Project timeline

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

Step 1 :- Defining requirements 1 - 2 days

● Analyzing strengths and weaknesses of the competitors.

● Defining industry specific requirements.

● Defining risks and countering it.

Step 2 :- Project plan preparation 3 - 4 days

● High-level software design: functional modules, advanced capabilities,


interactions between the modules and with other softwares.
● Defining a precise project scope, deliverables, Creating a software
development project plan with major milestones and a work breakdown
structure.

Step 3 :- Design UX and UI 2 - 3 weeks

● Conducting comprehensive UX research; describing how a user will


interact with the software.
● Creating wireframes that showcase basic functionality and content layout
on each screen.
● Combining wireframes into dynamic UX prototypes, transforming the
prototypes into full-color UI mockups.
● Performing the prototype user testing.
Step 4 :- Architect the software ~ 1 week

● Defining how functional modules of future software should work at the


code level.
● Designing a secure and scalable architecture for the solution.
● Deciding on integration approaches (point-to-point, middleware-based,
iPaaS, etc.) between the software components.
● Choosing the optimal technology stack.

Step 5 :- Code the solution ~ 1 month

● Establishing development, testing, and automation environments: CI/CD.


● Writing server-side code and APIs, Turning static UI mockups into the fully
functional GUI.
● Thoroughly documenting the software and coding process.

Step 6 :- Establish integrations

● Setting secure integrations between our software and the required systems
(Hardware).
● Fixing bugs detected by testing.

Step 7 :- Run rigorous testing 2 - 3 months

● Creating a test plan with a testing scope, test types addressing all
functional and non-functional software requirements, reporting procedures.
● Creating test cases and checklists, Writing and running automated test
scripts (API and UI tests).
● Fixing bugs detected by testing.
● Conducting unit testing and static code analysis in parallel with
development, carrying out functional, performance, security, integration
testing.

Step 8 :- Setting the ready solution live

● Deploying software in the production environment.


● User training and familiarity.
● Software performance monitoring and fixing the bugs that users discover.
● Planning improvements and new features to be added based on user
feedback.

Step 5 work division :-

Week 1 :- Researching about the technology stack to dump the results of the
code onto the hardware side from the windows (client).

Week 2 :- Coding the server side as well as the hardware side for smooth
handshaking. Developing multiple versions of solutions.

Week 3 :- Resolving errors and testing the compatibility.

Week 4 :- Continuing the testing process.