Download as pdf or txt
Download as pdf or txt
You are on page 1of 91

Details of Ongoing Contractual works under Engineering department of Bhusawal Division

Details of Ongoing Contractual works under Igatpuri to Pachora section of Bhusawal Division
Extended Nos. of
SN Name of work CA No & date Name of Contractor Cost of C.A. LOA dt Compl.dt. date of Labours
Compl. Engaged

BHUSAWAL M/s D S MUNOT-NASHIK


IGATPURI - BHUSAWAL section-:- Strengthening to sub DIVNENGINEERING AMBEDKAR ROAD
1 structure, WW/RW of existing 5x 18.30 + 2 x 14.20 m Imp /DRMWBSL272023t3 MANDMAD ₹ 50,753,176.67 18.08.2023 18.08.2024
GB No. 293/1 at KMS 293/2-6 . /00862150084797 NASHIK- 423104
Dated:18/08/2023 Maharashtra, India

1.)Provision ofarrangements to arrest water logging and


BHUSAWAL DIVN-
repairsof approach road at LHS provided in lieu of LCno. 02 M/s GOPAL DUBEY-
ENGINEERING /
at kms. 01/06-07 on MMR-ANK sectionUnder Aden MMR JALGAON
DRMWBSL282023t3
jurisdiction 2.)Provision ofarrangements to arrest water Plot no.67/B, Vasant Vihar
2 / ₹ 24,875,442.80 04.08.2023 04.04.2024
logging and repairsof approach road at LHS provided in lieu Tapi Nagar, Bhusawal
00845750083611
of LCno. 03 at kms. 03/03-04 on MMR-ANK sectionUnder Jalgaon- 425201
Dated:
Aden MMR jurisdiction 3.)Provision ofarrangements to arrest Maharashtra, India
04/08/2023
water logging and repairsof approach road at LHS provided
BHUSAWAL DIVN-
M/s A S CONSTRUCTION-
ENGINEERING/
PUNE
Bhusawal Division - Sr.DEN (South) Bhusawal Jurisdiction - DRMWBSL202023t1
Rajyog Township B-4,F-102,
3 Rehabilitation/ rebuilding of 15 bridges. (U WP21-22) PID / ₹ 76,662,942.95 31.07.2023 31.01.2025
LagadmallaSinghad Pune
01.01.32.21.1.50.006 00870370083121
Pune- 411041
Dated:
Maharashtra, India
31/07/2023

BHUSAWAL DIVN- M/s GOPAL DUBEY-


ENGINEERING / JALGAON
Miscellaneous P.waywork under SSE(P.way) MANMAD DRMWBSL222023t3 Plot no.67/B, Vasant Vihar
4 ₹ 15,883,007.50 26.07.2023 26.07.2024
underADEN MANMAD jurisdiction. / Tapi Nagar, Bhusawal
00845750082694 Jalgaon- 425201
Dated:26/07/2023 Maharashtra, India
Details of Ongoing Contractual works under Engineering department of Bhusawal Division
Details of Ongoing Contractual works under Igatpuri to Pachora section of Bhusawal Division
Extended Nos. of
SN Name of work CA No & date Name of Contractor Cost of C.A. LOA dt Compl.dt. date of Labours
Compl. Engaged

BHUSAWAL DIVN- M/s OM CONSTRUCTION


ENGINEERING / COMPANY-THANE
DRMWBSL272023t1 2/2 mamta colony,kailash
Miscellaneous P.waywork under SSE(P.way) North
5 / nagar,shankarpawsey ₹ 14,396,777.73 26.07.2023 26.07.2024
Chalisgaonunder ADEN Chalisgaon jurisdiction.
00889870082695 road,katemanevali,kalyan E
Dated: thane- 421306
26/07/2023 Maharashtra, India

M/s YV MANE
CONSTRUCTIONS
BHUSAWAL
PVT LTD-PUNE NEAR NEW
Miscellaneous P.way work under SSE(P.way) South DIVNENGINEERING
COURT, GAT NO 9,
6 Chalisgaon under ADEN Chalisgaon /DRMWBSL192023t2 ₹ 8,863,348.39 14.06.2023 14.06.2024
SANGHAVI RESIDENCY,
jurisdiction. /10308060079106
BHIGWAN ROAD,
Dated:14/06/2023
BARAMATI, PUNE - 413102
Maharashtra, India
Provision of Divyangjan amenities at stations in section of
M/s SHREE SAI BALAJI
Sr. DEN S standard ramps, ramps at booking window,
CONSTRUCTIONS-
Divyangjan water stands, Nonslippery walkway from parking
AHMEDNAGAR
lot to station building & signanges at Kasbe Sukene, BHUSAWAL
FLAT NO E 09
Kherwadi, Asvali & Ghoti stations (PWP- 2022-23) (P.ID- DIVNENGINEERING
ANANDBAG RESIDENCY
7 01.01.53.22.3.50.003) /DRMWBSL152023t1 ₹ 12,656,882.83 31.05.2023 31.05.2024
BURUDGAON ROAD
/10711170078240
VINAYAK
Dated:31/05/2023
NAGAR
AHMEDNAGAR- 414001
Maharashtra, India
Details of Ongoing Contractual works under Engineering department of Bhusawal Division
Details of Ongoing Contractual works under Igatpuri to Pachora section of Bhusawal Division
Extended Nos. of
SN Name of work CA No & date Name of Contractor Cost of C.A. LOA dt Compl.dt. date of Labours
Compl. Engaged
(i) Manmad (Filter plant):- Repairs to filter bed by over M/s SRINIVASA
hauling of Under drain system, Changing of filter media , CONSTRUCTION
Structural repairs of alum godown, periodical desilting of BHUSAWAL AND SUPPLIERS-
wells at Manmad & jackwell at Patoda. (ZBB-2022-23) (ii) DIVNENGINEERING AHMEDNAGAR
8 Manmad- Heavy repairs to Senior Institute /DRMWBSL122023t1 PLOT NO. 27A,AASARA ₹ 16,996,726.31 15.05.2023 15.05.2024
building and premises. ( ID No.01.01.64.22.3.50.014) /00894470076956 SOCIETY,GULMOHAR
(iii)Manmad : Repairs to TTE Rest House in connection with Dated:15/05/2023 ROAD,AHMEDNAGAR
Air conditioning. Ahmednagar- 414003
Maharashtra, India
(i)Nasik- Upgradation of staff quarters RB-I-101 to 111 for
uses as RPF Barrack at TMW at Nashik in connection with M/s LITTLE STAR
repairing /Upgradatopm of "PANDAV BARRACK" having BHUSAWAL ASSOCIATESBHUSAWAL
Capacity of 108 beds of RPF ZTC Nasik. (IRPSM ID- DIVNENGINEERING NIRMAL NAGAR NEW
9 01.01.65.22.3.50.001) (ii)KasbeSukene (KBSN) Goods Shed:- /DRMWBSL092023t1 NIMBHORA ₹ 20,035,149.57 08.05.2023 08.05.2024
Provision of Goods /00988310076527 BK DEEPNAGAR
Office , Merchant Room, Labour Room with basic amenities Dated:08/05/2023 BHUSAWAL- 425307
(IRPSM ID -01.01.16.22.4.50.006) Maharashtra, India

Nandgaon:
M/s SHREE SAI BALAJI
-Proposed construction of 8 units RB-IV staff BHUSAWAL
CONSTRUCTIONS-
quarters at Nandgaon Station on replacement DIVNENGINEERING
AHMEDNAGAR
account in lieu of old D-Type quarters at /
FLAT NO E 09
Nandgaon station. (Total 8 units RB-IV ), DRMWBSL082023t2
10 ANANDBAG RESIDENCY ₹ 15,808,323.11 02.05.2023 02.05.2024
under PH-51 (DRF), PB Item No. /
BURUDGAON ROAD
1141/NR/2022-23, Replacement of 10711170076228
VINAYAK
Old/Dilapidated Quarters. Dated:
NAGAR
02/05/2023
AHMEDNAGAR- 4
Details of Ongoing Contractual works under Engineering department of Bhusawal Division
Details of Ongoing Contractual works under Igatpuri to Pachora section of Bhusawal Division
Extended Nos. of
SN Name of work CA No & date Name of Contractor Cost of C.A. LOA dt Compl.dt. date of Labours
Compl. Engaged
Annual Sectional Contract Zone No. 1 for ADEN-Chalisgaon M/s R K SUNDRANI-
for Repairs and maintenance with white washing etc for BHUSAWAL JALGAON
Manmad(Ex.) to Galan (Incl.) with Chalisgaon-Dhule section. DIVNENGINEERING ROOM NO 422 SINDHI
11 /DRMWBSL042023t1 COLONY ₹ 19,999,999.99 03.03.2023 03.03.2025
/00853480072795 BHUSAWAL
Dated:03/03/2023 JALGAON- 425201
Maharashtra, India
Supply & stacking of 65 mm Gauge Machine crushed stone
M/s AISHWARYA
Ballast & loading in to Hopper's / BOB'N wagon's by
Letter No: CONSTRUCTIONS-NASHIK
mechanical means at Lasalgaon ballast depot. Quantity =
BHUSAWAL DIVN- AISHWARYA BUNGLO,
100000 M3.
ENGINEERING / GANESH NAGAR
12 ₹ 83,509,866.11 06.03.2023 06.03.2024
DRMWBSL032023t1 AT POST LASALGAON, TAL
/ 00881610072871 NIPHAD
Dated: 06/03/2023 NASHIK- 422306
Maharashtra, India
Miscellaneous P.way work under SSE(P.way) NANDGAON M/s SURYADEVARA
under ADEN Chalisgaon jurisdiction. ENGINEERS
BHUSAWAL
AND CONTRACTORS-
DIVNENGINEERING
KRISHNA
13 /DRMWBSL022023t2 ₹ 10,519,701.42 27.02.2023 27.02.2024
VIJAYAWADA
/00829680072436
VIJAYAWADA
Dated:27/02/2023
KRISHNA- 520010
Andhra Pradesh, India
"Limited Tender calling" of - Consultancy services for
M/s CONSULTING
Detailed Engineering surveys Geotech
BHUSAWAL ENGINEERS GROUP
investigation and preparation of drawings & design etc. of 4
DIVNENGINEERING LIMITED-JAIPUR CEG
Nos. ROBs (in lieu of LCs
14 /DRMWBSL602022t1 TOWER MALVIYA ₹ 7,113,232.00 22.02.2023 22.08.2023
No-80,96,120 & 40 on GQ-GD route) for GSU, Bhusawal
/10377730072159 INDUSTRIAL AREA,
Division on Central Railway
Dated:22/02/2023 JAIPUR JAIPUR- 302017
Rajasthan, India
Details of Ongoing Contractual works under Engineering department of Bhusawal Division
Details of Ongoing Contractual works under Igatpuri to Pachora section of Bhusawal Division
Extended Nos. of
SN Name of work CA No & date Name of Contractor Cost of C.A. LOA dt Compl.dt. date of Labours
Compl. Engaged
MMR CE (W/Shop) :- Provision of new bay with modification
to existing structure in connection with Modernization of
M/s PUSHPAK RAIL
Work shop at CE (W/Shop) Manmad. Sch(ii)MMR CE
CONSTRUCTION PRIVATE
(W/Shop) :- Repairs & modification of existing steel stock
LIMITED-ULHASNAGAR
yard - Provision of roofing and flooring in connection with BHUSAWAL
FLAT NO. 601, SAI
Modernization of Work shop at CE (W/Shop) Manmad.(ID DIVNENGINEERING
VILAYATRAI APARTMENTS
15 No. 01.01.42.21.1.16.001) /DRMWBSL582022t3 ₹ 94,605,630.40 16.02.2023 16.08.2024 0
NEAR ULHASNAGAR
/00822470071825
MUNCIPAL CORPORATION
Dated:16/02/2023
ULHASNAGAR - 421003
ulhasnagar- 421003
Maharashtra, India

Miscellaneous P.way work under SSE(P.way) DEVLALI under


ADEN MANMAD jurisdiction.
M/s SUDHA DEVI RAILWAY
BHUSAWAL CONTRACTOR-JALGAON
DIVNENGINEERING M/S Sudha Devi, Jamner
16 /DRMWBSL582022t1 Road SBI Main Branch, 12147155.04 03.02.2023 03.02.2024 0
/01025420070915 near Rohit Printing
Dated:03/02/2023 PressJalgaon- 425201
Maharashtra, India

Tender No. DRMWBSL562022t1 closing date 22-12-2022


Letter No: M/s SURYADEVARA
15:00 for Construction of retaining wall of 300 m from KM
BHUSAWAL ENGINEERS
160/48 to
DIVNENGINEERING AND CONTRACTORS-
160/34 in ASVALI - PADLI section.
/ KRISHNA
17 ₹ 26,592,971.59 16.01.2023 16.07.2023 0
DRMWBSL562022t1 VIJAYAWADA
/ VIJAYAWADA
00829680069846 KRISHNA- 520010
Dated:16/01/2023 Andhra Pradesh, India
Details of Ongoing Contractual works under Engineering department of Bhusawal Division
Details of Ongoing Contractual works under Igatpuri to Pachora section of Bhusawal Division
Extended Nos. of
SN Name of work CA No & date Name of Contractor Cost of C.A. LOA dt Compl.dt. date of Labours
Compl. Engaged
ADEN MANMAD Sub Division- Supplying potable water from
Letter No:
private party at Ghoti, Asvali, Devlali, Odha, Kherwadi,
BHUSAWAL M/s LOTUS CONTRACTORS
KasbeSukene, Niphad, Ugaon, Lasalgaon, Summit, Manmad,
DIVNENGINEERING AURANGABAD FLAT NO 20
Ankai, Ankai Killa for 01 year.(ZBB-22-23)
/ A WING 3RD FLOOR
18 DRMWBSL532022t1 ROOP MAHAL COMPLEX ₹ 2,416,014.05 17.12.2022 17.12.2023 6
/ FAZIL PURA
01428580068004 AURANGABAD- 431001
Dated: Maharashtra, India
17/12/2022
ADEN-Manmad for Repairs and maintenance with white M/s SARDAR ENGINEERS
washing etc for (i) Ghoti (Incl.) to Niphad (Ex.) with Nasik AND
Letter No:
Road (TMW), RPF Training Centre, Nasik Road ASSOCIATES-NASHIK
BHUSAWAL
Plot No 38 Siddeshwar
DIVNENGINEERING
Nagar
19 /DRMWBSL522022t2 ₹ 14,886,900.00 22.12.2022 22.12.2024 0
Old Saikheda Road Dasak
/
Jail Road
00861030068333
NAshik Road
Dated:22/12/2022
NAshik- 422101
Maharashtra, India
Manmad:- Heavy repairs to roads, water supply, drainage
Letter No:
system and flooring etc. of staff quarters in
BHUSAWAL M/s THULASI
Railway colony in SSE (Wks) Manmad section. (414 Nos)
DIVNENGINEERING ENTERPRISES LLPTHANE
(ZBB-22-23) 2. Your bid ID 14459282 dated 06/11
/ B wing flat no 202 shiv leela
20 DRMWBSL512022t1 arcade ₹ 21,883,862.43 21.11.2022 21.11.2023 2
/ bhatia chowk ulhasnagar
10675550066233 thane- 421004
Dated: Maharashtra, India
21/11/2022
Annual Sectional Contract Zone No.2 for ADEN-Manmad for
Letter No:
Repairs and maintenance with white washing M/s SHAHABUDDIN
BHUSAWAL
etc for Niphad (Incl.) to Manmad (Incl.) with Manmad-Ankai MASLUDDIN
DIVNENGINEERING
SHAIKH-NASHIK
/
SHIVAJI CHOWK,
21 DRMWBSL522022t3 ₹ 10,464,400.00 21.11.2022 21.11.2024 5
SAVARKAR ROAD
/
MANMAD
01336250066236
NASHIK- 423104
Dated:
Maharashtra, India
21/11/2022
Details of Ongoing Contractual works under Engineering department of Bhusawal Division
Details of Ongoing Contractual works under Igatpuri to Pachora section of Bhusawal Division
Extended Nos. of
SN Name of work CA No & date Name of Contractor Cost of C.A. LOA dt Compl.dt. date of Labours
Compl. Engaged
ADEN Chalisgaon sub divn.- Supplying potable water from
M/s RV ENTERPRISES-
private party in summer at Chalisgaon, Nandgaon,
JALGAON
Panewadi, Hiswahal, Panjhan, Pimparkhed, Naydongri,
PLOT NO 5, HIRAGAURI
Hirapur,Vaghali, Nagardeola on BHUSAWAL-IGATPURI 10375600064446
22 PARK ₹ 2,932,403.25 25.10.2022 25.10.2023 3
section & Jamdha, Shirud, Borvihir on CHALISGAON- Dated:25/10/2022
BEHIND RADHIKA HOTEL
DHULIA section for one year.(ZBB-2022-23).
JALGAON- 425001
Maharashtra, India
Manmad:-Heavy repairs to damaged Platform walling at PF
M/s PATEL
no 5/6 at Manmad, Toilet blocks, waiting rooms, sheds,
CONSTRUCTIONNASHIK
booking office, service building etc. (ZBB 2022-23)
00867980063531 F.NO 1 BHAKTI NAGAR
23 ₹ 18,268,689.73 11.10.2022 11.10.2023 15
Dated:11/10/2022 WADALA ROAD
NASHIK- 422011
Maharashtra, India
Provision of connectivity from already constructed FOB by
M/s PITAMBER VENSI-
providing staircase and provision of COP between the gap of
JALGAON
FOB's staircase to existing COP at Chalisgaon and Provision
ASHIRVAD, MUNICIPAL
of staircase to provide connectivity to platform at Ghoti
SUPERVISORY COLONY,
station. (Project ID- 01.01.53.21.1.50.011) 00866720061593
24 NEAR T.V. CENTRE, ₹ 54,241,294.17 09.09.2022 09.12.2023 5
Dated:09/09/2022
JAMNER ROAD,
BHUSAWAL JALGAON-
425201
Maharashtra, India
Details of Ongoing Contractual works under Engineering department of Bhusawal Division
Details of Ongoing Contractual works under Igatpuri to Pachora section of Bhusawal Division
Extended Nos. of
SN Name of work CA No & date Name of Contractor Cost of C.A. LOA dt Compl.dt. date of Labours
Compl. Engaged
CTR/S- 2.184 Tkms in various yard between
IGATPURIPACHORA section under Sr. DEN (South) M/s VIRENDRA
BHUSAWAL's Jurisdiction. Through sleeper renewal on CONSTRUCTION
Touts (1:8.5-12 nos. and 1:12-23 nos. Total 35 nos.) in AND ENGINEERING
IGATPURI-PACHORA section under Sr. DEN (South) COMPANY BHOPAL
00995280061544
25 BHUSAWAL's Jurisdiction. Through Tout renewal-Complete 88 Chandan Nagar Jain ₹ 19,539,710.05 08.09.2022 08.09.2023 19
Dated:08/09/2022
sets (by Manual-4 nos. by Colony Berasia Road
T-28-2 nos. Total 6.0 nos. of 1:8.5 Touts) in IGATPURI- Bhopal
PACHORA section under Sr. Bhopal- 462038
DEN (South) BHUSAWAL's Jurisdiction. Madhya Pradesh , India

Provision/Upgradation/Renovation of Divyangjan amenities


at CHALISGAON, VAGALI, KAJGAON, GALAN, JAMDA,
SHIRUD and DHULE stations (CHALISGAON jurisdiction), M/s NAVIN RANCHHOD
MANMAD & HISVAL, PANJHAN, NANDGAON, PIMPERKHED, RATHODNASHIK
NAYDONGRI and HIRAPUR (NANDGAON jurisdiction) Niphad 4,RADHESHYAM
& Lasalgaon stations. (ID 01.01.53.21.1.50.002) 2. IGATPURI APPARTMENT,JAGTAP
- Building for battery room, Equipment room and emergency 00874730061347 MALA
26 ₹ 50,834,358.73 06.09.2022 06.09.2023 17
T&P and testing equipment room at Igatpuri grid sub Dated: 06/09/2022 SWIMMING POOL
station. In connection with work of augmentation of traction ROAD,OPP.PRABHA ANAND
transformer capacity by replacing 10.5 MVA traction SANKUL,NASHIK ROAD
transformers along with HV&LV switch gear at Igatpuri grid NASHIK- 422101
sub station. (ID- 01.01.36.19.3.15.001) Maharashtra, India

TRR/P- 32.918 Tkms and TFR - 74.73 Tkms in IGATPURI - M/s BINDU PROJECTS
PACHORA section under Sr. DEN (South) Bhusawal's AND COBENGALURU
jurisdiction. Site No.22, 3rd Floor,
00841250061237 Dynasty Layout
27 ₹ 21,718,159.28 05.09.2022 09.09.2023 18
Dated:05/09/2022 Mariyanna Palya, H A Farm
Post Hebbal
BENGALURU- 560024
Karnataka, India
Details of Ongoing Contractual works under Engineering department of Bhusawal Division
Details of Ongoing Contractual works under Igatpuri to Pachora section of Bhusawal Division
Extended Nos. of
SN Name of work CA No & date Name of Contractor Cost of C.A. LOA dt Compl.dt. date of Labours
Compl. Engaged
1.Replacement of wornout switch with Thick Web Switch
M/s VIRENDRA
total 129 nos.( 1 in 12 - 86 nos. & 1 in 8.5 - 43 nos.) in
CONSTRUCTION
IGATPURI-MANMAD section under Sr. DEN (South)
AND ENGINEERING
BHUSAWAL jurisdiction. Project ID - 01.01.31.18.01.10.003
COMPANY BHOPAL
and 01.01.31.19.1.00.009 2.TSR (P) from 139.0 to 141.0 on 00995280060512
28 88 Chandan Nagar Jain ₹ 11,817,418.08 24.08.2022 24.08.2023 4
UP & DN road Total 4.0 Kms with TRT with DS by BCM in Dated:24/08/2022
Colony Berasia Road
IGATPURI MANMAD section in ADEN MANMAD jurisdiction.
Bhopal
Project ID -01.01.31.21.06.00.006 and 01.01.31.21.6.00.005
Bhopal- 462038
Madhya Pradesh , India
Bhusawal-Igatpuri section - (A)Extension of UP & DN loop
lines at Hisval station. (01.01.16.19.3.50.004) (Trackwork)
(B)Extension of UP & DN loop lines at Niphad station.
M/s SUDHA DEVI RAILWAY
(01.01.16.19.3.50.004) (Trackwork) (c)Extension of UP and
CONTRACTOR-JALGAON
DN loop line at Aswali station. (01.01.16.19.3.50.011)
M/S Sudha Devi, Jamner
(Trackwork) (D)Extension of UP and DN loop line at Lavahit 01025420060235
29 Road SBI Main Branch, ₹ 16,173,721.97 18.08.2022 18.02.2024 5
station. (01.01.16.19.3.50.011)(Trackwork) (E) Extension of Dated: 18/08/2022
near Rohit Printing Press
UP and DN loop line at Odha station. (01.01.16.19.3.50.011)
Jalgaon- 425201
(Trackwork) (F)Extension of UP and DN loop line at Kasbe
Maharashtra, India
sukhene station.(01.01.16.19.3.50.011) (Trackwork)

NASIK ROAD & DEVLALI - Augmentation in facilities for M/s PATEL


Divyangjan- Improvement in the circulating area for 00867980060248 CONSTRUCTION NASHIK,
30 ₹ 23,483,129.35 18.08.2022 18.08.2023 3
seamless movement of differently abled passengers by Dated:18/08/2022 F.NO 1 BHAKTI NAGAR,
providing slander ramps with railing, for barrier free entry, WADALA ROAD
Manmad- Ramp for FOB & COP PF 5/6, repair to PF surface
M/s PATEL
& water stand, Lasalgaon- Booking office, toilets, Second
CONSTRUCTION NASHIK,
Class Waiting Hall, circulating area, NIPHAD- Station facade,
00867980060252 F.NO 1 BHAKTI NAGAR,
31 WaitingHall & circulating area (Project ID- ₹ 23,200,836.52 18.08.2022 18.08.2023 19
Dated:18/08/2022 WADALA ROAD
1.01.53.21.1.50.008)
NASHIK- 422011
Maharashtra, India
Details of Ongoing Contractual works under Engineering department of Bhusawal Division
Details of Ongoing Contractual works under Igatpuri to Pachora section of Bhusawal Division
Extended Nos. of
SN Name of work CA No & date Name of Contractor Cost of C.A. LOA dt Compl.dt. date of Labours
Compl. Engaged
(i) NANDGAONRepairs to goods shed platform, cover shed, M/s NAVIN RANCHHOD
building and water stand in goods shed at NANDGAON RATHODNASHIK
Station. IRPSM ID no.01.01.53.21.4.50.003 (ii) Kasbesukene 4,RADHESHYAM
(KBSN) Goods Shed:- Development of Goods shed facilities at APPARTMENT,JAGTAP
00874730059847
32 Kasbe Sukene station.(ID No.01.01.16.21.1.13.001) MALA ₹ 33,883,171.08 10.08.2022 10.04.2023 5
Dated:10/08/2022
SWIMMING POOL
ROAD,OPP.PRABHA ANAND
SANKUL,NASHIK ROAD
NASHIK- 422101
TBR 65.809 Tkms (41.725 by BCM+ 24.084 by manual) in
M/s BINDU PROJECTS
IGATPURI-PACHORA section under Sr. DEN (S) jurisdiction.
AND COBENGALURU Site
No.22, 3rd Floor, Dynasty
00841250059510
33 Layout ₹ 33,189,993.83 04.08.2022 04.08.2023 5
Dated:04/08/2022
Mariyanna Palya, H A Farm
Post Hebbal BENGALURU-
560024 Karnataka, India
(i) Nandgaon: Heavy repairs to open drain in Running room Letter No: M/s SRS INFRATECH-
side in Nandgaon Station. (ZBB 2021-22) (ii) Panewadi - BHUSAWAL JALGAON PLOT NO 9
Heavy repairs to road by asphalting with misc. repairing PNV- DIVNENGINEERING SURVEY NO 147 4B 5A
"A" to PNV-"B" Cabin. /DRMWBSL162022t2 5B N H 6 VARANGAON
34 /00868270055744 ROAD ₹ 13,320,419.28 07.06.2022 07.03.2023 6
Dated: 07/06/2022 OPPOPSITE GOLANI
COMPLEX BHUSAWAL
JALGAON- 425201
Maharashtra, India
Reconditioning of CMS crossing in situ by RW-20 M/s OBEROI THERMIT
Translamatic Robotic welding or similar at various yards of PRIVATE
Bhusawal division, 45 each under ADEN Manmad, 00933960055743 LIMITED-NOIDA D 33
35 ₹ 6,183,435.74 07.06.2022 07.06.2023 5
Chalisgaon, Line/ Bhusawal, Akola, Badnera & Khandwa Dated:07/06/2022 Sector 59
jurisdiction Total 270 Noida- 201301 Uttar
Pradesh, India
Details of Ongoing Contractual works under Engineering department of Bhusawal Division
Details of Ongoing Contractual works under Igatpuri to Pachora section of Bhusawal Division
Extended Nos. of
SN Name of work CA No & date Name of Contractor Cost of C.A. LOA dt Compl.dt. date of Labours
Compl. Engaged
1)IGATPURI-BHUSAWAL - ADEN MANMAD Length -
Strengthening to various bridges on IGATPURI-BHUSAWAL
section (8 Bridges) 2) Sr.DEN (S) Bhusawal section- a)
Rehabilitation of existing arch bridge by RCC arch top box
00862150053005 DINESH SUKHLAL MUNOT-
36 (2bridges - 180/2, 177/2up) b) Jacketing to Abutments ₹ 95,461,277.66 19.04.2022 19.04.2023 11
dtd.19.04.2022 NASHIK
& Wing walls of Imp. Girder Br. No. 193/1 &
Jacketing to Substructure of Skew slab Br. No. 161/1. (2
Bridges).

