Professional Documents
Culture Documents
NYC_grouted area
NYC_grouted area
90
www.hilti.com
Company: Page: 1
Address: Specifier:
Phone I Fax: | E-Mail:
Design: grouted area Date: 1/15/2024
Fastening point:
Specifier's comments:
1 Input data
Anchor type and diameter: HY 270 + HAS-R 304/316 SS 3/8
Item number: 2045001 HAS-R 316 SS 3/8"x5 1/8" (element) /
2194247 HIT-HY 270 (adhesive)
Effective embedment depth: hef = 60.3 mm
Material: ASTM F 593
Evaluation Service Report: ESR-4143
Issued I Valid: 3/1/2023 | 1/1/2025
Proof: Design Method LRFD (AC58) Masonry + ACI 318-14
Stand-off installation: eb = 0.0 mm (no stand-off); t = 6.0 mm
Anchor plate :
R lx x ly x t = 200.0 mm x 60.0 mm x 6.0 mm; (Recommended plate thickness: not calculated)
Profile: no profile
Base material: 2
uncracked Grout-filled CMU, f=1500, f = 10.34 N/mm , L x W x H: 406.4 mm x 203.2 mm x 203.2 mm;
Solid Head Joint: no; open ended unit: no
Temp. short/long: 0 °C / 0 °C
Joints: vertical: 9.5 mm; horizontal: 9.5 mm
Installation: Face installation, Drill hole: Hammer drilled, Installation condition: Dry
R
- The anchor calculation is based on a rigid anchor plate assumption.
Geometry [mm]
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2024 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
1
Hilti PROFIS Engineering 3.0.90
www.hilti.com
Company: Page: 2
Address: Specifier:
Phone I Fax: | E-Mail:
Design: grouted area Date: 1/15/2024
Fastening point:
Anchor forces are calculated based on the assumption of a rigid anchor plate.
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2024 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
2
Hilti PROFIS Engineering 3.0.90
www.hilti.com
Company: Page: 3
Address: Specifier:
Phone I Fax: | E-Mail:
Design: grouted area Date: 1/15/2024
Fastening point:
3 Tension load
Load [kN] Capacity [kN] Utilization bN [%] Status
Steel 1.318 22.407 6 OK
Bond 1.318 3.455 39 OK
Masonry breakout 1.318 5.087 26 OK
Nmag = (AA ) · y
Na0
Na
ec1,Na · y ec2,Na · y ed,Na · Nba,m ACI 318-14 Eq. (17.4.5.1b)
f Nmag ³ Nua AC58 Table 3.2 + ACI 318-14 Table 17.3.1.1
ANa see ACI 318-14, Section 17.4.5.1, Fig. R 17.4.5.1(b)
2
ANa0 = (2 cNa) ACI 318-14 Eq. (17.4.5.1c)
t uncr,m
cNa = 10 da √ 1100
ACI 318-14 Eq. (17.4.5.1d)
( )
1
'
y ec,Na = eN £ 1.00 ACI 318-14 Eq. (17.4.5.3)
1+
cNa
Na
ACI 318-14 Eq. (17.4.5.4b)
Nba,m = l a · t uncr,m · p · da · hef ACI 318-14 Eq. (17.4.5.2)
Variables
da [mm] hef [mm] ca,min [mm]
2
t uncr,m [N/mm ] asat atop
9.5 60.3 57.7 3.03 1.000 1.000
Calculations
cNa [mm] ANa [mm ]
2
ANa0 [mm ]
2
y ed,Na
60.0 14,121 14,390 0.989
Results
Nmag [kN] f f Nmag [kN] f Nua [kN]
5.315 0.650 3.455 1.318
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2024 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
3
Hilti PROFIS Engineering 3.0.90
www.hilti.com
Company: Page: 4
Address: Specifier:
Phone I Fax: | E-Mail:
Design: grouted area Date: 1/15/2024
Fastening point:
ANm
Nmbg = · y ec,N,m y ed,N,m · y c,N,m · Nb,m ACI 318-14 Eq. (17.4.2.1b)
ANm0
f Nmbg ³ Nua AC58 Table 3.2 + ACI 318-14 Table 17.3.1.1
ANm see ACI 318-14, Section 17.4.2.1, Fig. R 17.4.2.1(b)
2
ANm0 = 9 · hef ACI 318-14 Eq. (17.4.2.1c)
( )
1
'
y ec,N,m = 2 eN £ 1.00 ACI 318-14 Eq. (17.4.2.4)
1+
3 · hef
c
y ed,N = 0.7 + 0.3 a,min £ 1.0 ACI 318-14 Eq. (17.4.2.5b)
1.5 · hef
1.5
Nb,m = km · l a · √ '
fm · hef ACI 318-14 Eq. (17.4.2.2a)
Variables
