Download as pdf or txt
Download as pdf or txt
You are on page 1of 38

SMS Interface –

Diving and Subsea – DSND UKCS-CSM-003

Contents

Authorisation for Issue


Amendment Record
Amendment Summary
Distribution List
Preface
Uncontrolled

SMS Interface – Diving and Subsea – DSND

March 2001 Issue 1 i/ii


SMS Interface –
Diving and Subsea – DSND UKCS-CSM-003

Authorisation for Issue

Issue Authority
Name: Rosy Wood

Signature: ________________________________________________

Date: ________________________________________________

Position: Delivery Manager


Uncontrolled

Technical Authority
Name: Trevor Stapleton

Signature: ________________________________________________

Date: ________________________________________________

Position: HSE Team Leader, CNS Gas

March 2001 Issue 1 iii/iv


SMS Interface –
Diving and Subsea – DSND UKCS-CSM-003

Amendment Record

For Audit Use


Amendment Incorporated By
Checked
Number
Name Signature Date Signature Date
Uncontrolled

AMOSAF.171

March 2001 Issue 1 v/vi


SMS Interface –
Diving and Subsea – DSND UKCS-CSM-003

Amendment Summary

Issue No Date Description


Issue 1 March 2001 First issue.
Uncontrolled

March 2001 Issue 1 vii/viii


SMS Interface –
Diving and Subsea – DSND UKCS-CSM-003

Distribution List

Holders of Controlled Hard Copy

Copy Copyholder Location

01 Manager of BP Contracts DSND


02 Data Control Centre (DCC) ODL, Aberdeen

Virtual Copyholders
Uncontrolled

Copy Copyholder

01 Document Issue Authority


(Rosy Wood)
02 Document Technical Authority
(Trevor Stapleton)

March 2001 Issue 1 ix/x


SMS Interface –
Diving and Subsea – DSND UKCS-CSM-003

Preface

Review and Update


This document will be subject to 12-monthly review and update, when document holders will
have the opportunity to express opinions and suggest improvements.
However, the document control system allows for continuous update of this document. As
such, any user may at any time identify an error or suggest an improvement using an
Amendment Proposal proforma which is available electronically on the UKCS SMS website,
from the Data Control Centre (DCC) Supervisor or from the Technical Authority.
Uncontrolled

All holders of this document are registered so that they can be sent updates and be kept
informed of changes or reviews.

Responsibility of Copyholders
It is the responsibility of the registered copyholder of controlled hard copy versions to
maintain the accuracy of the document by ensuring that all updates are promptly
incorporated and acknowledged.
Furthermore, the registered copyholder of controlled hard copy versions must at all times
maintain custody of this document unless prior approval is given by the relevant
Technical Authority.
The roles and responsibilities of copyholders and ‘virtual’ copyholders are detailed in Section 1
of the Document Control Procedure (UKCS-DCM-001).

March 2001 Issue 1 xi/xii


Region or Legal Entity: Document No:

Document Title: Customer Document No:


SMS Interface between BP Amoco and DSND Ltd.

TABLE OF CONTENTS

1.0 INTRODUCTION............................................................................................................................................. 2
1.1 SCOPE............................................................................................................................................................ 2
1.2 OBJECTIVES................................................................................................................................................. 2
2.0 SMS INTERFACE ............................................................................................................................................ 2

APPENDIX I MATRIX OF SAFETY MANAGEMENT SYSTEMS INTERFACE BETWEEN BP AMOCO


AND DSND SUBSEA LTD ........................................................................................................................................ 3

Rev. Page 1 of 27
Region or Legal Entity: Document No:

Document Title: Customer Document No:


SMS Interface between BP Amoco and DSND Ltd.

1.0 INTRODUCTION

1.1 SCOPE
This document constitutes a high level description of the Safety Management Systems
of BP and DSND Subsea Ltd, which are in operation on any one site whilst the two
companys’ are working in a contractual relationship.

1.2 OBJECTIVES
The objective of this report is to compare the documented Safety Management Systems
(SMS) of BP Amoco and DSND Subsea Ltd, and where recognised interface exists to,
identify the relevant BP Amoco and DSND Subsea Ltd documentation.

2.0 SMS INTERFACE

This exercise has been conducted by using the template provided by BP Amoco.