Bhusawal-Igatpuri section - (A)Extension of UP & DN loop


M/s SIDDHIVINAYAK
lines at Hisval station. (01.01.16.19.3.50.004) (Civilwork)
CONSTRUCTION
(B)Extension of UP & DN loop lines at Niphad station.
COMPANYTHANE
(01.01.16.19.3.50.004) (Civilwork) (c) Extension of UP and
NAV EVEREST TOWERS
DN loop line at Aswali station. (01.01.16.19.3.50.011)
00831060053804 CHS, BLDG
(Civilwork) (D)Extension of UP and DN loop line at Lavahit
37 Dated: NO. A, FLAT NO.102, ₹ 11,246,818.47 04.05.2022 04.05.2023 9
station.(01.01.16.19.3.50.011) ( Civilwork) (E) Extension of
04/05/2022 KARNIK ROAD,
UP and DN loop line at Odha station. (01.01.16.19.3.50.011)
CHIKANGHAR,
(Civilwork) (F) Extension of UP and DN loop line at Kasbe
KALYAN WEST
sukhene station. (01.01.16.19.3.50.011) (Civilwork)
THANE- 421301
Maharashtra, India
1.)Provision of arrangement to arrest water logging at LHs
provided in lieu of LC No-05 at kms. 340/09-10(JMD-SHF)
under ADEN CHALISGAON jurisdiction.(WP20-21, PB-
219),Project ID:- 01.01.30.21.3.50.015 2.)Provision of
arrangement to arrest water logging at LHs provided in lieu
of LC No- 10 at kms. 350/09-10(JMD-SHF) under ADEN
CHALISGAON jurisdiction. (WP20-21, PB-219),Project ID:-
01.01.30.21.3.50.009. 3.)Provision of arrangement to arrest
water logging at LHS provided in lieu of LC No-11 at M/s KAILASHCHANDRA
kms.356/01-02 (JMD-SHF) under ADEN CHALISGAON DILIPKUMAR
jurisdiction.(WP20-21,PB-219) Project ID:- CONSTRUCTIONS
01.01.30.21.3.50.010 4.) Provision of arrangement to arrest PRIVATE LIMITED-NAVI
water logging at LHS provided in lieu of LC No- 17 at kms. 00981360053507 MUMBAI
38 366/06-07 (SHF-DHI) under ADEN CHALISGAON Dated: 1313/1314 REAL TECH ₹ 72,050,845.87 28.04.2022 28.12.2022 7
jurisdiction (WP20-21, PB-219) Project ID:- 28/04/2022 PARK
01.01.30.21.3.50.011 5.)Provision of arrangement to arrest SECT 30A, VASHI,NAVI
water logging at LHS provided in lieu of LC No-114 at kms. MUMBAI
285/01-03( NGN Station) under ADEN CHALISGAON NAVI MUMBAI- 400703
jurisdiction.(WP20-21,PB-219) Project ID:- Maharashtra, India
01.01.30.21.3.50.004 6.)Provision of arrangement to arrest
water logging at LHs provided in lieu of LC No- 116 at kms.
309/04-06( NI-HPR) under ADEN CHALISGAON jurisdiction.
(WP20-21, PB-219) Project ID:- 01.01.30.21.3.50.019
7.)Provision of arrangement to arrest water logging at LHs
provided in lieu of LC No-121 at kms.332/16-18(CSN-VGL)
under ADEN CHALISGAON jurisdiction.(WP20-21,PB-219)
Project ID:- 01.01.30.21.3.50.014 8.)Provision of
Details of Ongoing Contractual works under Engineering department of Bhusawal Division
Details of Ongoing Contractual works under Igatpuri to Pachora section of Bhusawal Division
Extended Nos. of
SN Name of work CA No & date Name of Contractor Cost of C.A. LOA dt Compl.dt. date of Labours
Compl. Engaged
Widening of deep cutting and cess repairing & widening
M/s R B CHAD-
works in SSE (P.Way) DVL section under ADEN MMR
BHAVNAGAR
jurisdiction
BEHIND BUS
00823010051454 STAND,UNDAVI,UNDAVI,U
39 ₹ 18,353,513.44 21.03.2022 21.03.2023 4
dated 21.03.2022 NDAVI,BHAVNAGAR,BHAV
NAGAR,BHAVNAGAR
BHAVNAGAR- 364240
Gujarat , India
Repairs to steel structure COP, valley gutters, goods shed at
00866720045943 Shri Pitamber Vensi of
40 Chalisgaon and Dhule station under ADEN Chalisgaon ₹ 35,720,160.00 03.12.2021 03.06.2022 6/30/2022 9
dated 03.12.2021 Bhusawal
juirisdiction
3) Chalisgaon - Heavy repairs to side wall of Narayan Bunket
01336250045585 Shri Shahabuddin Shaikh
41 well and cover over shed on pumps (ZBB-2021-22) ₹ 7,257,596.00 27.11.2021 27.08.2022 0
dated 27.11.2021 of Manmad.
Bhusawal Division :-Repairs to staff quarters of ADEN
Chalisgaon SUB DIVN from Hisval, Panjhan, Nandgaon,
Pimparkhed, Rohini, Naydongri, Chalisgaon, Vaghali, CR/BSL/Civil/2021/ M/S Kailashchandra
42 ₹ 14,216,138.18 26.07.2021 26.01.2022 4/15/2022 8
Kajgaon, Nagardevla, Galan, Jamda, Rajmane, Borvihir, 0061 Dilipkumar of Navi Mumbai
Shirud, Dhule and gate lodge quarters.(267 Nos) (ZBB - 2020-
21)
Rebuilding of varous small span bridges b) Provision of
00854100044581 M/S Abhijit Products of
43 smallo opening to enhance reduced waterway due to ₹ 14,692,185.00 10.11.2021 09.11.2022 0
dated 09.11.2021 Jalgaon
jacketing of bridges
Details of Ongoing Contractual works under Engineering department of Bhusawal Division
Details of Ongoing Contractual works under Igatpuri to Pachora section of Bhusawal Division
Extended Nos. of
SN Name of work CA No & date Name of Contractor Cost of C.A. LOA dt Compl.dt. date of Labours
Compl. Engaged
ADEN CHALISGAON section - Miscellaneous repairs to 01000830035949 RAMESH CHINDUJI
44 ₹ 8,601,268.02 25.05.2021 25.09.2021 2/1/2022 0
various bridges Rev 20-21 dtd. 25.05.2021. PANDAGRE-NAGPUR
Work of Cess widening from km 328.470 to Km 384.150. CR/BSL/Civil/2021/
SANGEETA
45 Total 7.0 Tkms. on Chalisgaon-Dhulia section. 0019 dtd. ₹ 17,981,279.00 11.02.2021 21.08.2021 25
CONSTRUCTION-JALNA
15.09.2021.
ADEN Chalisgaon sub divn.- Supplying potable water from
private party in summer 2021 at Chalisgaon, Nandgaon,
Panewadi, Hiswahal, Panjhan, Pimparkhed, Naydongri,
Hirapur,Vaghali, Nagardeola, Gate No. 115A, C, 120, 125, CR/BSL/Civil/2021/
RV ENTERPRISES-
46 127, 128, 129 = 7 LCs on BSL-IGP section & 0024 dated ₹ 2,897,078.00 30.03.2021 30.03.2022 16
JALGAON
Jamdha,Shirud,Borvihir,LC No.6,15,21,22, 23 = 5LCs on 15.04.2021.
CSN-DHI section for 1 one year.(ZBB-2020-21)

TBR 29.202 Tkms by BCM on left over patches in IGATPURI - VIRENDRA


BHUSAWAL - KHANDWA section in BHUSAWAL Division. 00995280044195 CONSTRUCTION AND
47 ₹ 7,856,016.00 30.10.2021 09.11.2022. 9
dated 30.10.2021. ENGINEERING COMPANY-
BHOPAL
Replacement of worn-out switch with Thick Web Switch total
101 nos.( 1 in 12 - 69 nos. & 1 in 8.5 - 32 nos.) in 00863330045586 NARESH B AGGARWAL-
48 ₹ 5,179,355.00 27.11.2021 27.05.2023. 9
MANMAD - PACHORA section under Sr. DEN (S) BHUSAWAL dated 27.11.2021 AKOLA
jurisdiction.
Details of Ongoing Contractual works under Engineering department of Bhusawal Division
Details of Ongoing Contractual works under Igatpuri to Pachora section of Bhusawal Division
Extended Nos. of
SN Name of work CA No & date Name of Contractor Cost of C.A. LOA dt Compl.dt. date of Labours
Compl. Engaged
A) Kherwadi station:- Yard remodeling for extension of UP
& DN loop line to achieve 753m CSR. (Track work)
(IRPSM ID: 01.01.16.19.3.50.006) (B) Kajgaon station:-
Relaxing of PSR 80KMPH to normal 110KMPH on UP &
DN Road at KMs 346/0-7 Dn and 346/0-6 UP Kajgaon
Yard.(Track work) (IRPSM ID: 01.01.16.19.3.50.006) (C)
Galan station:- Yard remodeling for extension of UP &
DN Loop line to achieve 753m CSR of Galan yard. (IRPSM ID: 00869080045859
49 R V AGRAWAL-JALGAON ₹ 12,687,436.00 03.12.2021 03.12.2022. 7
01.01.16.19.3.50.008) WP-2019-20 (TRACK WORK) (D) dated 03.12.2021.
Hirapur station:- Yard remodeling for extension of UP &
DN Loop line to achieve 753m CSR of Hirapur yard. (IRPSM
ID: 01.01.16.19.3.50.008) WP-2019-20 (TRACK WORK)
Contractor's Address: 82 GANESH COLONY , JALGAON,
Maharashtra-425001 India

46.834 Tkms TWR with 75 mm wide gap welding 3603 nos.


THE INDIA THERMIT
in IGATPURI-BHUSAWAL-BADNERA under Sr. DEN (South) 00854630046537
50 CORPORATION LIMITED- ₹ 49,796,312.00 15.12.2021 15.12.2022. 14
BHUSAWAL & Sr. DEN (East) BHUSAWAL jurisdiction. dated 15.12.2021.
KANPUR
1. Hirapur station:- Yard remodeling for extension of UP
& DN Loop line to achieve 753m CSR of Hirapur yard.
(IRPSM ID: 01.01.16.19.3.50.008) WP-2019-20 (BRIDGE
& Civil Engg. WORK) 2. Galan station:- Proposed yard 00891660039717 MILIND P MUDAWADKAR-
51 ₹ 8,531,350.00 07.08.2021 07.02.2022. 25
remodeling for extension of UP & DN Loop line to dated 07/08/2021 DHULE
achieve 753m CSR of GAA yard. (Civil Work) (IRPSM ID:
01.01.16.19.3.50.008) WP-2019-20 PH - 16

Miscellaneous P.way work under SSE(P.way) CR/BSL/Civil/221/0


NIKHILESH TRIPATHI-
52 South/CHALISGAON under ADEN CHALISGAON. 040 dtd. ₹ 21,634,799.00 29.05.2021 28.05.2022 19
JABALPUR
27.06.2021
Miscellaneous P.way work under SSE(P.way)
CR/BSL/Civil/221/0 NIKHILESH TRIPATHI-
53 North/CHALISGAON under ADEN CHALISGAON. ₹ 20,776,125.00 27.06.2021 29.05.2022 9
039 dtd. 27.06.2021 JABALPUR
Details of Ongoing Contractual works under Engineering department of Bhusawal Division
Details of Ongoing Contractual works under Igatpuri to Pachora section of Bhusawal Division
Extended Nos. of
SN Name of work CA No & date Name of Contractor Cost of C.A. LOA dt Compl.dt. date of Labours
Compl. Engaged
Miscellaneous P.way work under SSE(P.way) NANDGAON CR/BSL/Civil/2021/
DBGUPTA RAIL INFRA LLP-
54 under ADEN CHALISGAON. 0043 dated ₹ 18,653,503.00 28.05.2021 28.05.2022 9
PUNE
02.09.2021.
1. Closure of LC No.100 @ Kms 221/12-14 (NI-UGN) by
provision of subway ( RCC Box of Sizes 5.0 X 4.5) by push
through method (Umbrella work 19-20, PB-212) (Project
ID:01.30.19.3.00.004)
2. Closure of LC No.102 @ Kms 227/02-04(UGN-LS) by
provision of subway (RCC Box of sizes 5.0 X 4.5) by push CR/BSL/CIVIL/2021 M/s. Chaitanya
55 ₹ 100,224,481.96 07.01.2021 06.04.22 0
through (Umbrella work 19-20, PB-212) (Project ID: /0010 Construction, Navi Mumbai
01.01.30.19.3.00.007)
3. Clusure of LC No.103 @ Kms 229/11-13 (UGN-LS) by
provision of subway (RCC Box of sizes 5.0x4.5)by push
through method. (Umbrella work 19.20, PB-212, Project
ID:01.30.19.1.00.008).
1. Closure of LC No.83/DN @ Kms 158/43-159/01 (PI-AV) by
provision of subway (RCC Box of sizes 5.0 x 4.5) by push
through method (Umbrella work 19-20, PB-212, Project
ID:01.01.30.19.1.00.007)
2. Closure of LC No.92 @ Kms 196/15-17 (NKRD-OD) by
provision of subway (RCC Box of Sizes 5.0x4.0m) by push
through method (Umbrella work 19-20, PB-212, Project ID:-
01.01.30.19.1.00.006) CR/BSL/CIVIL/2021 M/s Sanyu SCRN JV,
56 ₹ 139,687,041.19 07.01.21 06.04.22 0
3. Closure of LC No.84/1@ Kms 169/13-15(AV-LT) by /0018 Hyderabad
provision of subway (RCC Box of sizes 5.0x4.5) by push
through method.(Umbrella work 19.20, PB.212.Project
ID:01.01.30.19.1.00.008)
4.Closure of LC No.84F at Km 178/17-19 by pushing method
by providing twin subway of Sizes 2.0x4.0x5.0(barrel lengh
24.0m) between LI-DVL stn (IGP-MMR section) Project
ID:01.01.30.19.3.00.010)
Details of Ongoing Contractual works under Engineering department of Bhusawal Division
Details of Ongoing Contractual works under Igatpuri to Pachora section of Bhusawal Division
Extended Nos. of
SN Name of work CA No & date Name of Contractor Cost of C.A. LOA dt Compl.dt. date of Labours
Compl. Engaged
Bhusawal divi.:- Deep screening of T/outs by BCM total 433 M/S Nikhilesh Tripati Rl.
CR/BSL/CIVIL/2020
57 nos (179 nos in IGP-PC section, 122 nos in PC-KNW section Contractor ,Jabalpur ₹ 11,800,034.71 13.03.21 12.03.22 10
/0022
& 132 nos in BSL-BD section) T-110.MMR.2021.05
BSL Division -Deep screening of T/outs by BCM total 160
CR/BSL/CIVIL/2021 OM CONSTN. KALYAN.
58 nos.in IGP_PC section under Sr.DEN(S)BSL jurisdiction ₹ 6,735,290.26 09.08.21 08.08.22 9
/00 T-110.MMR.2021.11
Misc. P.way work under SSE(PW)DVL under ADEN MMR
M/S D.B.Gupta Rail Infra
CR/BSL/CIVIL/2021
59 LLP Ghorpadigaon ,Pune ₹ 15,918,249.29 28.05.21 27.05.22 8
/0041
T-110.MMR.2021/06
Misc. P.way work under SSE(PW)MMR under ADEN MMR
M/S D.B.Gupta Rail Infra
CR/BSL/CIVIL/2021
60 LLP Ghorpadigaon ,Pune ₹ 12,374,048.38 28.05.21 27.05.22 20
/
T-110.MMR.2021/08
Misc. P.way work under SSE(PW)NKRD under ADEN MMR
M/S D.B.Gupta Rail Infra
CR/BSL/CIVIL/2021
61 LLP Ghorpadigaon ,Pune ₹ 14,715,195.90 28.05.21 27.05.22 25
/0042
T-110.MMR.2021/07
BSL DIVIN:- TRR(P)29.30 Kms on ADEN MMR section under M/s. Bindu Projects and co-
CR/BSL/CIVIL/2021
62 Sr.DEN(S)BSL Jurisdication. Bengaluru ₹ 14,962,185.14 11.02.21 10.11.21 9
/0021
T110/MMR/2021/03
TRR(P)-76.498TKMS on ADEN MMR and amp ADEN CSN M/s. Bindu Projects and co-
CR/BSL/CIVIL/2020
63 under SrDEN(S)BSL Jurisdiction Bengaluru ₹ 35,416,813.18 19.05.2021 19.05.2022 7
/00036 .
T110/MMR/2021/13
Repair of trolley refugees(3500 Nos.) between IGATPURI-
PACHORA section on ADEN MANMAD & ADEN CR/BSL/Civil/2020/ Shri I Keshava Ratnam of
64 ₹ 10,506,231.00 14.07.2020 14.01.2021 13
CHALISGAON section under Sr.DEN(South) Jurisdiction 0077 Hyderabad.
Details of Ongoing Contractual works under Engineering department of Bhusawal Division
Details of Ongoing Contractual works under Igatpuri to Pachora section of Bhusawal Division
Extended Nos. of
SN Name of work CA No & date Name of Contractor Cost of C.A. LOA dt Compl.dt. date of Labours
Compl. Engaged
IGATPURI-BHUSAWAL section-Rebuilding of various small
span bridges including ORN-2 & 3 bridges under Sr.
CR/BSL/Civil/2020/ MS A S CONSTRUCTION-
65 Divisional Engineer South Jurisdiction. (57 Nos) WP 19-20 ₹ 50,580,093.00 21.08.2020 20.08.2021 4/30/2022 10
0091 PUNE
umbrella work From Kms 262 to 342 = 14 Bridges

Bhusawal Division - Proposed replacement of existing steel


girder by PSC slab (08 Bridges) Bhusawal-Badnera - 461/1,
578/2, Igatpuri-Bhusawal - 262/1, 318/1, and Bhusawal- CR/BSL/Civil/2020/ Shri Abhijit Dnyadeo Patil,
66 ₹ 68,763,823.58 14.03.2020 14.09.2021 4/30/2022 10
Khandwa section - 552/3, 537/1, 471/1, 488/2, Umbrela 0017 of 14.07.2020. of Jalgaon.
work - WP-19-20, PID No 01.01.32.19.3.19.3.00.003

Bhusawal Division- Proposed elimination of Level Crossing


by providing subway by box pushing method in lieu of Level
Crossing nos- (1)LC no. 03@ Kms 335/07-08 (Chalisgaon-
Jamda) (RCC Box of sizes 4.5x4.5m) (2) LC no. 04@ Kms
337/04-05 (Chalisgaon-Jamda) (RCC Box of sizes 4.5x4.5m)
(3)LC no. 08@ Kms 346/02-03 (Jamda-Shirud) (RCC Box of
sizes 4.5x4.5m) (4) LC no. 09@ Kms 348/05-06 (Jamda- CR/BSL/Civil/2020/
RIGHT CONSTRUCTION-
67 Shirud)(RCC Box of sizes 4.5x4.5m) (5) LC no. 12@ Kms 0048 dated ₹ 272,893,790.00 13.04.2020 13.07.2021 8
PUNE
357/10-11 (Jamda-Shirud) (RCC Box of sizes 4.5x4.5m) (6) 02.10.2020
LC no. 13@ Kms 359/04-05 (Jamda-Shirud) (RCC Box of
sizes 4.5x4.5m) (7) LC no. 14@ Kms 362/02-03 (Jamda-
Shirud) (RCC Box of sizes 4.5x4.5m) (8) LC no. 16@ Kms
364/05-06 (Shirud-Dhule) (RCC Box of sizes 4.5x4.5m)

Bhusawal Division- Proposed elimination of Level Crossing


by providing subway by box pushing method in lieu of Level
Crossing nos- (1)LC no. 02@ Kms 334/02-03 (Chalisgaon-
Jamda) (RCC Box of sizes 5.0x4.5m) (2) LC no. 06@ Kms
341/08-09 (Jamda-Shirud) (RCC Box of sizes 5.0x4.5m) (3)
LC no. 15@ Kms 363/07-08 (Shirud-Dhule)(RCC Box of sizes
5.0x4.5m) (4) LC no. 18@ Kms 370/02-03 (Shirud-Dhule) CR/BSL/Civil/2020/
RIGHT CONSTRUCTION-
68 (RCC Box of sizes 5.0x4.5m) (5) LC no. 20@ Kms 378/10-11 0049 dated ₹ 292,826,712.18 29.04.2020 29.07.2021 0
PUNE
(Shirud-Dhule) (RCC Box of sizes 5.0x4.5m) (6) LC no. 21@ 02.10.2020
Kms 381/01-02 (Shirud-Dhule) (RCC Box of sizes 5.0x4.5m)
(7) LC no. 23@ Kms 383/02-03 (Shirud-Dhule) (RCC Box of
sizes 5.0x4.5m) (8) LC No. 22 @ 382/05-06 by By cut &
cover method (sizes 2.0X 6.0X5.0)
Details of Ongoing Contractual works under Engineering department of Bhusawal Division
Details of Ongoing Contractual works under Igatpuri to Pachora section of Bhusawal Division
Extended Nos. of
SN Name of work CA No & date Name of Contractor Cost of C.A. LOA dt Compl.dt. date of Labours
Compl. Engaged
B - 1. Closure of LC no. 123 @ Kms 340/20-22 (VGL-KJ) by
provision of subway (RCC Box of sizes 6.0x5.0m) by Push
through method.(Umbrella work 19-20,PB-212)(Project ID:-
01.01.30.19.3.00.005) 2. Closure of LC no. 117 @ Kms
315/14-16 (NI-HPR) by provision of subway (RCC Box of
sizes 5.0x4.0m) by Push through method.(Umbrella work 19-
20,PB-212,Project ID:01.01.30.19.1.00.008) 3. Closure of LC
no. 128 @ Kms 359/13-15 (NGD-GAA) by provision of
subway (RCC Box of sizes 5.0x4.0m) by Push through
SANYU INFRA PROJECTS
method.(Umbrella work 19-20,PB-212,Project 1000480030231
69 PRIVATE LIMITED- ₹ 155,324,636.00 31.12.2020 30.03.2022 3/31/2023 16
ID:01.01.30.19.1.00.008) 4. Closure of LC no. 127 @ Kms dated 30/12/2020
HYDERABAD
349/06-08 (KJ-NGD) by provision of subway (RCC Box of
sizes 5.0x4.0m) by Push through method.(Umbrella work 19-
20,PB-212,Project ID:01.01.30.19.1.00.008) 5. Proposed
closure of LC no. 125 @ Kms 344/22-24 (VGL-KJ) by
provision of subway (RCC Box of sizes 5.0x4.5x24.0m) by
Push through method.(Umbrella work 19-20,PB-212,Project
ID:01.01.30.19.1.00.004)

A. Hiring of vehicle (Truck) for track maintenance to SSE (P


Way)Nandgaon under ADEN/Chalisgaon sec. in Sr. DEN
(South) Jurisdiction of Bhusawal Division for 02 Years B.
Hiring of vehicle (Truck) for track maintenance to SSE (P
Way)South/Chalisgaon under ADEN/Chalisgaon sec. in Sr.
DEN (South) Jurisdiction of Bhusawal Division for 02 Years 934250021604 dated KATIRA NIMIT AMAR-
70 ₹ 3,772,260.00 20.07.2020 07.07.2022 9
C. Hiring of vehicle (Truck) for track maintenance to SSE (P 20.07.2020 DHULE
Way)North/Chalisgaon under ADEN/Chalisgaon sec. in Sr.
DEN (South) Jurisdiction of Bhusawal Division for 02 Years
(24 Months)
Details of Ongoing Contractual works under Engineering department of Bhusawal Division
Details of Ongoing Contractual works under Igatpuri to Pachora section of Bhusawal Division
Extended Nos. of
SN Name of work CA No & date Name of Contractor Cost of C.A. LOA dt Compl.dt. date of Labours
Compl. Engaged
JAMDA Depot - 1) Supply & stacking of 65 mm Gauge
Machine crushed stone Ballast & loading in to
Hopper's / BOB'N wagon's by mechanical
means at Jamdha Depot. Quantity = 150000 M3. 2) Civil
SANYU INFRA PROJECTS
Work of construction of new ballast siding CSR-1420M (Zone- 1000480013772 dtd.
71 PRIVATE LIMITED- ₹ 136,205,419.00 16.01.2020 16.07.2021. 16
1 - 800m CSR) for 44 BOBYN between Chalisgaon-Dhule 16.01.2020
HYDERABAD
section at Jamda Yard in Sr. Section Engineer (P.Way)
South/Chalisgaon under Assistant Divisional Engineer
Chalisgaon sub division.

Bhusawal divi. :- 20 Kms Flash Butt welding of rails with


M/S The India Thermit
contractors mobile flash butt welding plants and machinery, CR/BSL/CIVIL/2020
72 Corporation Ltd. Kanpu T- ₹ 34,506,041.67 14.12.20 13.12.21 8/30/2022 8
to carry out Through weld renewal on IGP-Pc section. /0011
110.MMR.2020.34
Vijaya Infra Project
1.Closure of LC No.106@ Km 238/11-13(LS-SUM) by CR/BSL/CIVIL/2020
73 Pvt.Ltd.MUMBAI ₹ 103,880,670.24 29.12.20 28.06.22 6
provision of subway.2.Closure of LC No. 110@Km 250/18- /0014
WKS.MMR.20/35
74 20(LS_SUM) by provision of sub way3.Closure of LC No. 112
MANMAD CE’s Workshop – Repairs to ‘REVA’ Bay and Main CR/BSL/CIVIL/2020 Kailashchandra Dilipkumar ₹ 13,567,728.00 30.03.20 29.09.20 3/31/2021 9
75 Welding of rail joints ( 2137 Nos) in situ/cess and supply of CR/BSL/Civil/2020/ Chakradhar Industries LLP. ₹ 22,957,760.91 07.04.20 06.04.21 9
IGP-BSL Sec:- Replacement Of existing Channel Sleepers of
EASTERN HARDWARE
Bridge by H-beam channel sleepers at Important Girder CR/BSL/CIVIL/2020
76 MART, KALKATTA ₹ 11,920,925.08 17.06.20 16.10.20 3/31/2022 1
Bridge No.193/1 bet.NASHIK-ODHA section. /0039
T-110.MMR.20/24
Details of Ongoing Contractual works under Engineering department of Bhusawal Division
Details of Ongoing Contractual works under Igatpuri to Pachora section of Bhusawal Division
Extended Nos. of
SN Name of work CA No & date Name of Contractor Cost of C.A. LOA dt Compl.dt. date of Labours
Compl. Engaged
Tender No. DRMWBSL652019t7 closing date 29-11-2019
15:00 for (I) Sr. ADEN Manmad Jurisdiction- Repairs of side
drain at way side station in Sr. ADEN Manmad section
(DEVLALI 150.260 to 150.751 Up LH & RH 2x491 = 982m,
154.809 to 155.14 Up LH & RH 2x333= 666m, 154.247 to
155.174 DN LH 1x927 = 927m, DVL-155.142 to 156.00 Up
1x858=858m, 172.718 to 173.388 Up LH & RH M/s Sharda Const JBP 329
2x670=1340m =Total length = 4.773Kms. (ZBB-19-20) (II) GUPTESHWAR ROAD
CR/BSL/Civil/2020/
ADEN Chalisgaon jurisdiction-Heavy repairs to side drain MADANMAHAL JABALPUR
77 0040 ₹ 18,192,821.00 4
between Manmad-Chalisgaon section Dn road Km 298.050- JABALPUR- 482001
19.01.2021
298.600=0.550, 301.600-302.00=0.397, 302.310- Madhya Pradesh , India
302.900=0.590, 305.950-306.400=0.450, 308.400- Mob:9425324803
309.150=0.752 Total = 2.739 KM, Up road Km 298.050-
298.600=0.550, 302.310-302.900=0.590, 308.300-
309.150=0.852, Total =1.992 Km {Grand Total Up +Dn road
= 4.731 KM } under ADEN Chalisgaon sub division. (ZBB-19-
20)

Nasik :Prop.sewage treatment Plant of 200 KLD capacity On


phytorid based technology at Nasik under ADEN MMR Sub-
Ecologique Science
division. (Environmental related work using 1% povision of CR/BSL/CIVIL/2020
78 Tech.India Pvt.Ltd. NAGPUR ₹ 16,424,409.00 24.01.20 23.01.21 5/12/2021 8
sanctioned estimates) /0041
WKS.MMR.20/03

79 IGP-BSL Section:- Interim repairs to exposed rainforcement CR/BSL/CIVIL/2020 A.S. Constn.PUNE


₹ 3,524,185.66 12.05.20 11.07.20 1/31/2021 9
/0058
of slabs to ROB No.260/2 (MMR ROB) at Kms 260/16-18 by CR/BSL/CIVIL/2020 WKS.MMR.2020/23
BSL Sec. :- Rebuilding of various small span bridges Incl. Vijaya Infra Project
80 ₹ 38,084,251.00 22.01.20 21.01.21 3/31/2022 15
ORN-2 & 3 bridges under Sr.DEN(South)Juris. WP-2019-20 /0070 Pvt.Ltd.MUMBAI
BSL Sec. :- Rebuilding of various small span bridges Incl. Vijaya Infra Project
81 CR/BSL/CIVIL/0071 ₹ 88,679,131.00 22.01.20 21.07.21 8
ORN-2 & 3 bridges under Sr.DEN(South)Juris. (57 Nos.) WP- Pvt.Ltd.MUMBAI
Details of Ongoing Contractual works under Engineering department of Bhusawal Division
Details of Ongoing Contractual works under Igatpuri to Pachora section of Bhusawal Division
Extended Nos. of
SN Name of work CA No & date Name of Contractor Cost of C.A. LOA dt Compl.dt. date of Labours
Compl. Engaged
A) LT-DVL Sec-Constn/ of 2Nos.IBS Huts in connection with-
Provision of IBS in both direction in BSL Divn. B)MMR-SUM
Sec.-Construction of 1IBS Hut in connection with -Provision
of IBS in Manmad -Summit section in both direction on BSL
Div C)IGP(Grid Sub Station):-Prop.construction of Metering M/s SHAHABUDDIN
CR/BSL/CIVIL/2020
82 Room(Size-3.50x3.50m),Under Ground RCC oil sump,Oil MASLUDDIN SHAIKH MMR ₹ 3,541,324.70 7
/0089
apron and Baffle wall in connection with :- Augmentation of WKS. MMR.2020.20
traction transformer capacity by replacing 10.5 MVA traction
transformers along with HV & LV switchgear at Igatpuri GS.

Bhusawal section :- Rebuilding of various small span bridged


A.S. Constn.PUNE
83 including ORN-2 & 3 bridges under SrDEN(S)BSL CR/BSL/CIVIL/2021 ₹ 50,580,093.10 21.08.20 20.08.21
T-110.MMR.20/32
jurisdiction (57Nos) from km 262- 342 /0091
A) KW Stn.:- Prop.yard remodeling for extention Remodeling
for extension of UP and DN Loop line to achieve 753m CSR
(Civil work) (IRPSM ID 01.01.16.19.3.50.006)
CR/BSL/CIVIL/2020 A.S. Constn.PUNE T-
84 ₹ 27,045,111.00 22.08.20 21.08.21 17
B) KJN Stn. :- Proposal for relaxing of PSR 80 KMPH to /0092 110.MMR.20/15
Normal 110 KMPH on UP & DN Road at Kms.346.0-7 DN and
346/0-6 UP Kajgaon Yard. (Civil work)

BSL Divn:- TRR(P)4.598 TKMS on 9 Brides Total= 6.823 Vivek Brijkishor Thakur,
CR/BSL/CIVIL/2020
85 TKMS on ADEN MMR & ADEN CSN Sec.under Chandrapur. ₹ 4,040,085.00 18.05.20 17.05.21 4
/0094
SR.DEN(S)BSL Jurisdiction. T-110.MMR.2020.11
BSL Divn :- TRR (P- 11 TKMS On ADEN MMR Section under
CR/BSL/CIVIL/2020 Rohini Rajesh Bamanhalli,
86 Sr.DEN(South)BSL Jurisdiction. ₹ 6,053,714.00 21.08.20 20.01.21 8/18/2021 3
/0099 Solapur T-110.MMR.20/16
Bhusawal Division-Kajgaon Depot-Supply & stacking of 65
mm Gauge Machine crushed stone Ballast & loading into M/s Kasat Stone Industries,
Hoppers/BOBY’ N’ Wagons by mechanical means for A/19-20/S/01 Kasat Bunglow, Paldhi,
87 ₹ 52,633,534.46 20.03.19 19.09.20
Igatpuri - Pachora Section .Qty.= 60000M3 dt.02.05.2019 N.H.No.6, Distt. Jalgaon.
Details of Ongoing Contractual works under Engineering department of Bhusawal Division
Details of Ongoing Contractual works under Igatpuri to Pachora section of Bhusawal Division
Extended Nos. of
SN Name of work CA No & date Name of Contractor Cost of C.A. LOA dt Compl.dt. date of Labours
Compl. Engaged
(1)C. Rly Construction of B/ wall along track at vulnerable
Locations in BSL, Nagpur, Pune and . BSL Division-Provision
M/s Patel Construction,
of Boundary wall on both side of Railway land on BSL to IGP
Railway Contractor,
Sec. under Sr.DEN(S)BSL Km.183/23.15,Km.190/12to
A/19-20/S/02 Flat No.1, Bhakti Nagar,
88 191/21,Km192/11-13,194/21to 195/05 Total=1.47Km (2) ₹ 13,167,074.49 23.02.19 22.11.19
dt.08.05.2019 Wadala Road,
Manmad-Renovation of RPF Barrack at MMR. (Chargeable
NASHIK-422001
to Security related works @ 0.25%).