hef [mm] ec1,N,m [mm] ec2,N,m [mm] ca,min [mm] y c,N,m kc
60.3 0.0 0.0 57.7 1.000 17
' 2
la fm [N/mm ]
1.000 10.34
Calculations
ANm [mm ]
2
ANm0 [mm ]
2
y ec1,N,m y ec2,N,m y ed,N,m Nb,m [kN]
26,825 32,752 1.000 1.000 0.891 10.718
Results
Nmbg [kN] f f Nmbg [kN] Nua [kN]
7.826 0.650 5.087 1.318
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2024 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
4
Hilti PROFIS Engineering 3.0.90
www.hilti.com
Company: Page: 5
Address: Specifier:
Phone I Fax: | E-Mail:
Design: grouted area Date: 1/15/2024
Fastening point:
4 Shear load
Load [kN] Capacity [kN] Utilization bV [%] Status
Steel 0.143 12.410 2 OK
Pryout bond 0.143 3.721 4 OK
Masonry crushing strength 0.143 12.780 2 OK
Masonry breakout in direction x- 0.143 7.175 2 OK
( )
1
'
y ec,Na = eN £ 1.0 ACI 318-14 Eq. (17.4.5.3)
1+
cNa
ac
ACI 318-14 Eq. (17.4.5.4b)
Nba,m = l a · t uncr,m · p · da · hef ACI 318-14 Eq. (17.4.5.2)
Variables
2
kcp da [mm] hef [mm] ca,min [mm] t uncr,m [N/mm ]
1 9.5 60.3 57.7 3.03
Calculations
cNa [mm] ANa [mm ]
2
ANa0 [mm ]
2
y ed,Na y ec1,Na y ec2,Na
60.0 14,121 14,390 0.989 1.000 1.000
Results
Vmpg [kN] f f Vmpg [kN] Vua [kN]
5.315 0.700 3.721 0.143
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2024 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
5
Hilti PROFIS Engineering 3.0.90
www.hilti.com
Company: Page: 6
Address: Specifier:
Phone I Fax: | E-Mail:
Design: grouted area Date: 1/15/2024
Fastening point:
Variables
' 2 2
fm [N/mm ] Ase,v [mm ]
10.34 50
Results
Vmc [kN] f f Vmc [kN] Vua [kN]
25.559 0.500 12.780 0.143
Vmbg = (AA ) y
Vm
Vm0
ec,V,m y ed,V,m y m,V y h,V,m y parallel,V Vb,m ACI 318-14 Eq. (17.5.2.1b)
f Vmbg ³ Vua AC58 Table 3.2 + ACI 318-14 Table 17.3.1.1
AVm see ACI 318-14, Section 17.5.2.1, Fig. R 17.5.2.1(b)
2
AVm0 = 4.5 ca1 ACI 318-14 Eq. (17.5.2.1c)
( )
1
'
y ec,V,m = 2ev £ 1.0 ACI 318-14 Eq. (17.5.2.5)
1+
3ca1
a1
ACI 318-14 Eq. (17.5.2.6b)
= (7 ( ) √ d ) l
0.2
l
Vb,m e
a a √f'm c1.5
a1 ACI 318-14 Eq. (17.5.2.2a)
d a
Variables
2 2 ' 2
le [mm] da [mm] ca1 [mm] ca2 [mm] AVm [mm ] AVm0 [mm ] fm [N/mm ]
60.3 9.5 57.7 914.4 15,001 15,001 10.34
Calculations
y ed,V,m y parallel,V ec,V [mm] y ec,V,m y m,V y h,V,m
1.000 2.000 0.0 1.000 1.400 1.000
Results
Vb,m [kN] f f Vmbg [kN] Vua [kN]
3.661 0.700 7.175 0.143
z z
bNV = bN + bV <= 1
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2024 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
6
Hilti PROFIS Engineering 3.0.90
www.hilti.com
Company: Page: 7
Address: Specifier:
Phone I Fax: | E-Mail:
Design: grouted area Date: 1/15/2024
Fastening point:
6 Warnings
• The anchor design methods in PROFIS Engineering require rigid anchor plates per current regulations (AS 5216:2021, ETAG 001/Annex C,
EOTA TR029 etc.). This means load re-distribution on the anchors due to elastic deformations of the anchor plate are not considered - the
anchor plate is assumed to be sufficiently stiff, in order not to be deformed when subjected to the design loading. PROFIS Engineering
calculates the minimum required anchor plate thickness with CBFEM to limit the stress of the anchor plate based on the assumptions
explained above. The proof if the rigid anchor plate assumption is valid is not carried out by PROFIS Engineering. Input data and results
must be checked for agreement with the existing conditions and for plausibility!