Where relevant, DSND Subsea Ltd documentation is listed opposite that of BP Amoco.

Given the space available, a certain amount of selection had to be exercised in the
process. Should any entry require explanations or discussions, the undersigned will be
happy to provide further information as the case may be.

Rev. Page 2 of 27
Region or Legal Entity: Document No:

Document Title: Customer Document No:


SMS Interface between BP Amoco and DSND Ltd.

APPENDIX I
MATRIX OF SAFETY MANAGEMENT SYSTEMS INTERFACE
BETWEEN
BP AMOCO AND DSND SUBSEA LTD

(19 Pages to Follow)

Rev. Page 3 of 27
BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE BP
Am
BP
Am
St
olt
Reference Documentation
ISSUES TO BE
oco oco Off
ADDRESSED
Fed Bus sh
eral ines or
s e
Unit

(where applicable to BP Amoco Federal Documentation Contractor Business Unit


the scope of the Documentation Specific
contract) Documentation

1.0 Set Interfacing Policy / Objectives

1.1 Policy Objectives and Corporate Acceptance of Responsibility


Health and safety    BP Amoco, What we stand for….. our Business Policies, Commitments and Expectations,
Sir John Browne, Feb 1999
QHSE Policy Statement. Identification of any
objectives Business Unit specific
Signed 01 / 2000 .
BP Amoco HSE Policy, Sir John Browne, February 1999 policy statements.

BP Amoco Safety Charter, Alan Jones, February 1999

Getting HSE Right, January 1999


Joint statement of
commitment (if
 (Interface documentation will take into account the company statements of both parties.
There is no requirement for an additional statement, unless there is a specific Business
Joint contractors statement to
be drafted for any work during
appropriate) Unit need) 2001

2.0 Organise

2.1 Structure and Accountability


Integrated   Hierarchical organigram representing the key positions within the scope of the contract DSND Organisation Charts Business Unit requirements
organigram identified within this document. – see 5.2 Figure 1 identified.
Company and Project

Responsibility   Reference to specific key positions within each management system, or short statements Current Functional
statements required in this document. See 5.2 Descriptions

HSE Awareness plan


BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE BP
Am
BP
Am
St
olt
Reference Documentation
ISSUES TO BE
oco oco Off
ADDRESSED
Fed Bus sh
eral ines or
s e
Unit

(where applicable to BP Amoco Federal Documentation Contractor Business Unit


the scope of the Documentation Specific
contract) Documentation

Communication of    Project Bridging Document Business Unit requirement


SMS Interfacing
Vessel Familiarisation
Arrangements to
persons on
integrated
organigram

Communication of    Project/Department Induction Business Unit requirement


SMS Interfacing Procedure
Arrangements to
Safety Manual Vol 4, Ch. 1
workforce
Sc. 10

Additional resources   Identified at Projectt level as Identified at Business Unit


for SMS Interfacing required level is required
Arrangements

Working time    Identified prior to the commencement of the contract and monitored by each Business Unit. Refer to DSND Employment
arrangements Guide

2.2 Involvement of the Workforce


SMS Interfacing   BP Amoco Safety Representatives Communication Forum Safety Committees Business Unit specific
Arrangements for arrangements.
Safety Manual Vol 4, Ch. 1
employee Safety
Sc. 13
Representatives and
Safety Committees

3.0 Plan and Set Standards

3.1 Hazard Analysis and Controlling Risks


BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE BP
Am
BP
Am
St
olt
Reference Documentation
ISSUES TO BE
oco oco Off
ADDRESSED
Fed Bus sh
eral ines or
s e
Unit

(where applicable to BP Amoco Federal Documentation Contractor Business Unit


the scope of the Documentation Specific
contract) Documentation

Review of applicable   UK Offshore Safety Legislation, HSQ 01.05.13 Legislation updates available Business Unit specific
health and safety Rev2, March 1996 through Croners systems, e.g. Westons on-
regulations subscriptions, and available to line, Oilrig software.
all HSE Advisors