Construction of TSS at Borvihir and SSP / SP at Jamdha, CEE/P/Engg/RE/CS


Sharda Enterprises of
89 Rajmane, Shirud and Dhule including earthwork in N-DHI/11 dt.11.10.18 ₹ 9,640,179.31 04.06.18 03.10.18
Thane)
Chalisgaon-Dhule section.
Miscellaneous P.way works under SSE P.Way NGN Section of
A/19-20/S/10 OM Construction Company
90 Assistant Divisional Engineer Chalisgaon Sub Division. ₹ 11,260,578.70 16.09.2019 15.09.2020
dtd.15.01.2020 of Kalyan(E) Thane
Miscellaneous P.way works under SSE P.Way South/
A/19-20/S/11 OM Construction Company
91 Chalisgaon Section of Assistant Divisional Engineer ₹ 17,742,101.45 16.09.2019 15.09.2020 4
dtd.15.01.2020 of Kalyan(E) Thane
Chalisgaon Sub Division.
Miscellaneous P.way works under SSE P.Way North/
A/19-20/S/12 OM Construction Company
92 Chalisgaon Section of Assistant Divisional Engineer ₹ 14,801,249.45 16.09.2019 15.09.2020 7
dtd.15.01.2020 of Kalyan(E) Thane
Chalisgaon Sub Division.
Nasik Road-Proposed extension (32 m length)3.66 m wide
A/19-20/S/13 M/s.KOHLI BUILDERS-
93 Foot Over Bridge (FOB) connecting PF No.2/3 and PF No.4 at ₹ 20,808,736.52 13.11.2019 12.11.2020
dtd.15.01.2020 Thane
Nasik Road station.
Miscellaneous repairs to various bridges under ADEN/CSN
A/19-20/S/21 M/s.Dream Construction of
94 ₹ 18,274,669.12 19.11.2019 18.11.2020 12
dtd.20.03.2020 Nandurbar
Bhusawal Division- Replacement of gate lodges with
standard gate lodges with toilets (Standard drawing) on
A/18-19/S/17 Shubham Construction of
95 (a)DEN (East)Bhusawal,(b)Sr.DEN(South) Bhusawal & (c) ₹ 43,471,279.79 26.06.18 25.06.19
dt.03.10.18 Itarsi, Hoshangabad
Sr.DEN (North) Bhusawal Sections(Total 48 gates) (Works
Prog. 18-19)
Details of Ongoing Contractual works under Engineering department of Bhusawal Division
Details of Ongoing Contractual works under Igatpuri to Pachora section of Bhusawal Division
Extended Nos. of
SN Name of work CA No & date Name of Contractor Cost of C.A. LOA dt Compl.dt. date of Labours
Compl. Engaged
(1)Bhusawal Division - SSE (P Way) Devalali & NashikRoad
Section - Rebuilding of various small span slab, flat top &
rail top bridges.(16 Nos)(WP18-19 PB ItemNo.553) (Total 14
Deep Construction of
bridges). (2)Bhusawal Division - Rebuilding of small span A/18-19/S/20
96 Lasalgaon. Mob- ₹ 59,559,144.20 02.08.18 01.10.19 0
bridges by RCC Segmental box. Bhusawal –Badnera Bridge dt.06.11.2018
9422250856.
No. 519/1 & Igatpuri- Bhusawal -Bridge No. 257/3. (DWP
17-18).

Jamdha, Shirud & Dhule- Extension of loop line to achieve


M/s Dream Construction,
753 CSR. (Electrification of Chalisgaon- Dhule section)- A/18-19/S/21
97 Nandurbar-Maharastra ₹ 18,667,748.64 17.07.18 16.01.19
Bridge Extension Work (Bridge No.340/3 &362/1). dt.13.11.2018

Bhusawal Division - Proposed elimination of Level Crossing


by providing subway by box pushing/Cut & Cover method in
lieu of Level Crossing Nos.-(1) Level Crossing No. 02 at
Kms. 01/07-08 by providing subways of sizes 4.0x4.0 (barrel Vijaya Infra Project Pvt.
length 16.0m)between Manmad-Ankai Station.(2) Level Ltd., Railway Contractor,
Crossing No. 03 at Kms 03/03-04 by providing subways of 15/A, Kaysons Building
A/18-19/S/25
98 sizes 4.0x4.0 (barrel length 16.0m)between Manmad-Ankai Behind Church, ₹ 59,497,292.75 05.12.18 04.12.19 4
dt.27.12.2018
Station. (3) Level Crossing No.114 at Kms 285/02-04 (near Station Road, Vikhroli (W)
Nandgaon Station) by provision of subway(RCC Box of sizes Mumbai-400079
6.0x2.65m) at Kms 284/36-285/2 by Push through method
on Nandgaon station.(DWP 18-19)

(1)Up-gradation of toilets at NSG - 2,3,4,5 & NSG - 6


M/s K. D. Construction Pvt.
Stations of Sr.DEN (S) Section of Bhusawal Division. (28
Ltd., 1313/1314, Real Tech
Stations) (2) Devalali-Chalisgaon Section-Provision of Ladies A/18-19/S/27
99 Park, Sec-30A, Vashi, Navi ₹ 20,460,997.77 13.12.18 12.06.19 34
Rest room with changing and toilet facilities on work place dt.23.01.2019
Mumbai.
at various stations. ( 08 Nos).

(1)NasikRoad(IREEN):-Augmentation of Hostel capacity for


Vijaya Infra Project Pvt.
Probationary officers. (2)Nasik Road:-Development of green
Ltd., Railway Contractor,
area as environment sustainability work at IRIEEN
15/A, Kaysons Building
premises. A/18-9/S/30
100 Behind Church, Station ₹ 80,706,391.14 31.01.19 30.07.19
dt.22.03.2019
Road, Vikhroli (W) Mumbai-
400079
Details of Ongoing Contractual works under Engineering department of Bhusawal Division
Details of Ongoing Contractual works under Igatpuri to Pachora section of Bhusawal Division
Extended Nos. of
SN Name of work CA No & date Name of Contractor Cost of C.A. LOA dt Compl.dt. date of Labours
Compl. Engaged
Flash Butt Welding (60000 Joints) of 60 Kg/52 Kg new/old
rails at Chalisgaon plant using contractor's own mobile flash A/ Dy.CE Tr.I of M/S Khem Chand, Railway
101 ₹ 144,847,236.30 28.03.2018 27.04.2020
butt welding plant in stationary mode. 23.07.2018. Contractor, Varanasi.

Bhusawal Division- Chalisgaon Flash butt welding plant-


Shri Ajay K. Misar , Jamner
Unloading of rails from Railway ’s wagon / Truck and A/17-18/S/03
102 Road, Bhusawal ₹ 670,268.16 17.03.17 16.07.17
carriage using dip lorry to Flash butt welding plant. dt.15.05.17

BSL DIVN: ADEN MMR Sub-Divn:- GO-PI Sec:- Protection of


bank by stone piitching between Kms.148.545.149.218 =
A-17-18/S/06 N.R.RATHOD,NKRD T-
103 0.673 Tkms ( UP & DNRD) & Kms.150.783-151.805 - 1.022 ₹ 7,407,854.00 29.03.17 28.07.17
Dt.30.06.2017 110.MMR.16/34
Tkms ( Total = 1.695 Tkms)

Nasik Road (TMW) - Heavy repairs to Roof of Main Workshop Dinesh K. Chouksey,
Field Coil & SMR section of Traction Machine Workshop at K.K.Oil Mill Near Station
A/16-17/S/18
104 Nasik Road.(Rev. 16-17) Harda (M.P.) ₹ 11,749,433.19 09.09.16 08.03.17
dt.15.11.16
Mob.9179099483

Manmad(Filter plant)- Supplying and installing of chlorinator


Shri Kapure Pramod Pandit,
gravity type including maintenance at Manmad Filter Plant
A/16-17/S/27 126, Pushp Kunj, Ganesh
105 for 03 Years.(ZBB-16-17). ₹ 265,608.72 05.12.16 04.12.19 15
dt.17.02.17 Colony, JL.

Bhusawal Division:(I)DVL :- Repairs to road by asphalting


near PWI Office.(II)NKRDTMW):- Heavy repairs to road by
asphalting at Workshop and colony at TMW/
NKRD.(III)Manmad:- Repairs to colony road in Panchawati
colony, RTS Colony and Vrindawan colony etc(IV) Manmad :- A-16-17/S/28 Dt. R.K.SAWANT, NASIK
106 ₹ 14,032,218.00 26.12.16 25.06.17
Repairs to colony roads in Filter House colony, 50/36 units 17.02.2017 WKS.MMR.16/28
colony, 28 unit colony and Godawari colony etc.
Details of Ongoing Contractual works under Engineering department of Bhusawal Division
Details of Ongoing Contractual works under Igatpuri to Pachora section of Bhusawal Division
Extended Nos. of
SN Name of work CA No & date Name of Contractor Cost of C.A. LOA dt Compl.dt. date of Labours
Compl. Engaged
BSL Divn: DEN(S)BSL Juris: (1)TWR by FBW Plant at CSN
(Total = 75.76 Tkms) (i)SSE(P.Way)NGN - 21.5 Tkms.
(ii)SSE(P.Way(S)CSN - 33.1 Tkms. (iii)SSE(P.Way)N/CSN -
21.16 Tkms.(2) D/screening by BCM G.Total = 89.81
Tkms.(Kms.198.24-205.36 = 7.120, 213.16-217.8 = 4.640, A/2016-17/S/32 SHRI.NARESH AGRAWAL,
107 ₹ 47,288,764.38 13.01.2017 31.03.2022
287.326.15=39.15 Total 50.90 Tkms on DNRD) (Km.139- Dt.09.03.2017 Railway Contractor,AKOLA.
139.94 = 0.940,146.2-150.25 - 4.05, 195.54-213.00 =
17.459, 213.40-229.850 = 16.450 Total 38.90 Tkms on
UPRD.

BSL Divn:- (1)Repl.of various worn out./ deficient fittings,


channel sleeper & various pads of channel sleeper fittings on
ADEN MMR Jurisdiction (ZBB 2015-16)(2)SSE(P.Way)NKRD EASTERN HARDWARE
A-16-17/S/33
108 Length:- Repairs to various bridges approaches by fixing of MART, KALKATTA ₹ 8,082,338.00 21.12.16 20.06.17
Dt.17.03.2017
guard rails on bridges as per RDSO's standard drawing. B-710.MMR.16/27
(ZBB 2015-16)

Manmad:- Heavy repairs to water supply pipeline parallel to


Down and UP Mainline and repairs to other distribution A-15-16/S/33 New Aadesh Entp.PUNE
109 ₹ 3,066,851.00 26.10.15 25.02.16
pipeline in station yard and Passenger Platform. Dt.15.01.16 WKS.MMR.15/29

BSL Divn-IGP-MMR Sec:- Heavy repairs to various bridges A-14-15/S/ 24 Deep Constn.LS.
110 ₹ 7,139,170.25 18.09.14 17.03.15
on SSE(Wks)NKRD. Dt.01.11.14 B-110.MMR.14/23
Supplying & installation of Chlorine gas cylinders 100Kg at A-14-15/S/14 M/s.A.M.Jain, BSL
111 ₹ 511,290.00 30.06.14 30.07.17
Manmad Filter House for Three years. Dt.25.08.14 WKS.MMR.14/18
Mobile flash butt welding of 60/52 Kg releases rails from
track at nominated site,cess aswell as in running track for
M/S The India Thermit
removal of defective AT/SKV weld , etc. with contractors A-2009-10/S/30
112 Corporation Ltd. Kanpur ₹ 22,982,200.00 19.06.2009 18.04.2010
mobile flash butt welding plant,equipment,material and Dt.01.02.2010
T-110.MMR.09.14
labour between IGP-BSl section approx. qty. 6495 jts

Total Contract Cost of Works between Igatpuri-Bhusawal section ₹ 3,916,569,204.51 686


Details of ongoing Contractual Works under Pachora- Khandwa section of Bhusawal Division
Extended Nos.of
Sr. Date of Comp. as per
Name of Work C.A. No. & Date Name of Contractor S/Shri Cost of CA Rs. Dt of Comm. Date of Labours
No. C.A.
Compl. Engaged
Mobile flush butt welding of 60/52 Kg. Released rails from track at
The India Thermit
nominated site cess as well as in running track for removal of
A/2009-10/N/28 Corporetion Ltd. Kanpur
1 defective AT/SKV weld etc. with contractor's mobile flash butt ₹ 22,167,525.00 6/4/2009 12/31/2015 8
Dated 15-12-2009 84/22 FAZALGANJ
welding plant, equipment , material and labour between Bhusawal-
Kanpur. UP
Khandwa Section Sch. Qty.6500 Joints.

Divisional Engineer(North) Bhusawal jurisdiction:- (I)Deep


Shri.Ajay Kishan Prasad
screening of Loop lines of various Yard of Pachora-Bhusawal-
Misar of Bhusawal.
Khandwa section. (II)Replacement of existing turnout Nos. 105 B, A/2016-17/N/09,
Railway Contractor.
2 113 B, 115 B ( 1 in 12) and 101 A, 103 B (1 in 8.5) in Nepanagar dtd. 05-Jul-16 ₹ 10,386,833.16 14-May-16 13-Dec-16 8
Sonikchha wadi-m
Yard and Point No.104 B, 114 B, 111 B (1 in 12) , 102B (1 in 8.5)
Jamner Road,
in Mandwa Yard. 52 Kg by 60 Kg under Bhusawal - Khandwa
Bhusawal.
section.

The India Thermit


Supply of 52 Kg -2124 WR (90 UTS) SKV weld portions with single A/2016-17/N/23,
Corporetion Ltd. Kanpur
3 shot crucible for Bhusawal Yard under Jurisdiction of Assistant dtd. 02-Feb-17 ₹ 9,379,584.00 16-Dec-16 15-Jun-17 8
84/22 FAZALGANJ
Divisional Engineer ( Line) Bhusawal.
Kanpur. UP

BSL-Divn- Sr.DEN (North) BSL Jurisdiction-ADEN KNW


Jurisdiction- BSL-KNW Section- 1) Through weld renewal at Shri.Ajay Kishan Prasad
Km.459.0 -469.0=10 Tkms on down road. 2)Through Fastening Misar of Bhusawal.
A/2016-17/N/29,
Renewal between kms.451.53 -497.45 =45.92 Tkms 499.387 - Railway Contractor.
4 dtd. 23-Feb-17 ₹ 10,372,623.00 24-Jan-17 23-Sep-17 8
520.0 =20.60 Tkms and Kms 525.47 to 530.0 =4.53 total 71.063 Sonikchha wadi-m
on Down road and 494.0-518 =24 Tkms, on Up road Grand Total Jamner Road,
95.063 Tkms on BSL-KNW Section under ADEN KNW Bhusawal.
jurisdiction.

1)Khandwa-Replacement of AC Sheet of cover over sheds & FOB


by pre-coated G.I. Sheet from Platform No. 1 to 5.2) Khandwa -
Repairs to waiting hall with extension in circulating area.
3)Pardhade -Repairs to Up and Down Platform surface kaccha Shri. Ratan Vishambhar
A/2016-17/N/31,
portion at Pardhade. 4) Savda, Nimbhora, Raver, Waghoda, Agarawal, Contractor ,
5 dtd. 23-Feb-17 ₹ 12,304,124.23 24-Jan-17 23-Jan-18 8
Asirgarh road - Provision of pathway to connecting Up and Down 82 Ganesh Colony, of
platform.5) Bhadli, Shirsoli, Mhasawad, Maheji, Pardhade - Repairs Jalgaon.
to pathway for connecting all platforms for handicapped persons
.6)Chandni, Nepanagar, Mandwa, Dongargaon, Kohdad, Bagmar,
Khandwa – Repairs to pathway for disabled persons.
Details of ongoing Contractual Works under Pachora- Khandwa section of Bhusawal Division
Extended Nos.of
Sr. Date of Comp. as per
Name of Work C.A. No. & Date Name of Contractor S/Shri Cost of CA Rs. Dt of Comm. Date of Labours
No. C.A.
Compl. Engaged
Pardhade - Heavy repairs to colony road of Pardhade Railway
Colony staff quarter No. H-1/A-D, H2, MA 3,4,5,6,7,RB-I 4 units,
RB-II 8/A-C. Pachora:-Repairs to fencing towards station upside
from Railway colony staff quarters No.D-17, G-25, UIC 42, E-6, RB-
I 34/AB, 35/A-C, 36/A-B, H-26, MB 32/AB, MB 8/AB, H-12/AB to
14/AB. 2) Pachora to Jalgaon section: - Repairs to plastering and
flooring of staff quarters at Pachora, Paradhade, Maheji,
Mhasawad, Sirsoli and Jalgaon. 3)Pachora: - Repairs to roof
leakages of Staff quarters No. D-17, G-25, UC-42, K-18/A-R, H-32/
A-B = 23 units and repairs to courtyard flooring of staff quarters
No. K-18/A-R = 18 units. Total 41 units.4)Pachora – Pardhade: -
Shri. Ratan Vishambhar
Repairs to broken window, doors, ventilators, ceiling of IPS, A/2016-17/N/30,
Agarawal, Contractor ,
6 repeater room, IBS room at 403, 413, 435, 442,393 Microwave dtd. 23-Feb-17 ₹ 22,460,498.17 23-Feb-17 23-Jan-18
82 Ganesh Colony, of
office, Loco office, OHE Office, PWI Office. 5)Jalgaon: - Repairs to
Jalgaon.
leaky roof of station building on down Platform No. 3 and 4.6)
Maheji:-Heavy repairs to flooring of Relay Room, Power
Room&Dy.SS Office at Maheji Station 7)Jalgaon (New Goods shed):-
Heavy repairs to Goods shed road by using unserviceable Concrete
sleeper &retaining wall with storm water drain.8) Pachora:- (i)
Provision of Metering Room(3.50m.x3.50m size) (ii)Provision of oil
apron at Pachora GS in connection with :- Augmentation of
Traction Transformer capacity by replacing 10.5MVA Scott
connected transformer by 21.6/30 MVA Transformer along with HV
& LV switchgear at Pachora.

Anwar Husain Noor


Bhusawal Division- Bhusawal - Construction of concrete apron on
7 A/2017-18/N/15 Dtd.02-11-2017 Mohd, Burhanpur 273, ₹ 5,566,858.76 7-Sep-17 6-Mar-18
Bhusawal yard Line No. 10 on Bhusawal Yard (Deposit Work )
Near kundi, Bhandara
BSL Divn-Assistant Divisional Engineer-Khandwa Sub division-
Khandwa Depot- Supply & stacking of 65 mm Gauge Machine M/s K. K. Vidyut of
crushed stone Ballast & loading in to Hopper /BOB wagon by Ahamadnagar Sarola
8 A/2017-18/N/14 Dtd.25-10-2017 ₹ 48,896,310.00 4-Sep-17 3-Jan-19 5
mechanical means for Bhusawal- Khandwa Section. Qty.=62130 Kasar Ahmednagar
M3 Maharashtra.

Flash butt welding of Rails with contractors Mobile Flash Butt The India Thermit
welding Plants and Machinery , to carry out Through Weld A/2019-20/N/16 , Corporetion Ltd. Kanpur
9 ₹ 40,709,116.38 25-Sep-18 9-Apr-19 8
Renewal on Igatpuri- Bhusawal, Bhusawal –Badnera & Bhusawal– dtd.03-2-2020 84/22 FAZALGANJ
Khandwa. Kanpur. UP
Details of ongoing Contractual Works under Pachora- Khandwa section of Bhusawal Division
Extended Nos.of
Sr. Date of Comp. as per
Name of Work C.A. No. & Date Name of Contractor S/Shri Cost of CA Rs. Dt of Comm. Date of Labours
No. C.A.
Compl. Engaged
Senior Divisional Engineer(North) Bhusawal Jurisdiction-Repair to Prominent Engineering,
holes of SEJ, Turn outs and Guard Rail sleepers by removing 149, Datta Colony,
A/2018-19/N/35
10 broken / seized plate screw and fixing new PVC dowel with Airport Road,Bhopal, ₹ 2,057,695.30 12-Sep-18 11-Jan-19
Dtd.31-12-2018
suitable adhesive. (M.P).

Bhusawal Division- (Bhusawal Division- (1)ADEN(Line)Bhusawal &


ADEN Khandwa Section-Rebuilding of various small span
Shreenath Infra Projects
stone/flat top, Rail top bridges by RCC segmented box. (18 bridges)
Pvt. Ltd. Fortune Aura
(WP18-19 PB Item No.570 (2) Proposed closure of Level Crossing
Bhanwer Kua, Main
No.170/A (Ajanta Gate) at Kms.475 /20-22 on Bhusawal - A/2018-19/N/27 ,
11 Road,304, 1- Gurmeet ₹ 93,313,384.60 20-Sep-18 19-Sep-19 8
Khandwa section by construction of Subway at Kms.475/34-36 by dtd.28-12-2018
Nagar,Indore – Madhya
push through method. (DPWP17-18,PH-30)(Project
Pradesh
01.01.30.17.4.50.004) (3) Proposed heavy repairs to Bridge
No.448/1 at Km 448/2-4 on Bhusawal – Khandwa ection by RCC
segmented box.

Bhusawal Division –(1) Burhanpur - Provision of 3.66 m wide Unique Associates,


additional FOB at Bhusawal End. (Against Pink Book Item No.770) Railway Contractor, 13,
A/2018-2019/N/19
12 (2) Burhanpur - Provision of COP on Up Platform ( 144 x 10.5 M) Gopal Nagar, 2nd Bus ₹ 34,029,197.96 6-Aug-18 5-Apr-19 7
Dtd.10-9-2018
(Against Pink Book Item No.769) (3) Burhanpur - Provision of COP stop Nagpur
on Down Platform ( 144 x 8.5 M) (Against Pink Book Item No.769).

Shri P. N.
Sarode,Railway
Contractors,Plot No.
9/3A, S. N. 167 Near
Bhusawal Division-Proposed rehabilitation of existing steel girder
T.S. Zope School,
bridges by cast in situ RCC box. (05 Nos) on Bhusawal -Khandwa A/2018-19/N/14
13 BHUSAWAL. Ph No ₹ 45,582,597.83 18-Apr-18 17-Apr-19 9
section) (WP18-19) Dtd.03-7-2018
9102582240307,
9109422779679
email:-
ksksarode782gmail.com
Details of ongoing Contractual Works under Pachora- Khandwa section of Bhusawal Division
Extended Nos.of
Sr. Date of Comp. as per
Name of Work C.A. No. & Date Name of Contractor S/Shri Cost of CA Rs. Dt of Comm. Date of Labours
No. C.A.
Compl. Engaged
Shri. Abhijit D.
Patil,Railway
PACHORA-BHUSAWAL & PACHORA-JAMNER Section:-
A/2018-19/N/13 Contractor,9, Suyog
14 Miscellaneous repairs and water way cleaning to various bridges. ₹ 7,169,051.73 19-Mar-18 18-Dec-18
Dtd.20-6-2018 Colony,
(As per CR-USSOR-2011).
Girna Tank
Road,Jalgaon
E-Tender Notice No :- DRM(W)Bhusawal/80/2018
Date04/08/2018.. for the work of - (1) Proposed Closure of Level
Crossing No. 133/C at 375/16-18 by pushing method by
providing subways of sizes 4.50x3.75 (barrel length 20.0m)
between Pachora-Paradhade Station.(Igatpuri-Bhusawal Section)
(2) Proposed Closure of Level Crossing No. 135/C at 384/12-14 by
pushing method by providing subways of sizes 4.50x3.75 (barrel
length 20.0m)between Paradhade-Maheji Station. (Igatpuri-
Bhusawal Section) (3) Proposed Closure of Level Crossing No.
ABHIJAYNESH INFRA
137/C at 389/00-01 by pushing method by providing subways of
–JV, MISAR+ABHIJIT
sizes 4.50x3.75 (barrel lengh 20.0m) between Maheji-Mhasavad
PATIL
Station.(Igatpuri- Bhusawal Section) (4) Proposed Closure of Level
A/2018-19/N/31 , 28, Lewa Boarding
15 Crossing No. 138/C at 390/03-05 by pushing method by providing ₹ 173,302,559.67 24-Sep-18 23-Sep-19
dtd.12-02-2019 Complex,
subways of sizes 4.50x3.75 (barrel lengh20.0m)between Maheji-
Jalgaon – (M.S.)
Mhasavad Station (Igatpuri- Bhusawal Section) (5) Proposed
PIN – 425 001
Closure of Level Crossing No. 140 at 393/19-21 by pushing
Ph No 9822340956
method by providing subways of sizes 4.50x3.75 (barrel lengh
20.0m) between Maheji-Mhasavad Station (Igatpuri- Bhusawal
Section) (6) Proposed Closure of Level Crossing No. 142/C at
395/26-28 by pushing method by providing subways of sizes
4.50x3.75 (barrel lengh 20.0m) between Maheji-Mhasavad Station
.(Igatpuri- Bhusawal Section) (7) Proposed elimination of LC No
176C at kms. 518/30-32 by providing subways of size 4.0mx4.0m
(RCC Segmented Box) at kms.518/18-20 on Bhusawal –Khandwa
Section by push through method.

Bhusawal Division- (1) Provision of Boundary wall on both side of


Railway land at various locations to avoid tress passing on Igatpuri Shreenath Infra Projects
to Badnera and Bhusawal- Khandwa Section under Senior Pvt. Ltd. Fortune Aura
Divisional Engineer(North)Bhusawal (2)Khandwa- Proposed raising Bhanwer Kua, Main
A/2018-19/N/43 ,
16 of Platform No.6 from rail level to high level.(624 M)(PB Item Road,304, 1- Gurmeet ₹ 50,929,462.36 4-Dec-18 3-Aug-18
dtd.27-02-2019
No.770.)RRSK (Project ID 01.01.53.18.3.00.012) (3)Khandwa- Nagar,Indore – Madhya
Provision of second class waiting hall cum Booking office on Pradesh.
Platform No.6.(PB Item No.769) DF-I (Project ID
01.01.53.18.3.00.011)
Details of ongoing Contractual Works under Pachora- Khandwa section of Bhusawal Division
Extended Nos.of
Sr. Date of Comp. as per
Name of Work C.A. No. & Date Name of Contractor S/Shri Cost of CA Rs. Dt of Comm. Date of Labours
No. C.A.
Compl. Engaged
Shri Sunil Chauhan,
44, Shree Krishna
Chawl,
Khandwa-Heavy repairs to Platform apron of Up loop and side wall A/2018-19/N/36 , Indira Nagar, Parsik
17 ₹ 2,950,384.94 24-Oct-18 23-Feb-19 5
drain.(ZBB-16-17) dtd.02-01-2019 Kharigaon,
Kalwa – Thane
(Maharashtra)

(1)Jalgaon(NewGoods shed):-Repairs to Roof,damaged Doors,side Jain Metal and Material


sheeting,Platform walling etc. of New Goods shed at Supply Corporation,
Jalgaon.(2)Pachora:-provision of shed for homing road mobile ART Railway Contractor, 10-
at Pachora(M&P_17-18)(3) Savada to Ashirgarhroad:-Repairs to Adinath Society,
flooring, plastering,Roof leakage and walling etc. of service A/2018-19/N/40 , Shivram Nagar,
18 ₹ 16,684,589.67 8-Aug-18 7-May-19
buildings.(4)Provision of Ladies toilet on work place at various dtd.18-01-2019 JALGAON. 425001.
Offices, sheds,SSE/SE depots,stations.etc.(14Nos) in Pachora- Ph No 912572224969,
Khandwa(Excl. Bhusawal section connection with Bhusawal Divn.:- 919503088822 email:-
Provision of Ladies toilet on work place at various Offices, ulhas4@gmail.com
sheds,SSE/SE depots,stations.etc.(50 Nos).

Bhusawal Division (1) Burhanpur- Improvement to Up and Down Shri R.V.Agrawal,


Platform surface with side wall.(Against Pink Book Item No.770 (2) Railway Contractor,
Burhanpur-Provision of New station building with Retiring room 02 82,Ganesh Colony,
Nos. and VIP louge with cafeteria to match the asthetic importance JALGAON. Ph. No
A/2018-19/N/25 ,
19 of city. (Against Pink Book Item No.769)(3) Burhanpur – Provision 919422222976, ₹ 46,132,187.43 13-Aug-18 13-Apr-19 7
dtd.30-10-2018
of Entrance gate with Neon sign station name boards and separate 912572250860
parking with Drop and Go facility. (Against Pink Book Item No.769) email:-
(4) Burhanpur –Provision of lilft at FOB (2 Nos.)(Civil Engineering rvagr01@gmail.com
portion)(DPWP17-18 OT)

Shubham Construction,
Shankar Mandir Gali,
Surajganj
Bhusawal Division –(1)Burhanpur, Mandwa&Dongargaon stations-
Itarsi, Dist.
Proposed construction of Panel Building.(2) Bhusawal:-Proposed
A/2018-19/N/23 , Hoshangabad (MP) Ph
20 construction of Panel Building(2Nos) (3) Proposed construction of ₹ 33,770,233.05 17-Jul-18 16-Jul-19 8
dtd.31-12-2018 No 919425642898,
IBH Huts .( Relay Room, IPS Room )between Bhusawal – Badnera
919425642898. email id
section (6Nos.) & WA & BAU Stns.
dilipdilipp077@gmail.co
m
Details of ongoing Contractual Works under Pachora- Khandwa section of Bhusawal Division
Extended Nos.of
Sr. Date of Comp. as per
Name of Work C.A. No. & Date Name of Contractor S/Shri Cost of CA Rs. Dt of Comm. Date of Labours
No. C.A.
Compl. Engaged

(1)(A)Burhanpur-Provision of 90000 lts capacity RCC tank for


Platforms at Down side Bhusawal end.(B)Burhanpur-Heavy repairs
Shri Vijay Hingu Yadav,
to existing water supply pipe line (DPWP-17-18) 2)Nepanagar-
Railway Contractor
Replacement of old steel tank by RCC tank of 90000 litres.(DPWP-
Vill- Fekri,
2017-18) (3)Dongargaon-Provision of RCC HS tank of 90000
BHUSAWAL.. Ph No
litres.(DPWP-2017-18) (4) ADEN Khandwa Subdivision:- PART{A} (i)
919403833665,
Savada - Provision of 200mm dia bore well with pipe ine(ii)Raver- A/2018-19/N/15
21 919028137590, ₹ 24,308,859.71 22-Mar-18 21-Mar-18 7
Provision of 200 MM dia bore well with pipeline(iii)Burhanpur - Dtd.20-6-2018
9194003833665.
Replacement of old damaged PVC storage tank of D/S RB I AND
emasil:-
RB II RB III Staff Quarters [ RB I 57/AH ; 58AH 59/AC ; RBII
vijayhyadav111@gmail.c
/53/AH , 54AH , 55 AG ; RB III /56/AD = 46 UNITS ] (ZBB-17-18).
om
PART {B} Savada-Nimbora-Raver-Burhanpur-Asirgarh road -
Repairs to Underground drainage of staff quarters.(ZBB-17-18)

Shri. Ashok D.
Kawathe,
Assistant Divisional Engineer (Line) Bhusawal's Jurisdiction:- Railway Contractor,
A/2018-2019/N/29
22 Repairs to side drain 6045M on Down Road &1640M on Up road House No. 197, Near ₹ 28,791,595.64 12-Sep-18 11-Sep-19 8
Dtd.05-11-2018
Total length = 7685 M on Pachora - Bhusawal section. Grampanchayat Office,
Fekri, Bhusawal.

