Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

Contact

Muhammad Azhar
www.linkedin.com/in/muhammad- Quality control supervisor NEOM and Aramco approved
azhar-7522a26b (LinkedIn) Tabuk Region

Top Skills Summary


ITP
I have over 16 years of experience as a Quality Control supervisor/
Products inspection
inspector/coordinator with different organizations in oil/gas, fertilizers,
Quality Assurance Standards
and design and build projects in UAE, KSA, and Pakistan.

Experience
NEOM
Project Quality supervisor
August 2023 - Present (1 year)
NEOM

Managing and/or establishing the project quality management system from the
project
award through to the handover to the client, under the guidelines of ISO-
9000/9001, Schedule –Q, SAEP-1154.
Evaluating adequacy and effectiveness of quality management system
allocated/
required resources and recommending ways of improvements to top
management.
Scheduled reviews of QMS to enhance the efficacy of the system.
Preparation of quality documents; Quality Policy, Quality Plan, Special
Procedures,
Inspection Test Plans and inspection checklists etc.
Planning for scheduled Audit and allocating resources for internal and external
audits/third party, where required.
Assisting the top management in the planning of Resources; Competent
Manpower,
Equipment and Materials required for the project.
EXECUTION,MONITORING AND REPORTING,ANALYZING,
IMPROVEMENTS,PERSONAL OBLIGATIONS

Sicim
QA Qc Inspector Mechanical /Piping
January 2021 - December 2023 (3 years)
Saudi Arabia
Page 1 of 7
Planning the way of execution, Reviewing/ preparing Method statements/
procedures
for approvals of clients or representatives.
Appointing competent persons, PQCS, QCI, DC, preparing/reviewing their
documents
and getting their approval from the client. Evaluation of team members and
allocating responsibilities as per their performance, ability, and skills in
consideration
of project requirements.
Ensuring the right people for the right job.
Ensuring that work is executed as per approved procedures, drawings, codes
and
standards through designated and approved team members.
Allocating available resources as per job assessments and planning and
arranging
resources from the market, if and when required. Providing/ensuring required
resources for the team members; like Offices, logistics, IT, and
documentation.,Reporting to top management and clients for daily, weekly,
and monthly progressPeriodic analysis of cost and budget allocation, to ensure
the overall performance as
per plan.
Analyzing the monthly quality index/data with comparison to client satisfaction.
Reviewing the non-conformances for trends and looking for areas of
improvement.Follow-up with audit findings for extra measures recommended
to enhance
performances and the outcomes.
Arranging training and education to enhance, upgrade, and refresh industrial
knowledge and experience of team members.Responsible participation in
company image-building in the industry and maintaining
a good company profile in the industry and keeping a sober interaction with
people as
company’s representative.
Motivating team members by frequent physical appearances on site and
appreciation
to good performers.
Close monitoring of each team member, resolving their issues for their
peace of mind and welfare

Arkad Engineering & Construction Company


4 years 1 month
Page 2 of 7
Quality Assurance Quality Control Inspector
August 2019 - January 2021 (1 year 6 months)
Ad Dawādimī, Saudi Arabia

THE BRIEFEST MOTTO: CONFORMANCE TO THE REQUIREMENTS=


QUALITY.Supervising QA/QC Inspectors, resolving quality issues and their
job-related Needs/issues.
Allocating duties to QC inspectors as per site requirements.
Daily and weekly lookahead prepared and sent to the client inspection team.
Recording Non-Conformances and suggesting preventive measures to avoid
re-work.
Dealing with the client’s representative for all quality issues on a daily basis.
Preparing special process procedures, work procedures, and method
statements prior to the start of work
activities and submission to the client for approval
Preparing SATIP & SAIC, where typical inspection plan does not adequately
cover
the activity.
Reviewing Contractors and Sub Contractors QCP and ITPs.
Evaluating team member’s performances and arranging training programs, if
required, processing for their approvals from the client
Reporting and suggesting management for the improvement of quality Mutual
coordination with another discipline for smooth quality work.
Dealing with sub-contractor issues and evaluating their progress rate.
Verifying materials as per scope of work, recording, evaluating & controlling
material consumption.
Coordination with the procurement team for follow-up of quality documents
required for
materials receiving inspections.
Arranging training for quality personnel, internally and with third parties.
Managing inspection & testing on site and with third parties, where required.
Internal auditee during 15% and 60% progress internal audits.
Data verification, punch listing & follow-up with the mechanical team for a
timely

Quality Assurance Quality Control Inspector


February 2019 - August 2019 (7 months)
Alhasa, At Tafilah, Jordan

preparation of lowering packages, hydrostatic test packages, and submission


to client for review and approval.Submit the PQI and PQM reports to the client
every month.

Page 3 of 7
Continue Support and encouragement for Site Mechanical inspectors for the
implementation of standards.
Daily Proactive and preventive Site surveillance for site observations and
corrective actions.
Attend meetings with management and clients daily and weekly and implement
points of agreement.
Attend Quality meetings every week with the client to share quality issues and
their solution.
Review and verification of Hydro test packages/service test packages.
Preparation /review of weekly and monthly reports and timely submission to
clients.
Supervised and helped hand to field inspectors.
Closing and issuing of INCRS/ LBEs.
Make sure quality control and quality assurance implementation and
compliance during the construction
phase.

