SMS Interface –

Diving and Subsea – Stolt Comex Seaway UKCS-CSM-005

Contents

Authorisation for Issue


Amendment Record
Amendment Summary
Distribution List
Preface
Uncontrolled

SMS Interface – Diving and Subsea – Stolt Comex Seaway

March 2001 Issue 1 i/ii


SMS Interface –
Diving and Subsea – Stolt Comex Seaway UKCS-CSM-005

Authorisation for Issue

Issue Authority
Name: Rosy Wood

Signature: ________________________________________________

Date: ________________________________________________

Position: Delivery Manager


Uncontrolled

Technical Authority
Name: Trevor Stapleton

Signature: ________________________________________________

Date: ________________________________________________

Position: HSE Team Leader, CNS Gas

March 2001 Issue 1 iii/iv


SMS Interface –
Diving and Subsea – Stolt Comex Seaway UKCS-CSM-005

Amendment Record

For Audit Use


Amendment Incorporated By
Checked
Number
Name Signature Date Signature Date
Uncontrolled

AMOSAF.171

March 2001 Issue 1 v/vi


SMS Interface –
Diving and Subsea – Stolt Comex Seaway UKCS-CSM-005

Amendment Summary

Issue No Date Description


Issue 1 March 2001 First issue.
Uncontrolled

March 2001 Issue 1 vii/viii


SMS Interface –
Diving and Subsea – Stolt Comex Seaway UKCS-CSM-005

Distribution List

Holders of Controlled Hard Copy

Copy Copyholder Location

01 Manager of BP Contracts Stolt Comex Seaway


02 Data Control Centre (DCC) ODL, Aberdeen

Virtual Copyholders
Uncontrolled

Copy Copyholder

01 Document Issue Authority


(Rosy Wood)
02 Document Technical Authority
(Trevor Stapleton)

March 2001 Issue 1 ix/x


SMS Interface –
Diving and Subsea – Stolt Comex Seaway UKCS-CSM-005

Preface

Review and Update


This document will be subject to 12-monthly review and update, when document holders will
have the opportunity to express opinions and suggest improvements.
However, the document control system allows for continuous update of this document. As
such, any user may at any time identify an error or suggest an improvement using an
Amendment Proposal proforma which is available electronically on the UKCS SMS website,
from the Data Control Centre (DCC) Supervisor or from the Technical Authority.
Uncontrolled

All holders of this document are registered so that they can be sent updates and be kept
informed of changes or reviews.

Responsibility of Copyholders
It is the responsibility of the registered copyholder of controlled hard copy versions to
maintain the accuracy of the document by ensuring that all updates are promptly
incorporated and acknowledged.
Furthermore, the registered copyholder of controlled hard copy versions must at all times
maintain custody of this document unless prior approval is given by the relevant
Technical Authority.
The roles and responsibilities of copyholders and ‘virtual’ copyholders are detailed in Section 1
of the Document Control Procedure (UKCS-DCM-001).

March 2001 Issue 1 xi/xii


   
Combines Stolt Comex Seaway and ETPM

Customer : BP Amoco Exploration


Project Title : BP Amoco Subsea Support Services
Contract No : 101974

Signature legend :
Originator : Georges Arnoux (GAA) Project Safety Advisor
Checker : Dave Melton (DML) Project Team Leader
Approver : Ken London (KLO) Group HSEQ Manager

File Ref : n:bpa/397/docs/wp/600/wp-eng-397-600.doc


/Copy No: Distributed To: Distribution Date: Classification:

A Issued for Use 21/3/00 GAA DML KLO

Revisions Date Orig. Chk. Appr.

Document Title: Stolt Offshore Ltd Document No:


SMS INTERFACE BETWEEN WP-ENG-397-600
BP AMOCO AND STOLT
OFFSHORE LTD Customer Document No:

WP-ENG-397-600.doc UK105F-01-C Page 1 of 24


Region or Legal Entity: Document No:
Stolt Offshore Ltd WP-ENG-397-600

Document Title: Customer Document No:


SMS Interface between BP Amoco and Stolt Offshore Ltd.

DISTRIBUTION

Recipient Company Location No Off

Trevor Stapleton BP Amoco Dyce 1

Ken London Stolt Offshore Bucksburn 1

Dave Melton Stolt Offshore Bucksurn 1

Nicola McClelland Stolt Offshore Bucksburn 1

WP-ENG-397-600.doc UK105F-01-C Page 2 of 24


Region or Legal Entity: Document No:
Stolt Offshore Ltd WP-ENG-397-600

Document Title: Customer Document No:


SMS Interface between BP Amoco and Stolt Offshore Ltd.