Shri. Rajendra Singh


Kiledar, of Betul
Supply & stacking 65mm machine crushed stone ballast & loading
A/2018-2019/N/29 Ph No (07141) 238540
23 the same in to Hoppers/BOB wagon by mechanical means at ₹ 30,807,226.07 21-Aug-18 20-Feb-20 5
dated.23-11-2018 email :-
Burhanpur Depot. Qty. 34,130 m3.
rskcon_pvtltd@yahoo.co
.in, rskcon8@gmail.com

Tirupati Balaji
Roadlines India,88,
Jaideo, Central Avenue
Road,Chaprunagar,
Bhusawal Division- Transportation of P.Way material from various Nagpur Square,Nagpur
A/2018-19/N/50
24 locations of Bhusawal division and from other division to Bhusawal (M.S.) Ph No ₹ 26,145,465.28 3/11/2019 3/10/2020 9
Dtd.10-5-2019
division at various location. 9107122730118,
919823034344 email:-
anilmodi123@yahoo.co
m
Details of ongoing Contractual Works under Pachora- Khandwa section of Bhusawal Division
Extended Nos.of
Sr. Date of Comp. as per
Name of Work C.A. No. & Date Name of Contractor S/Shri Cost of CA Rs. Dt of Comm. Date of Labours
No. C.A.
Compl. Engaged
Shri Pawar Dhiraj
Ashok
At Post Chapora, Ta.
(1)Upgradation of toilets at NSG - 2,3,4,5 & NSG - 6 Stations of
Burhanpur
Senior Divisional Engineer (North)Section of Bhusawal Division. (21
A/2019-20/N/01 Dist. Burhanpur (M.P.)
25 Stations) (2) Pachora-Khandwa Section-Provision of Ladies Rest ₹ 13,662,624.88 27-Mar-19 26-Sep-19 14
Dtd.05-7-2019. Ph No :- 919826618461
room with chang-ing and toilet facilities on work place at various
email:-
stations ( 07 Nos)
pawardhiraja@gmail.co
m

Shreenath Infra Projects


Pvt. Ltd. Fortune Aura
Bhanwer Kua, Main
Khandwa - Augmentation of circulating area towards Platform
Road,304, 1- Gurmeet
No.6 with modification of existing circulating area and facade A/2019-20/N/02
26 Nagar,Indore – Madhya ₹ 3,850,412.34 1-Mar-19 31-Mar-20 7
towards platform no. 5 including relocation of affected structure. Dtd.05-8-2019.
Pradesh
(WP 18-19) Umbrella work Project ID 01.01.53.18.3.00.018
Ph No 8149968698,
8966005999

Shri Quddus Panjwani ,


Railway Contractor,
58,Imlipura, near A-one
kirana,
KHANDWA
QUOTATION NOTICE No. Engg.N.03-19.Qtn 3 dtd 18-03-2019 for
A/2019-2020/N/04 Shri Quddus Panjwani ,
27 the work of- Khandwa (ORH) – Up Keep and maintenance o ₹ 387,449.00 9/4/2019 3-May-20
Dtd.27-9-2019 Railway Contractor,
‘NARMADA’ Officer’s Rest House @ KNW for 8 months period
58,Imlipura, near A-one
kirana,
KHANDWA .
Ph No - 8770564631
Details of ongoing Contractual Works under Pachora- Khandwa section of Bhusawal Division
Extended Nos.of
Sr. Date of Comp. as per
Name of Work C.A. No. & Date Name of Contractor S/Shri Cost of CA Rs. Dt of Comm. Date of Labours
No. C.A.
Compl. Engaged

M/S. N.S. Manwani,


Rly.Contractor, Near Sai
Petrol Pump, Jamner
Sr.Divisional Engineer(North)Section:-Provision of tool room cum A/2019-2020/N/07 Road, Bhusawal. Ph. No
28 ₹ 20,526,834.31 10/22/2019 7/21/2020 13
gang Huts 15 nos. for trackmans. JL-2, Dtd.18-11-2019 9102582242119,
919325251919. email:-
msnsmanwanibsl@gmail
.com

Shri.Nawalkishor Mittal,
Rly.Contractor,
(1) BHUSAWAL-KHANDWA Section:- Provision of Cover Over Jagadamba Sadan,
Platform (COP) and other miscellaneous work at Raver, Nimbhora, Gajanan Maharaj Nagar,
A/2019-2020/N/11
29 Nepanagar Stations. (2) BHUSAWAL-BADNERA Section:- Provision Bhusawal. Ph.No ₹ 46,633,996.90 11/6/2019 5/5/2020 6
/B Dtd.18-12-2019
of Cover Over Platform (COP) and other miscellaneous work at 9102582225265,
Badnera, Akola and Malkapur Stations. 9102582226891,
919422276050 email:-
nawal_m24@yahoo.com

Shri.Dineshkumar
Chouksey, Contractor of
Harda. Ph no
A/2019-2020/N/13
30 Khandwa:- Heavy repairs to water supply system at Khandwa. 9107577222415, ₹ 20,826,498.12 9/12/2019 6/11/2020 8
Dtd.15-01-2020.
919826743460 email-
mchoukseyharda@rediff
mail.com

Shri. Avinash P. Gawali,


Kulkarni Plots, Behind
Old S.B.I Bhusawal. Ph
Assistant Divisional Engineer (Line)Bhusawal subdivision-Jamner- No 919403266828
A/2020-2021/N/17
31 Repairs to old HS tank and shed of open well at Jamner email:- ₹ 3,104,663.80 12/14/2019 7/13/2020
Dtd.07-8-2020
Station.(ZBB-2017-18) avinashpgawali1215@g
mail.com
Details of ongoing Contractual Works under Pachora- Khandwa section of Bhusawal Division
Extended Nos.of
Sr. Date of Comp. as per
Name of Work C.A. No. & Date Name of Contractor S/Shri Cost of CA Rs. Dt of Comm. Date of Labours
No. C.A.
Compl. Engaged
M/S. ISC Project Pvt.
Ltd. Near Bund Garden
Bhusawal Division-Bhusawal Depot-Supply & stacking of 65 mm
Road, Pune. Ph
Gauge Machine crushed stone Ballast & loading into A/2019-2020/N/10
32 No ₹ 101,589,831.84 10/11/2019 4/10/2021 9
Hoppers/BOBY’ N Wagons by mechanical means .Qty.= 125000 Dtd.06-12-2019.
912041299000/01/02
M3. (ZONE-II)
email:-
info@iscprojects.co.in

SUDHA DEVI,
CONTRACTOR, Near
Rohit Printing Press,
CR/BSL/CIVIL/2020
Miscellaneous P.Way works under SSE(P.Way) Pachora under Main State Bank of
33 /0067 Dtd.07-11- ₹ 9,985,331.66 5/27/2020 5/26/2021 18
ADEN(Line)Bhusawa's jurisdiction. India, branch, Jamner
2020
Road, Bhusawal. Ph No
09011873256 email:-
sdevi3330@gmail.com

LAXYO ENERGY
LIMITED, Contractor,
CR/BSL/CIVIL/2020
Miscellaneous P. Way works under SSE (P.Way) (Main Line) Laxyo tower, 46/1, T I
34 /0103 Dtd.11-01- ₹ 19,508,019.70 9/3/2020 9/2/2021 20
Bhusawal under ADEN (Line) BSL’s jurisdiction road, RATLAM. FAX :
2021
07412220960 email:-
jpsharma@laxyo.com

M/S.Y.V. Mane,
Contractor, Near New
Court, Gat No.9,
CR/BSL/CIVIL/2020
Miscellaneous P. Way works under SSE (P.Way) (North) Burhanpur Sanghavi Resid-
35 /0106 Dtd.29-12- ₹ 9,702,326.26 9/14/2020 9/13/2021 16
under ADEN Khandwa Jurisdiction. Bhigwan Road,
2020
Baramati -Pune. Ph.No
919420204444 email:-
yvmcpl@gmail.com

M/S.Y.V. Mane,
Contractor, Near New
Court, Gat No.9,
Miscellaneous P. Way works under SSE (P.Way) (South) Burhanpur CR/BSL/CIVIL/2020 Sanghavi Resid-
36 ₹ 10,506,375.95 9/3/2020 9/2/2021 16
under ADEN Khandwa Jurisdiction. /0105 Dt.11-01-2021 Bhigwan Road,
Baramati -Pune. Ph.No
919420204444 email:-
yvmcpl@gmail.com
Details of ongoing Contractual Works under Pachora- Khandwa section of Bhusawal Division
Extended Nos.of
Sr. Date of Comp. as per
Name of Work C.A. No. & Date Name of Contractor S/Shri Cost of CA Rs. Dt of Comm. Date of Labours
No. C.A.
Compl. Engaged

M/s Ghai Enterprises,


Pune C2, Flat
No 103, ist floor
CA No:-
mandheke Advantages,
Miscellaneous P. Way works under SSE (P.Way) (KNW) under CR/BSL/CIVIL/2020
37 Lullanagar. Ph no ₹ 10,689,867.74 11/20/2020 11/19/2021 10
ADEN Khandwa Jurisdiction. /0115 dated
912026837017,
22.02.2021
919421279000. email:-
ghaienterprises786@gm
ail.com

M/S.Y.V. Mane,
Contractor, Near New
Court, Gat No.9,
BHUSAWAL-DIVISION- TRR / pP-8.03 TKMS on 31 Bridges on
CR/BSL/CIVIL/2020 Sanghavi Resid-
38 ADEN (Line)Bhusawal and ADEN Khandwa’s Section on ₹ 2,776,957.25 3/23/2020 3/22/2021
/0052 Dtd.09-9-2020 Bhigwan Road,
Sr.Divisional Engineer(North)BSL’s jurisdiction.
Baramati -Pune. Ph.No
919420204444 email:-
yvmcpl@gmail.com

M/S. BHAGWATI
ASSOCIATES,
Contractor, 4 Timber
BHUSAWAL (Station) :- (I) Yard remodeling of facilities for handling CR/BSL/CIVIL/2020
Market, BHUSAWAL,
39 long haul trains. (II) Ease out sharp curves of GC-11 and Up by /0047 Dtd.18-11- ₹ 19,347,842.57 3/23/2020 12/22/2020 9
Ph.No 919689968969
Pass Line in Bhusawal yard. 2020
email:-
pareshjadwani1@gmail.
com

M/S. Ganpati
Enterprieses, of
Mumbai. Ganesh Murty
Nagar Bhag 2 , 15/13,
CR/BSL/Civil/2020/
TRR/P-19.00 TKMS on ADEN(Line)Bhusawal & ADEN Khandwa's Capt p Pathe marg, Cuff
40 0084 dated ₹ 3,642,586.07 2/12/2020 5/11/2020 36
Section on Sr.DEN(N)BSL's jurisidisction. Pared, Colaba, Mumbai.
25.02.2021
Ph no 919309582045,
917045764251. email :-
ganpatienterprises132@
gmail.com
Details of ongoing Contractual Works under Pachora- Khandwa section of Bhusawal Division
Extended Nos.of
Sr. Date of Comp. as per
Name of Work C.A. No. & Date Name of Contractor S/Shri Cost of CA Rs. Dt of Comm. Date of Labours
No. C.A.
Compl. Engaged

EASTERN HARDWARE
MART- Contractor, of
Senior Divisional Engineer (North) Bhusawal Section -Procurement
Kolkotta (W-Bengal). Ph
& replacement of worn out /deficient channel sleepers / fittings &
No; 913322423341,
pads of various steel girder bridges under Assistant Divisional CR/BSL/2020/0024
41 913322428266, ₹ 24,552,681.96 1/11/2020 1/10/2021 9
Engineer Khandwa and Assistant Divisional Engineer (Line) Dtd.13-7-2020
919836927290.
Bhusawal H BeamSection (OOT WP 18-19 PID No.
email:-
01.01.31.18.6.00.018).
easternhardware1983@
gmail.com

SUDHA DEVI,
CONTRACTOR, Near
Rohit Printing Press,
Shallow screening (72.02 KM's) Manual in Busawal-Khandwa
CR/BSL/CIVIL/2020 Main State Bank of
42 Section under jurisidiction of Assistant Divisional Engineer- ₹ 11,456,424.91 5/8/2020 11/7/2020
/0029 Dtd.22-8-2020 India, branch, Jamner
Khandwa's jurisdiction.
Road, Bhusawal. Ph No
09011873256 email:-
sdevi3330@gmail.com

SUDHA DEVI,
CONTRACTOR, Near
Rohit Printing Press,
CR/BSL/CIVIL/2020
BHUSAWAL DIVISION:- Replacement of broken/unserviceable Main State Bank of
43 /0030 Dtd.07-11- ₹ 10,709,294.57 3/23/2020 6/22/2020 9
sleepers under ADEN(Line) Bhusawal Jurisdiction. India, branch, Jamner
2020
Road, Bhusawal. Ph No
09011873256 email:-
sdevi3330@gmail.com

Bhusawal Division –(A)BURHANPUR:- Extension of existing rack


machine siding. (Length 175 Meter) up to length 250 Meter) at BAU
Yard i.e. extension work =75 M (Track Meter). (B) DONGARGAON M/S.Gopal Dubey,
YARD:- Construction of track machine siding for (300 + 500 ) Rly.Contractor, Vasant
M=450 M CSR. (C) SAVAD YARD:- :-Construction of track machine Vihar, Tapi Nagar,
siding. (D) MAHEJI YARD:- Construction of track machine siding CR/BSL/CIVIL/2020 Bhusawal. Ph no :
44 ₹ 51,790,638.85 3/5/2020 3/4/2021
(300 +150) M=450 M clear standing room CSR. (E) PACHORA /0018 Dtd.15-7-2020 912582225373,
YARD:- Construction of track machine siding for making 300 M 919422292253
=300 M CSR. (F)KHANDWA Station:- Construction of track email:- gopaldubey10
machine siding for 300 M CSR. (F)KHANDWA Station:-Provision of @gmail.com
isolation on Up goods lines for dealing passenger train on platform-
6.
Details of ongoing Contractual Works under Pachora- Khandwa section of Bhusawal Division
Extended Nos.of
Sr. Date of Comp. as per
Name of Work C.A. No. & Date Name of Contractor S/Shri Cost of CA Rs. Dt of Comm. Date of Labours
No. C.A.
Compl. Engaged

Tirupati Balaji
Roadlines India,88,
Jaideo, Central Avenue
Road,Chaprunagar,
CR/BSL/CIVIL/2020 Nagpur Square,Nagpur
Picking up of released rails and MBC sleepers with crane mounted
45 /0031 Dtd.10-12- (M.S.) Ph No ₹ 10,364,315.40 4/13/2020 4/12/2021 16
on BFR laying in the Bhusawal Division.
2020 9107122730118,
919823034344 email:-
anilmodi123@yahoo.co
m

The India Thermit


Corporetion Ltd. Kanpur
Welding of Rail Joints (1256 No) in situ/ cess and supply of AT 84/22 FAZALGANJ
CR/BSL/CIVIL/2020
welds tools and equipments and accessories with all mechanical Kanpur. UP Ph. No
46 /0064 Dtd.11-11- ₹ 14,314,623.12 5/13/2020 5/12/2021
equipments in Pachora –Bhusawal-Khandwa Section of 9105122215161,
2020
Sr.DEN(N)Bhusawal Jurisdiction. 917408440060.
email:-
tech@indiathermit.com

M/S.Dynamic Egineers,
Contractor, E-20,
Chambal Industrial
CR/BSL/CIVIL/2020 Area, KOTA. Ph no
BHUSAWAL-DIVISION:-Fabrication &assembly of 60 Kg./52 Kg. in
47 /0053 Dtd.26-10- 917442481721, ₹ 20,128,652.00 5/20/2020 5/19/2021 18
situ glued joints. =1005 Nos.
2020 917442481722,
919414191184.. Email
:-
skgupta@dynengg.com
Details of ongoing Contractual Works under Pachora- Khandwa section of Bhusawal Division
Extended Nos.of
Sr. Date of Comp. as per
Name of Work C.A. No. & Date Name of Contractor S/Shri Cost of CA Rs. Dt of Comm. Date of Labours
No. C.A.
Compl. Engaged

Virender construction ,
Bhopal 88 Chandan
Nagar Jain colony
CR/BSL/CIVIL/2021
TBR 20.013 TKMS in Bhusawal Khadwa Section under Berasia Road Bhopal.
48 /0004 ₹ 6,872,667.27 12/8/2020 9/7/2021 19
Sr.DEN(N)BSL's Jurisdiction. Ph No: 919977931993
Dtd.27.02.2021
email:-
tarunsaini974@gmail.co
m

M/S.Dilip Kumar,
Contractor, D-1343
Indra Nagar, LUCKNOW
BHUSAWAL-DIVISION:- Manual Deep Screening of Trunouts ( 40 CR/BSL/CIVIL/2021
D 1343 Indra Nagar
49 Nos.) in Pachora-Khandwa Section under Sr.DEN(N)BSL's /0009 ₹ 4,587,386.99 12/8/2020 10/7/2021 18
Lucknow Ph No
Jurisdiction. Dtd.08.12.2020
919351127139 email:-
rakeshbatra838@yahoo.
com

M/S. S.P.Constructions,
Contractor, Ward No.13,
Jai Bhawani Colony,
CR/BSL/CIVIL/2021
TRR/P-29.625 TKMS on Bhusawal-Khandwa Section under Sihora-JABALPUR. Ph
50 /0006 ₹ 15,308,520.15 12/4/2020 9/3/2021 18
Sr.DEN(N)BSL's jurisidiction. no :- 919630266313
Dtd.20.04.2021
email:-
spconstructionsihora@g
mail.com

M/S. Milind G.
Dharmadhikari,
Contractor , 3/357/1,
Provision of connectivity to Pit Line along-with extension of existing CR/BSL/CIVIL/2021
Kulkarni Plots,
51 stabling line No.1 for 600 m in connection with Yard remodeling /0005 ₹ 3,626,967.54 12/24/2020 3/23/2021
Bhusawal. Ph no :-
for augmentation of facilities in Bhusawal Coaching comples. Dtd.25.03.2021
912582226515. email:-
mgdsatisfaction@gmail.c
om
Details of ongoing Contractual Works under Pachora- Khandwa section of Bhusawal Division
Extended Nos.of
Sr. Date of Comp. as per
Name of Work C.A. No. & Date Name of Contractor S/Shri Cost of CA Rs. Dt of Comm. Date of Labours
No. C.A.
Compl. Engaged
M/S. VIJAYA INFRA
PROJECT PVT. LTD,
Contractor, 15/A
Kaysons building,
IGATPURI-BHUSAWAL & BHUSAWAL-KHANDWA Section:-
Station road Vikroli
Rebuilding of various small span bridges including ORN-3 bridges CR/BSL/CIVIL/2020
west –Mumbai. Ph no :-
52 under Sr. Divisional Engineer(North)Jurisdiction. ( 48 Nos) WP /0027 Dtd.14-10- ₹ 37,622,777.13 1/22/2020 1/21/2021 9
912225781626,
2019-2020 Umbrella work (Part-A1) under ADEN (Line)Bhusawal= 2020
912225781626,
11 Bridges..
919819022252.
email:-
kumarpillaimumbai@gm
ail.com

M/S. VIJAYA INFRA


PROJECT PVT. LTD,
Contractor, 15/A
Kaysons building,
IGATPURI-BHUSAWAL & BHUSAWAL-KHANDWA Section:-
Station road Vikroli
Rebuilding of various small span bridges including ORN-3 bridges CR/BSL/CIVIL/2020
west –Mumbai. Ph no :-
53 under Sr. Divisional Engineer(North)Jurisdiction. ( 48 Nos).WP /0068 Dtd.29-12- ₹ 113,766,773.95 2/22/2020 8/21/2021 6
912225781626,
2019-2020 Umbrella work (Part-A2) under ADEN Khandwa= 37 2020
912225781626,
Bridges.
919819022252.
email:-
kumarpillaimumbai@gm
ail.com

Shri. Abhijit D.
Patil,Railway
Contractor,9, Suyog
Colony,
BHUSAWAL DIVISION:- Proposed replacement of existing steel
Girna Tank
girder s by PSC Slabs ( 8 Bridges) on BSL-BD Section=
CR/BSL/CIVIL/2020 Road,Jalgaon.
54 461/1,578/2 on IGP-BSL Section= 262/1,318/1 & BSL-KNW ₹ 68,763,846.70 3/14/2020 9/13/2021
/0017 Ph No :-
Section= 526/3,539/7,471/1,488/2 umbrellas work (WP-2019-
912572221796,
2020).
912572221795,
919766816393.
email:-
p_abhijit@rediffmail.com
Details of ongoing Contractual Works under Pachora- Khandwa section of Bhusawal Division
Extended Nos.of
Sr. Date of Comp. as per
Name of Work C.A. No. & Date Name of Contractor S/Shri Cost of CA Rs. Dt of Comm. Date of Labours
No. C.A.
Compl. Engaged

Bhusawal Division- Proposed elimination of Level Crossing (LC) by M/S. VIJAYA INFRA
providing subway by box pushing method in lieu of Level Crossing PROJECT PVT. LTD,
nos-(1) LC no. 151 @ Kms 427/11-13 (Igatpuri-Bhusawal) (RCC Contractor, 15/A
Box of sizes 5.0x4.5m) (2) LC no. 152 @ Kms 429/05-07 (Igatpuri- Kaysons building,
Bhusawal) (RCC Box of sizes 5.0x4.5m) (3) LC no. 146 @ Kms Station road Vikroli
CR/BSL/CIVIL/2020
428/28-30 (Igatpuri-Bhusawal)(RCC Box of sizes 5.0x4.5m)(4) LC west –Mumbai. Ph no :-
55 /0087 dated ₹ 172,578,088.25 4/13/2020 7/12/2021 9
no. 150 @ Kms 424/21-23 (Igatpuri-Bhusawal) (RCC Box of sizes 912225781626,
17.03.2021
5.0x4.5m) (5) LC No. 132(Pachora-Pardhade block section) at Kms 912225781626,
373/15-17 RCC Box of sizes 6.0X4.0M (Igatpuri-Bhusawal Section) 919819022252.
and unmanned L-xing No-1/D in Pachora-Jamner NG Section by email:-
providing subways of sizes 6.0X4.0M (Pachora-Jamner Section) kumarpillaimumbai@gm
Total:05 NO's ail.com

Bhusawal Division- Proposed elimination of Level Crossing (LC) by


providing subway by box pushing method in lieu of Level Crossing
nos-(1) LC no. 158 @ Kms 452/22-24 (Bhusawal-Khandwa) (RCC
Box of sizes 5.0x4.5m) (2) LC no. 165 @ Kms 464/10-12 (Bhusawal-
M/S. ISC Project Pvt.
Khandwa) (RCC Box of sizes 5.0x4.5m) (3) LC no. 166 @ Kms
Ltd. Near Bund Garden
466/02-04 (Bhusawal-Khandwa) (RCC Box of sizes 5.0x4.5m) (4)
CR/BSL/CIVIL/2020 Road, Pune. Ph
LC no. 170 @ Kms 472/22-24 (Bhusawal-Khandwa) (RCC Box of
56 /0086 dated No ₹ 328,898,177.18 6/29/2020 9/28/2021 9
sizes 5.0x4.5m) (5) LC no. 174A(PATONDA GATE) @ kms 496/10-
21.12.2020 912041299000/01/02
12 (Bhusawal-Khandwa)(RCC Box of sizes 5.0x4.0m) (6) LC no.
email:-
174(BIRODA GATE) @ 492/22-24.(Bhusawal-Khandwa) (RCC Box
info@iscprojects.co.in
of sizes 5.0x4.0m) (7) LC no. 172(TAMASWADI GATE) @ 481/22-
24 (Bhusawal-Khandwa) (RCC Box of sizes 5.0x4.0m) (8) LC no.
164(SUNODA GATE) @ 462/00-02 (Bhusawal-Khandwa) (RCC Box
of sizes 5.0x4.0m), Total:08 NOs

Shri. P.K. Makhija,


Rly.contractor, Infront
of Hotel Rangoli,
CR/BSL/CIVIL/2020
Repairs to sand humps (18 Nos). And dead ends(23 Nos) in Jamner Road,
57 /0032 Dtd.15-10- ₹ 16,216,499.42 1/17/2020 1/16/2021 6
Assistant Divisional Egnineer, Khandwa's Secion. Bhusawal. Ph no
2020
919665700115 email :-
prakashmakhija1967@g
mail.com
Details of ongoing Contractual Works under Pachora- Khandwa section of Bhusawal Division
Extended Nos.of
Sr. Date of Comp. as per
Name of Work C.A. No. & Date Name of Contractor S/Shri Cost of CA Rs. Dt of Comm. Date of Labours
No. C.A.
Compl. Engaged
Shri. Balasaheb
Sonyabapu Bhujbal,
Contractor of
Ahamadnagar, Yashoda
(I) KHANDWA:- Provision of water recycling plant of 0.50 MLD
nagar, Pipeline road
capacity at Khandwa Station. (II) ADEN Khandwa Section:- Heavy CR/BSL/CIVIL/2020
58 savedi Ahmednagar. Ph ₹ 21,316,209.33 1/7/2020 1/6/2021 5
repairs to existing water supply pipe line at Bagmar & Kohadad /0025 Dtd.20-8-2020
no:- 919403988412,
Station under ADEN KNW jurisdiction. ( ZBB-2019-2020).
919822783408
email:-
balasaheb.bhujabal@red
iffmail.com

M/S. Anand Buildcon,


Contractor,Shanti
Sadan, Opp. PNB Bank,
Balaji Lane, Bhusawal.
BHUSAWAL-DIVISION:-Improvements to Goods Shed facilities at CR/BSL/CIVIL/2020
59 (Chordia) PhNo ₹ 11,338,013.38 8/12/2020 2/11/2021
Nasik, Khandwa and Badnera Goods Shed /0066 Dt.02-11-2020
9102582222584,
919422279595. email
anandbuildcon2@rediff
mail.com

Shri P. N.
Sarode,Railway
Contractors,Plot No.
9/3A, S. N. 167 Near
(A)DUSKHEDA STATION:- Proposed for extension of Up & Dn Loop
CR/BSL/CIVIL/2020 T.S. Zope School,
Line of DSK Yard. (B) SHIRSOLI STATION:- Proposed yard
60 /0090 Dtd.29-12- BHUSAWAL. Ph No ₹ 3,947,487.96 9/4/2020 3/3/2021
remodeling for extension of Dn Loop Line and relaxation of
2020 9102582240307,
15Kmph PSR to 30 Kmph at Shirsoli Station.
9109422779679
email:-
ksksarode782gmail.com
Details of ongoing Contractual Works under Pachora- Khandwa section of Bhusawal Division
Extended Nos.of
Sr. Date of Comp. as per
Name of Work C.A. No. & Date Name of Contractor S/Shri Cost of CA Rs. Dt of Comm. Date of Labours
No. C.A.
Compl. Engaged

M/s K. K. Vidyut of
Ahamadnagar Sarola
Kasar Ahmednagar
Supply & stacking of 65 mm Gauge Machine crushed stone Ballast CR/BSL/CIVIL/2021
Maharashtra. Ph No
61 & loading in to Hoppers /BOB ‘N’ wagons by mechanical means. /0013 ₹ 52,603,474.68 12/30/2020 6/29/2022 9
912412425981,
At PACHORA depot. Qty.=60000 M3. Dtd.12.09.2021
919422220314
email:-
kkvidyutkk@gmail.com

Shri.Akhilesh Kumar
B.Sharma, Contractor,
Hiring of Vehicle (Truck) for track maintenance to SSE (P.Way) Pandhana Road,
CR/BSL/CIVIL/2020
North- Burhanpur under Assistant Divisional Engineer, Khandwa Khandwa. Ph No
62 /0074 Dtd.26-11- ₹ 1,352,592.90 8/11/2020 8/10/2022
Section in Sr. Divisional Engineer (North) Bhusawal Jurisdiction of 919827208695
2020
Bhusawal Division. For 2 Years ( 24 Months). email:-
akhilesh.s2121@gmail.c
om

Shri.Akhilesh Kumar
B.Sharma, Contractor,
Hiring of Vehicle (Truck) for track maintenance to SSE (P.Way) Pandhana Road,
CR/BSL/CIVIL/2020
Khandwa under Assistant Divisional Engineer, Khandwa Section Khandwa. Ph No
63 /0075 Dtd.25-11- ₹ 1,349,333.64 8/11/2020 8/10/2022
in Sr. Divisional Engineer (North) Bhusawal Jurisdiction of 919827208695
2021
Bhusawal Division. For 2 Years ( 24 Months). email:-
akhilesh.s2121@gmail.c
om

M/S.Seven Seas
Enterpriese, Contractor,
Bhusawal Division-Hiring of Vehicle (Truck) for track maintenance
H.No.1875, Bhaskar
to SSE (P.Way) Main Line Bhusawal under Assistant Divisional CR/BSL/CIVIL/2020
Market-Jalgaon. Ph no
64 Engineer (Line)Bhusawal Section in Sr. Divisional Engineer (North) /0076 Dtd.06-11- ₹ 1,499,259.60 8/11/2020 8/10/2022 1
919225126542,
Bhusawal Jurisdiction of Bhusawal Division. For 2 Years ( 24 2020
919225126542. email:-
Months).
sohilpathan0028@gmail
com

