e c t i v e s are l a r g e l y
also made near Clyde to recognise areas statements of the intent of the zones and
where soils are suitable for large-scale have previously been published in reports by
market gardening. the Board but not previously written into the
Scheme.
The four new zones are:
The amendment also updates and clarifies
• General Farming B Zone, w i t h a minimum the criteria to be used in deciding
lot size of 80 hectares development applications.
• Corridor B Zone, with a minimum lot size of
4 0 hectares
• Corridor C Zone, with a minimum lot size of
80 hectares
• Intensive Agricultural B Zone, with a
minimum lot size of 4 0 hectares and
suitable for market gardening.
Among localities affected by the changes
are:
• Merri Corridor and the Corridor west of
Werribee are included in the Corridor C
Zone, minimum lot size 80 hectares
• Point Cook Corridor is included in the
General Farming A Zone, minimum lot size
4 0 hectares
• Sunbury, where the existing Corridor Zone
outside the designated township area is
included in General Farming B Zone,
minimum lot size 8 0 hectares

21
4.8 4.9
Changes t o Designation of Roads Parking Provisions
The maps that form part of Amendment Amendment 150 contains major revisions
1 50 to the Melbourne Metropolitan Planning to car parking clauses. These provide for
Scheme change the designation of a number parking limitation areas, changes to parking
of roads. requirements and designation of the central
business district as a limitation area. They are
These changes bring the designations into
made in response to the findings of the
line with the way the road system functions.
Metropolitan Parking Study.
The changes are limited to existing roads. No
road widenings or new road routes are The Board commissioned reports into
included in the maps and no additional metropolitan parking after criticisms, largely
privately-owned land is reserved. The from councils, that the requirements of the
changes are based on knowledge gained in Metropolitan Planning Scheme were
the Hierarchy of Roads Study. inadequate and that certain land uses were
omitted from the relevant Scheme clause.
The terms 'main' and 'secondary' are
retained for the present. It is intended that The study by Nicholas ClarkandAssociates
'main' w i l l later be replaced by 'freeway' and developed a framework w h i c h included two
'primary arterial' road classifications in the separate conditions in each of which a
Hierarchy of Roads Study, and 'secondary' by different method of calculating parking
'secondary arterial'. It is not intended that the requirements should apply. These are:
Metropolitan Planning Scheme maps should
• limitation areas, in w h i c h the level of
designate collector roads or local access
locally generated traffic is approaching or
streets.
exceeds some critical value, or where the
Board wishes to influence the nature and
extent of d e v e l o p m e n t for strategic
reasons
• generation areas, where there is no major
traffic problem caused by parking, and
where the proposed development has
adequate p r o v i s i o n for vehicle
movements.
Wilbur Smith & Associates developed the
requirements to be included in the Scheme
from a combination of field surveys and a
review of studies done by others. Variation in
parking demand revealed by these figures
determined the upper and lower limits
specified in the generation area tables. These
are expanded to include a wider selection of
purposes than previously specified in the
parking provisions of t h e Metropolitan
Planning Scheme.

22

You might also like