TABLE OF CONTENTS

1.0 INTRODUCTION............................................................................................................................................. 4
1.1 SCOPE............................................................................................................................................................ 4
1.2 OBJECTIVES................................................................................................................................................. 4
2.0 SMS INTERFACE ............................................................................................................................................ 4

APPENDIX I MATRIX OF SAFETY MANAGEMENT SYSTEMS INTERFACE BETWEEN BP AMOCO


AND STOLT OFFSHORE LTD ............................................................................................................................... 5

WP-ENG-397-600.doc Rev. Page 3 of 24


Region or Legal Entity: Document No:
Stolt Offshore Ltd WP-ENG-397-600

Document Title: Customer Document No:


SMS Interface between BP Amoco and Stolt Offshore Ltd.

1.0 INTRODUCTION

1.1 SCOPE
Contract 101974 Diving and Subsea Support Services between BP Amoco and Stolt
Offshore Ltd.

1.2 OBJECTIVES
The objective of this report is to compare the documented Safety Management Systems
(SMS) of BP Amoco and Stolt Offshore, and where recognised interface exists to,
identify the relevant BP Amoco and Stolt Offhsore documentation.

2.0 SMS INTERFACE

This exercise has been conducted by using the template provided by BP Amoco.

Where relevant, Stolt Offshore documentation is listed opposite that of BP Amoco.

Given the space available, a certain amount of selection had to be exercised in the
process. Should any entry require explanations or discussions, the undersigned will be
happy to provide further information as the case may be.

WP-ENG-397-600.doc Rev. Page 4 of 24


Region or Legal Entity: Document No:
Stolt Offshore Ltd WP-ENG-397-600

Document Title: Customer Document No:


SMS Interface between BP Amoco and Stolt Offshore Ltd.

APPENDIX I
MATRIX OF SAFETY MANAGEMENT SYSTEMS INTERFACE
BETWEEN
BP AMOCO AND STOLT OFFSHORE LTD

(19 Pages to Follow)

WP-ENG-397-600.doc Rev. Page 5 of 24


BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE Reference Documentation

BP Amoco Business
BP Amoco Federal
ISSUES TO BE
ADDRESSED

Stolt Offshore
(where applicable to BP Amoco Federal Documentation Stolt Offshore Business Unit
the scope of the Documentation Specific
contract)

Unit
Documentation

1.0 Set Interfacing Policy / Objectives

1.1 Policy Objectives and Corporate Acceptance of Responsibility


Health and safety    BP Amoco, What we stand for….. our Business Policies, Commitments and Expectations,
Sir John Browne, Feb 1999
SHE Policy Statement. Identification of any
objectives Business Unit specific
Signed 02 / 2000 .
BP Amoco HSE Policy, Sir John Browne, February 1999 policy statements.

BP Amoco Safety Charter, Alan Jones, February 1999

Getting HSE Right, January 1999


Joint statement of
commitment (if
 (Interface documentation will take into account the company statements of both parties.
There is no requirement for an additional statement, unless there is a specific Business
Joint contractors statement
(Foinaven Specific)
Foinaven

appropriate) Unit need)

2.0 Organise

2.1 Structure and Accountability


Integrated   Hierarchical organigram representing the key positions within the scope of the contract Published 15 / 02 / 2000 . Business Unit requirements
organigram identified within this document. – see 5.2 Figure 1 identified.

Responsibility   Reference to specific key positions within each management system, or short statements Current Functional
statements required in this document. See 5.2 Descriptions

Quality plan – Northsea HSE


Department

Communication of    Project Bridging Document Business Unit requirement


SMS Interfacing
Vessel Familiarisation
Arrangements to
persons on
integrated
organigram
BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE Reference Documentation

BP Amoco Business
BP Amoco Federal
ISSUES TO BE
ADDRESSED

Stolt Offshore
(where applicable to BP Amoco Federal Documentation Stolt Offshore Business Unit
the scope of the Documentation Specific
contract)

Unit
Documentation

Communication of    Project/Department Induction Business Unit requirement


SMS Interfacing Procedure
Arrangements to
GP-UK-106-011
workforce

Additional resources   Personnel Administration Identified at Business Unit


for SMS Interfacing Instruction level is required
Arrangements
AI-UK-106-001

Working time    Identified prior to the commencement of the contract and monitored by each Business Unit. Onshore Staff Handbook
arrangements
Offshore Staff Handbook