M/S.M.S.Shaikh Javed,
Bhusawal Division-Hiring of Vehicle (Truck) for track maintenance Contractor, Shivaji
to SSE (P.Way) South, Burhanpur under Assistant Divisional CR/BSL/CIVIL/2020 Nagar lal Bag,
65 Engineer, Khandwa Section in Sr. Divisional Engineer (North) /0062 Dtd.06-11- Burhanpur. ₹ 1,499,259.60 8/11/2020 8/10/2022
Bhusawal Jurisdiction of Bhusawal Division. For 2 Years ( 24 2020 Ph No :- 919168843077
Months). email:-
zeenat4412@gmail.com
Details of ongoing Contractual Works under Pachora- Khandwa section of Bhusawal Division
Extended Nos.of
Sr. Date of Comp. as per
Name of Work C.A. No. & Date Name of Contractor S/Shri Cost of CA Rs. Dt of Comm. Date of Labours
No. C.A.
Compl. Engaged

M/S.Sai Electrical and


Hardware, Contractor ,
D.L.Hindi High School,
Hiring of Vehicle (Truck) for track maintenance to SSE (P.Way)
CR/BSL/CIVIL/2020 Shivaji Nagar,
Pachora under Assistant Divisional Engineer, (Line) Bhusawal
66 /0097 Dtd..18-11- Bhusawal. Ph no:- ₹ 1,421,037.36 8/11/2020 8/10/2022 1
Section in Sr. Divisional Engineer (North) Bhusawal Jurisdiction of
2020 910258222694,
Bhusawal Division. For 2 Years ( 24 Months).
919637861237.
email:-
milind9637861237

M/S.Seven Seas
Enterpriese, Contractor,
Bhusawal Division-Hiring of Vehicle (Truck) for track maintenance H.No.1875, Bhaskar
CR/BSL/CIVIL/2020
to SSE (P.Way) Yard Bhusawal under Assistant Divisional Market-Jalgaon. Ph no
67 /0079 Dtd.06-11- ₹ 1,434,074.40 8/11/2020 8/10/2022 1
Engineer (Line)Bhusawal Section in Sr. Divisional Engineer (North) 919225126542,
2020
Bhusawal Jurisdiction. For 2 Years ( 24 Months). 919225126542. email:-
sohilpathan0028@gmail
com

Annual Sectional Contract for Zone No.1 for ADEN Khandwa for Shri.Mahesh Richariya,
CR/BSL/CIVIL/2020
Repairs and maintenance with white washing etc. for Contractor, 182, Gaytri
68 /0083 Dtd.17-11- ₹ 24,493,740.00 8/12/2020 6/30/2022 8
Duskheda(Excl) to Khandwa(Incl) Section. (For the Year 2020-2021 Vihar,Bagh Mungalia
2020
& 2021-2022). Bhopal. 7798607531
Details of ongoing Contractual Works under Pachora- Khandwa section of Bhusawal Division
Extended Nos.of
Sr. Date of Comp. as per
Name of Work C.A. No. & Date Name of Contractor S/Shri Cost of CA Rs. Dt of Comm. Date of Labours
No. C.A.
Compl. Engaged

M/S. Anand Buildcon,


Contractor,Shanti
Sadan, Opp. PNB Bank,
Annual Sectional Contract for Zone No.1 for ADEN(Line)Bhusawal CR/BSL/CIVIL/2020 Balaji Lane, Bhusawal.
69 for Repairs and maintenance with white washing etc. for /0065 Dtd.02-11- (Chordia) PhNo ₹ 17,600,000.00 8/12/2020 6/30/2022 9
Galan(Excl) to Bhusawal(Excl) with Pachora-Jamner Section. 2020 9102582222584,
919422279595. email
anandbuildcon2@rediff
mail.com

Jain Metal and Material


Supply Corporation,
Railway Contractor, 10-
Adinath Society,
Supply & stacking of 65 mm Gauge Machine crushed stone Ballast CR/BSL/CIVIL/2021
Shivram Nagar,
70 & loading in to Hoppers /BOB ‘N’ wagons by mechanical means. /0020 ₹ 25,438,665.87 1/12/2021 7/11/2022 5
JALGAON. 425001.
At BURHANPUR depot. Qty.=30000 M3. Dtd.26.04.2021
Ph No 912572224969,
919503088822 email:-
ulhas4@gmail.com

Virender construction ,
Bhopal 88 Chandan
BHUSAWAL DIVISION:- CTR/S work at Savda Up & Dn Loop,
Nagar Jain colony
Raver Up & Dn Loop, Burhanpur Up & Dn Loop, Nepanagar Dn CR/BSL/CIVIL/2021
Berasia Road Bhopal.
71 Loop, Dongargaon Dn Loop, Khandwa D, 1st and 2nd Loop. ( Total /0029 ₹ 28,883,867.69 4/5/2021 10/4/2021 24
Ph No: 919977931993
8.551 TKM) on ADEN Khandwa Section under Senior Divisional Dtd.06.07.2021
email:-
Engineer (North) Bhusawal's jurisdiction
tarunsaini974@gmail.co
m

Kirit Engineering,
ADEN(Line)Bhusawal Sub-Division:- Supplying of potable waer Contractor,
from private party in summer 2020-2021 at Jamner, Pahur, 126”Pushpakunj” 82
CR/BSL/CIVIL/2021
Shendurni, Varkhedi, Pachora, Mhasawad,Sirsli, Jalgaon, Bhadli & Ganesh Colony,
72 /0037 ₹ 2,933,708.70 5/10/2021 5/9/2022
Pachora-Jamner Section:- LC-1/C, 4/C, 9A/D, 174/C, 19/C, Jalgaon. Ph No :-
Dtd.01.10.2021
20/C, 27, 38A, 27A/B, & Bhusawal Pachora Section – LC Nos. 9822037396
146,150, 151, 152 Total =13 LCs for One year. ( ZBB-2020-2021). email:-
kiritgroup@gmail.com
Details of ongoing Contractual Works under Pachora- Khandwa section of Bhusawal Division
Extended Nos.of
Sr. Date of Comp. as per
Name of Work C.A. No. & Date Name of Contractor S/Shri Cost of CA Rs. Dt of Comm. Date of Labours
No. C.A.
Compl. Engaged
Shri. Abhijit D.
Patil,Railway
Contractor,9, Suyog
Colony,
Girna Tank
CR/BSL/CIVIL/2021
Extension of Up & Dn loop Lines at Burhanpur and Dongargaon Road,Jalgaon.
73 /0030 ₹ 8,264,917.20 5/20/2021 2/20/2022 5
stations in Bhusawal-Khandwa Section. (Bridge work). Ph No :-
Dtd.28.07.2021
912572221796,
912572221795,
919766816393.
email:-
p_abhijit@rediffmail.com
M/S.Shrikant
Hanumant Mane,
CR/BSL/CIVIL/2021 Contractor of Pune.
Repairs to rolly refuges 3500 Nos. in Pachora-Bhusawal-Khandwa
74 /0053 PhNo-9420204444 ₹ 11,539,210.39 6/4/2021 7/21/2021 9
section under jurisdiction of Sr.DEN(North)Bhusawal.
Dtd.13.12.2021 email:-
mane.shrikant02@gmail
.com

M/s Ghai Enterprises,


Pune C2, Flat
No 103, ist floor
CTR/P 6.95TKMS with PQRS in Bhusawal- Khandwa Section CR/BSL/CIVIL/2021 mandheke Advantages,
75 under Sr.DEN(North)Bhusawal’s JurisidictionKms.449/36-450/02 /0059 Lullanagar. Ph no ₹ 7,558,528.28 6/14/2021 2/13/2022 67
by push through method. (Project ID 01.01.30.14.3.50.005) Dtd.03.11.2021 912026837017,
919421279000. email:-
ghaienterprises786@gm
ail.com
Details of ongoing Contractual Works under Pachora- Khandwa section of Bhusawal Division
Extended Nos.of
Sr. Date of Comp. as per
Name of Work C.A. No. & Date Name of Contractor S/Shri Cost of CA Rs. Dt of Comm. Date of Labours
No. C.A.
Compl. Engaged

M/S.Gravity Infratech,
Contractor of Bhopal.
148 9B, Near BSNL
CR/BSL/CIVIL/2021
NEPANAGER:- Replacement of 1 in 8 1/2 Turnouts with PSC Lat office saket Nagar.
76 /0048 ₹ 2,944,326.11 6/22/2021 7/21/2021 8
out and Deep Screening of Line No.8 of Nepa Mills Siding. Ph No:- 7798607531
Dtd.12.10.2021
email:-
prafull_wakode@yahoo.c
om

M/S.DILEEP KUMAR,
Contractor, D-1343
CTR(S) work a Pachora Up & Dn loop, Jalgaon Dn, Up 1st & 2nd CR/BSL/CIVIL/2021 Indra Nagar, Lucknow.
77 Loop= 3.784 TKMS on ADEN(Line)Bhusawal Section under /0047 Ph No 9351127139. ₹ 10,207,342.66 7/12/2021 1/20/2022 17
Sr.DEN(North)Bhusawal's jurisdiction. Dtd.23.10.2021 email :-
rakeshbatra838@yahoo.
com

M/S.Swati Constructon
Co. Contractor,
ADEN Khandwa Jurisdiction:- (a) Miscellaneous repairs to various Jankalyan Sciety, B/H
bridges like (Repairs to WW/RW, flooring/apron, ballast wall, cess CR/BSL/CIVIL/2021 Vidodariya Hospital,
78 widening, Gabions, Inspection steps, strengthening to substructure /0073 Paliyad Road, Botad- ₹ 17,698,745.76 7/12/2021 4/11/2022
by jacketing etc). (b) Repairs to various bridges by CPG & epoxy Dtd.14.02.2022 Bhavnagar. Ph No:-
grouting. 9016464942 email:-
swati.gvlaniya@gmail.co
m

Shri R.V.Agrawal,
Railway Contractor,
82,Ganesh Colony,
CR/BSL/CIVIL/2021 JALGAON. Ph. No
Extension of Up & Dn loop Lines at Burhanpur, Mandwa and
79 /0058 919422222976, ₹ 12,952,134.17 8/3/2021 5/3/2022 7
Dongargaon stations in Bhusawal-Khandwa Section. (Track work).
Dtd.12.11.2021 912572250860
email:-
rvagr01@gmail.com
Details of ongoing Contractual Works under Pachora- Khandwa section of Bhusawal Division
Extended Nos.of
Sr. Date of Comp. as per
Name of Work C.A. No. & Date Name of Contractor S/Shri Cost of CA Rs. Dt of Comm. Date of Labours
No. C.A.
Compl. Engaged

1-(A):- Khandwa to Savda :- Repairs to leaky roof of staff M/S Smart construction
Quarters(210 Nos). (B) Khandwa to Savda:- repairs to Doors & contractor, Banvari
Windows of staff quarters. (265 Nos). (C) Khandwa to Chandni:- CR/BSL/CIVIL/2021 nagar , chhibramau
80 Repairs to drainage arrangement of staff Quarters. 2-ADEN /0075 Kannauj. Ph no:- ₹ 23,905,310.86 8/25/2021 5/25/2022 8
Khandwa Sub-Division:- Repairs to Flooring, Plastering, Approach Dtd.31.12.2021 9696996655 email:-
Road, Pathway, and Sanitary & Water supply arrangements to staff smartconstructionn@gm
Quarters. ail.com

M/S. Manoj stone Infra


Pvt Ltd Contractor, 104
Jai shankar CHS Opp.
Axis Bank Naupada
Supply & stacking of 65 mm Gauge Machine crushed stone Ballast CR/BSL/CIVIL/2021
Thane. Ph no:-
81 & loading in to Hoppers /BOB ‘N’ wagons by mechanical means. /0080 ₹ 43,731,196.27 9/9/2021 9/9/2022
918369994242,986921
At Khandwa ballast depot. Qty.=55330 M3. Dtd.21.02.2022
4618, 869272999
email:-
mscc.1979sr@gmail.co
m

M/S Chandra Shekhar


Saini,Contractor Bno 36
phase 2 jain nagar
Replacement of wor-out switch with Thick Web Switch total 90 Nos. CR/BSL/CIVIL/2022
Lalghati BHOPAL.
82 ( 1 in 12=55 Nos. and 1 in 8.5 =35 Nos.) in Pachora-Bhusawal /0001 ₹ 4,512,236.51 10/5/2021 4/6/2023
PhNo;- 8120614578
Secion. Dtd.28.03.2022
email:-
Gaurav.saini805@gmail.
com

M/S SUNIL KUMAR


GUPTA,
Manual Deep Screening of left over patches of Main Line in various
Contractor,1057,Gwalio
yards, PFs, Bridges & approaches in between Turnout patches etc. CR/BSL/CIVIL/2021
r road , BKD Chauraha,
83 under ADEN/Line Bhusawal =9.186 TKMS and ADEN Khandwa /0081 ₹ 11,146,219.30 10/6/2021 10/6/2022 35
Jhansi.
=3.31 TKMS. (Total 12.496 TKMS) in Pachora-Bhusawal-Khandwa Dtd.21.02.2022
Ph No:- 9415031207
Section. (Project ID -01.01.31.19.1.10.007, 01.01.31.21.1.10.007).
email:-
shivam138@gmail.com
Details of ongoing Contractual Works under Pachora- Khandwa section of Bhusawal Division
Extended Nos.of
Sr. Date of Comp. as per
Name of Work C.A. No. & Date Name of Contractor S/Shri Cost of CA Rs. Dt of Comm. Date of Labours
No. C.A.
Compl. Engaged
MALLIKARJUN S
BANKAPURE
ENGINEERS AND
CONRACTORS OF
PUNE. B-49, Sai
BHUSAWAL DIVISION- Deep Screening of Turnouts by BCM total CR/BSL/CIVIL/2021
Amar, Tukaram Tupe
84 122 Nos. in PACHORA-BHUSAWAL-KHANDWA Section UNDER /0084 ₹ 4,367,112.77 10/26/2021 10/26/2022 8
Nagar Manjri Bk, Pune
Sr.DEN(N)BHUSAWAL Jurisdiction. Dtd.21.02.2022
Ph no:- 9881219101,
912026825522
email:-
ma.bankapure@gmail.co
m

M/S.Y.V. Mane,
Contractor, Near New
Court, Gat No.9,
CR/BSL/CIVIL/2022
TRR/P-66.061 TKms in PACHORA-BHUSAWAL-KHANDWA section Sanghavi Resid-
85 /0009 ₹ 19,844,042.11 12/21/2021 21-Dec-22 36
under Sr.DEN (North) Bhusawal jurisdiction Bhigwan Road,
Dtd.16.02.2022
Baramati -Pune. Ph.No
919420204444 email:-
yvmcpl@gmail.com

R V ENTERPRISES -
JALGAON Plot no 5,
ADEN KHANDWA sub divn:- Supplying potable water from private Hiragauri Park Behind
CR/BSL/CIVIL/2022
party in summer at (i) Khandwa (ii) Bagmar (iii) Kodhad (iv) Radhika Hotel jalgaon.
86 /0010 ₹ 1,415,169.84 12/28/2021 12/28/2022
Dongargaon (v) Raver (vi) Asirgarh (vii) Savada (viii) Ph no:- 9595914896
Dtd.16.04.2022
Burhanpur. (ZBB 2021-2022) email:-
vsalunkhe4896@gmail.c
om

M/s Dilip Kumar


Pandey- Satna HN
28/350 DHAWARI
CR/BSL/CIVIL/2022
Miscellaneous P. Way works under SSE (P.Way) (KNW) under Behind Govt Girls Hr
87 /0017 ₹ 6,600,397.40 1/18/2022 1/18/2023
ADEN Khandwa Jurisdiction. Sec School satna-
Dtd.23.05.2022
Phone no:- 7000178781
email:-
dilipkr81@gmail.com
Details of ongoing Contractual Works under Pachora- Khandwa section of Bhusawal Division
Extended Nos.of
Sr. Date of Comp. as per
Name of Work C.A. No. & Date Name of Contractor S/Shri Cost of CA Rs. Dt of Comm. Date of Labours
No. C.A.
Compl. Engaged

EASTERN HARDWARE
MART- Contractor, of
Kolkotta (W-Bengal). Ph
Bhusawal Division- TBTR 2692 Nos at Important Girder Br. No. CR/BSL/CIVIL/2022 No; 913322423341,
88 449/1 between Bhusaval - Duskheda section. (H beam sleeper) WP /0024 913322428266, ₹ 82,446,670.10 2/28/2022 10/28/2022 9
2020-21 PB It. No. 531 Dtd.27.07.2022 919836927290.
email:-
easternhardware1983@
gmail.com

SANJAY SHANKAR
CHAUDHARI
CONTRACTORS AND
SUPPLIERS LLP-
JALGAON. S No
Provision of arrangement to arrest water logging at LHS provided in CR/BSL/CIVIL/2022
43/1A Plot No 10
89 lieu of LC No- 135,133,137,138,140,142,145 under ADEN LINE/ /0029 dated ₹ 42,479,234.13 5/4/2022 11/4/2022 9
Jugadevi Nagar near
Bhusawal jurisdiction. 03.08.2022
Manag Bag Bhusawal.
Ph no:- 9422284061
email:-
sschaudhari3690@gmail
.com

DBGUPTA RAIL INFRA


LLP-PUNE Office no 5
Laxmi Memories Behind
CR/BSL/CIVIL/2022
Miscellaneous P.way work under SSE (P.way) Yard Bhusawal under Anant theatre Ghorpadi
90 /0048 dated ₹ 14,579,247.51 7/15/2022 15.07.2023 42
jurisdiction of ADEN(Line). Gaoan Pune. phNo :-
12.11.2022
9623343536 email:-
khandelwal.keshav94@g
mail.com
Details of ongoing Contractual Works under Pachora- Khandwa section of Bhusawal Division
Extended Nos.of
Sr. Date of Comp. as per
Name of Work C.A. No. & Date Name of Contractor S/Shri Cost of CA Rs. Dt of Comm. Date of Labours
No. C.A.
Compl. Engaged

M/S. Anand Buildcon,


Contractor,Shanti
Sadan, Opp. PNB Bank,
Annual Sectional Contract Zone No 1 for ADEN (Line) Bhusawal for CR/BSL/CIVIL/2022 Balaji Lane, Bhusawal.
91 Repairs and maintenance with white washing etc. for Galan(Ex) to /0059 dated (Chordia) PhNo ₹ 21,486,850.00 7/6/2022 30.06.2024 9
Bhusawal (Ex) with Pachora-Jamner Section. 30.11.2022 9102582222584,
919422279595. email
anandbuildcon2@rediff
mail.com

R K Sundrani- Jalgaon ,
Room No 422 Sindhi
Annual Sectional Contract Zone for ADEN Khandwa for Repairs CR/BSL/CIVIL/2022 Colony, Bhusawal,
92 and maintenance with white washing etc. for Duskheda (Ex) to /0056 dated Jalgaon, Ph No:- ₹ 21,416,100.00 7/18/2022 30.06.2024
Khandwa (Incl.) Section. 22.11.2022 919021973375 email:-
rksundrani23@gmail.co
m

SURENDRAKUMAR
AGRAWAL-JALGAON,
ADEN KHANDWA Subdivision- KHANDWA, DONGARGAON,
CR/BSL/CIVIL/2022 Sharda Nagar Near ICT
KOHDAD, NEPANAGAR, BURHANPUR, WAGHODA, RAVER,
93 /0053 dated Bhusawal Ph no:- Rs 6233978.69 8/4/2022 8/4/2023
NIMBHORA, SAVDA: - Repairs to staging, Gantry, Pump Room,
12.11.2022 9823124679 email:-
Water storage tank/Water supply installations (ZBB 2021-22).
kapilagrawal30@gmail.c
om

M/s DIPTESH ASHOK


SONAWANE-JALGAON
g nO 1693/4 NANDA
LOA NO :- PARK APARTMENT
BHUSAWAL-KHANDWA section:- Jacketting of sub structure BHUSAWAL DIVN- SAHAKAR NAGAR
(Abutments/piers) to accommodate the stools with proper bearings ENGINEERING / BHUSAWAL
94 ₹ 3,991,019.11 9/6/2022 06.03.2023
& raising girders of Bridge No. 454/1 at Kms. 454/14-16 (DWP 17- DRMWBSL352022t3 JALGAON- 425201
18), PID No. 01.01.32.17.4.50.003) / 01488140061344 Maharashtra, India,
dated 06.09.2022 PhNo:- 7385356534
email:-
dipteshsonawane1993@
gmail.com
Details of ongoing Contractual Works under Pachora- Khandwa section of Bhusawal Division
Extended Nos.of
Sr. Date of Comp. as per
Name of Work C.A. No. & Date Name of Contractor S/Shri Cost of CA Rs. Dt of Comm. Date of Labours
No. C.A.
Compl. Engaged

M/s OM PRAKASH
LOA NO: BHUSAWAL MENGHANI-BHOPAL,
DIVN-ENGINEERING G1 Abhiruchi Tower
TBR 64.419 Tkms (43.356 by BCM+ 21.063 by manual) in
/ Sawan Nagar Halalpura
95 PACHORA-BHUSAWAL-KHANDWA section under Sr. DEN (North) ₹ 37,510,400.31 9/6/2022 06.09.2023
DRMWBSL362022t5 Lalghati Bhopal PhNo:-
jurisdiction.
/ 00856140061365 9752599210 email:-
dated 06.09.2022 someshmenghani99@g
mail.com

M/s A P ENTERPRISES
- THANE, Shop no 07
Yamuna bai Chawl
Tandapada road Near A
Removal of weeds/bushes and stacked/ demarcated muck debris LOA NO
one Tailor santosh
96 etc. from various locations in Bhusawal Yard under ADEN (Line) 01540270063124 ₹ 2,468,670.78 10/4/2022 04.10.2023
Bhawan Nallasopara
Bhusawal section. Dated 04.10.2022
east Thane. Ph no:-
9607616043 email:-
apenterprises879@gmail
.com

EASTERN HARDWARE
MART- Contractor, of
Kolkotta (W-Bengal). Ph
LoA No :- No; 913322423341,
BHUSAWAL- KHANDWA Section- TBSR (H Beam) = 775 Nos. (03
97 00864470063368 913322428266, ₹ 22,262,498.20 10/10/2022 10.07.2023 9
Bridges)
Dated 10.10.2022 919836927290.
email:-
easternhardware1983@
gmail.com

M/s VIJAY HINGU


YADAV- JALGAON
BHUSAWAL, Near new
ADEN/Line Bhusawal Jurisdiction- Repairs to station building, LOA NO :- water tank at post
98 platform surfaces, circulating area etc. at various locations. (ZBB 00844850063364 fekari Jalgaon bhusawal ₹ 9,278,414.30 10/10/2022 10.04.2023
2021-22) Dated 10.10.2022 Ph No :- 9403833665
email:-
vijayhyadav111@gmail.c
om
Details of ongoing Contractual Works under Pachora- Khandwa section of Bhusawal Division
Extended Nos.of
Sr. Date of Comp. as per
Name of Work C.A. No. & Date Name of Contractor S/Shri Cost of CA Rs. Dt of Comm. Date of Labours
No. C.A.
Compl. Engaged
M/s VIJAY HINGU
YADAV- JALGAON
BHUSAWAL, Near new
Provision of 04 lifts under Sr.DEN/North section (At – KHANDWA- LOA NO :- water tank at post
99 01, JALGAON-01 and BURHANPUR- 02 Stations) on BHUSAWAL 00844850063365 fekari Jalgaon bhusawal ₹ 18,804,413.92 10/10/2022 10.07.2023
Division Project Id No. 01.02.53.18.3.51.038. (WP- 2018-2019). Dated 10.10.2022 Ph No :- 9403833665
email:-
vijayhyadav111@gmail.c
om

M/s VIJAY HINGU


YADAV- JALGAON
BHUSAWAL, Near new
LOA NO :- water tank at post
KHANDWA- Provision of 02 Nos, Escalator on PF 1 / 2 & 5 (Civil
100 00844850063366 fekari Jalgaon bhusawal ₹ 8,561,662.17 10/10/2022 10.04.2023
Engg. Work Portion).
Dated 10.10.2022 Ph No :- 9403833665
email:-
vijayhyadav111@gmail.c
om

M/s JAIPRAKASH
1) Jalgaon- Provision/Up gradation/ Renovation of Divyangjan
SURAJBHAN AGRAWAL
amenities such as Non- slippery walkway, Standard ramp,
- BHUSAWAL,Sharda
Pathway, Parking area, toilet facilities, water stands, booking office
LOA NO :- Nagar Near ICT
and ramp at booking office, Divyangjan signage at Jalgaon station.
101 00863010063770 Bhusawal Ph ₹ 61,573,866.29 10/14/2022 14.10.2023
(Project ID : 01.01.53.21.1.50.003) (2) Jalgaon- Improvement to
Dated 14.10.2022 no:-9422279631
front façade of station building and circulating area with waiting
email:-
hall, cycle stand and pedestal for engine. (Project ID-
jp.agarwal77@gmail.co
01.01.53.21.1.50.010)
m

Kirit Engineering,
ADEN (Line) Bhusawal Sub Division :-Supplying of potable water Contractor,
from Private party in Summer at Jamner, Pahur, Sendurni, 126”Pushpakunj” 82
LOA NO :-
Varkhedi, Pachora, Shirsoli, Jalgaon, Bhadli & PACHORA JAMNER Ganesh Colony,
102 00909100065448 ₹ 2,083,689.00 10.11.2022 10.11.2023
Section LC 1/C, 4/, C 9A/D, 17A/C, 19/C, 20/C, 27@44&47@A Jalgaon. Ph No :-
Dated 10.11.2022
27A/B & BHUSAWAL-PACHORA Section LC No.146, 150, 151, 9822037396
152, Total 13 LCs for one year (ZBB-2022-23) email:-
kiritgroup@gmail.com
Details of ongoing Contractual Works under Pachora- Khandwa section of Bhusawal Division
Extended Nos.of
Sr. Date of Comp. as per
Name of Work C.A. No. & Date Name of Contractor S/Shri Cost of CA Rs. Dt of Comm. Date of Labours
No. C.A.
Compl. Engaged

M/S.Y.V. Mane,
Contractor, Near New
Court, Gat No.9,
LOA NO :-
TRR/P- 27.689 Tkms in PACHORA - KHANDWA section under Sr. Sanghavi Resid-
103 10308060065958 ₹ 12,809,358.00 17.11.2022 17.07.2023
DEN (North) Bhusawal's jurisdiction. Bhigwan Road,
Dated 17.11.2022
Baramati -Pune. Ph.No
919420204444 email:-
yvmcpl@gmail.com

M/S. N.S. Manwani,


Rly.Contractor, Near Sai
Elimination of LC No. 177 C at kms 544/23-25 by providing Petrol Pump, Jamner
LOA NO :-
subway of size 5.0x 4.50 M(RCC Segmental box) at Kms 544/25-27 Road, Bhusawal. Ph. No
104 10530360069146 ₹ 45,270,591.32 04.01.2023 04.09.2023
on BSL-KNW Section by push through method.(Dongargaon 9102582242119,
Dated 04.01.2023
Yard)(Umbrella 2020-21, Pink Book-217, Other than GQ/GD route, 919325251919. email:-
msnsmanwanibsl@gmail
.com

LATA CONSTRUCTION-
NASIK B-9 SWASTIK
LOA NO :- CHAMBER PATHARDI
105 Khandwa- Repairs to filtration plant at Khandwa. (ZBB-2022-23) 01035840069602 PHATA NASIK Mob No :- ₹ 3,539,859.99 11.01.2023 11.10.2023
Dated 11.01.2023 9373920354, emailid:-
mailme_latagroup@redif
fmail.com

MATOSHRI
CONSTRUCTION-
NASHIK Shivaji nagar
No 2 276 07 Dargude
Yard remodeling for 30 KMPH and increase of CSR on Loop Lines LOA NO :-
wasti waghdardi oad
106 in MAHASAVAD Yard remodeling for 30 KMPH on DN Loop Line in 01437510069870 ₹ 2,599,290.48 16.01.2023 16.05.2023
Manmad NASIK Mob
MAHEJI (ID No. 01.01.16.22.4.50.004.) Dated 16.01.2023
No :- 9209479118,
emailid:-
dhananjayd118@gmail.c
om
Details of ongoing Contractual Works under Pachora- Khandwa section of Bhusawal Division
Extended Nos.of
Sr. Date of Comp. as per
Name of Work C.A. No. & Date Name of Contractor S/Shri Cost of CA Rs. Dt of Comm. Date of Labours
No. C.A.
Compl. Engaged

Shri P. N.
Sarode,Railway
A - Buhanpur (RPF Thana) - Proposed construction of RPF Thana Contractors,Plot No.
with basic amenities at Burhanpur works under Umbrella work 9/3A, S. N. 167 Near
LOA NO :-
2022-23 Plan head-64 (Other specified works) PWP-2022-23. B - T.S. Zope
107 853660070620 Dated ₹ 10,219,274.00 30.01.2023 30.09.2023
Nepanagar:- Repairs to drain in yard between DN main and DN School,BHUSAWAL. Ph
30.01.2023
loop line (700M) & Track Machine siding yard.(350M) (ZBB- No 9102582240307,
2022-23) 9109422779679
email:-
ksksarode782gmail.com

M/s Badami Builders-


Gautambuddha Nagar
Cess repair work in PACHORA-BHUSAWAL-KHANDWA section LOA NO :-
Panchwati Properties
108 under Sr. DEN (North) BHUSAWAL jurisdiction. ( Sch. Qty -60995 10036180072756 ₹ 9,104,330.42 03.03.2023 03.03.2024
Old petrol Pump village
Cum.) Dated 03/03/2023
Bisrakh Gautambuddha
Nagar-201306 UP

M/s Ajay Kisan Prasad


Misar-Jalgaon
1. Miscellaneous P.way work under SSE(P.way) (Main Line) Sonikchha wadi-
LOA NO :-
Bhusawal under ADEN Bhusawal jurisdiction. 2. CTR/S- 1.11 Jamner Road,
109 00857500072762 ₹ 28,682,018.70 03.03.2023 03.03.2024
Tkms & TRR/S- 0.449 Tkms in Bhusawal yard under Sr. DEN Bhusawal.
Dated 03/03/2023
(North) Bhusawal's Jurisdiction. Ph .no +919822340956
email:-
ajay.misar@yahoo.in
Details of ongoing Contractual Works under Pachora- Khandwa section of Bhusawal Division
Extended Nos.of
Sr. Date of Comp. as per
Name of Work C.A. No. & Date Name of Contractor S/Shri Cost of CA Rs. Dt of Comm. Date of Labours
No. C.A.
Compl. Engaged