Process for hazard   HSE Risk Analysis Standard, HSQ 01.02.01, Rev AMOEX Procedure and Guidance Hazard Identification and Risk
identification & 0, Nov 1992 (prepared by Saf Eng approved by for Hazard Identification and Risk Assessment procedure
assessment HSQ Mngr) Assessment, AMO-O-011
DSND Diving and Subsea
Methodology for Hazard Identification and Hazard Intervention Manual
Assessment for Existing Installations,
HSQ/MC/92/004, Rev A1, May 1992
BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE BP
Am
BP
Am
St
olt
Reference Documentation
ISSUES TO BE
oco oco Off
ADDRESSED
Fed Bus sh
eral ines or
s e
Unit

(where applicable to BP Amoco Federal Documentation Contractor Business Unit


the scope of the Documentation Specific
contract) Documentation

Risk assessments

QRA/Hazop/Hazid   Guidelines for HAZID Studies, HSQ Amoex Safety Case and COMAH Safety Hazard Identification and Risk
01.05.01 Report Management Manual, AMO-O-012 Assessment procedure

Guidelines for HAZOP Studies, HSQ DSND Diving and Subsea


01.05.26 Rev0, Dec 1995 (prepared by Saf
Safety Case and CIMAH Report Intervention Manual.
Eng approved
Management, AMO-S-206
Guidelines for Carrying Out Critical; Safety
Reviews, HSQ 01.05.16

Quantified Risk Assessment Guidance on


Best Practice, HSQ 01.05.27, Rev 0a, Feb
1995

Formal Safety Assessment: Risk


Management Model, Rev R1, HSQ
01.05.12, May 1996 (prepared by Saf Eng
approved by Saf Mngr)

Task/activity specific   Task Risk Assessment, HSE Practice No 9 Workplace Risk Assessments, AMO-S-213
Hazard Identification and Risk
risk assessments MHSWR - Risk Assessment Guidelines, Amoex Procedure and Guidance for Hazard Assessment procedure
HSQ 01.05.11 Identification and Risk Assessment, AMO- DSND Diving and Subsea
O-011 Intervention Manual

Amoex Operations Procedure Review


Process, AMO-S-218
BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE BP
Am
BP
Am
St
olt
Reference Documentation
ISSUES TO BE
oco oco Off
ADDRESSED
Fed Bus sh
eral ines or
s e
Unit

(where applicable to BP Amoco Federal Documentation Contractor Business Unit


the scope of the Documentation Specific
contract) Documentation

COSHH/workstation/   Control of Substances Hazardous to Amoex Occupational Health and Hygiene


Safety Management System

manual handling Health, HSE Practice No18 Manual, AMO-H-001, Part A, Section 1, Local Risk Assessments
assessments Control of Substances Hazardous to Health
Guidance on the Implementation of
COSHH in UKOps HSQ 21.06.01 Amoex Occupational Health and Hygiene
Manual, AMO-H-001, Part A, Section 6,
Display Screen Equipment Regulations
Display Screen Equipment.
Guidance for Co-ordinators, HSQ 01.05.19,
Rev0 April 1993 Amoex Occupational Health and Hygiene
Manual, AMO-H-001, Part A, Section 7,
Manual Handling Operations, Guidelines
Manual Handling
for Risk Assessment and Mitigation, HSQ
01.05.14

Method statements   Task Specific Workpacks Business Unit specific.


and work instructions Task Plans

Communication of   Toolbox Talks. Toolbox talks, safety


risk assessments meetings, pre-work
Minutes of Safety Committee
meetings.
Meetings.

Shift Handover meeting


BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE BP
Am
BP
Am
St
olt
Reference Documentation
ISSUES TO BE
oco oco Off
ADDRESSED
Fed Bus sh
eral ines or
s e
Unit

(where applicable to BP Amoco Federal Documentation Contractor Business Unit


the scope of the Documentation Specific
contract) Documentation

Permit to Work   Permit to Work System, HSE Practice No3 Permit to Work Procedure
Safety Manual Vol 4, Ch.1,
system (and BPX Guidance in the use of the Permit to Sec. 8
associated activities) Work System, HSQ 01.05.03
Interactive Training with
Breaking Containment, HSE Practice No Video/Questionnaire.
12
Bridging Document between
Isolations, HSE Practice No31 DSND/installation PTW
system.
General Standards

Passenger and   Helicopter Operations HSEP No 22 Amoex Production Operational Guidelines, Marine Operations
freight transportation AMO-O-003, Addendum 1 Helicopter Procedures
Operations.