2.2 Involvement of the Workforce


SMS Interfacing   BP Amoco Safety Representatives Communication Forum SHE Committees Business Unit specific
Arrangements for arrangements.
GP-OO-103-005
employee Safety
Representatives and SHE Delegates Procedure
Safety Committees
GP-OO-103-006

3.0 Plan and Set Standards

3.1 Hazard Analysis and Controlling Risks


Review of applicable   UK Offshore Safety Legislation, HSQ 01.05.13 Legislation Subscription (Oil Business Unit specific
health and safety Rev2, March 1996 Rig Westons, and SOS), and systems, e.g. Westons on-
regulations available to all HSE Advisors line, Oilrig software.

Process for hazard   HSE Risk Analysis Standard, HSQ 01.02.01, Rev AMOEX Procedure and Guidance Hazard Identification and Risk
identification & 0, Nov 1992 (prepared by Saf Eng approved by for Hazard Identification and Risk Assessment procedure
assessment HSQ Mngr) Assessment, AMO-O-011
GP-CO-103-002
Methodology for Hazard Identification and Hazard
Assessment for Existing Installations,
HSQ/MC/92/004, Rev A1, May 1992
BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE Reference Documentation

BP Amoco Business
BP Amoco Federal
ISSUES TO BE
ADDRESSED

Stolt Offshore
(where applicable to BP Amoco Federal Documentation Stolt Offshore Business Unit
the scope of the Documentation Specific
contract)

Unit
Documentation

Risk assessments

QRA/Hazop/Hazid   Guidelines for HAZID Studies, HSQ Amoex Safety Case and COMAH Safety Hazard Identification and Risk
01.05.01 Report Management Manual, AMO-O-012 Assessment Procedure

Guidelines for HAZOP Studies, HSQ GP-CO-103-002


01.05.26 Rev0, Dec 1995 (prepared by Saf
Safety Case and CIMAH Report Covering :
Eng approved
Management, AMO-S-206
- HAZID
Guidelines for Carrying Out Critical; Safety
Reviews, HSQ 01.05.16 - HAZOP

Quantified Risk Assessment Guidance on - FMEA


Best Practice, HSQ 01.05.27, Rev 0a, Feb
1995 - Critical Job Analysis .

Formal Safety Assessment: Risk


Management Model, Rev R1, HSQ
01.05.12, May 1996 (prepared by Saf Eng
approved by Saf Mngr)

Task/activity specific   Task Risk Assessment, HSE Practice No 9 Workplace Risk Assessments, AMO-S-213 HAZID & Risk Assessment
Procedure : GP-CO-103-002
risk assessments MHSWR - Risk Assessment Guidelines, Amoex Procedure and Guidance for Hazard
HSQ 01.05.11 Identification and Risk Assessment, AMO- Section 2 :
O-011 - Generic R A
- Stage 1 R A (project)
Amoex Operations Procedure Review - Stage 2 R A (Vessel)
Process, AMO-S-218 - Stage 3 R A (ToolBox)
BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE Reference Documentation

BP Amoco Business
BP Amoco Federal
ISSUES TO BE
ADDRESSED

Stolt Offshore
(where applicable to BP Amoco Federal Documentation Stolt Offshore Business Unit
the scope of the Documentation Specific
contract)

Unit
Documentation

COSHH/workstation/   Control of Substances Hazardous to Amoex Occupational Health and Hygiene


Safety Management System

manual handling Health, HSE Practice No18 Manual, AMO-H-001, Part A, Section 1, Control of Substances
assessments Control of Substances Hazardous to Health Hazardous to Health ,
Guidance on the Implementation of Procedure GP-00-103-003.
COSHH in UKOps HSQ 21.06.01 Amoex Occupational Health and Hygiene Subscription to SYPOL.
Manual, AMO-H-001, Part A, Section 6,
Display Screen Equipment Regulations Task Assessments .
Display Screen Equipment.
Guidance for Co-ordinators, HSQ 01.05.19,
Rev0 April 1993 Amoex Occupational Health and Hygiene Manual Handling Procedure
Manual, AMO-H-001, Part A, Section 7, GP-OO-103-018
Manual Handling Operations, Guidelines
Manual Handling
for Risk Assessment and Mitigation, HSQ List of Substances Used by
01.05.14 Stolt Offshore .

