Professional Documents
Culture Documents
JOCELYN_BASILAN_13AUG23-A109
JOCELYN_BASILAN_13AUG23-A109
JOCELYN_BASILAN_13AUG23-A109
ARCHITECTURAL
GROUND FLOOR PLAN
SECTION THRU C-C
A209 SECTION THRU A-A
ROOF FLOOR PLAN
SECOND FLOOR PLAN HEAD, BLDG. OFFICIAL
FRONT ELEVATION
REAR SIDE ELEVATION
LEFT-SIDE ELEVATION
A309 STAIR RAILING DETAIL
SECTION THRU B-B
SCHEDULE OF DOORS & WINDOWS
RIGHT-SIDE ELEVATION
STRUCTURAL
PLAN
SECOND FLOOR BEAM PLAN
TYP.WALL OPENING
SPOT DETAIL HEAD, LINE AND GRADE
WALL FOOTING DETAILS
STAIR DETAIL
TYP. CHB WALL ELEVATION
S309 COLUMN TIES & BEAM
STIRRUPS ARRANGEMENTS
ROOF FRAMING PLAN
ROOF BEAM DETAILS
BEAM DETAIL
COMPUTATIONS
S409 COLUMN FOOTING DETAIL HEAD, ARCHITECTURAL
COLUMN DETAIL
ELECTRICAL
SECOND LIGHTING LAYOUT
SCHEDULE OF LOAD AND
E109 COMPUTATIONS
02 PERSPECTIVE LEGEND
RISER DIAGRAM
A109 SCALE: NTS
SPECIFICATION HEAD, STRUCTURAL
SECOND POWER LAYOUT
GROUND POWER LAYOUT
PLUMBING
LEGEND
P109 GROUND FLOOR PLUMBING LAYOUT
SECOND FLOOR PLUMBING LAYOUT
VENT DETAILS
DETAILS OF CATCH BASIN HEAD, SANITERY & PLUMBING
DETAILS OF SEPTIC TANK
FLOOR CLEANOUT
SEPTIC DRAINAGE FIELD
GENERAL NOTES:
01 SITE DEVELOPMENT PLAN 03 LOCATION PLAN 6. REFERENCE ELEVATION TOP OF NATIONAL HIGHWAY LEVEL SHALL BE @ 0.00 MTRS, THE
BUILDING GROUND FINISH FLOOR LINE SHALL BE 0.40 MTR.
SEAL DESIGNED BY: PROJECT TITLE & LOCATION OWNER: SHEET CONTENT REVISION: DATE 13 AUG 2023 REVISION: SHEET NO.:
EXCAVATION PLAN
STAKE-OUT PLAN
CADD DCPM
PROPOSED TWO (2) STOREY STAIR NOSING DETAIL
DETAILED SECTION CHECKED
A1
RESIDENTIAL BUILDING w/ BASEMENT
REG. NO.: TIN NO.: APPROVED
PTR. NO.: DATE: LOCATION: LOCATION: SCALE VERIFY
09