Basket transfers   Marine Operations Procedure Business Unit specific

Adverse Weather   Marine Operation Procedure Business Unit specific


Working Policy

Scaffolding/Access/    Confined Space Entry, HSE Practice No16 Amoex Production Operational Guidelines, PTW procedure
Working AMO-O-003, Section 3 Mechanical and Safety Manual Vol 4, Ch.1,
Environment Construction, Para 2, Access Sec. 8

Tools and equipment  Amoex Production Operational Guidelines, Planned Maintenance System
AMO-O-003, Section 3 Mechanical and
Safety Notices.
Construction, Para 3, Use of Tools and Para
4, Mechanical Equipment and Guards. Compliance with PUWER and
LOLER
BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE BP
Am
BP
Am
St
olt
Reference Documentation
ISSUES TO BE
oco oco Off
ADDRESSED
Fed Bus sh
eral ines or
s e
Unit

(where applicable to BP Amoco Federal Documentation Contractor Business Unit


the scope of the Documentation Specific
contract) Documentation

Electrical   Working with Electricity, HSE Practice


No15
AMOEX Electrical Procedures, AMO-O-005.
Electrical Work Procedure
Safety Manual Vol 4. Ch. 2,
Sec. 8

Safety Notices

Ignition sources   Permit to Work Business Unit specific

Housekeeping   Safe means of access and Business Unit specific


safe place of work, general
housekeeping

Safety Manual V0l. 4, Ch. 2,


Sec 3

Hazard Observation System

Personal Protective   Personal Protective Equipment


HSE Practice No 5
(PPE), Amoex Occupational Health and Hygiene
Manual, AMO-H-001, Part A Occupational
Personal Protection
Equipment Procedure
Equipment Hygiene, Section 9 Personal Protective Safety Manual V0l. 4, Ch. 2,
Equipment. Sec 1
Equipment   XEU BP Procurement Handbook, October General Procurement AMO-S-242 Quality Management System
Procurement 1996
Approved Vendors List
Standards
XEU Procurement Vision, Policy and (FPAL)
Strategy Statement
Procurement Procedure
En Garde Guidelines QA009

Offshore Contractors Charter


BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE BP
Am
BP
Am
St
olt
Reference Documentation
ISSUES TO BE
oco oco Off
ADDRESSED
Fed Bus sh
eral ines or
s e
Unit

(where applicable to BP Amoco Federal Documentation Contractor Business Unit


the scope of the Documentation Specific
contract) Documentation

Equipment   Equipment Maintenance


Instructions
Business Unit specific
Certification LV3-02FACA-00001-PR

Equipment Certification
Control Procedure
LV3-02FACA-00002-PR
BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE BP
Am
BP
Am
St
olt
Reference Documentation
ISSUES TO BE
oco oco Off
ADDRESSED
Fed Bus sh
eral ines or
s e
Unit

(where applicable to BP Amoco Federal Documentation Contractor Business Unit


the scope of the Documentation Specific
contract) Documentation

Equipment QC   Certification Control Business Unit specific


System Procedure

LV3-02FACA-00002-PR

Safety critical    Interpretation and Guidance on Amoex Verification Manual, AM-I-001 Audit procedure Business Unit specific
equipment Performance Standards and Written (combined PFEER and DCR) verification arrangements
AB-Q-PR-00002
verification Schemes of Examination SI 1995 No743 - for compliance with DCR
PFEER PSR/G/96/0052 D.E.S.I.G.N. Audit (IMCA) and PFEER Regs.

Guidance on Where to Apply PFEER For Diving Systems .


Regulations Performance Standards HSQ
01.05.27. DPVOA Annual Trials

Guidance Notes on DCR, SPR/G/97/0018 Marine Safety Audits

Occupational Hygiene Standards

Hazardous   Hydrogen Sulphide, HSEP No10 Amoco NSDG H2S Contingency Manual –
Offshore, AMO-D-003
Storage and Handling of
substances/materials Materials