Display Screen Equipment at


Work Guidelines
GU-UK-103-009
Method statements   Task Specific Work Business Unit specific.
and work instructions Procedure

Task Plans

SHE Instructions

AI-OO-103-001

Communication of   Check Sheets of Toolbox Toolbox talks, safety


risk assessments Talks. meetings, pre-work
meetings.
Minutes of Safety Committee
Meetings.

Pre-Work meeting minutes

Training Records.
BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE Reference Documentation

BP Amoco Business
BP Amoco Federal
ISSUES TO BE
ADDRESSED

Stolt Offshore
(where applicable to BP Amoco Federal Documentation Stolt Offshore Business Unit
the scope of the Documentation Specific
contract)

Unit
Documentation

Permit to Work   Permit to Work System, HSE Practice No3 Permit to Work Procedure
GP-CO-013-011.
system (and BPX Guidance in the use of the Permit to
associated activities) Work System, HSQ 01.05.03 Interactive Training with CD-
ROM.
Breaking Containment, HSE Practice No
12 Bridging Document between
Stolt Offshore and vessel
Isolations, HSE Practice No31 /installation PTW system.
General Standards

Passenger and   Helicopter Operations HSEP No 22 Amoex Production Operational Guidelines, Marine Operations
freight transportation AMO-O-003, Addendum 1 Helicopter Procedures
Operations.
Helidecks

Basket transfers   Marine Operations Procedure Business Unit specific

GP-CO-208-001 .

Adverse Weather   Marine Operation Procedure Business Unit specific


Working Policy
GP-CO-208-001

Scaffolding/Access/    Confined Space Entry, HSE Practice No16 Amoex Production Operational Guidelines, PTW procedure
Working AMO-O-003, Section 3 Mechanical and
GP-CO-103-011
Environment Construction, Para 2, Access

Tools and equipment  Amoex Production Operational Guidelines, Planned Maintenance


AMO-O-003, Section 3 Mechanical and
System MAXIMO.
Construction, Para 3, Use of Tools and Para
4, Mechanical Equipment and Guards. Safety Notices.

Compliance with PUWER and


LOLER
BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE Reference Documentation

BP Amoco Business
BP Amoco Federal
ISSUES TO BE
ADDRESSED

Stolt Offshore
(where applicable to BP Amoco Federal Documentation Stolt Offshore Business Unit
the scope of the Documentation Specific
contract)

Unit
Documentation

Electrical   Working with Electricity, HSE Practice


No15
AMOEX Electrical Procedures, AMO-O-005.
Electrical Work Procedure
GP-CO-110-004 .

Safety Notices

Safety Campaign

Ignition sources   Permit to Work Business Unit specific


GP-CO-103-011

Housekeeping   SHE Handbook Business Unit specific


HB-CO-103-001

Undesired Event Reporting


Procedure
GP-CO-103-014

Personal Protective   Personal Protective Equipment


HSE Practice No 5
(PPE), Amoex Occupational Health and Hygiene
Manual, AMO-H-001, Part A Occupational
Personal Protection
Equipment Procedure
Equipment Hygiene, Section 9 Personal Protective GP-OO-103-012
Equipment.
Equipment   XEU BP Procurement Handbook, October General Procurement AMO-S-242 Quality Management System
Procurement 1996
Procurement Instructions
Standards
XEU Procurement Vision, Policy and AI-CO-109-001 .
Strategy Statement
Approved Vendors List
En Garde Guidelines
Procurement Procedure
Offshore Contractors Charter GP-00-109-001

Equipment   Equipment
Instructions
Maintenance
Business Unit specific
Certification
AI-UK-110-001 .

Equipment Certification
Control Procedure
GP-UK-110-003
BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE Reference Documentation

BP Amoco Business
BP Amoco Federal
ISSUES TO BE
ADDRESSED

Stolt Offshore
(where applicable to BP Amoco Federal Documentation Stolt Offshore Business Unit
the scope of the Documentation Specific
contract)

Unit
Documentation

Equipment QC   Certification Control Business Unit specific


System Procedure

GP-UK-110-001

Safety critical    Interpretation and Guidance on Amoex Verification Manual, AM-I-001 Audit procedure Business Unit specific
equipment Performance Standards and Written (combined PFEER and DCR) verification arrangements
GP-CO-102-001
verification Schemes of Examination SI 1995 No743 - for compliance with DCR
PFEER PSR/G/96/0052 D.E.S.I.G.N. Audit (IMCA) and PFEER Regs.