M/S. Anand Buildcon,


Contractor,Shanti
Sadan, Opp. PNB Bank,
ADEN (Line) Bhusawal - Miscellaneous repairs to staff quarters and
LOA NO :- Balaji Lane, Bhusawal.
improvement to colony roads under ADEN (Line) Bhusawal
110 00853750072802 (Chordia) PhNo ₹ 7,789,680.00 03.03.2023 03.03.2024
Jurisdiction at JALGAON, Mhasavad, Maheji and Pardhade
Dated 03/03/2023 9102582222584,
stations in Bhusawal Division.
919422279595. email
anandbuildcon2@rediff
mail.com

SUDHA DEVI,
CONTRACTOR, Near
Rohit Printing Press,
LOA NO :-
Miscellaneous P.way work under SSE(P.way) North Burhanpur Main State Bank of
111 01025420072803 ₹ 10,141,471.00 03.03.2023 03.03.2024
under ADEN Khandwa jurisdiction. India, branch, Jamner
Dated 03/03/2023
Road, Bhusawal. Ph No
09011873256 email:-
sdevi3330@gmail.com

SUDHA DEVI,
CONTRACTOR, Near
Rohit Printing Press,
Miscellaneous P.way work for Newly commissioned section of 3rd LOA NO :-
Main State Bank of
112 line from 373.0 to 400.420 = 27.42 Tkms. under SSE (P.way) 01025420075254 ₹ 6,032,885.00 17.04.2023 17.04.2024
India, branch, Jamner
PACHORA jurisdiction . Dated 17/04/2023
Road, Bhusawal. Ph No
09011873256 email:-
sdevi3330@gmail.com

Virender construction ,
Bhopal 88 Chandan
Nagar Jain colony
LOA NO :-
Miscellaneous P.way work under SSE(P.way) KHANDWA under Berasia Road Bhopal.
113 00995280075334 ₹ 11,383,215.00 18.04.2023 18.04.2024
ADEN KHANDWA jurisdiction. Ph No: 919977931993
Dated 18/04/2023
email:-
tarunsaini974@gmail.co
m
Details of ongoing Contractual Works under Pachora- Khandwa section of Bhusawal Division
Extended Nos.of
Sr. Date of Comp. as per
Name of Work C.A. No. & Date Name of Contractor S/Shri Cost of CA Rs. Dt of Comm. Date of Labours
No. C.A.
Compl. Engaged
LITTLE STAR
ASSOCIATES-
BHUSAWAL. , NIRMAL
NAGAR NEW
NIMBHORA BK
DEEPNAGAR,
LOA NO :-
BHUSAWAL,
114 Asirgarh - Construction of New panel building at Asirgarh. 00988310075600 ₹ 10,184,237.00 21.04.2023 21.01.2024
Maharashtra-425307
Dated 21/04/2023
Indiaa) Phone no :-
9422779803
b) Email id:-
ingalevidhyadhar@gmail
.com

Virender construction ,
Bhopal 88 Chandan
Nagar Jain colony
LOA NO :-
Miscellaneous P.way work under SSE(P.way) South Burhanpur Berasia Road Bhopal.
115 00995280075604Dat ₹ 11,164,441.00 21.04.2023 21.04.2024
under ADEN KHANDWA jurisdiction. Ph No: 919977931993
ed 21/04/2023
email:-
tarunsaini974@gmail.co
m

RIGHT CONSTRUCTION-
PUNE, Ram krishna
Hari Bunglow, Plot No
8, Co. Op Housing
Khandwa (RPF):-Proposed construction of 25 Bedded RPF Barrack Society, Laxmi Park
LOA NO :-
at Khandwa in connection with construction of 25 Bedded RPF Colony ,NearSenadatta
116 811950077594 Dated ₹ 13,004,709.32 24.05.2023 24.02.2024
Barrack at KNW & BD under Umbrella works under PH-64 ( police Chowky, Navi
24.05.2023
ID No.01.01.64.22.1.50.001) Peth, pune.
9823410777
Email-
rightconstruction77@gm
ail.com
Details of ongoing Contractual Works under Pachora- Khandwa section of Bhusawal Division
Extended Nos.of
Sr. Date of Comp. as per
Name of Work C.A. No. & Date Name of Contractor S/Shri Cost of CA Rs. Dt of Comm. Date of Labours
No. C.A.
Compl. Engaged

YASHPAL DAYARAM
1. Upgradation of stations under Amrit Bharat Station Scheme by
SHARMA-AKOLA AT
improving circulating area, facade, Roads,horticulture&
POST BORGAON
landscaping, renovation/retrofitting to existing buildings &
LOA NO :- MANJU TQ.AKOLA
toilets, raising and surfacing of platform, Cover Over Platform etc.
117 10219740077711 DIST.AKOLA AT POST ₹ 151,065,586.00 25.05.2023 25.02.2024
at Malkapur, Savda, Raver & NepaNagar station under Gati
Dated 25.05.2023 BORGAON MANJU
Shakti Unit of Bhusawal Division Central Railway. 2. Minimum
TQ.AKOLA DIST.AKOLA,
Essential Amenitites & Facilities for Divyangjan at stations:-
AKOLA, Maharashtra-
Malkapur, Savda, Raver & NepaNagar.
444102 India

AJAY KISANPRASAD
Sr. DEN (North) Bhusawal Jurisdiction - A) Rebuilding of various
MISAR-JALGAON
small span bridges including ORN-3 bridges on BHUSAWAL-
LOA NO :- SONICHHA WADI,
KHANDWA and IGATPURI-BHUSAWAL section by RCC box.
118 00857500078180 JAMNER ROAD ₹ 74,075,827.00 31.05.2023 30.11.2024
(23Nos) B)BHUSAWAL-KHANDWA section-Rehabilitation of ORN-3
Dated 31.05.2023 BHUSAWAL, JALGAON,
arch bridge No. 476/3 (Umbrella WP 20-21)PID-
Maharashtra-425201
01.01.32.20.1.11.002
India

KRISHNA
CONSTRUCTION CO-
Bhusawal station- Yard remodeling for augmentation of facilites in
ULHASNAGAR
Bhusawal coaching complex. (IRPSM ID:- 01.01.16.19.3.00.001)
B.K No 732, Room No.
WP-2019-20 PH - 16 (A) BSL Yard- Extension of existing stabling
3, Punjabi Colony,
line no. 1, 2 for 600m and provision of two additional stabling line LOA NO :-
Hospital Area,
119 of 600m each. (Ballast Supply) (B) BSL Yard :-Ease out of sharp 882300079651 Dated ₹ 9,589,462.00 22.06.2023 22.12.2023
Ulhasnagar-421003
curves in loco coaching BSL end. (Ballast Supply) (C) BSL Yard:- 22.06.2023
Maharashtra, India
Remodelling of yard lines to ease out sharp curves of break-down
email id :-
siding and track machine siding in loco yard Bhusawal. (Ballast
krishnaconst732@gmail.
Supply)
com Ph.No:-
917875199000

M/S.Y.V. Mane,
Contractor, Near New
Court, Gat No.9,
1. TBR 68.843 Tkms (59.0 by BCM+ 9.843 by manual at scattered LOA NO :-
Sanghavi Resid-
120 location) in BHUSAWAL Division. 2. TSR (P)- 47.02 Kms with TRT 10308060080067 ₹ 90,009,333.00 27.06.2023 27.06.2024
Bhigwan Road,
with DS by BCM in BHUSAWAL Division. Dated 27.06.2023
Baramati -Pune. Ph.No
919420204444 email:-
yvmcpl@gmail.com
Details of ongoing Contractual Works under Pachora- Khandwa section of Bhusawal Division
Extended Nos.of
Sr. Date of Comp. as per
Name of Work C.A. No. & Date Name of Contractor S/Shri Cost of CA Rs. Dt of Comm. Date of Labours
No. C.A.
Compl. Engaged

Bhusawal station- Yard remodeling for augmentation of facilites in M/S. BHAGWATI


Bhusawal coaching complex. (IRPSM ID:- 01.01.16.19.3.00.001) ASSOCIATES,
WP-2019-20 PH - 16 (A) BSL Yard- Extension of existing stabling Contractor, 4 Timber
LOA NO :-
line no. 1, 2 for 600m and provision of two additional stabling line Market, BHUSAWAL,
121 10253380080854 ₹ 14,049,415.00 07.07.2023 07.01.2023
of 600m each. (Trackwork) (B) BSL Yard :-Ease out of sharp curves Ph.No 919689968969
Dated 07.07.2023
in loco coaching BSL end. (Trackwork) (C) BSL Yard:- Remodelling email:-
of yard lines to ease out sharp curves of break-down siding and pareshjadwani1@gmail.
track machine siding in loco yard Bhusawal. (Trackwork) com

1. Burhanpur Goods shed - Merchant room, labour room, Goods


shed office with toilet facility, COP (300m x 15m) and alternate
approach road.(ID No.01.01.53.22.4.50.002) 2. (i) Jalgaon (Parcel
office)- Development of circulating area and flooring of Parcel
godown / shed.(ii) Jalgaon (Parcel office) -Provision of pathway to
connect all platform of BSL end. (iii) Khandwa- Provision of
LOA NO :- VINODKUMAR
pathway to connect all PFs at BSL end. (iv) Khandwa (Parcel office)-
122 00907370082267 MOHANLAL JADWANI- ₹ 48,197,758.00 21.07.2023 21.07.2024
Provision of Parcel transit office on PF no. 1/2 at KNW. (v)
Dated 21.07.2023 BHUSAWAL
Burhanpur (Parcel office)- Renovation of new parcel office. (vi)
Burhanpur (Parcel office)- Provision of Pathway for Parcel at BSL
end in connection with Provision of pathway, Development of
circulating area Flooring of parcel godown/shed at Jalgaon &
Provision of Pathway at Khandwa & Burhanpur. (IRPSM ID
No.01.01.53.22.3.50.004)

1.) Provision of arrangements to arrest water logging and repairs of


approach road at LHS provided in lieu of LC no. 157 @ km 449/35-
LOA NO :-
37 (Bsl-KNW) Under Aden KNW jurisdiction 2.) Provision of SRS INFRATECH-
123 00868270085426 ₹ 15,015,170.84 26.08.2023 26.04.2024
arrangements to arrest water logging and repairs of approach road JALGAON
Dated 26.08.2023
at LHS provided in lieu of LC no. 170A (Ajanta Gate) at Rly Kms.
475@ 47"45@ 36 on BSL-KNW section Under Aden KNW
Total Contract Cost of Works between Pachora-Khandwa section ₹ 3,323,186,181.35 795
Details of Ongoing Contractual works under Bhusawal to Badnera section of Bhusawal Division

Extended Nos. of
Name of
SN Name of work CA No & date Cost of C.A. LOA dt Compl.dt. date of Labours
Contractor
Compl. Engaged

(I)Nandura-Balance work -Heavy repairs to staff quarters by plastering,


M/s KBC
flooring, leakages of slab, doors, sunshed, fencing etc. (Total 28 units) A/2014-15/E/15 dt
1 Infrastructure of ₹ 4,441,102.27 21.10.14 20.4.15 31.3.17
(II)Jalamb-Balance work -Heavy repairs to staff quarters at Jalamb.(Total 08.12.2014
Mulund (W)Mumbai
46 Nos.)
Reconditioning of CMS crossings in situ by RW-20 Translamatic robotic
welding or similar at various yards of BSL Division 30 each under ADEN M/s ABC Railroad
A/2016-17/E/20 dt
2 Manmad, ADEN CSN, ADEN(Line)BSL, ADEN(West)Akola, ADEN(East)Akola Products Pvt. Ltd of ₹ 8,063,160.91 07.6.16 06.6.17 30.7.18
16.02.2017
and ADEN Khandwa jurisdiction (Total 180 Nos.). Lucknow

Bhusawal Division-Rebuilding of various small span bridges.(24Nos) PB


A/2016-17/E/15 dt M/s R-KAD
3 Item No. 480 PID No. 01.01.32.16.1.50.001. ₹ 69,212,276.81 03.10.16 02.10.17 30.06.2022
29.12.2016 Consultants of Indore
Bhusawal Division-Automatic Banner flag on non-Interlocked manned level
crossing gates (27 Nos. LC)as per RDSO Drg. No.RDSO/T-8416 (L.B.2015- A/2016-17/E/18 dt Shri Navin R.Rathod
4 ₹ 1,965,922.34 17.11.16 16.02.17
16 on OOT basis) (Project ID-01.01.29.15.6.00.001). 06.01.17 of Nasik

Bhusawal Division- Rebuilding (9 Small Span bridges ) (P.B.2017-18


Item.No. 496) ( P.ID.No.01.01.32.17.1.11.001) (Bhusawal -Badnera Bridge
A/2017-18/E/06 dt M/s P.N.Sarode of
5 No.562/1, 577/1, 579/2, 579/3, 580/2, 581/1& 618/4 , Igatpuri - ₹ 28,025,564.20 20.7.17 19.4.18 30.06.2021
11.9.17 BSL
Bhusawal Bridge No.167/2 & Chalisgaon - Dhule Bridge No.337/1).

Bhusawal-Badnera Section: Deep Screening by BCM 83.52Tkms. A/2017-18/E/10 dt Shri Ajay K. Misar of
6 ₹ 27,998,755.16 16.9.17 15.9.19 31.05.2020
24.11.17 BSL
Bhusawal-Badnera section- 1)TRR (Primary) -35.351 TKMS, (2) TFR- A/2017-18/E/22 dt M/s D.T.Rathi of
7 ₹ 26,092,918.33 09.11.17 08.11.18 31.12.2020
208.61 Tkms. 07.02.18 Vashind
(1)Akola- Heavy repairs to water supply pipe lines and repairs to water
stand on Platform No.1,2 & 3 at Akola.(ZBB-16-17),(2) Proposed
Surwade Rajendra
construction of one building(Relay Room, Equipment Room) in connection A/2017-18/E/18 dt
8 Pandharinath of ₹ 2,225,566.76 20.11.17 19.5.18 31.03.2020
with Spliting up of Achegaon-Bodwad (11.92KM)long block section by 17.01.18
Velhala
providing IBS in both direction on Bhusawal Division. (WP-2017-
18/PH:16).
Assistant Divisional Engineer (East)Akola section: Badnera-Chandur Bazar Narayansingh B.
A/2017-18/E/16 dt
9 Section:-Removal of defective welds= 400Nos. Pawar of ₹ 2,195,953.13 20.11.17 19.5.18 25.07.2020
17.01.18
Dhamangaon Rly
Details of Ongoing Contractual works under Bhusawal to Badnera section of Bhusawal Division

Extended Nos. of
Name of
SN Name of work CA No & date Cost of C.A. LOA dt Compl.dt. date of Labours
Contractor
Compl. Engaged

Bhusawal Division -Welding of Rail Joints with 52kg/60kg portion with


contractor’s material & equipment in connection with Track Renewal & M/s Chakradhar
A/2017-18/E/23 dt
10 Maintenance work under Bhusawal – Badnera section of Bhusawal Industries LLP of ₹ 5,338,425.02 21.11.17 20.7.18
20.02.18
Division. Total – 928 Nos. of Joints. VileParle Mumbai

(1) Murtizapur:- Repairs to Boudary wall of Murtizapur Railway station. (2)


Shegaon :- Provision of Boundary wall between Km. 547/550 to 548/650
on both Up & Down side (both) to prevent encroachment, under Assistant
Divisional Engineer(West)Akola. (3)Amaravati- Heavy repairs to boundary M/s
A/2017-18/E/21 dt
11 wall at Irwin end and in front of old station.(4) Amaravati and New M.N.Abhichandani of ₹ 37,896,547.28 09.01.18 08.7.19 30.06.2022
07.02.18
Amaravati- Provision of Boundary wall to prevent encroachment. (5) Daund
Chandur bazar & Walgaon:- Provision of Boundary wall to prevent
encroachment

(1)Malkapur-Bodwad section- Urgent repairs to Kucha Drains in cutting.


M/s Sangeeta
(Total length = 4750M) (ZBB-17-18), (2) Murtizapur-Repairs to yard drain A/2017-18/E/24 dt
12 Construction of ₹ 13,138,727.69 09.01.18 08.10.18 30.10.2021
between platform no.1 & 2 at Murtizapur station. (Total length = 870M) 28.02.18
Jalna.
(ZBB-17-18).
Bhusawal Division –Annual Maintenance Contract (AMC) for Small Track Machines available in various SSE(P.Way) depots of Bhusawal Division.
A/2018-19/E/02 dt M/s Shah
13 ₹ 1,704,844.80 22.3.18 21.3.20
20.4.2018 Enterprises of BSL
Bhusawal Division- Mana Station:- Proposed extension of up & Dn loop
A/2018-19/E/05 dt M/s Rama
14 line to achieve 753M. CSR (For W.P. 2017-18) (IRPSM ID ₹ 7,152,894.32 23.02.18 22.8.18 30.06.2020
21.5.2018 Enterprises of BSL
No.01.01.16.17.1.50.002).
Bhusawal -Badnera section- Replacement of existing steel girders (9.14m
spans) by PSC slabs with jacketing to substructure. (05 bridges) For A/2018-19/E/15 dt Shri Abhijit D.Patil of
15 ₹ 58,450,224.36 02.4.18 01.4.19 30.07.2021 8
Group 2-3 Bridges (Bridge No. 488/1, 528/2, 542/2 )(WP 18-19 PB Item. 18.7.2018 Jalgaon
No.573).
1)Shegaon - Improvement of circulating area near Home platform. (DWP 17-
18) (Project ID-01.01.53.17.4.50.002), (2)Bodwad:- Proposed Extension of
Up high level platform to accommodate 24 coaches passenger train (DWP
17-18) (Project ID - 01.01.53.17.4.50.004), (3) Bodwad:- Proposed
Extension of Down high level platform to accommodate 24 coaches
passenger train with Bridge extension (Br. No.471/01) (DWP 17-18)
(Project ID - 01.01.53.17.4.50.005), (4) Nandura -Proposed construction of A/2018-19/E/16 dt M/s SRS Infratech of
16 building/panel room(balance work) in connection with replacement of old ₹ 15,617,621.21 23.02.18 22.02.19 31.01.2023
20.7.2018 BSL
age panel & signal with panel interlocking (PL) at Nandura “A” route on
Bhusawal division (PH 33 /WP 15-16), (5)Gaigaon – proposed construction
of battery room and control room at Gaigaon SSP in connection with
Gaigoan(Yard) remodeling for provision of facilities for handling long haul
trains in Down loop line.
Details of Ongoing Contractual works under Bhusawal to Badnera section of Bhusawal Division

Extended Nos. of
Name of
SN Name of work CA No & date Cost of C.A. LOA dt Compl.dt. date of Labours
Contractor
Compl. Engaged

Bhusawal Division (1)Rehabilitation/Extension of barrel length of 10


bridges. (WP 18-19 PB Item No. 551) (2)Rebuilding of various small span
bridges.(08 Nos) (Bhusawal –Badnera- Br. No. 485/1, 527/1, 590/3, A/2018-19/E/20 dt M/s R-KAD
17 ₹ 97,855,308.40 04.6.18 03.6.19 31.12.2022
606/1, 630/1, 638/1 Igatpuri- Bhusawal Br. No. 413/3 Bhusawal 06.8.2018 Consultants of Indore
–Khandwa- 468/1 (WP 18-19 PB Item No. 545).

Bhusawal Division-ADEN(West)Akola & ADEN(East)Akola Section-


Rebuilding of various small span stone/flat top, Rail top bridges by RCC A/2018-19/E/21 dt M/s Prabh Engineers
18 ₹ 120,551,404.63 09.7.18 08.01.20 30.09.2022 6
segmented box on Bhusawal-Badnera section. (31 bridges) (W.P. 2018-19, 01.9.2018 ofAkola
P.B. item No.574).
Bhusawal Division-Proposed for interlocking of Level Crossing Gate for 04
gates S-2 (Badnera-Amaravati), Level Crossing -176 & 164 (Bhusawal -
Khandwa)& Level Crossing -57(Bhusawal - Badnera-) against the
sanctioned work of Proposed for interlocking of Level Crossing gate No. S- A/2018-19/E/22 dt M/s Ruchi
19 ₹ 2,976,593.14 20.7.18 19.3.19 30.06.2022
2(Badnera-Amaravati), Level Crossing 02(Manmad-Aurangabad), Level 10.9.2018 Enterprises of Thane
Crossing -176 & 164 (Bhusawal -Khandwa), Level Crossing -24 & 57
(Bhusawal – Badnera).

Bhusawal Division: Welding of Rail Joints with 52kg/60kg portion=3466 nos. with contractor’s material & equipment in connection with Track Maintenance work.
M/s Harshad
A/2018-19/E/24 dt Thermic Industries
20 ₹ 18,389,892.40 08.5.18 07.5.19 31.03.2022
20.9.2018 Pvt. Ltd. Unit-II of
Raipur
Assistant Divisional Engineer (West) Akola & (East) Akola’s Jurisdiction –1)TRR(Primary) - 37.005 Tkms. (2)Jalamb-Khamgaon Branch Line - Complete Track Renewal (Secondary) by Manual method - between Kms
A/2018-19/E/25 dt Shri Naresh
21 ₹ 25,079,038.18 08.8.18 07.8.19 31.08.2021
27.9.2018 B.Aggarwal of Akola
Bhusawal Division - Proposed elimination of Level Crossing by providing
subway by box pushing method in lieu of Level Crossing Nos.- (1)Level
Crossing No.13 at Kms. 499/10-12 by providing subways of size
4.5x4.5(barrel length 18.0m) between Malkapur-Wadodara block section.
(2) Level Crossing No.14 at Kms. 502/02-04 by providing subway of size
4.5x4.5( barrel length 18.0m) between Malkapur-Wadodara block
section.(3) Level Crossing No.55A at Kms. 633/29-31 by providing
subways of size 5.0x4.0(barrel length 20.0m) in Mana Yard. (4)
Improvement to approach road of Proposed subways at Level Crossing
Nos.156,156A & 156B(near ZRTI ,Bhusawal), by providing Retaining walls,
Concrete Surface and covered shed. (5) Improvement to approach road of A/2018-19/E/33 dt AAN Infra JV of
22 ₹ 160,351,150.58 02.11.18 01.11.19 30.07.2022
Proposed subways at Level Crossing Nos.133 (between Pachora -Pardhade 12.02.2019 Jalgaon
Station.), 135 (between Pardhade -Maheji Station)& 137(between Maheji -
Mhasawad Station.), by providing Retaining walls, Concrete Surface and
covered shed.(6)Improvement to approach road of Proposed subways at
Level Crossing Nos.138(between Maheji -Mhasawad Station),140(between
Maheji -Mhasawad Station) & 142(between Maheji -Mhasawad Station.), by
providing Retaining walls, Concrete Surface and covered shed. (TWO BID
SYSTEM).
Details of Ongoing Contractual works under Bhusawal to Badnera section of Bhusawal Division

Extended Nos. of
Name of
SN Name of work CA No & date Cost of C.A. LOA dt Compl.dt. date of Labours
Contractor
Compl. Engaged

Bhusawal Division-Ballast supply for the following work-(A)Borgaon-


Proposed extension of Up& Down Loop line to achieve 753 m. CSR (WP-18-
19) (IRPSM ID-01.01.16.18.3.50.004), (B) Kurum station-Shifting of DS
Point No. 104 B at Badnera end to increase CSR of Up Loop line.(DWP-
2017-18)(IRPSM ID-01.01.16.17.4.50.008) ,(C) Badnera station-Removal of
existing Turnout and Laying of Turnout and Track in connection with M/s Shri J.P.Khosla
A/2018-19/E/34 dt
23 setting up of Walgaon Repair (POH) Workshop at Badnera., (D)Amravati of Akola Mobile ₹ 9,862,033.50 13.02.19 12.06.19 31.03.2022
20.3.19
Station - Extension of Platform and augmentation of other passenger No.9422160785
amenities with incidental yard work to accommodate 26 coach length
train. (PH – 53) under RRSK under Umbrella Work 770

Akola-Provision of water recycling plant of 0.50MLD capacity at Akola Shri B. S. Bhujbal of


24 station LOA dt 28.02.19 Ahmednagar ₹ 20,734,336.95 28.02.19 27.02.20 31.10.2022
M.No.9822783408
Walgaon Station :- Provision of open drain in Down yard upto colony to
Shri Naresh
drain out the rain water from Track. (PWP-Year 18-19 on out of turn basis
25 LOA dt 14.3.19 B.Aggarwal of Akola ₹ 23,426,312.07 14.3.19 13.11.19 30.06.2022
under PH-31, ID No.01.01.31.18.6.00.026).
M.No.8600111583
Conducting "Continuous Scour Monitoring" of foundations of Bridge
No.680/1 Between New Amaravati- Walgaon Stations of Badnera-
Narkhed Section of Bhusawal Division " using "Sonar Echo-rang
technology" by Airmar Echo Range SS510 Smart Sensor or similar Tranz Rail Solutions
26 equipment on trial basis & submitting continuous monitoring data, LOA dt 24.5.19 Limited Liability ₹ 3,763,200.00 24.5.19 23.01.21
analysis and preparation / submission of detailed Reports of continuous Partnership of Noida
scour monitoring data, generating alarms/SMS alerts and validation of
reports with grounds levels. (Rev. 17-18).

Providing & Laying of Non –Woven Geo-Textile (JGT) between Badnera- M/s OM Prakash
ChandurBazar Single Line in connection with increasing speed Meghani of BPL
27 LOA dt 24.5.19 ₹ 11,407,514.77 24.5.19 23.09.19 31.07.2022
from100KMPH to 110KMPH.(Total 7.4Kms). Mobile
no.9752599210
Details of Ongoing Contractual works under Bhusawal to Badnera section of Bhusawal Division

Extended Nos. of
Name of
SN Name of work CA No & date Cost of C.A. LOA dt Compl.dt. date of Labours
Contractor
Compl. Engaged

( 1) Assistant Divisional Engineer (West) Akola section- Heavy repairs to


M/s A.S.Construction
various bridges. (Rev. 18-19) (2) Senior Section Engineer (Works)
28 LOA dt 24.5.19 of PUNE-41 ₹ 31,563,654.84 24.5.19 23.02.20 30.06.2021
Murtizapur Section- Repairs to various bridges by jacketing, pointing, CPG
M.No.9923587355
etc (Rev.17-18).
Bhusawal Division: Provision of Lift (Civil Portion)=25Nos. (Nasik Road-1,
M/s Aditya
Manmad-1, Chalisgaon-3, Jalgaon-1, Bhusawal-4, Shegaon-2, Akola-2,
Construction of
29 Badnera-4, Amravati-2, Malkapur-2, Burhanpur-2, Khandwa-1) (P.B.Item LOA dt 31.5.19 ₹ 59,311,937.98 31.5.19 30.05.20 30.09.2022
Kalyan
No.770/2018-19 PH-53) (Project ID 01.02.53.18.3.00.038).
M.No.9323230031
BSL Division- Provision of Boundary wall on both side of Railway land at
various locations to avoid tress passing on Igatpuri to Badnera and
Bhusawal- Khandwa Section Total 17Km under Umbrella work at item No M/s Dharamsingh
30 LOA dt 06.6.19 ₹ 41,449,847.91 06.6.19 05.03.20 30.06.2022
1139 (RRSK) under Jurisdiction of Senior Divisional Engineer(East)BSL Construction of Surat
(5.30Kms out of 17Kms.).

Senior Divisional Engineer (East)Section-Provision of Tool Room cum Gang M/s N.S.Manwani of
31 hut for Trackman LOA dt 12.6.19 BSL ₹ 21,297,089.86 12.6.19 11.03.20 30.06.2021
M.No.9325251919
Preparation of the general Arrangement Drawing for rehabilitation/
A/2019-20/E/08 Shri Ajay S.Khanke of
32 rebuilding etc works of various bridges under Sr.DEN(E)jurisdiction at ₹ 428,340.88 12.06.2019 11.09.2019 31.12.2020
dt.15.07.2019 BSL
Bhusawal Division (Rev. 2018-19).
Bhusawal Division (1) MALKAPUR YARD- Proposal for construction of 300
M CSR track machine siding at Malkapur Yard. (2) Varangaon- Proposal for
construction of 300 M CSR track machine siding at Varangaon Yard. (3) M/s Vikas Yadav of
Nandura-Construction of 345 M CSR track machine siding at Nandura A/19-20/E/15
33 Thane (W) ₹ 43,328,489.09 27.09.19 26.12.20 31.12.2022
Yard. (4) Shegaon-Construction of existing track machine siding. (5) AKOLA- dt.26.11.19
M.No.9325252626
Construction of 250m CSR track machine siding at Akola Yard.