Safety Manual Vol. 4, Ch2,


Sec 2

SYPOL Risk Assessment


Database

COSHH/OCNS   Control of Substances Hazardous to Health


Amoex Occupational Health and Hygiene
Manual, AMO-H-001, Part A Occupational
Storage and Handling of
(COSHH) HSEP No 18 Hygiene, Section 1 Control of Substances Materials
Hazardous to Health (COSHH).
Guidance on the Implementation of Safety Manual Vol. 4, Ch2,
COSHH in UKOps, HSQ 21.06.01 Sec 2

SYPOL Risk Assessment


Database
BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE BP
Am
BP
Am
St
olt
Reference Documentation
ISSUES TO BE
oco oco Off
ADDRESSED
Fed Bus sh
eral ines or
s e
Unit

(where applicable to BP Amoco Federal Documentation Contractor Business Unit


the scope of the Documentation Specific
contract) Documentation

Dangerous Goods   As per IATA Regulations Standard IATA Declaration


Declaration – IATA Forms Utilised
Regs
BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE BP
Am
BP
Am
St
olt
Reference Documentation
ISSUES TO BE
oco oco Off
ADDRESSED
Fed Bus sh
eral ines or
s e
Unit

(where applicable to BP Amoco Federal Documentation Contractor Business Unit


the scope of the Documentation Specific
contract) Documentation

Noise and vibration   Noise Risk Management HSEP No 21 Amoex Occupational Health and Hygiene Noise at Work
Manual, AMO-H-001, Part A Occupational
Guidance on the Implementation of the Safety Manual Vol 4, Ch. 1,
Hygiene, Section 5 Noise Management
Noise at Work Regs in UKOps, HSQ Sec 12
Programme.
21.06.02
Noise control part of Vessel
Safety Plan .

Noise Assessments and


Records

Thermal radiation   Appropriate Risk Business Unit specific


Assessments

Ionising/Non-Ionising   Radioactive Materials HSE Practice No 17 AMOEX Manual of Work for Radioactive
Substances, AMO-S-003
Radiation Procedures
radiation Procedures Related to the Storage, Use Safety Manual Vol 4, Ch. 2,
and Disposal of Radioactive Materials,
HSQ 34.04.05 Sec 10

Manual for Work with Radioactive Material,


HSQ 01.05.25

Manual of Working for Equipment


Contaminated by LSA Radioactive Scale,
HSQ 34.04.03
Pressure   Pressure/Leak Testing HSE Practice No 26 Amoex Production Operational Guidelines,
AMO-O-003, Section 3 Mechanical and
Pressure Testing (hydraulic
Construction, Para 13 Pressure Testing. and Pneumatic)

Safety Manual Vol 4, Ch.2,


Sec. 9

Project Specific Procedures


BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE BP
Am
BP
Am
St
olt
Reference Documentation
ISSUES TO BE
oco oco Off
ADDRESSED
Fed Bus sh
eral ines or
s e
Unit

(where applicable to BP Amoco Federal Documentation Contractor Business Unit


the scope of the Documentation Specific
contract) Documentation

Manual handling   Manual Handling Operations, Guidelines Amoex Occupational Health and Hygiene Storage and Handling of
for Risk Assessment and Mitigation, HSQ Manual, AMO-H-001, Part A, Section 7, Materials
01.05.14 Manual Handling
Safety Manual Vol 4, Ch. 2,
Sec. 2

Display screen   Display Screen Equipment Regulations Amoex Occupational Health and Hygiene Appropriate Risk
equipment Guidance for Co-ordinators, HSQ 01.05.19, Manual, AMO-H-001, Part A, Section 6, Assessments
Rev0 April 1993 Display Screen Equipment.

Food hygiene   Offshore Medics Policies and Procedures Vessel Operations Safety
Manual, HSQ 02.04.01 Manual
BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE BP
Am
BP
Am
St
olt
Reference Documentation
ISSUES TO BE
oco oco Off
ADDRESSED
Fed Bus sh
eral ines or
s e
Unit

(where applicable to BP Amoco Federal Documentation Contractor Business Unit


the scope of the Documentation Specific
contract) Documentation

Potable water,   Offshore Medics Policies and Procedures Vessel Operations Safety
Legionella sampling Manual, HSQ 02.04.01 Manual

3.2 Competency and Training


Competence   BP Amoco : CMAS (Competency Workpack Competency Matrix
assurance process Management Assurance System)

Health, Safety and Environmental


Competence Assurance Programme HSQ
00.01.02. Rev0.

Competency Asurance for Onshore Based


Staff XEG/G/93/004

Onshore induction    BP Amoco Dyce Office Induction Onshore Induction Checklist BU Specific Induction

Offshore induction –    Step Change Common Induction to be


Amoex Safety Management System, AMO-
S-001, Section 10, General Safety Offshore.
Vessel Specific Induction Platform specific induction
health and safety instigated
Procedure and Video

Offshore induction –  Project Specific Induction Job specific induction


job
Procedure .

PTW system formal   XEU Central Training Guidance, Use of Interactive


training Permit to Work System Manual video/questionnaire training,
supervised and logged

Job and task training  Offshore Training Manual M-7118 Training and Development as
per Job Description
requirements
BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE BP
Am
BP
Am
St
olt
Reference Documentation
ISSUES TO BE
oco oco Off
ADDRESSED
Fed Bus sh
eral ines or
s e
Unit

(where applicable to BP Amoco Federal Documentation Contractor Business Unit


the scope of the Documentation Specific
contract) Documentation

Hazardous  COSHH Awareness / Assessors Training COSHH Training Course.


substances training (Occupational Hygiene, Dyce)
Training Records

Occupational health  BP Group Principals of Occupational Vessel Medics. Business Unit specific
and hygiene training Hygiene (Occupational Hygiene, Sunbury)
Training Records

Emergency response   Offshore Emergency Training Standards


Training, Drills and
223
Simulations, AMO-S-
Training Material.
training HSQ 01.02.10. Rev0 May 1995
Training Records.

3.3 Control of Change


Method for    BP Amoco Procurement Management Process Forums and Management Business Unit specific
developing, agreeing Meeting Minutes.
BP Amoco Change Management Process (TBA) Foinaven
and reviewing
Minutes of Safety Committee
programme of
Meetings.
shared activity
Feedback from Suppliers and
Contractors.

Subcontractor Safety Culture


Reviews

Time out for Safety


Discussions

Safety Behaviour Workshops

Offshore Safety Seminar


BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE BP
Am
BP
Am
St
olt
Reference Documentation
ISSUES TO BE
oco oco Off
ADDRESSED
Fed Bus sh
eral ines or
s e
Unit

(where applicable to BP Amoco Federal Documentation Contractor Business Unit


the scope of the Documentation Specific
contract) Documentation

Responsibilities and arrangements for managing change

Programme of    Change Assessment and Management Onshore Change Request


shared activity Process, AMO-S-212 Procedure
(workscope/program
Amoex Change Assessment Procedure LV2- OADMIN-00003-PR
me/plans)
(CAP) AMO-O-007

Management   BP Amoco Procurement Management Process QHS&E Plans Business Unit specific
structure
Organisation Charts

Key personnel   BP Amoco Procurement Management Process QHS&E Plans Business Unit specific

SMS Interfacing    Management of Contractors HSE Practice Bridging Documents Specific


Arrangements No 33 to each project .

Step Change Guidance on SMS Interfacing,


Jan 1999

Engineering,   Technical Integrity Performance Standards Amoex Change Assessment Procedure Onshore Change Request Business Unit specific
hardware mods. (TIPS) XEG/G/93/029 (CAP) AMO-O-007 Procedure process.

LV2- OADMIN-00003-PR

Safety Case impact  Offshore Safety Cases - Change Safety Case and COMAH Report Activity Hazard Identification
Management and Material Change Criteria, Management, AMO-S-012 Meetings
HSQ 01.05.10, Rev2, Jan 1996

Health and safety   Amoex Change Assessment Procedure Company Safety


standards and (CAP) AMO-O-007 Management System
procedures
BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE BP
Am
BP
Am
St
olt
Reference Documentation
ISSUES TO BE
oco oco Off
ADDRESSED
Fed Bus sh
eral ines or
s e
Unit

(where applicable to BP Amoco Federal Documentation Contractor Business Unit


the scope of the Documentation Specific
contract) Documentation

3.4 Selection and Control of Third Parties


Third party   Management of Contractors HSE Practice Approved Suppliers List
qualification and No 33 (FPAL)
selection

Third party SMS   Management of Contractors HSE Practice Project Specific Bridging
Interfacing No 33 documents.
Arrangements