Guidance on Where to Apply PFEER For Diving Systems .


Regulations Performance Standards HSQ
01.05.27. DPVOA Annual Trials

Guidance Notes on DCR, SPR/G/97/0018 Marine Safety Audits

Occupational Hygiene Standards

Hazardous   Hydrogen Sulphide, HSEP No10 Amoco NSDG H2S Contingency Manual –
Offshore, AMO-D-003
Control of Substances
substances/materials Hazardous to Health
Procedure

GP-OO-103-003

COSHH/OCNS   Control of Substances Hazardous to Health


Amoex Occupational Health and Hygiene
Manual, AMO-H-001, Part A Occupational
Control of Substances
(COSHH) HSEP No 18 Hygiene, Section 1 Control of Substances Hazardous to Health
Hazardous to Health (COSHH). Procedure
Guidance on the Implementation of
COSHH in UKOps, HSQ 21.06.01 GP-OO-103-003

Dangerous Goods   As per IATA Regulations Standard IATA Declaration


Declaration – IATA Forms Utilised
Regs
BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE Reference Documentation

BP Amoco Business
BP Amoco Federal
ISSUES TO BE
ADDRESSED

Stolt Offshore
(where applicable to BP Amoco Federal Documentation Stolt Offshore Business Unit
the scope of the Documentation Specific
contract)

Unit
Documentation

Noise and vibration   Noise Risk Management HSEP No 21 Amoex Occupational Health and Hygiene Noise control part of Vessel
Manual, AMO-H-001, Part A Occupational Safety Plan .
Guidance on the Implementation of the
Hygiene, Section 5 Noise Management
Noise at Work Regs in UKOps, HSQ Noise Assessments and
Programme.
21.06.02 Records

Thermal radiation   Appropriate Risk Business Unit specific


Assessments

Ionising/Non-Ionising   Radioactive Materials HSE Practice No 17 AMOEX Manual of Work for Radioactive
Substances, AMO-S-003
Hyperbaric Welding
radiation Procedures Related to the Storage, Use Instructions
and Disposal of Radioactive Materials,
HSQ 34.04.05 OI-CO-204-00

Occupational Health
Manual for Work with Radioactive Material,
HSQ 01.05.25 Procedure

GP-OO-103-004
Manual of Working for Equipment
Contaminated by LSA Radioactive Scale,
HSQ 34.04.03
Pressure   Pressure/Leak Testing HSE Practice No 26 Amoex Production Operational Guidelines,
AMO-O-003, Section 3 Mechanical and
Pressure Testing Operations
Construction, Para 13 Pressure Testing. WP-CO-214-026

Project Specific Procedures

Manual handling   Manual Handling Operations, Guidelines Amoex Occupational Health and Hygiene Manual Handling Procedure
for Risk Assessment and Mitigation, HSQ Manual, AMO-H-001, Part A, Section 7,
GP-OO-103-018 .
01.05.14 Manual Handling

Display screen   Display Screen Equipment Regulations Amoex Occupational Health and Hygiene Display Screen Equipment at
equipment Guidance for Co-ordinators, HSQ 01.05.19, Manual, AMO-H-001, Part A, Section 6, Work Guidelines
Rev0 April 1993 Display Screen Equipment.
GU-UK-103-009

Food hygiene   Offshore Medics Policies and Procedures Occupational Health and Hygiene Manual Occupational Health
Manual, HSQ 02.04.01 AMO-H-001 Procedure

GP-OO-103-004
BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE Reference Documentation

BP Amoco Business
BP Amoco Federal
ISSUES TO BE
ADDRESSED

Stolt Offshore
(where applicable to BP Amoco Federal Documentation Stolt Offshore Business Unit
the scope of the Documentation Specific
contract)

Unit
Documentation

Potable water,   Offshore Medics Policies and Procedures Occupational Health and Hygiene Manual Biological Control Guidance
Legionella sampling Manual, HSQ 02.04.01 AMO-H-001
GU-OO-103-001 .

3.2 Competency and Training


Competence   BP Amoco : CMAS (Competency
Amoex Competency Assurance System
AMO-S-239
Competency Assessment
assurance process Management Assurance System)
Procedure : GP-UK-106-013 .
Amoex Safety Management System, AMO-
Health, Safety and Environmental S-001, Section 15 Training.
Competence Assurance Programme HSQ
00.01.02. Rev0.

