SCHEDULE OF FOOTINGS SLAB SCHEDULE

SHORT SPAN LONG SPAN


MARK "t" " Lx " " Lz " " DEPTH " REINFORCEMENT BAR REMARKS THICK-
(mm) (mm) (mm) (mm) MARK NESS
BOTTOM TOP BARS (mm) BOTTOM TOP BARS (mm)
REMARKS
BARS (mm) CONTINUOUS EDGEDISCONTINUOUS EDGE BARS (mm) CONTINUOUS EDGEDISCONTINUOUS EDGE
(mm)
F1 300 1600 1600 ± 1500 from NGL 9-16mmØ BOTTOM BOTHWAYS ON CENTER
F2 300 1600 1600 ± 1500 from NGL 10-16mmØ BOTTOM BOTHWAYS ON EDGE

F3 300 1100 1100 ± 1500 from NGL 5-16mmØ BOTTOM BOTHWAYS ON EDGE/ ON CORNER
NOTE: NO FOUNDATION'S REST ON BACKFILL MATERIALS

TOP BARS
TOP BARS TOP BARS

MAIN SPAN MAIN SPAN


BOTTOM BARS BOTTOM BARS
50% OF MAIN SPAN
BARS (STAGGERED)
ANCHORED @ SUPPORT
SECTION
PLAN

3 TYPICAL SLAB REINFORCEMENT DETAILS


SCALE: N.T.S.
S-2
1 ISOLATED FOOTING DETAILS
N.T.S.
S-2 SCALE:
COLUMN SCHEDULE
BEAMS REINFORCEMENT SCHEDULE

C1 C2

4 BEAM REINFORCEMENT SPACING DETAIL


SCALE: N.T.S.
2 TYPICAL BEAM REINFORCEMENT DETAIL S-2
S-2 SCALE N.T.S.

SEAL CIVIL ENGINEER OWNER: PROJECT TITLE: SHEET CONTENTS: DATE: SHEET NO.
AS SHOWN
PROPOSED TWO STOREY
MR. ALVIN A. DAVID RESIDENCE WITH ROOFDECK CAD BY:
DGCA
S-2
188 ALABAT STREET, BALOT TONDO, MANILA