3.5 Control in Emergencies


Emergency response   BP Amoco Dyce Emergency Response Procedures Manual Emergency Preparedness
organigram/plan/ Documents
responsibilities
Weekly Duty Rosters

Emergency   BP Amoco Dyce Emergency Response Procedures Manual Emergency Preparedness


communication Documents

Weekly Duty Rosters

Exercises and drills   Specific to each company Business Unit specific


schedule vessel . schedule.
BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE BP
Am
BP
Am
St
olt
Reference Documentation
ISSUES TO BE
oco oco Off
ADDRESSED
Fed Bus sh
eral ines or
s e
Unit

(where applicable to BP Amoco Federal Documentation Contractor Business Unit


the scope of the Documentation Specific
contract) Documentation

3.6 Occupational Health


Health and fitness  Offshore Medics Policies and Procedures UKOOA Guidelines for
screening/monitoring Manual, HSQ 02.04.01 medical Aspects fitness for
Offshore Work

Requirements of SI 2776 for


divers .

Drug and alcohol  Substance abuse policy Business Unit specific


abuse policy

Smoking, hygiene  Vessel Operations Manuals Business Unit specific


and welfare
Site Specific Instructions

Medical   Offshore Medics Policies and Procedures Accident and Incident


treatment/emergenci Manual, HSQ 02.04.01 Reporting procedure
es
Diving Manual

Emergency and Contingency


Manual
BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE BP
Am
BP
Am
St
olt
Reference Documentation
ISSUES TO BE
oco oco Off
ADDRESSED
Fed Bus sh
eral ines or
s e
Unit

(where applicable to BP Amoco Federal Documentation Contractor Business Unit


the scope of the Documentation Specific
contract) Documentation

4.0 Measure Performance

4.1 Active Monitoring


Key health and safety   Identified in BP Amoco Procurement Management of Contractors, HSE Practice HSEQ Performance Indicators
performance Management Process and specific for each 33
indicators contract.

Joint health and  Management of Contractors, HSE Practice Additional Business Unit
safety performance 33 requirements.
targets

Structured health and safety monitoring programme

Health and safety   BP Amoco Procurement Management Process Project HS&E Awareness Business Unit specific
meetings schedule Plan
schedule

Worksite/plant/equip   BP Amoco Procurement Management Process Vessel/Company Audit Business Unit specific / site
ment inspections Schedule
schedule

Observation of   STOP Programme Be Safe Programme Hazard Observation System


work/behaviour
Advanced Safety Auditing

Competence reviews  Activity Hazard Identification Business Unit specific


Meetings
BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE BP
Am
BP
Am
St
olt
Reference Documentation
ISSUES TO BE
oco oco Off
ADDRESSED
Fed Bus sh
eral ines or
s e
Unit

(where applicable to BP Amoco Federal Documentation Contractor Business Unit


the scope of the Documentation Specific
contract) Documentation

General  Vessel Safety Tours Business Unit specific


housekeeping
inspections

Joint management   Project Safety Tours Identified by Business Unit


worksite visits
Personal Safety Action Plans

Workforce surveys   Ad-Hoc Questionnaire Business Unit specific

Recognition/incentive   BP Amoco Procurement Management Process Safety Behaviour Workshops Business Unit specific
schemes
Offshore Safety Seminars

Improvement   BP Amoco Procurement Management Process Project Specific Performance Additional Business Unit
initiatives Improvement Plan specific initiatives.

Health and safety    BP Amoco Procurement Management Process, Monthly Performance Reporting and Monthly, Quarterly and
performance reports Performance Reviews Annually Project Safety
(Review of performance Reports
against targets etc.)

Communication/track   Federal Action Tracking System Action Tracking Database. Business Unit specific
ing/follow-up of processes
(SYNERGI)
improvement actions
– shared learning Project Close Out Reports.

Undesired events

Close out reports.