Provision of water recycling plant of 0.50MLD capacity at Amravati station. Shri B. S. Bhujbal of
34 LOA dt.27.11.19 Ahmednagar ₹ 22,686,315.26 27.11.19 26.11.20 26.01.2023 2
M.No.9822783408
Details of Ongoing Contractual works under Bhusawal to Badnera section of Bhusawal Division

Extended Nos. of
Name of
SN Name of work CA No & date Cost of C.A. LOA dt Compl.dt. date of Labours
Contractor
Compl. Engaged

Replacement of Thick web switch 1 in 8.5 =10 Nos. and 1 in 12 =25


Shri Rama
Nos.(Total=35 Nos.) under SSE(P.Way)Akola in Bhusawal- Badnera
Enterprises of
35 section. LOA dt.19.12.19 ₹ 6,645,660.75 19.12.19 18.06.20
Bhusawal
M.No.9422771349
Replacement of Thick web switch 1 in 8.5 =10 Nos. and 1 in 12 =19
Nos.(Total=29 Nos.) under SSE(P.Way)Bodwad in Bhusawal- Badnera
Shree Construction of
36 section. LOA dt.19.12.19 ₹ 5,496,872.57 19.12.19 18.06.20
JL

Murtizapur station- Yard Remodelling for provision of Facilities for Shidhivinayak


Handling Long Haul Trains in UP & DN loop line civil work with Building Construction Co. of
37 LOA dt.23.12.19 ₹ 8,552,804.67 23.12.19 22.06.20
Thane
M.No.8928407809
Replacement of Thick web switch 1 in 8.5 =09 Nos. and 1 in 12 =24
Little Star Associates
38 Nos.(Total=33 Nos.) under Sr. Section Engg. (P.Way) SHEGAON jurisdiction LOA dt.27.12.19 ₹ 6,252,739.30 27.12.19 26.06.20
of BSL
in Bhusawal- Badnera section.
Bhusawal Division - TRR/P- 34.874 Tkms & 3.13 Tkms on 12 bridges Total Shri Naresh B.
39 38.004 Tkms on ADEN AKOLA & ADEN BADNERA section under Sr. LOA dt.01.01.2020 Aggarwal of AK ₹ 20,654,613.73 01.01.20 31.12.20 10
DEN(East)Bhusawal's Jurisdiction. M.No.8600111583
Assistant Divisional Engg (West) Akola sub divn.- Supplying potable water
by Tanker at Railway Colony under SSE(Wks) Akola's section. (ZBB-2019-
20) (2) Assistant Divisional Engg (West) Akola juridiction - Supplying Shri S.V.Kale of
40
potable water from private party in summer at station Varangaon, Bodwad, LOA dt.14.01.2020 Bhusawal ₹ 12,406,579.30 14.01.20 13.01.21
Khamkhed, Malkapur, Wadoda, Biswa bridge, Khamgaon Burty, Nandura, M.No.9767879750
Jalamb, Khamgaon, Shegaon, Nagziri, Gaigaon & Paras. (ZBB-2019-20)

Murtizapur station- Earth work in connection with Yard Remodelling for Shri Chandan kumar
provision of Facilities for Handling Long Haul Trains in UP & DN loop line Das of
41 LOA dt. 06.03.2020 ₹ 16,616,755.78 06.03.20 05.09.20
. Chakradharpur
M.No.7903690024
Details of Ongoing Contractual works under Bhusawal to Badnera section of Bhusawal Division

Extended Nos. of
Name of
SN Name of work CA No & date Cost of C.A. LOA dt Compl.dt. date of Labours
Contractor
Compl. Engaged

Bhusawal Division - Proposed replacement of existing steel girder by PSC


Shri Abhijeet D. Patil
slabs. (08 bridges, Bhusawal-Badnera- 461/1, 578/2 , Igatpuri- Bhusawal -
42 LOA dt. 14.03.2020 of Jalgaon ₹ 68,763,823.58 14.03.20 13.09.21 8
262/1, 318/1 & Bhusawal -Khandwa - 526/3, 539/7, 471/1, 488/2)
M.No.9766816393
Umbrella work
ADEN Badnera sub divisionn.- Supplying potable water by Tanker/piped Shri S.V.Kale of
43 water at Railway Colony & Stations. (ZBB-2019-20) LOA dt. 26.06.2020 Bhusawal ₹ 13,648,116.07 26.06.20 25.06.21
M.No.9767879750
Annual Sectional Contract Zone No.1 for ADEN (West)Akola for Repairs and
SRS infratech of BSL
44 maintenance with white washing etc for Bhusawal (Ex.) to Akola (Incl.) with LOA dt.15.07.2020 ₹ 26,400,000.00 15.07.20 30.06.22
M.No.9370094949
Jalamb-Khamgaon section.
Badnera station-Removal of existing Turnout and Laying of Turnout and
Shri Narayan Singh
Track in connection with setting up of Wagaon Repair (POH) Workshop at
45 LOA dt.16.07.2020 B. Pawar of Amravati ₹ 12,096,077.18 16.07.20 15.11.20
Badnera (Trackwork).
M.No.9923732107
TRR-P-57.069 Tkms on ADEN AK & ADEN BD section under DEN(E)BSL M/s OM Prakash
jurisdiction. Meghani of BPL
46 LOA dt.04.09.2020 ₹ 31,060,837.76 04.09.20 03.09.21 24
Mobile
no.9752599210
TBR 75.675 Tkms in Bhusawal - Badnera section under DEN (East)
M/s J RATHNAKAR of
Bhusawal Jurisdiction.
47 LOA dt.11.09.2020 Hyderabad. Mob. ₹ 25,861,414.56 11.09.20 10.09.21
9036910919
Miscellaneous P.Way works under SSE(P.way) Shegaon under ADEN (West) M/s OM Prakash
AKOLA jurisdiction of Bhusawal - Badnera section. Meghani of BPL
48 LOA dt.30.09.2020 ₹ 17,518,801.15 30.09.20 29.09.21
Mobile
no.9752599210
Murtizapur station- Track work in connection with Yard Remodelling for
Shri Narayan Singh
provision of Facilities for Handling Long Haul Trains in UP & DN loopline.
49 LOA dt.26.10.2020 B. Pawar of Amravati ₹ 8,745,284.43 26.10.20 25.04.21
M.No.9923732107
Welding of rail Joints 2000Nos. in situ/cess in Bhusawal-Badnera Section
50 LOA dt.09.11.2020 ITC Kanpur ₹ 12,690,257.33 9.11.20 08.11.21
of DEN(E)BSL Jurisdiction
Bhusawal Division-Manual deep screening of turnouts(40nos.) in BSL-BD
J. Rathnakar Reddy
51 section under Sr.DEN(East)BSL’s jurisdiction LOA dt.11.11.2020 ₹ 4,640,043.67 11.11.20 10.09.21
of Hyderabad
Badnera:- Repairing of Drain at Badnera Yard under ADEN Badnera sub
Avon Cleaners &
52 division. (ZBB-2020-21). LOA dt.23.11.2020 ₹ 1,674,661.43 23.11.20 22.05.21
Construction of NGP
Malkapur-Bhusawal section:-Urgent repairs to kuchha drain at M/s Surdevara
Km.468.670 to 463.432= 238M X2=476M(Up and Dn road) between Engineers &
53 LOA dt.23.11.2020 ₹ 3,791,893.23 23.11.20 22.11.21
Bodwad-Achegaon section with standardization of cutting slope. Contractors of
Krishna
Details of Ongoing Contractual works under Bhusawal to Badnera section of Bhusawal Division

Extended Nos. of
Name of
SN Name of work CA No & date Cost of C.A. LOA dt Compl.dt. date of Labours
Contractor
Compl. Engaged

C2 - 1.Closure of LC no.25 @ Kms 541/04-06 (JALAMB-SEG) by provision


of subway (RCC Box of sizes 5.0x4.0) by Push through method.
2.Construction of Normal height subway (5.0m X 5.0m) in liue of level
54
crossing No.32B @ Kms.565/28-30 on BSL-BD section on BSL Division by LOA dt.04.12.2020 N.T.Mittal of BSL ₹ 84,950,262.32 04.12.20 03.03.22 5
push through method. 3.Construction of Normal height subway (4.0m
X4.0mx18.0) in liue of level crossing No.35 @ Kms.573/20-22 in GAO-AK
on BSL Division by push through method.

C1 - 1. Closure of LC no. 21 @ Kms 524/20-22 (Nandura-Jalamb) by


provision of subway (RCC Box of sizes 5.0x4.0) by Push through method.
2. Closure of LC no. 22 @ Kms 26/14-16 (Nandura-Jalamb) by provision of
subway (RCC Box of sizes 5.0x4.0) by Push through method. 3. Closure of Pilcon Engineering of
55 LC no. 23 @ Kms 529/12-14 (Nandura-Jalamb) by provision of ubway LOA dt.21.12.2020 ₹ 150,187,987.56 21.12.20 20.03.22 4
NGP
(RCC Box of sizes 5.0x4.5) by Push through method. 4. Closure of LC no.
05 @ Kms 464/02-04 (Achegaon-Bodwad) by provision of subway (RCC
Box of sizes 5.0x4.0) by Push through method.

Supply & stacking of 65 mm Gauge Machine crushed stone Ballast &


Jain Metal & Material
56 loading in to Hopper's / BOB'N wagon's by mechanical means at Bodwad LOA dt.24.12.2020 ₹ 46,763,728.32 24.12.20 23.06.22
Corp. of JL
Depot. Quantity = 60000 M3.
D - 1. Closure of LC no.55 @ Kms 630/03-05(MZR-Mana) by provision of
subway (RCC Box of sizes 5.0x4.5m) by Push through method .
2.Construction of Normal height subway (5.0m X5.0mx18.0m) in liue of
level crossing No.44 @ Kms.603/12-14 on BSL-BD section on BSL Division
by push through method. 3. Construction of Normal height subway 5.0m Vijaya Infra Project
57 X 4.0mx18.0m) in liue of level crossing No.50B @ Kms.617/21-23 on BSL- LOA dt.21.12.2020 ₹ 108,888,298.50 21.12.20 20.03.22
Pvt. Ltd. Of Mumbai
BD section on BSL Division by push through method. 4. Closure of LC no.
47 @ Kms 607/17-19 (BGN-KTP) by provision of subway (RCC Box of sizes
5.0x4.5x22.0m) by Push through method .
Details of Ongoing Contractual works under Bhusawal to Badnera section of Bhusawal Division

Extended Nos. of
Name of
SN Name of work CA No & date Cost of C.A. LOA dt Compl.dt. date of Labours
Contractor
Compl. Engaged

Manual Deep screening of Main line=13.926 Tkms in various yard PF,


Shri Ajay K. Misar of
Bridges and left over patches by BCM under ADEN/AKOLA=8.631 TKMS
58 LOA dt.24.12.2020 BSL ₹ 123,276,825.58 24.12.20 23.09.21
and ADEN BADNERA=5.295 TKMS Jurisdiction on BHUSAWAL-BADNERA
M.No.9822340956
section .
Bhusawal Division- Bhusawal Division- Proposed elimination of Level
Crossing by providing subway by box pushing method in lieu of Level
Crossing nos-A(1)LC no. 39 @ Kms 586/21-23 (AK-YAD) (RCC Box of sizes
5.0x4.5m) B(2)LC no. 41 @ Kms 591/20-22 (YAD-BGN)(RCC Box of sizes M/s SANDEEP
5.0x4.5m) C(3)LC no. 54 @ Kms 627/03-5(MZR- Mana) (RCC Box of sizes SHRICHAND
59 5.0x4.5m) D(4) LC no. 56 @ Kms 636/17-19(Mana-Kurum)(RCC Box of LOA dt. 02.03.2021 ₹ 172,408,975.89 02.03.21 01.06.22 6
ROOPCHANDANI-
sizes 5.0x4.5m ) E(5) LC no. 57 @ Kms 639//27-29(Mana-Kurum)(RCC Box SOLAPUR
of sizes 5.0x4.5m ) F(6) LC no. 58 @ Kms 643/01-02(Mana-Kurum)(RCC
Box of sizes 5.0x4.5m) on Bhusawal-Badnera Section.

Supply & stacking of 65 mm Gauge Machine crushed stone Ballast &


M/s J.P.Khosla of
60 loading into Hoppers/BOBY’ N’ Wagons by mechanical means at Kurum LOA dt. 12.05.2021 ₹ 81,768,188.46 12.05.21 11.11.22 2
Akola
Depot Qty.= 100000M3
Malkapur, Shegaon & Jalamb-Khamgaon section:- Repairs to various
M/s Ravindra Singh
61 bridges under SSE(W)SEG section by CPG & exposed reinforcement of slab LOA dt. 20.05.2021 ₹ 5,382,753.67 20.05.21 19.09.21 8
of NGP
bridges.
Deepscreening of loop lines total= 23.777Tkms in BSL-BD section under
M/s Bindu Project
62 Sr.DEN(E) Jurisdiction. LOA dt. 29.05.2021 ₹ 20,750,737.72 20.05.21 19.05.22
and Co. of Bangaluru
SSE(Works)Murtizapur section:- Repairs to various bridges by CPG etc. M/s N.K. Rathod of
63 LOA dt. 20.05.2021 ₹ 7,428,637.63 29.05.21 28.11.21
Jabalpur
Repairs of Sand hump 11 Nos. in BSL-AK & 11 nos. in AK-BD & BD-CNDB
M/s S.S. Chaudhari
64 section, Total=22nos. of sand hump under Sr.DEN(E) jurisdiction LOA dt. 04.06.2021 ₹ 16,910,331.46 04.06.21 03.06.22
LLP of BSL
Recoupment od shoulder & crib ballast and ancillary work for FRM in Srinivasa
65 Bhusawal Division (Total= 150Kms). LOA dt. 07.06.2021 Construction of ₹ 18,583,392.60 07.06.21 06.06.22
Ahmadnagar
Jalamb Yard:- (i) Heavy repairs to open drain between Up main line and Dn
main line from Km.533/800 to 534/600=800M in Jalamb station. (ii)
M/s S.S. Chaudhari
66 Urgent repairs to catch water drain between Km.553/K-10 to 534/K- LOA dt. 08.06.2021 ₹ 12,354,409.42 08.06.21 07.06.22
LLP of BSL
36=1800M in Jalamb- Khamgaon line in Jalamb yard

(1) Badnera (C&W):- Homing shed of 15m. Length x 8m. Width x 8m. High
for stabling the road ART at Badnera.(2) Badnera (C&W) :- Provision of
Supervisor room with toilet size - 5x5m , bill unit room size - 5x4m , staff
room size - 8x5m & toilet Block (Ladies/Gents ) size -3x4m.(Total SRS infratech of BSL
67 Area=97m2. (3) Badnera :-Provision of fencing with barded wire on top LOA dt. 24.06.2021 ₹ 6,850,135.50 24.06.21 23.03.22
M.No.9370094949
towards main line.(110m long) (4) Badnera :-Proposed approach road (5x40
M= 200 M2) In connection with Provision of shed and other facilities for
homing of Road Mobile ART at Badnera..

SSE(Works)Badnera section:- Miscellaneous repairs to various bridges M/s Ravindra Singh


68 LOA dt. 29.06.2021 ₹ 4,824,516.13 29.06.21 28.12.21
under SSE(W)BD section. of NGP
1. SHEGAON Section-Repairs to Drain, Road, Pipe line, Doors & Windows,
Leaky Roof, Flooring, Plastering of staff quarter under SSE (Wks) Shegaon
jurisdiction of Bhusawal Division. 2. Heavy repairs to roof leakage, M/s Chandak
69 Drainage arrangement, Water supply pipe line, Doors & windows, Toilet LOA dt. 06.07.2021 ₹ 25,840,324.02 06.07.21 05.07.22 7
Construction of Akola
etc. of staff quarters at Akola, Gaigaon, Paras & Naghzhiri Stations of
Bhusawal division.
Details of Ongoing Contractual works under Bhusawal to Badnera section of Bhusawal Division

Extended Nos. of
Name of
SN Name of work CA No & date Cost of C.A. LOA dt Compl.dt. date of Labours
Contractor
Compl. Engaged

BHUSAWAL-BADNERA Section- a) Rebuilding of various small span


bridges including ORN-3 bridges . (33Nos ) b) Rehabilitation to ORN-3 arch
bridge No. 504/1, 588/3 (2 Nos) c) Extension & Strengthening of apron at
Br. No.532/3. U 20-21 PID No. 01.01.32.20.1.11.001 Part A2 - Jha Construction of
70 LOA dt. 13.07.2021 ₹ 65,701,606.51 13.07.21 12.07.22 8
a)Rebuilding bridges from Kms 513 to 572 = 8 Bridges ,b)Rehabilitation of Mumbai
arch bridge No. 504/1= 1 Bridge, c)Extension & Strengthening of apron at
Br. No. 532/3= 1Bridge

(A1) Bhusawal Division- 1.)Closure of LC no. 3 at kms 455/14-16 between


Bhusawal-Varangaon station by provision of subway (RCC Box of sizes
5.0x4.5) by Push through method with RH Girder on BSL-BD section.
(Umbrella 2020-21,PB No-219,Project ID:-01.01.30.21.1.00.003) 2.)Closure
of LC no. 4 at kms 459/30-460/02 between Varangaon-Achegaon station
by provision of subway (RCC Box of sizes 5.0x4.5) by Push through method M/s Abhijeet D Patil
71 LOA dt.02.08.2021 ₹ 115,651,850.39 02.08.21 01.11.22
with RH Girder on BSL-BD section.(Umbrella 2020-21,PB No-219,Project of Jalgaon
ID:-01.01.30.21.1.00.003) (3.)Closure of LC no. 6 at kms 471/24-26
between Achegaon-Bodwad station by provision of subway (RCC Box of
sizes 5.0x4.5) by Push through method with RH Girder on BSL-BD section

(A2) Bhusawal Division- 1.)Closure of LC no. 8 at kms 476/28-477/02


between Bodwad-Khamkhed station by provision of subway (RCC Box of
sizes 5.0x4.5) by Push through method with RH Girder on BSL-BD section.
(Umbrella 2020-21,PB No-219,Project ID:- 01.01.30.21.1.00.003)
2.)Closure of LC no. 9 at kms 478/16-18 between Bodwad-Khamkhed
station by provision of subway (RCC Box of sizes 5.0x4.5) by Push through
method with RH Girder on BSL-BD section.(Umbrella 2020-21,PB No-
219,Project ID:- 01.01.30.21.1.00.003) 3.)Closure of LC no. 10 at kms
481/12-14 between Bodwad-Khamkhed station by provision of subway
(RCC Box of sizes 5.0x4.5) by Push through method with RH Girder on BSL- M/s Shree Anukul
72
BD section.(Umbrella 2020-21,PB No-219,Project ID:- LOA dt.02.08.2021 Industries Pvt. Ltd. Of ₹ 191,959,370.39 02.08.21 01.11.22 9
01.01.30.21.1.00.003) 4.)Closure of LC no. 10A at kms 482/16-18 between Mumbai
Bodwad-Khamkhed station by provision of subway (RCC Box of sizes
5.0x4.5) by Push through method with RH Girder on BSL-BD
section.(Umbrella 2020-21,PB No-219,Project ID:- 01.01.30.21.1.00.003)
5.)Closure of LC no. 11 at kms 483/24-26 between Bodwad-Khamkhed
station by provision of subway (RCC Box of sizes 5.0x4.5) by Push through
method with RH Girder on BSL-BD section

(B) Bhusawal Division- 1.)Closure of LC no. 15 at kms 503/18-20 between


Wadoda-Biswa bridge station by provision of subway (RCC Box of sizes
5.0x4.5) by Push through method with RH Girder on BSL-BD section.
(Umbrella 2020-21,PB No-219,Project ID:- 01.01.30.21.1.00.003)
2.)Closure of LC no. 16 at kms 514/16-18 between Biswa bridge-Nandura M/s Deep
73 station by provision of subway (RCC Box of sizes 5.0x4.5) by Push through LOA dt.02.08.2021 Construction of ₹ 115,487,583.26 02.08.21 01.11.22 7
method with RH Girder on BSL-BD section.(Umbrella 2020-21,PB No- Lasalgaon
219,Project ID:- 01.01.30.21.1.00.003) 3.)Closure of LCs no. 26 at kms.
543/14-16 between Jalamb-Shegaon station by provision of subway (RCC
Box of sizes 5.0x4.5) by Push through method with RH Girder on BSL-BD
Section
Details of Ongoing Contractual works under Bhusawal to Badnera section of Bhusawal Division

Extended Nos. of
Name of
SN Name of work CA No & date Cost of C.A. LOA dt Compl.dt. date of Labours
Contractor
Compl. Engaged

(C1) Bhusawal Division- 1.)Closure of LCs no. 29 at kms. 551/22-24


between Shegaon-Nagziri station by provision of subway (RCC Box of sizes
5.0x4.5) by Push through method with RH Girder on BSL-BD Section.
(Umbrella 2020-21,PB No-219,Project ID:- 01.01.30.21.1.00.004)
2.)Closure of LCs no. 31 at kms. 559/08-10 between Nagziri-Paras station M/s Deep
74 by provision of subway (RCC Box of sizes 5.0x4.5) by Push through method LOA dt.10.08.2021 Construction of ₹ 114,077,583.04 10.08.21 09.11.22 7
with RH Girder on BSL-BD Section.(Umbrella 2020-21,PB No-219,Project Lasalgaon
ID:-01.01.30.21.1.00.004) 3.)Closure of LCs no. 32 at kms. 561/02-04
between Nagziri-Paras station by provision of subway (RCC Box of sizes
5.0x4.5) by Push through method with RH Girder on BSL-BD Section

(C2) Bhusawal Division- 1.)Closure of LCs no. 33 at kms. 569/09-11


between Paras-Gaigaon station by provision of subway (RCC Box of sizes
5.0x4.5) by Push through method with RH Girder on BSL-BD
Section.(Umbrella 2020-21,PB No-219,Project ID:- 01.01.30.21.1.00.004)
2.)Closure of LCs no. 34 at kms. 572/04-06 in Gaigaon Yard by provision M/s Shree Anukul
75 of subway (RCC Box of sizes 5.0x4.5) by Push through method with RH LOA dt.09.08.2021 Industries Pvt. Ltd. Of ₹ 114,031,203.24 09.08.21 08.11.22
Girder on BSL-BD Section.(Umbrella 2020-21,PB No-219,Project ID:- Mumbai
01.01.30.21.1.00.004) 3.)Closure of LCs no. 36 at kms. 576/10-12
between Gaigaon-Akola station by provision of subway (RCC Box of sizes
5.0x4.5) by Push through method with RH Girder on BSL-BD Section

(D) Bhusawal Division- 1.)Closure of LCs no. 46 at kms. 606/07-09


between Borgaon-Katepurna station by provision of subway (RCC Box of
sizes 5.0x4.5) by Push through method with RH Girder on BSL-BD
Section.(Umbrella 2020-21,PB No-219,Project ID:- 01.01.30.21.1.00.001)
2.)Closure of LCs no. 48 at kms. 611/31-33 between Katepurna- M/s Vijaya Infra
76 Murtizapur station by provision of subway (RCC Box of sizes 5.0x4.5) by LOA dt.02.08.2021 Project Pvt. Ltd. Of ₹ 115,713,067.14 02.08.21 01.11.22
Push through method with RH Girder on BSL-BD Section.(Umbrella 2020- Mumbai
21,PB No-219,Project ID:- 01.01.30.21.1.00.001) 3.)Closure of LCs no. 49
at kms. 614/01-03 between Katepurna-Murtizapur station by provision of
subway (RCC Box of sizes 5.0x4.5) by Push through method with RH
Girder on BSL-BD Section

1. SSE (Wks) Murtizapur - Repairs to doors, windows, courtyard wall,


fencing, leaky Roofs, slabs, pathway, apron, chambers and drainage
arrangement of Railway staff quarters. (Total 157 Nos) 2.Heavy repairs to M/s M.V. Motwani of
77 LOA dt.05.08.2021 ₹ 11,338,181.46 05.08.21 04.05.22 4
doors, windows, leaky roofs, pipe lines & water supply system under SSE Murtizapur
(Wks) Badnera Jurisdiction. (Total 38 Nos).
Details of Ongoing Contractual works under Bhusawal to Badnera section of Bhusawal Division

Extended Nos. of
Name of
SN Name of work CA No & date Cost of C.A. LOA dt Compl.dt. date of Labours
Contractor
Compl. Engaged

Miscellanious P.Way work under SSE(P.Way)Akola under ADEN Akola M/s Shrinivasha
jurisdiction. Construction and
78 LOA dt.05.08.2021 ₹ 12,628,750.45 05.08.21 04.08.22
Supplier of
Ahemadnagar
TSR/P-10.35 kms with TRT with deep screening by BCM in Jalgaon-
M/s Track Tech of
79 Bhusawal & Bhusawal-Badnera section in Bhusawal Division LOA dt.10.08.2021 ₹ 10,986,938.99 10.08.21 09.02.22
Prayagraj
ADEN(W)Akola jurisdiction-Miscellaneous repairs to various bridges like
M/s A. S.
80 (Repairs to WW/EW, Flooring/Apron, Ballast wall, waterway cleaning etc. LOA No. 0040602 ₹ 19,081,920.82 26.08.21 25.02.22
Construction of PA
(Rev.21-22)
Bhusawal Division:- TBCSR (H Beam)-2415Nos. UIWP 2021-22 (PID No.
LOA No.45337 Eastern Hardware
81 01.01.31.21.1.10.008) Out of which under ADEN Akola, Badnera & ₹ 60,385,085.94 23.11.21 22.08.22
dt.23.11.2021 Mart of Kolkata
(Line)Bhusawal =2142 Nos
Misc. Pway work under SSE(P.way)BDWD under ADEN Akola jurisdiction.
LOA No. 45337 dt M/S Bindu Project
82 ₹ 13,706,454.09 05.01.22 04.01.23
23.11.2021 co. of Bangaluru
GIS Mapping of Off-track assets of BSL Division
83 LOA dt 21.12.2020 SKY Technology of NK ₹ 576,918.95 21.12.2020 20.02.21
ADEN(West)Akola sub division- supplying potable water by Tanker at LOA NO.
84 Railway colony under SSE(Wks)Akola’s section. (ZBB- 2021-22) 01414080048993 Madhur Jal of Akola ₹ 1,800,265.65 01.02.2022 31.01.2023
dated0 01.02.2022
ADEN(West)Akola jurisdiction- Supplying potable water from private party
in summer at station Varangaon, Bodwad, Khamkhed, Malkapur, Wadoda,
LOA
85 Biswa Bridge, Khamgaon Burty, Nandura, Jalamb, Khamgaon, Shegaon, S. V. Kale ₹ 5,394,059.00 01.02.2022 31.01.2023
No.889880049002
Nagziri, Gaigaon & Paras. (ZBB 2021-22)

a) Rebuilding of various small span bridges including ORN-3 bridges .


(33Nos) b) Rehabilitation to ORN-3 arch bridge No. 504/1, 588/3 (2 Nos) c)
Extension & Strength ening of apron at Br. No.532/3. U 20-21 PID No. LOA No.
86 01.01.32.20.1.11.001 Part A1- (a) Rebuilding bridges between KMs 451 to Abhijit Projects ₹ 87,622,744.23 08.02.2022 07.08.2023
00854100049401
484 & Kms 585 to 662 =25 Bridges, (b) Rehabilitation to ORN-3 arch
bridge No. 588/3= 1 Bridge.

(A)Biswa bridge - Extension of loop line at Biswa-Bridge station to achieve


753 m CSR. (01.01.16.19.3.50.009) (Trackwork) (BNandura - Extension of
loop line at Nandura station to achieve 753 m CSR. (01.01.16.19.3.50.009)
(Trackwork) (C)Jalamb - Extension of loop line at Jalamb station to achieve LOA No. Narayansingh B.
87 753 m CSR. (01.01.16.19.3.50.009) (Trackwork) (D)BadneraYard 00981880053816 Pawar of ₹ 16,029,987.74 04.05.2022 04.08.2023 10
remodelling for provision of additional goods loop line of 753 m CRS in UP dated-04/05/2022 Dhamangaon Rly
direction. (01.01.16.19.3.50.005) (Trackwork)
Details of Ongoing Contractual works under Bhusawal to Badnera section of Bhusawal Division

Extended Nos. of
Name of
SN Name of work CA No & date Cost of C.A. LOA dt Compl.dt. date of Labours
Contractor
Compl. Engaged

Amaravati (C&W):- (1)Provision of staff Room with attached Lav(5x4M). (2)


Provision of SSE's office withattached Lav. (5x4M) (3) Provision of
Ladiesstaff Room with attachedLav.(5x4M) (4)Provision of fencing with
barbed wire on toptowards main line (650m long) (5) Proposedapproach
road by concreting from Rajapeth toC&W Depot.(160M Length) in LOA No. M/s SIDDHIVINAYAK
88 connection withBhusawal Up gradation of Coaching Pit lineexamination 00831060053295 CONSTRUCTION ₹ 15,018,428.96 25.04.2022 25.01.2022 3
facilities at various coachingdepots (LAW Book 2019-20 under PH-42) dated 25/04/2022 COMPANY-THANE
{IDNo.01.01.42.19.3.16.003}(DF-III) (2) Shegaon(RPF)- Construction of RPF
Thana with basicamenities at Shegaon. Project IDNo.01.01.64.21.3.50.001

1.)Provision ofarrangement to arrest water logging at LHSprovided in lieu of


LC No-13 at kms.499/10-12 (MKU-WDD) underADEN/W/AKOLA
jurisdiction.(WP20-21,PB219)ProjectID:- 01.01.30.21.3.50.0132.)Provision
of arrangement to arrest waterlogging at LHS provided in lieu of LC No-14
at kms. 502/02-04 (MKU-WDD) underADEN/W/AKOLA jurisdiction.(WP20- LOA No.
21,PB-219) Project ID:- 01.01.30.21.3.50.0183.)Provision of arrangement M/s SIDDIQUI
89 01373600053491 ₹ 21,168,081.02 27.04.2022 27.08.2022
to arrest waterlogging at LHS provided in lieu of LC No- BROTHERSNAGPUR
dated 27/04/2022
55A at kms. 633/29-31(Mana yard) underADEN Badnera
jurisdiction.(WP20-21,PB-219) Project ID:- 01.01.30.21.3.50.016.

