JOCELYN_BASILAN_13AUG23-A109

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

TABLE OF CONTENTS REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


SHEET NO. DESCRIPTION OFFICE OF BUILDING OFFICIAL
EXTERIOR PERSPECTIVE
A109 LOCATION MAP
SITE DEVELOPMENT PLAN

BASEMENT FLOOR PLAN

ARCHITECTURAL
GROUND FLOOR PLAN
SECTION THRU C-C
A209 SECTION THRU A-A
ROOF FLOOR PLAN
SECOND FLOOR PLAN HEAD, BLDG. OFFICIAL

FRONT ELEVATION
REAR SIDE ELEVATION
LEFT-SIDE ELEVATION
A309 STAIR RAILING DETAIL
SECTION THRU B-B
SCHEDULE OF DOORS & WINDOWS
RIGHT-SIDE ELEVATION

S109 STRUCTURAL NOTES HEAD, LAND USE & ZONING

FOUNDATION W/ TIE BEAM


LAYOUT PLAN
CEILING ISOMETRIC
BDRM. CLOSET DET.
TYP. CLNG. DETAIL
S209 GROUND FLOOR WF & TIE BEAM

STRUCTURAL
PLAN
SECOND FLOOR BEAM PLAN
TYP.WALL OPENING
SPOT DETAIL HEAD, LINE AND GRADE
WALL FOOTING DETAILS
STAIR DETAIL
TYP. CHB WALL ELEVATION
S309 COLUMN TIES & BEAM
STIRRUPS ARRANGEMENTS
ROOF FRAMING PLAN
ROOF BEAM DETAILS

BEAM DETAIL
COMPUTATIONS
S409 COLUMN FOOTING DETAIL HEAD, ARCHITECTURAL
COLUMN DETAIL

BASEMENT POWER LAYOUT


BASEMENT LIGHTING LAYOUT
GROUND LIGHTING LAYOUT

ELECTRICAL
SECOND LIGHTING LAYOUT
SCHEDULE OF LOAD AND
E109 COMPUTATIONS
02 PERSPECTIVE LEGEND
RISER DIAGRAM
A109 SCALE: NTS
SPECIFICATION HEAD, STRUCTURAL
SECOND POWER LAYOUT
GROUND POWER LAYOUT

GUTTER DRAIN DETAIL


SPECIFICATION
PIPE BRACKET
PIPE HANGER

PLUMBING
LEGEND
P109 GROUND FLOOR PLUMBING LAYOUT
SECOND FLOOR PLUMBING LAYOUT
VENT DETAILS
DETAILS OF CATCH BASIN HEAD, SANITERY & PLUMBING
DETAILS OF SEPTIC TANK
FLOOR CLEANOUT
SEPTIC DRAINAGE FIELD

GENERAL NOTES:

1. IN CASE OF DISCREPANCIES BETWEEN THESE DRAWINGS AND SPECIFICATIONS AND/OR OTHER


DRAWINGS, PLEASE REFER TO THE ARCHITECT AND HIS DULY AUTHORIZED REPRESANTATIVE
FOR FINAL VERIFICATION.
2. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO CONSTRUCTION. MAKE COMPREHENSIVE
OCCULAR INSPECTION OF ALL EXISTING UTILITIES AND SHALL ACCEPT THE SITE AS IS. IT SHALL
BE HIS SOLE RESPONSIBILITY TO INFORM THE ARCHITECT OR HIS DULY AUTHORIZED
REPRESENTATIVE IN WRITING OF ANY DISCREPANCY FOUND BETWEEN THE ACTUAL
DIMENSIONS AND THESE SETS OF PLANS AND DRAWINGS.
3. DURING CONSTRUCTION STAGE, SHOULD VARIATIONS FROM THE DESIGN INTENT AS SHOWN HEAD. ELECTRICAL
IN THESE DRAWINGS BECOME NECESSARY /OR/ SHOULD CHANGES BE REQUIRED TO SUIT
ACTUAL SITE CONDITIONS, THE GENERAL CONTRACTOR SHALL SUBMIT SHOP DRAWINGS
WITH KEY PLAN, CONSTRUCTION METHODOLOGY, AND SAMPLE OF PRODUCT TO BE USE FOR
THE APPROVAL OF THE ARCHITECT PRIOR TO PURCHASE, FABRICATION , OR IMPLEMENTATION.
4. NO VARIATION ORDER/S SHALL BE IMPLEMENTED WITHOUT FINAL APPROVAL FROM THE
ARCHITECT AND OWNER AND/OR HIS DULY AUTHORIZED REPRESENTATIVE.
5. FOR DETAILS OF OTHER ALLIED DISCIPLINES / OTHER TRADE SERVICES, PLEASE REFER TO THE
PLANS & DRAWINGS PREPARED BY THE DESIGNER FOR STRUCTURAL, ELECTRICAL,
MECHANICAL,SANITARY, CIVIL, & OTHER MISCELLANEOUS DRAWINGS AND COORDINATE
THEM WITH THE ARCHITECT / OR HIS DULY AUTHORIZED REPRESENTATIVE.

01 SITE DEVELOPMENT PLAN 03 LOCATION PLAN 6. REFERENCE ELEVATION TOP OF NATIONAL HIGHWAY LEVEL SHALL BE @ 0.00 MTRS, THE
BUILDING GROUND FINISH FLOOR LINE SHALL BE 0.40 MTR.

A109 SCALE: NTS A109 SCALE: NTS

SEAL DESIGNED BY: PROJECT TITLE & LOCATION OWNER: SHEET CONTENT REVISION: DATE 13 AUG 2023 REVISION: SHEET NO.:
EXCAVATION PLAN
STAKE-OUT PLAN
CADD DCPM
PROPOSED TWO (2) STOREY STAIR NOSING DETAIL
DETAILED SECTION CHECKED
A1
RESIDENTIAL BUILDING w/ BASEMENT
REG. NO.: TIN NO.: APPROVED
PTR. NO.: DATE: LOCATION: LOCATION: SCALE VERIFY
09

You might also like