-
BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE BP
Am
BP
Am
St
olt
Reference Documentation
ISSUES TO BE
oco oco Off
ADDRESSED
Fed Bus sh
eral ines or
s e
Unit

(where applicable to BP Amoco Federal Documentation Contractor Business Unit


the scope of the Documentation Specific
contract) Documentation

4.2 Investigation and Recording of Accidents and Incidents


Accident and incident   Standard for Notification and Recording of RIDDOR Reporting, AMO-S-228 Accident and Incident
notification (internally and Fatalities, HSQ 01.02.05 Rev0 Reporting Procedure
externally to authorities)
User Guide for Serious Occurrence RIDDOR Reporting.
Reporting, HSQ 01.05.02 Rev1, Jan 1993

Guidance on the Loss Potential Matrix,


HSQ 01.05.05. Rev4, Feb 1995

Accident and incident   Incident Reporting and Investigation, HSE Accident/Incident Investigation and Analysis,
reporting, Practice No2 AMO-S-225
Accident / Incident Reporting
investigation and
Standard for the Measurement, Valuation SH&E Data Collection and Reporting Procedure
review
and Reporting of Loss, HSQ 10.02.01 Mar (Prosafe), AMO-S-230
1991

Reporting of Halon/CFC Releases HSQ


43.06.01 Oct 1991

Involvement of Offshore Safety Reps in


Accident/Incident Investigations, HSQ
34.06.01, Feb 1990

Communication/track   Lessons Learned, HSE Practice No34 Project Safety Review Business Unit specific
ing/follow-up of Meeting minutes. processes
Federal Action Tracking System
accident and incident
Accident reporting Log.
corrective actions –
shared learning Management Meeting
Minutes.

Safety Notices.

Safety Flyers.
BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE BP
Am
BP
Am
St
olt
Reference Documentation
ISSUES TO BE
oco oco Off
ADDRESSED
Fed Bus sh
eral ines or
s e
Unit

(where applicable to BP Amoco Federal Documentation Contractor Business Unit


the scope of the Documentation Specific
contract) Documentation

5.0 Audit and Review

5.1 Audit, Review and Apply the Lessons


Structured joint health and safety audit and review programme

Pre-execution audits  Safety Audit Schedule Business Unit specific

Audits of third parties   Safety Audit Schedule Business Unit specific

SMS audits   Safety Audit Schedule Business Unit specific

Audits to check   Safety Audit Schedule Business Unit specific


compliance with
standards

Audits to assist the   Safety Audit Schedule Business Unit specific


implementation of
health and safety
plans

Final review of the   BP Amoco Procurement Management Process Review of Bridging


SMS Interfacing documents at Mobilisations.
Management of Contractors, HSE Practice No33
Arrangements before
start of operations

Periodic reviews of   BP Amoco Procurement Management Process


safety performance
Weekly Management Meeting
reports, including
Minutes.
reviews of accident
and incident reports
and statistics
BP Amoco / Stolt Offshore HSE Management Systems Interface Matrix

INTERFACE BP
Am
BP
Am
St
olt
Reference Documentation
ISSUES TO BE
oco oco Off
ADDRESSED
Fed Bus sh
eral ines or
s e
Unit

(where applicable to BP Amoco Federal Documentation Contractor Business Unit


the scope of the Documentation Specific
contract) Documentation

Audits to check   Safety Plans Business Unit specific


compliance with SMS
Interfacing
Arrangements

Review and update   Safety Plans. Business Unit specific


of SMS Intefacing
Arrangements

Demobilisation and   Safety Plans. Business Unit specific


close out reviews

Communication/track    Federal Action Tracking System Closeout reports. Business Unit specific
ing/follow-up of audit
Audit Reports.
and review
recommendations –
shared learning of
lessons from audits
and reviews
SAFETY M ANAG EM ENT SYSTEM INTERFACE B ETW EEN BP AM OCO AND DSND Subsea LTD

DSND Subsea DSND Subsea


AS BP Am oco Ltd

D S N D S ubsea B P A m oco DSND


M arine O perations A sset O ffice Line m anager
P roject
S afety A dvisor
B P A m oco
U T G S ubsea DSND
T eam P roject M anager
Onshore
Offshore
B P A m oco B P A m oco/S tolt O ffshore
A sset O IM R epresentative

DSND
V essel M aster O ffshore P roject
M anager

S afety Delegate S afety Com m ittee

C hief
O fficer

ROV D iving O ther


S urveyor
S upervisor S upervisor S upervisor

S hip C hief
C rew E ngineer R O V P ilots & D iving C rew O ther C rew
Technicians

A B B S eatec
D iving T echs O ther T echs
Techs

You might also like