Competency Asurance for Onshore Based


Staff XEG/G/93/004

Onshore induction    BP Amoco Dyce Office Induction Induction Procedure BU Specific Induction
GP-UK-106-011

Onshore Induction Video

Offshore induction –    Step Change Common Induction to be


Amoex Safety Management System, AMO-
S-001, Section 10, General Safety Offshore.
Vessel Specific Induction Platform specific induction
health and safety instigated
Procedure and Video

Offshore induction –  Vessel Specific Induction Job specific induction


job
Procedure .

PTW system formal   XEU Central Training Guidance, Use of Interactive CD-ROM training,
training Permit to Work System Manual supervised and logged

Job and task training  Offshore Training Manual M-7118 Training and Development
Policy GP-UK-106-014 .
BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE Reference Documentation

BP Amoco Business
BP Amoco Federal
ISSUES TO BE
ADDRESSED

Stolt Offshore
(where applicable to BP Amoco Federal Documentation Stolt Offshore Business Unit
the scope of the Documentation Specific
contract)

Unit
Documentation

Hazardous  COSHH Awareness / Assessors Training COSHH Training Course and


substances training (Occupational Hygiene, Dyce) Guide lines GU-UK-110-002 .

Training Records

Occupational health  BP Group Principals of Occupational Vessel Medics Handbook. Business Unit specific
and hygiene training Hygiene (Occupational Hygiene, Sunbury)
Training Records

Emergency response   Offshore Emergency Training Standards


Training, Drills and
223
Simulations, AMO-S-
Emergency Task Force
training HSQ 01.02.10. Rev0 May 1995 Specifications

GS-UK-103-001

Training Material.

Training Records.

3.3 Control of Change


Method for    BP Amoco Procurement Management Process Forums and Management Business Unit specific
developing, agreeing Meeting Minutes.
BP Amoco Change Management Process (TBA) Foinaven
and reviewing
Minutes of Safety Committee
programme of
Meetings.
shared activity
Feedback from Suppliers and
Contractors.
BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE Reference Documentation

BP Amoco Business
BP Amoco Federal
ISSUES TO BE
ADDRESSED

Stolt Offshore
(where applicable to BP Amoco Federal Documentation Stolt Offshore Business Unit
the scope of the Documentation Specific
contract)

Unit
Documentation

Responsibilities and arrangements for managing change

Programme of    Change Assessment and Management Change Control Guidelines


shared activity Process, AMO-S-212 GU-CO-108-002
(workscope/program
Amoex Change Assessment Procedure
me/plans)
(CAP) AMO-O-007

Management   BP Amoco Procurement Management Process Quality Plans Business Unit specific
structure

Key personnel   BP Amoco Procurement Management Process Quality Plans Business Unit specific

SMS Interfacing    Management of Contractors HSE Practice Bridging Documents Specific


Arrangements No 33 to each project .

Step Change Guidance on SMS Interfacing, HSE Requirements for


Jan 1999
Contractors GU-UK-103-007

Engineering,   Technical Integrity Performance Standards Amoex Change Assessment Procedure Engineering Instructions Business Unit specific
hardware mods. (TIPS) XEG/G/93/029 (CAP) AMO-O-007 process.
OI-CO-201-001

Safety Case impact  Offshore Safety Cases - Change Safety Case and COMAH Report
Management and Material Change Criteria, Management, AMO-S-012
HSQ 01.05.10, Rev2, Jan 1996

Health and safety   Amoex Change Assessment Procedure SHE Instructions


standards and (CAP) AMO-O-007
AI-OO-103-001
procedures
BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE Reference Documentation

BP Amoco Business
BP Amoco Federal
ISSUES TO BE
ADDRESSED

Stolt Offshore
(where applicable to BP Amoco Federal Documentation Stolt Offshore Business Unit
the scope of the Documentation Specific
contract)

Unit
Documentation

3.4 Selection and Control of Third Parties


Third party   Management of Contractors HSE Practice Procurement, Subcontracting
qualification and No 33 and Logistic Instructions
selection
AI-CO-109-001

Third party SMS   Management of Contractors HSE Practice Project Specific Bridging
Interfacing No 33 documents.
Arrangements
Out of Hours Duty Rosters

3.5 Control in Emergencies


Emergency response   BP Amoco Dyce Emergency Response Procedures Manual Emergency Preparedness
organigram/plan/ Documents
responsibilities
Weekly Duty Rosters

Emergency   BP Amoco Dyce Emergency Response Procedures Manual Emergency Preparedness


communication Documents

Weekly Duty Rosters

Exercises and drills   Specific to each company Business Unit specific


schedule vessel . schedule.
BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE Reference Documentation

BP Amoco Business
BP Amoco Federal
ISSUES TO BE
ADDRESSED

Stolt Offshore
(where applicable to BP Amoco Federal Documentation Stolt Offshore Business Unit
the scope of the Documentation Specific
contract)

Unit
Documentation

3.6 Occupational Health


Health and fitness  Offshore Medics Policies and Procedures SHE Instructions
screening/monitoring Manual, HSQ 02.04.01
AI-OO-103-001

Element 10 – Occupational
Health

UKOOA Guidelines for


medical Aspects fitness for
Offshore Work

Requirements of SI 2776 for


divers .

Drug and alcohol  Substance abuse policy and Business Unit specific
abuse policy
Procedure GP-UK-106-006

Smoking, hygiene  Smoking policy Business Unit specific


and welfare
GP-UK-106-005

Medical   Offshore Medics Policies and Procedures Medical Treatment and


treatment/emergenci Manual, HSQ 02.04.01 Reporting Procedure
es
GP-OO-103-017
BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE Reference Documentation

BP Amoco Business
BP Amoco Federal
ISSUES TO BE
ADDRESSED

Stolt Offshore
(where applicable to BP Amoco Federal Documentation Stolt Offshore Business Unit
the scope of the Documentation Specific
contract)

Unit
Documentation

4.0 Measure Performance

4.1 Active Monitoring


Key health and safety   Identified in BP Amoco Procurement Management of Contractors, HSE Practice North Sea HSE Action Plan
performance Management Process and specific for each 33
QP-UK-103-001
indicators contract.
Stolt Offshore/BP Amoco
Contract 101974 Section VI,
HSEQ Performance Indicators

Joint health and  Management of Contractors, HSE Practice Additional Business Unit
safety performance 33 requirements.
targets

Structured health and safety monitoring programme

Health and safety   BP Amoco Procurement Management Process Project Safety Plan Business Unit specific
meetings schedule
SP-ENG-364-600 schedule

Worksite/plant/equip   BP Amoco Procurement Management Process Audit Schedule Business Unit specific / site
ment inspections
schedule

Observation of   STOP Programme Be Safe Programme Undesired Events Reporting


work/behaviour
Advanced Safety Auditing GP-CO-103-014

Competence reviews  Project Specific Pre- Business Unit specific


Mobilisation (Project HSEQ
Plan)

SP-ENG-364-600
BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE Reference Documentation

BP Amoco Business
BP Amoco Federal
ISSUES TO BE
ADDRESSED

Stolt Offshore
(where applicable to BP Amoco Federal Documentation Stolt Offshore Business Unit
the scope of the Documentation Specific
contract)

Unit
Documentation

General  Project HSEQ Plan Business Unit specific


housekeeping
SP-ENG-364-600
inspections

Joint management   Project Safety Tours Identified by Business Unit


worksite visits
Schedule

Workforce surveys   Ad-Hoc Questionnaire Business Unit specific

Recognition/incentive   BP Amoco Procurement Management Process Ad-Hoc Project Specific Business Unit specific
schemes Schemes

Improvement   BP Amoco Procurement Management Process Project Specific Performance Additional Business Unit
initiatives Improvement Plan specific initiatives.

Health and safety    BP Amoco Procurement Management Process, Monthly Performance Reporting and Monthly, Quarterly and
performance reports Performance Reviews Annually Project Safety
(Review of performance Reports
against targets etc.)

Communication/track   Federal Action Tracking System Action Tracking Database. Business Unit specific
ing/follow-up of processes
Project Close Out Reports.
improvement actions
– shared learning Undesired events

Close out reports.


-
BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE Reference Documentation

BP Amoco Business
BP Amoco Federal
ISSUES TO BE
ADDRESSED

Stolt Offshore
(where applicable to BP Amoco Federal Documentation Stolt Offshore Business Unit
the scope of the Documentation Specific
contract)

Unit
Documentation

4.2 Investigation and Recording of Accidents and Incidents


Accident and incident   Standard for Notification and Recording of RIDDOR Reporting, AMO-S-228 Undesired Events Reporting
notification (internally and Fatalities, HSQ 01.02.05 Rev0
Procedure GP-CO-103-014 .
externally to authorities)
User Guide for Serious Occurrence
RIDDOR Reporting.
Reporting, HSQ 01.05.02 Rev1, Jan 1993

Guidance on the Loss Potential Matrix,


HSQ 01.05.05. Rev4, Feb 1995

Accident and incident   Incident Reporting and Investigation, HSE Accident/Incident Investigation and Analysis, Undesired Events Reporting
reporting, Practice No2 AMO-S-225
Procedure GP-CO-103-014
investigation and
Standard for the Measurement, Valuation SH&E Data Collection and Reporting
review Accident / Incident
and Reporting of Loss, HSQ 10.02.01 Mar (Prosafe), AMO-S-230
Investigation Procedure
1991
GP-OO-103-013
Reporting of Halon/CFC Releases HSQ
43.06.01 Oct 1991

Involvement of Offshore Safety Reps in


Accident/Incident Investigations, HSQ
34.06.01, Feb 1990

Communication/track   Lessons Learned, HSE Practice No34 Project Safety Review Business Unit specific
ing/follow-up of Meeting minutes. processes
Federal Action Tracking System
accident and incident
Accident reporting Log.
corrective actions –
shared learning Operation Safety Meeting
Minutes.

Safety Notices.

Safety Flyers.
BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE Reference Documentation

BP Amoco Business
BP Amoco Federal
ISSUES TO BE
ADDRESSED

Stolt Offshore
(where applicable to BP Amoco Federal Documentation Stolt Offshore Business Unit
the scope of the Documentation Specific
contract)

Unit
Documentation

5.0 Audit and Review

5.1 Audit, Review and Apply the Lessons


Structured joint health and safety audit and review programme

Pre-execution audits  Safety Audit Schedule Business Unit specific

Audits of third parties   Safety Audit Schedule Business Unit specific

SMS audits   Safety Audit Schedule Business Unit specific

Audits to check   Safety Audit Schedule Business Unit specific


compliance with
standards

Audits to assist the   Safety Audit Schedule Business Unit specific


implementation of
health and safety
plans

Final review of the   BP Amoco Procurement Management Process Review of Bridging


SMS Interfacing documents at Mobilisations.
Management of Contractors, HSE Practice No33
Arrangements before
Mobilisation Audits.
start of operations

Periodic reviews of   BP Amoco Procurement Management Process Project Safety Review


safety performance Meetings every two weeks.
reports, including
Operation Meeting Minutes.
reviews of accident
and incident reports
and statistics
BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE Reference Documentation

BP Amoco Business
BP Amoco Federal
ISSUES TO BE
ADDRESSED

Stolt Offshore
(where applicable to BP Amoco Federal Documentation Stolt Offshore Business Unit
the scope of the Documentation Specific
contract)

Unit
Documentation

Audits to check   Safety Plans Business Unit specific


compliance with SMS
Interfacing
Arrangements

Review and update   Safety Plans. Business Unit specific


of SMS Intefacing
Arrangements

Demobilisation and   Safety Plans. Business Unit specific


close out reviews

Communication/track    Federal Action Tracking System Closeout reports. Business Unit specific
ing/follow-up of audit
Audit Reports.
and review
recommendations –
shared learning of
lessons from audits
and reviews
SAFETY M AN AG EM EN T SYSTEM INTERFAC E BETW EEN BP AM OC O AND STO LT O FFSH O RE LTD

Vessel Ow ner BP Am oco Stolt O ffshore

B P A m oco S to lt
V essel O w ner
A s s e t O ffic e T eam Leader
P ro je c t
S a fe ty A d v is o r
B P A m oco
U TG S ubsea S to lt
T eam P ro je c t M a n a g e r
O nshore
O ffshore

B P A m oco B P A m o c o /S to lt O ffs h o re
A s s e t O IM R e p re s e n ta tiv e

S to lt O ffs h o re
V e s s e l M a s te r
O ffs h o re M a n a g e r

S a fe ty D elega te S a fe ty C om m ittee
C h ie f
O ffic e r

ROV D iving O the r


S u rveyor
S u pervisor S u pervisor S u pervisor

S h ip C h ie f
C re w E n g in e e r R O V P ilots &
D iving C rew O the r C rew
T echnicians

A B B S eatec
D iving T echs O the r T echs
T echs