PT.

BUMI MINERAL SULAWESI


DIMENSION INSPECTION REPORT
QUALITY CONTROL DEPARTMENT
Project : BMS HEPP (3x75 MW)
Report No. : /QC/ /DIM/2022 DATE : 5/7/2019
Drawing No. : REV :
Applicable Code & Standard : Owner Technical Specification
Description : CHECK SHEET VERTICALITY COLUMN STRUCTURE GIS BMS (BEFORE GROUTING)

Measuring Result (mm)


Measuring Point X Y
COLUMN (ATAS) 57058 -2198
COLUMN (BAWAH) 57056 -2197
Difference (+/-) 2 -1
REMARK : TAKE WITH SURVEY INTRUMENT. TOTAL STATION.

Field Supervisor Surveyor QC Inspector Head Of QC

Date : ………………………. Date : ………………………. Date : ………………………. Date : ……………………….


Distribution : 1. File QA/QC (original) 2. Originator (copy) 3. Engineering (copy)