Quality Control Inspector Mechanical


January 2017 - February 2019 (2 years 2 months)
mazalij and abu jifan pipeline project Saudi Arabia

Review Material test reports. Preparation of HT packages and review of


packages.
Review and verify materials/ mill certificates.
Coordinating with suppliers/third-party inspectors for the clearance of received
material.
Preparation /review of hydro test packages.
Carrying out quality control activities as per Inspection and Test plan,
approved Isometric drawings.
Making necessary inspection reports as per ITP requirements and getting
signatures from thirdparty/client representatives

Doosan Babcock
QA/QC Inspector
October 2016 - December 2016 (3 months)
UAE

Monitor & follow up the timely close out of Non-Conformities, Corrective Action
Requests (CAR), and
Preventive Action Requests (PAR).
Piping spools erection/installation inspections
Line walking and punch listing for hydrostatic testing.
Preparation Of hydrostatic test packages before the hydro test.
Page 4 of 7
Inspection of internal cleaning of completed piping loops by air blowing and
flushing and pipeline mechanical
cleaning as per approved procedure.
Witnessing Hydro test, Leak test, and Pneumatic test activities.
Witnessing the lay-up of completed hydrostatic tested piping spools and
pipeline sections as per approved
procedure.
Monitoring of dew point for layup piping spools and pipeline sections.
Reinstatement inspection of completed piping spools and pipeline after
hydrostatic testing.=

Qatar Engineering & Construction Company W.L.L


QA QC Coordinator
February 2016 - June 2016 (5 months)
Ruwais UAE

Material receiving Inspections (Pipes, and fittings, etc.) as per approved project
Specifications & stamped Heat
Nos according to MTC.
Pipe handling activities during construction, which include: Stockpiling pipe
materials. Stringing the pipe
together. Bending the pipe.
Pump station and Booster station Piping Spools Inspection during and after
fabrication as per IFC drawings
Pump station, Booster station Piping spools, and Associate valve erection/
installation inspections.
Pump station and booster station valve erection/installation inspections. (MOV,
PZV, PSV) as per P&ID.
Pump station and booster station Motors, power supply system verification.
Pump station and booster station Equipment control system and alarm system
verification.
Hydrostatic testing of valves including seat and body testing.
Coordination for inspection and testing activities with the project execution
team, preparation of inspection &
Testing schedules and conducting/ reporting inspection and testing as per QIP.
Piping Spools Inspection during and after fabrication as per IFC drawings.
Maintaining issued NCR Log.

EKL- engineering kinetics (pvt.) ltd.


QC Inspector
June 2015 - January 2016 (8 months)

Page 5 of 7
Working with NEOM, ETSD & EPM, is a unique experience as the organization
itself is going through
the process of establishing highly sophisticated quality and industrial practices,
codes and
standards, which are being defined, implemented, and monitored under multi-
discipline, diversified
and multinational teams of experts.
Quality Management system in NEOM seems mostly derived from ISO and is
similar to
ARAMCO, in the application, however, is more stringent and objective with
raised levels of minimum
acceptance criteria than any other organization of this level and region,
concerning the
Schedule Q and NEOM specifications, as examples. Specifications are
beautifully tailored with more
clarity and conceptual, making a deep-rooted understanding.
Having a sound knowledge of piping fabrication and welding /NOT of on-plot
piping/plant piping.
Material Receiving Inspection as per Purchase Order and Material Request.
Carrying out inspections at the fabrication shop/ workshop during fabrication.=

Descon Engineering Limited


QA/Qc inspector and NDT Inspector
April 2008 - January 2015 (6 years 10 months)
UAE

Punch listing for RMC (Ready for Mechanical Completion) test packs of piping/
pipeline and verification
inspection of punch killing.
Preparing & submitting RFI of mechanical,Inspection of Support Foundation
before Structural or Equipment Installation
Repair/Correction of Errors of Structural Alignment
Pre-Installation Procedure Verification Testing of Turn-of-Nut Method ASTM
A325 or ASTM A490 Bolts
Structural Alignment Before Grouting
Final bolt tightening insp. & testing
Inspect Access Structure Installation
NOE Of Structural Steel (AWS D1.1) Selection & Performance of NOE
including any repairs.Conducting inspection and coordination with the client's
inspection team regarding static equipment like,

Page 6 of 7
Ensure that the QA/QC procedures are implemented carefully in my area of
responsibility and will be
responsible for the quality of work.
Pre-inspection (inspection findings) of Static Equipment’s upon opening of
(Heat Exchanger, Vessels, Drums,
Columns, Air Fan Coolers, and Tanks).
Post-cleaning inspection after hydro jetting and mechanical cleaning or any
cleaning method.
Hydro Testing of Heat exchangers, (shell side, tube side, shell side with test
ring, Differential Test) Air fin fan
coolers, and piping.
Vessels, Columns, and Tanks internal inspection (Demisters, Trays, manways,
and internals).
In shutdowns replacing valves, and coordinating in opening of PSV and
Control valve for maintenance.
In shutdown inspection of opening and closing of main holes of columns and
cleaning of main trains, bubble

 Worked with DESCON ENGINEERING (Pakistan) as a “QA/QC Inspector”


on Engro Chemical Karachi Bin Qasim
Pakistan From Sept 2007 to April 2008.

Education
Government Technical college
DAE mechanical, Mechanical Engineering · (2003 - 2006)

Government technical university kpk


Associate's degree, Mechanical Engineering · (August 2003 - August 2006)

Page 7 of 7

You might also like