• Refer to the manufacturer's product literature for cleaning and installation instructions.
• For additional information about ACI 318 strength design provisions, please go to
https://submittals.us.hilti.com/PROFISAnchorDesignGuide/
• The min. sizes of the bricks, the masonry compressive strength, the type / strength of the mortar and the grout (in case of fully grouted CMU
walls) has to fulfill the requirements given in the relevant ESR-approval or in the PTG.
• Only the local load transfer from the anchor(s) to the wall is considered, a further load transfer in the wall is not covered by PROFIS!
• Wall is assumed as being perfectly aligned vertically – checking required(!): Noncompliance can lead to significantly different distribution of
forces and higher tension loads than those calculated by PROFIS. Masonry wall must not have any damages (neither visible nor not visible)!
While installation, the positioning of the anchors needs to be maintained as in the design phase i.e. either relative to the brick or relative to
the mortar joints.
• The effect of the joints on the compressive stress distribution on the plate / bricks was not taken into consideration.
• If no significant resistance is felt over the entire depth of the hole when drilling (e.g. in unfilled butt joints), the anchor should not be set at
this position or the area should be assessed and reinforced. Hilti recommends the anchoring in masonry always with sieve sleeve. Anchors
can only be installed without sieve sleeves in solid bricks when it is guaranteed that it has not any hole or void.
• The accessories and installation remarks listed on this report are for the information of the user only. In any case, the instructions for use
provided with the product have to be followed to ensure a proper installation.
• The compliance with current standards (e.g. 2018, 2015, 2012, 2009 and 2006 IBC) is the responsibility of the user.
• Drilling method (hammer, rotary) to be in accordance with the approval!
• Masonry needs to be built in a regular way in accordance with state-of the art guidelines!
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2024 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
7
Hilti PROFIS Engineering 3.0.90
www.hilti.com
Company: Page: 8
Address: Specifier:
Phone I Fax: | E-Mail:
Design: grouted area Date: 1/15/2024
Fastening point:
7 Installation data
Anchor plate, steel: ASTM A36; E = 199,947.97 N/mm ; fyk = 248.21 N/mm
2 2 Anchor type and diameter: HY 270 + HAS-R 304/316 SS
3/8
Profile: no profile Item number: 2045001 HAS-R 316 SS 3/8"x5 1/8"
(element) / 2194247 HIT-HY 270 (adhesive)
Hole diameter in the fixture: df = 11.1 mm Maximum installation torque: 0.008 kNm
Plate thickness (input): 6.0 mm Hole diameter in the base material: 11.1 mm
Recommended plate thickness: not calculated Hole depth in the base material: 60.3 mm
Drilling method: Drilled in hammer mode Minimum thickness of the base material: 193.7 mm
Cleaning: No cleaning of the drilled hole is required
Hilti HIT-V threaded rod with HIT-HY 270 injection mortar with 60.325 mm embedment h_ef, 3/8, Stainless steel, Hammer drilled installation
per ESR-4143
y
100.0 100.0
30.0
30.0
2 1
-0.0
x
30.0
30.0
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2024 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
8
Hilti PROFIS Engineering 3.0.90
www.hilti.com
Company: Page: 9
Address: Specifier:
Phone I Fax: | E-Mail:
Design: grouted area Date: 1/15/2024
Fastening point:
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2024 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan