Project timeline
Project timeline
● Setting secure integrations between our software and the required systems
(Hardware).
● Fixing bugs detected by testing.
● Creating a test plan with a testing scope, test types addressing all
functional and non-functional software requirements, reporting procedures.
● Creating test cases and checklists, Writing and running automated test
scripts (API and UI tests).
● Fixing bugs detected by testing.
● Conducting unit testing and static code analysis in parallel with
development, carrying out functional, performance, security, integration
testing.
Week 1 :- Researching about the technology stack to dump the results of the
code onto the hardware side from the windows (client).
Week 2 :- Coding the server side as well as the hardware side for smooth
handshaking. Developing multiple versions of solutions.