Miscellaneous P.way work under SSE(P.way) Murtizapur under ADEN


BADNERA jurisdiction. M/s VIRENDRA
LOA No.-
CONSTRUCTION
90 0995280054415 ₹ 15,753,167.26 13.05.2022 13.05.2023 19
AND ENGINEERING
dated- 13/05/2022
COMPANYBHOPAL

(A)Biswa bridge -Extension of loop line at Biswa-Bridge station to achieve


753 m CSR. (01.01.16.19.3.50.009) (Civilwork) (B) Nandura - Extension
of loop line at Nandura station to achieve 753 m CSR. LOA No.
(01.01.16.19.3.50.009) (Civilwork) (C) Jalamb - Extension of loop line at M/s KHUSHAL INFRA-
91 01049810055043 ₹ 7,572,242.80 26.05.2022 26.03.2023
Jalamb station to achieve 753 m CSR. (01.01.16.19.3.50.009) (Civilwork) NAGPUR
dated 26.05.2022
(D) Badnera - Yard remodelling for provision of additional goods loop line of
753 m CRS in UP direction. (01.01.16.19.3.50.005) (Civilwork)

Supplying and loading of crushed stone (Grit dust) & Boulder in LOA No.
M/s SHRI J P
92 open/closed wagons for monsoon rake at KURUM station 2000 m3 on 00848080056748 ₹ 4,898,577.36 24.06.2022 24.10.2022
KHOSLA- AKOLA
BHUSAWAL division. dated 24.06.2022
Annual Sectional Contract Zone No.1 for ADEN Badnera for Repairs and
maintenance with white washing etc for Akola(Ex.)to Badnera (Incl.) & LOA No. M/s M V MOTWANI
93 Amravati(Incl.) and Amravati - Chandur-bazar section& with Murtizapur 10715800056932 AND ₹ 21,600,000.00 29.06.2022 29.06.2024
-Yavatmal,Murtizapur -Achalpur Section dated 29.06.2022 SONSMURTIZAPUR

Murtizapur-(i) TSS office Murtizapur(TRD office) Asphalting of front road of


LOA No. M/s YASHPAL
TSS office (ii) Asphalting of road surface from existing Saltoda village road
94 10219740057821 DAYARAM ₹ 8,377,120.00 11.07.2022 11.01.2023
to Saltoda Pump house under SSE(W)Murtizapur's jurisdiction.
dated 11.07.2022 SHARMA-AKOLA
ADEN Badnera Jurisdiction:- (i)Repairs to drain infront of Running room
Badneraand behind quarters at Badnera (BD), NewAmaravati (NAMI),
LOA No. M/s M V MOTWANI
Walgaon & Chandur Bazar(CNDB) under ADEN Badnera section. (ii)
95 10715800059498 AND SONS- ₹ 6,543,549.84 04.08.2022 04.04.2023
Badnera-Repairs to Doors, windows, circulating area anddrain of running
dated 04.08.2022 MURTIZAPUR
room at Badnera railway station.
Details of Ongoing Contractual works under Bhusawal to Badnera section of Bhusawal Division

Extended Nos. of
Name of
SN Name of work CA No & date Cost of C.A. LOA dt Compl.dt. date of Labours
Contractor
Compl. Engaged

A. Provision of FOB span alongwith staircase and adjoining COPs to


LOA No.
provideconnectivity to all platforms at Murtijapur, Badneraand Malkapur M/s PITAMBER
96 00866720059574 ₹ 72,842,215.89 05.08.2022 05.11.2023
stations. (Project ID:01.01.53.21.1.50.009) VENSI-JALGAON
dated 05.08.2022
B. Provision of ramp to FOBat Shrikshetra Nagzhari and Jalamb. Extension
Borgaon Station :- Augmentation ofGoods shed facilities at Borgaon. (ID LOA No. M/s YASHPAL
97 No.01.01.16.21.1.13.002.) 10219740059571 DAYARAM SHARMA- ₹ 28,896,052.65 05.08.2022 05.06.2023
dated 05.08.2022 AKOLA
Borgaon Station :-Augmentation of Goods shed facilities at LOA No.
M/s SUMIT KUMAR
98 Borgaon(Trackwork). (ID No. 01.01.16.21.1.13.002.) 10495830060022 ₹ 1,927,322.22 16.08.2022 16.04.2023
RAI-JHANSI
dated 16.08.2022
Provision of 07 Lifts underSr.DEN/East section - 07 No. of lift (At - AKOLA-
LOA No. M/s NAWALKISHOR
01, MALKAPUR - 02, BADNERA - 03 andSHEGAON - 01 stations) on
99 00869310060021 MITTAL ANDSONS- ₹ 33,324,214.26 16.08.2022 16.08.2023 8
BHUSAWALDivision
dated 16.08.2022 BHUSAWAL
(Project ID 01.02.53.18.3.00.038(WP -2018-19))
Malkapur to Shegaon section:-Balance work of Heavy repairs to drain in
cuttingbetween (i) Km 498/21 to 499/09=2x800 (Up &Dn)=1600M, (ii) Km
500/15 to 500/01=2x500 (Up &Dn)=1000M (iii)Km 501/13 to 501/17
=2x150 (Up &Dn)=300M. (iv) Km 503/09 to 503/17=2x270(Up &Dn)=540M
(v) Km 506/23 to 507/01=2x500 (Up &Dn)=1000M & ends LOA
M/s NARESH B
100 5x2x2x10=200M.(Total length4700M) ZBB-2020-21. No.00863330060773 ₹ 31,824,970.00 29.08.2022 29.08.2023
AGGARWAL-AKOLA
Shegaon-Balance work ofHeavy repairs to water supply pipe line from dated 29.08.2022
Junglewell to RCC tank at Dn side colony with repairs toexisting water
supply arrangement and boundarystones to prevent railway land. (ZBB-
2021-22)

TRR/P- 12.703 Tkms and TFR- 67.718 Tkms in BHUSAWAL-BADNERA LOA No.-
M/s SURESH CHAND
101 section under Sr. DEN (East) BHUSAWAL's Jurisdiction. 00798820061270 ₹ 11,665,455.43 06.09.2022 06.09.2023
GUPTA-JHANSI
dated 06.09.2022
Through sleeper renewal on Touts (1:8.5-1 nos. and 1:12-6 nos. Total 7
LOA No.-
nos.) and TTR-Complete sets (Total 4.0 nos. of 1:8.5 Touts)in BHUSAWAL- M/S Vishi Rail Infra-
102 01352830061728 ₹ 2,136,491.80 12.09.2022 12.09.2023
AKOLA section under Sr. DEN (E) BHUSAWAL's jurisdiction. Noida
dated 12.09.2022
Badnera (Goods Shed)- Provision of approach road and remaining portion
of BADNERA goods shed Bhusawal end by released concrete sleeper at
LOA No.-
BADNERA Goods shed in connection with BSL-BD- Improvement to Goods M/s SIDDIQUI
103 01373600061422 ₹ 8,501,502.38 07.09.2022 07.03.2023 9
shed facilities at Nasik, Khandwa and Badnera Goods shed.(ID No. BROTHERS-NAGPUR
dated 07.09.2022
01.01.16.19.3.50.013 )( Allocation- RRSK 291662)

Deep screening of T/out byBCM total 102 nos. in Bhusawal-Badnera


M/s VIRENDRA
sectionunder Sr. DEN (East) Bhusawal Jurisdiction. LOA No.-
CONSTRUCTION
104 00995280060657 ₹ 9,506,048.55 26.08.2022 26.08.2023
ANDENGINEERING
dated 26.08.2022
COMPANY-BHOPAL
TBR 26.985 Tkms (14.635 byBCM+ 12.35 by manual) in BHUSAWAL-
M/s VIRENDRA
BADNERA section under Sr. DEN (East)jurisdiction. LOA no-
CONSTRUCTION
105 00995280061473 ₹ 14,919,031.27 08.09.2022 08.09.2023
ANDENGINEERING
dated 08.09.2022
COMPANY-BHOPAL
Details of Ongoing Contractual works under Bhusawal to Badnera section of Bhusawal Division

Extended Nos. of
Name of
SN Name of work CA No & date Cost of C.A. LOA dt Compl.dt. date of Labours
Contractor
Compl. Engaged

Balance work of -(i)Murtizapur-Heavy Repairs to water supply pipeline,


distribution pipe line of Murtizapur Railwayquarter and station. (ZBB 2021-
LOA No.- M/s VIJAY HINGU
22)
106 00844850062131 YADAV- ₹ 15,125,183.06 19.09.2022 19.06.2022
Balance workof - (ii)Badnera - Repairs of existing water supplypipe at
dated-19.09.2022 JALGAONBHUSAWAL
Badnera under ADEN Badnera SubDivision (Well 412 & Triangle well etc)
(ZBB2021-22)
Provision of arrangement toarrest water logging at LHS provided in lieu of LOA NO.- M/s YASHPAL
107 LCNo-61 at kms.652/24-26 (Kurum-Takli) underADEN BADNERA 10219740061400 DAYARAM SHARMA- ₹ 6,598,827.10 07.09.2022 07.01.2023
jurisdiction. (UWID -010130213020) dated 07.09.2022 AKOLA
A. BADNERA -Augmentation in facilities for Divyangjan - improvement in
the circulating area for seamless movement of differently abled passengers
by providing slander rams with railing, for barrier free entry , onsleepery
tactile paving using braille tile with signages, mprovement of water booth,
improvement of toilets. (Project Id- 01.01.53.21.3.50.001) B. LOA No.- M/s ADITYA
108 Provision/Upgradaion/Renovation of Divyangjan amenities at MANA, BGN, 00837200062722 CONSTRUCTION- ₹ 60,407,151.38 28.09.2022 28.12.2023
YAD, KTP (MZR Jurisdiction), BD, AMI, WLGN, KUM, CNDB, NAVI (BD dated 28.09.2022 KALYAN
Jurisdiction) & SEG and NN. (Project Id- 01.01.53.21.1.50.004) C. AKOLA -
provision of 1 No. Escalator on RMS side AKOLA Station.

Annual Sectional Contract Zone No.1 for ADEN (West)Akola for Repairs and LOA No.
P N AGARWAL-
109 maintenance with white washing etc for Bhusawal (Ex.) to Akola (Incl.) with 00860470063355 ₹ 26,399,999.99 10.10.2022 31.06.2024
AKOLA
Jalamb-Khamgaon section. dated 10.10.2022
A:- Urgent repairs to Deck slab & Steps of FOB at Jalamb Station B:-
Urgent repairs and raising of platform surface ( balance Portion) with
improvement to water supply system at Jalamb Station. C:- ADEN AK LOA no.
P N AGARWAL-
110 section:- Urgent repairs to water supply system (Bore well, pipeline, with 00860470063358 ₹ 25,473,706.58 10.10.2022 7/10/2023
AKOLA
water storage tank) at Jalamb, Nandura, Khumgaon burti, Biswa and dated 10.10.2022
Wadoda under SSE(W)SHEGAON jurisdiction. (ZBB-22-23).

Khamgaon - Proposed yard remodeling for augmentation of Goods shed LOA no.
N S MANWANI-
111 capacity and extension of passenger platform for 16 coaches. 10530360064178 ₹ 80,562,661.58 20.10.2022 4/20/2024
BHUSAWAL
(01.01.16.19.3.50.010) (Civilwork) dated 20.10.2022
A. Badnera Goods Shed - Repairs to existing road by asphalting at Badnera
LOA no. SURYADEVARA
Goods Shed. B. Badnera - Repairs to existing road by asphalting at Gandhi
112 00829760064228 SAMBASIVA RAO- ₹ 9,566,273.21 20.10.2022 7/20/2023
Vidyalaya and Panch Bunglow Colony Badnera
dated 20.10.2022 KRISHNA

A - AKOLA - Repair to circulating area Entry Exit Gate ,PF surface ,Water
stand ,Toilets,Seating arrangment at PF -1,2,3 and dismantling of old FOB LOA No. M/s
113 at Akola. B - SHEGAON to MALKAPUR urgent repairs to platform surface 00844830065583 dtd SURENDRAKUMAR ₹ 28,622,479.34 11.11.2022 11.11.2023
,water stand post,service building ,sitting arrangments of SSE(Works) 11.11.2022 AGRAWALJALGAON
SHEGAON Jurisdiction with Dismantling of old FOB of NANDURA Station.

(A)New Khamkhed- Standardisation of layout by providing loop line in both


LOA no. M/s NARAYANSINGH
direction. (01.01.16.19.3.50.014) (Trackwork) (B)Khamgaon - Proposed
114 00981880065962 dtd B PAWAR-AMRAVATI ₹ 18,548,990.00 17.11.2022 17.02.2024
yard remodeling for augmentation of Goods shed capacity and extension of
17.11.2022
passenger platform for 16 coaches. (01.01.16.19.3.50.010) (Trackwork)
Details of Ongoing Contractual works under Bhusawal to Badnera section of Bhusawal Division

Extended Nos. of
Name of
SN Name of work CA No & date Cost of C.A. LOA dt Compl.dt. date of Labours
Contractor
Compl. Engaged

(i)Varangaon- Provision of New AXLE counter room (4X5.5M) ABS


equipment and Maintainer's room (4X5.5M) @ Varangaon station.
(ii)Bodwad- Provision of New AXLE counter room (4X5.5M) ABS equipment
and Maintainer's room (4X5.5M) @ Bodwad station in connection with
provision of automatic block signalling between VNA-AK
section(iii)Malkapur- Provision of New AXLE counter room (4X5.5M) ABS
equipment and Maintainer's room (4X5.5M) @ Malkapur station in
connection with provision of automatic block signalling between VNA-AK
section(iv) KMKD-MKU IBH- Provision of Equipment and Maintainer room
(3.50X5.5M), ABS equipment and power room (4X5.5M) and new ABS relay
room (4X5.5M) @Km 489.500 (Between KMKD-MKU station) (v) MKU-WDD
M/s JAIN METALAND
IBH- Provision of Equipment and Maintainer room (3.50X5.5M), ABS LOA No.
MATERIAL SUPPLY
115 equipment and power room (4X5.5M) and new ABS relay room (4X5.5M) 00855990070258 dtd ₹ 22,360,745.77 23.01.2023 23.10.2023
CORPORATION-
@Km 494.26 (Between MKU-WDD station) (vi)Nandura- Provision of New 23.01.2023
JALGAON
AXLE counter room (4X5.5M), ABS equipment and Maintainer's room
(4X5.5M) @ Nandura station in connection with provision of automatic
block signalling between VNA-AK section(vii)Biswa Bridge- Provision of
equipment room (4X5M), ABS equipment and Maintainer's room (4X6M) @
Biswa Bridge station in connection with provision of automatic block
signalling between VNA-AK section(viii)Jalamb- Provision of New AXLE
counter room (4X5.5M), IPS and power equipment room (4X5.5M), ABS
equipment and Maintainers room (3.50X5.5MM) @Jalamb station (ix) PS-
NGZ IBH- Provision of equipment and Maintainers room, ABS equipment
and power room and new ABS relay room @Km 559.235 (Between Paras-
Nagziri station) .(x)Paras- Provision of New AXLE counter room, IPS and
power equipment
Miscellaneous ,ABS
P.way equipment
work and Maintainers
under SSE(P.way) roomunder
BADNERA @ Paras station in
ADEN LOA No. M/S BHAGWATI
116 BADNERA jurisdiction. 10253380070781 dtd ASSOCIATES- ₹ 22,296,245.80 01.02.2023 01.02.2024
01.02.2023 JALGAON
A. BADNERA - Repairs to Platform Surfacing on PF No.-1 & 2. B.
BADNERA-CHANDUR BAZAR section:-Repairs to kachha Side Drain on
LOA No. M/S DHARMENDRA
mid-section of BD-CNDB Single Line section SSE/Wks/BADNERA
117 00868550071815 dtd NARAYANDAS KELA- ₹ 16,686,886.44 16.02.2023 16.11.2023
jurisdiction under ADEN Badnera. Locations Km 690/0 to 691/400 =
16.02.2023 AKOLA
1.400 Km Both side. (Rev-2022-23)

A.BODWAD - 2nd class Waiting hall B. Nandura- Devlopment of LOA No. M/s CHANDAK
118 Circulating area, entry-exit gate &renovation of Waiting Room C.SHEGAON- 10101730073023 CONSTRUCTIONS- ₹ 33,045,847.50 08.03.2023 08.03.2024
Soft upgrade dtd 08.03.2023 AKOLA
Badnera (RPF):-Proposed construction of 25 Bedded RPF Barrack at
Badnera in connection with construction of 25 Bedded RPF Barrack at 10715800078689 dt M V MOTWANI AND
119 ₹ 15,024,038.00 07.06.2023 07.03.2024
KNW & BD under Umbrella works under PH-64 ( ID 07.06.2023 SONS-MURTIZAPUR
No.01.01.64.22.1.50.001)

M/s VIRENDRA
Miscellaneous P.way 00995280082880 CONSTRUCTION AND
120 ₹ 16,041,447.16 28.07.2023 28.07.2024
work under SSE(P.way) SHEGAON under ADEN AKOLA jurisdiction. dated 28.07.2023 ENGINEERING
COMPANYBHOPAL

Total Contract Cost of Works between Bhusawal-Badnera section ₹ 4,000,078,232.19 174


Details of ongoing Contractual Works under Bhusawal Headquarter section of Bhusawal Division
Date of Extended
Sr. Date of Nos.of Labours
Name of work/contract. C.A.No.& Date. Name of Contractor. Cost of work/ Contract. Rs. Commence- Date of
No. completion Engaged
ment. Compl.
(1) BHUSAWAL :- Repairs to platform surface to get standard
Shri.Vinodkumar
height of platform No.1/3 and platform edge engraving for
Mohanlal,
Divyangjan Passengers. (2) BHUSAWAL:- Repairs to platform
Rly.Contractor,
surface to get standard height of platform No.4/6 and platform edge A/2017-2018/C/23
1 "Pitruchhaya"Infront ₹ 23,330,556.08 2/7/2018 11/6/2018 30.08.2022
engraving for Divyangjan Passengers. (3) BHUSAWAL:- Repairs to Dtd.15-3-2018
of Talathi Office,
improvement to AC sheet roof by PPGI roof and polycarbonate sheet
Jamner Road,
for natural lighting for platform No.1/3 and Old FOB.(CR-USSOR-
Bhusawal.
2011).
(1) BHUSAWAL (Central Zone) :- Proposed 3.0 Lakh liters capacity
M/S. VILAS PATIL &
RCC HS tank of 20 M. height at Bhusawal (DPWP-2017-2018). (2)
ASSOCI-
BHUSAWAL (Central Zone):- Proposed rising main and distribution
ATES,Railway
net work for HS tank supplying water to Central Zone Area. (DPWP-
A/2018-2019/C/09 Contractor, 14-People
2 2017-2018). (As per CR-USSOR-2011). ₹ 13,224,729.39 2/9/2018 2/8/2019 30.10.2022 8
Dtd.10-5-2018 Bank Colony,
Shanti Nagar,
BHUSAWAL.

BHUSAWAL DIVISION - (1) BHUSAWAL (RPF) :- Augmentation of


amenities for Male/Female RPF staff in RPF reserve Line at
Bhusawal. (2) BHUSAWAL (RPF):- Repairs to compound wall and Sudha Devi,
A/2018-2019/C/18
3 main gate in RPF reserve Line at Bhusawal (3) BHUSAWAL :- Contractor ₹ 9,318,107.05 5/17/2018 3/19/2019 30.08.2022 5
Dtd 28-6-2018
Provision of ladies toilets on work place at various Offices, Sheds, Bokaro/Jharkhand.
SSE/SE Depots, Stations etc.(06 Nos) at Bhusawal. (CR-USSOR-
2011).
BHUSAWAL :- Constructions of new model running room building
M/S. S.J.S. Nakoda,
having 250 beds along-with all amenities.(CR-USSOR-2011).
(JV) Contractor,“Opp-
A/2018-2019/C/22 Surana Building”
4 ₹ 96,552,703.26 7/5/2018 7/4/2019 31.10.2022
Dated. 19.9.2018 Anand Nagar,
Jamner Road,
Bhusawal.
Details of ongoing Contractual Works under Bhusawal Headquarter section of Bhusawal Division
Date of Extended
Sr. Date of Nos.of Labours
Name of work/contract. C.A.No.& Date. Name of Contractor. Cost of work/ Contract. Rs. Commence- Date of
No. completion Engaged
ment. Compl.
(1) BHUSAWAL :- Provision of COP on platform No.1/3 both ends
and on platform No.4/6 (Both end). and platform No.7/8 (Middle
Portion) and SHEGAON:- Extension of COP on platform No.1/2 ( at M/S.M.S.Jain,
Badnera end, middle portion & infront of old station building Total Contractor, Plot
1300 Sqm). (Umbrella Work). (Project ID -01.01.53.18.3.50.004). (2) A/2018-2019/C/23 No.13, Ring road,
5 ₹ 66,209,355.02 18--9-2018 9/17/2019 31.12.2022 6
BURHANPUR & KHANDWA:- Proposed extension of COP on Dtd.17-10-2018 Near Dr.Rote side of
platform No.2(144 x 8.5 M) at Burhanpur and Platform No. 1&2 Koranne Clasess, of
(128 x 16 M) at Khandwa Station. (Project ID- Jalgaon.
01.01.53.18.3.50.005). ( As per USSOR-2011).

(1) BHUSAWAL (Central Zone) :- Repairs to colony road surface by M/S.Yogaraj


asphalting in Central Zone Area. (2) Bhusawal(Filter Plant):- Heavy Constructions,
repairs to road surface by asphalting of Railway Hospital, Railway Contractor, Plot
A/2018-2019/C/24
6 School, Filter Plant Road, Inside road of DRM's Office Road and Side No.168, At & Post- ₹ 12,416,647.66 7/25/2018 1/24/2019 31.05.2021 8
Dtd.17-10-2018
drain, Out let wash out drain at filter Plant. (As Per CR-USSOR- Khamkheda, Tal-
2011). Muktainagar, Distt-
Jalgaon.
(1) BHUSAWAL DIVISION: - Provision of boundary wall on both side
M/S. VILAS PATIL &
of Railway land at various locations to avoid tress passing on
ASSOCI-
Igatpuri to Badnera and Bhusawal- Khandwa Section under
ATES,Railway
Divisional Engineer (Spl/Works) Bhusawal. (2) BHUSAWAL:-
A/2018-2019/C/29 Contractor, 14-People
7 Provision of boundary wall in 40 blocks area and Kandari Railway ₹ 47,179,718.80 10/16/2018 1/15/2020 30.06.2022 6
Dtd.07-12-2018 Bank Colony,
Colony for protection of encroachments. ( As per USSOR-2011).
Shanti Nagar,
BHUSAWAL.

BHUSAWAL :- (1) Proposed construction of Railway Quarters 82


M/S. VILAS PATIL &
Units + 8 Units = Total 90 Units RB-II type of staff Quarters and 20
ASSOCI-
Units + 8 Units = total 28 Units RB-III type Staff Quarters at
ATES,Railway
Bhusawal in connection with Manmad-Jalgaon 3rd Line and
A/2019-20/C/01 dt Contractor, 14-People
8 Jalgaon Bhusawal 4th Line. (2) Proposed construction of officers ₹ 115,991,719.22 24.12.2018 23.12.2019 30.06.2022 9
04.04.2019 Bank Colony,
Rest House 4 rooms and Sub-Ordinate Rest House 4 rooms at
Shanti Nagar,
Bhusawal Division in connection with Jalgaon-Bhusawal 4th Line.
BHUSAWAL.
(As per CR-USSOR-2011).
Details of ongoing Contractual Works under Bhusawal Headquarter section of Bhusawal Division
Date of Extended
Sr. Date of Nos.of Labours
Name of work/contract. C.A.No.& Date. Name of Contractor. Cost of work/ Contract. Rs. Commence- Date of
No. completion Engaged
ment. Compl.
Bhusawal(ELW): Rain water harvesting work at ELW Bhusawal.
M/S. VILAS PATIL &
ASSOCI-
ATES,Railway
A/2019-20/C/06 dt Contractor, 14-People
9 ₹ 21,647,813.68 03.4.2019 02.10.2019 02.05.2022 6
009.5.2019 Bank Colony,
Shanti Nagar,
BHUSAWAL.

BHUSAWAL-DIVISION (1) Bhusawal(Central Zone):- Repairs to


courtyard walls of RB-I,II,III type staff Quarters of Central Zone at
Bhusawal Station (61 Units). (2) BHUSAWAL:- Repairs to fencing
under Assistant divisional Engineer (HQ)Bhusawal jurisdiction at
Loco Area, 15 Block and central Zone to protect land vacated from M/S. VILAS PATIL &
encroachment. (Length=3.85 KM). (3) BHUSAWAL:- Heavy repairs to ASSOCI-
roof leakages, courtyard drain, flooring, apron of RPF Gangotri ATES,Railway
Colony in 40 Blocks area. (Total 94 Units). (4) BHUSAWAL:- Heavy A/2019-20/C/10 dt Contractor, 14-People
10 ₹ 34,502,044.94 24.5.2019 23.11.2019 30.04.2021 6
repairs to flooring of RB-I,II,III and MB type staff Quarters at 15 04.7.2019 Bank Colony,
Blocks at Bhusawal (Total 387 Units). (5) BHUSAWAL (Kandari):- Shanti Nagar,
Heavy repairs to existing underground water storage tank. (ZBB- BHUSAWAL.
2018-19). (6) BHUSAWAL(15 Blocks):- Repairs to pipe line, PVC
tank for staff Quarters in POH colony, 15 Block area. (ZBB_2017-
2018).

BHUSAWAL :- Periodical cleaning of overhead and underground PANTANE


water tanks of various capacity and staff Quarters, Service HEALTHCARE
Buildings & various colonies. (For 02 (Two) years and Two times in SOLUTIONS,
A/2019-20/C/16
11 each year ( ZBB-2018-2019). Contractor, D-34, ₹ 782,323.98 5/24/2019 5/23/2021 30.09.2021 5
dt28.8.2019
MIDC Ind. Area,
Hingna NAGPUR.
Details of ongoing Contractual Works under Bhusawal Headquarter section of Bhusawal Division
Date of Extended
Sr. Date of Nos.of Labours
Name of work/contract. C.A.No.& Date. Name of Contractor. Cost of work/ Contract. Rs. Commence- Date of
No. completion Engaged
ment. Compl.
BHUSAWAL-DIVISION :- (1) BHUSAWAL (40 Blocks):- Repairs to
fencing of B, C, D & F type of Quarters with chain link fencing &
M/S. Vinodkumar
steel gates in 40 blocks area. (Total 98 Units). (2) BHUSAWAL
Mohanlal Jadwani,
(Kandari):- Repairs to flooring, doors and windows of staff Quarters
Rly.Contractor,
at Kandari. (3) BHUSAWAL (Kandari):- Repairs to fencing of RB-I, II, A/2019-20/C/17 dt
12 "Pitruchhaya" Infront ₹ 39,779,246.34 26.7.2019 25.7.2020 30.10.2022 7
III double storey staff Quarters at Kandari. (4) BHUSAWAL (Central 16.9.2019
of Talathi Office,
Zone):- Repairs to water supply pipe line in staff Quarters RB-II-176
Jamner Road,
to RB-II-193 Central Zone Area Bhusawal. (ZBB-2018-2019). (CR-
Bhusawal.
USSOR-2011).

Bhusawal: Repairs to staff quarters of Trackman in 40 Blocks and


Kandari area Bhusawal. Total 50 nos. Units. M/s Jha P and
Company, Azad Nagar
Colony,Opp. Golden
A/2019-20/C/21 dt
13 Textile, Khemani ₹ 6,174,681.39 23.9.2019 22.3.2020 31.12.2022 8
11.11.2019
Road,Ulhasnagar-
421002 (Thane)Mob.
No.9823648880

Bhusawal (Divisional Railway Managers Office):- Repairs to septic


tank ,drainage arrangement and circulating area. (ZBB-18-19). M/s Jha P and
Company, Azad Nagar
Colony,Opp. Golden
A/2019-20/C/22 dt
14 Textile, Khemani ₹ 2,295,840.22 27.9.2019 26.3.2020 31.12.2022 5
11.11.2019
Road,Ulhasnagar-
421002 (Thane)Mob.
No.9823648880

Bhusawal (Fiter Plant):Heavy repairs to water supply structures i.e.


M/s Well Track
filter Plant setting tank, Tapti pump house, pipe line stagings, water
Solutions OPC Pvt.
fitting etc. (ZBB-2019-20).
Ltd.
303, Sai Shardha
Appartment,
A/2019-20/C/24 dt
15 Jivdhani Nagar, V.S. ₹ 3,215,502.01 04.11.2019 03.5.2020 27.10.2021 5
21.11.2019
Marg,
Virar (East) Thane-
401305 (Palghar)
Mob. No.7028489324
Details of ongoing Contractual Works under Bhusawal Headquarter section of Bhusawal Division
Date of Extended
Sr. Date of Nos.of Labours
Name of work/contract. C.A.No.& Date. Name of Contractor. Cost of work/ Contract. Rs. Commence- Date of
No. completion Engaged
ment. Compl.
(Civil engineering portion work) – 1) Provision of escalator at
M/s Tulsi
Amravati and Akola station (Single escalator), (2) Provision of
Enterprises,
escalator at Nasik Road, Khandwa and Badnera station (01 Unit
Railway Contractor,
each), (3)Bhusawal- Repairs to old AC sheets by PPGI Sheet on
A/2019-20/C/25 dt 504, Hill Queen
16 PF.No.5/6 & 7/8 and repairs to valley gutter on PF no.4. ₹ 30,534,827.24 01.10.2019 30.9.2020 9
26.11.2019 Tower, O.T.Section,
Ulhasnagar-4
Mob. No.8459257181

Bhusawal:Provision of R.O.Plant 1000 LPH capacity on rental basis


for a period of 03(Three) years in DRM office.(ZBB-2019-20). Kirit Engineering,
(Through Quotation) Railway Contractor,
A/2019-20/C/26 dt 126, Ganesh Colony,
17 ₹ 467,457.50 30.9.2019 29.9.2022 29.09.2022
26.11.2019 Jalgaon
Mob.No.9822037396

Bhusawal: Maintenance of Garden, lawns and decorative plants.


Shri Babulal Munna
Bande,
Railway Contractor
Plot No.42, Padmavati
Nagar,
A/2019-20/C/28 dt
18 Varangaon Road, ₹ 2,812,399.81 25.11.2019 24.11.2020 30.04.2022 26
08.01.2020
Near Varsha Gas
Godown,
Bhusawal.
Mob. No.9673355859

Bhusawal (Filter Plant): Repairs to filter bed by over hauling of


under drain system changing of filter media, structural repairs of M/s Siddhivinayak
alum godown, aeration tower, clarifier, periodical desilting of jack Construction
well and duct line for Pump No. 1 to 6 at Tapti Pump House. (ZBB- Company,
2019-20). Railway Contractor,
Nav Everest Towers
CHS,
A/2019-20/C/31 dt
19 Bldg No.A, Flat ₹ 5,557,513.36 30.11.2019 29.5.2020 30.12.2021 5
10.02.2020
No.102,
Karnik Road,
Chikanghar,
Kalyan (West) Thane
Mob. No.8928407809
Details of ongoing Contractual Works under Bhusawal Headquarter section of Bhusawal Division
Date of Extended
Sr. Date of Nos.of Labours
Name of work/contract. C.A.No.& Date. Name of Contractor. Cost of work/ Contract. Rs. Commence- Date of
No. completion Engaged
ment. Compl.
Bhusawal DRM (Divisional Railway Manager’s) Office:- (I)Repairs to
broken chajja and windows in rear verandah of DRM office. (II) M/s Jha P and
Repairs to flooring of Battery Room, SCADA ROOM,UPS ROOM etc. Company
behind TRD Power control office premises in DRM,s office. (III) Azad Nagar Colony,
Repairs to broken UCR compound wall of DRM office premises. Opp. Golden Textile,
A/2019-20/C/34 dt
20 Khemani Road, ₹ 5,419,104.06 30.11.2019 29.5.2020 31.12.2022 10
23.3.2020
Ulhasnagar-421002
(Thane)
Mob. No.9823648880

Bhusawal: Improvement of canopy at south side entrance of


M/s Aditya
Bhusawal station to reduce water percolating down at main gate
Construction,
and resultant inconvenience to passengers
Railway Contractor,
A/2019-20/C/27 dt 3/A, Hudco Colony,
21 ₹ 10,923,432.24 30.11.2019 29.5.2020 29.03.2022 6
31.12.2019 Wanjola Road,
Bhusawal.
Mob. No.7875476056

Bhusawal Division - Annual Maintenance contract for carry out M/s. Genset Power
AMC for overhauling, Major repairing & replacement of spare Point
CR/BSL/Civil/2022
parts for Small Track Machines of Bhusawal Division for the year 1088, KHANDERAV
22 /0036 dt. ₹ 3,000,000.00 13.06.2022 12.06.2024 2
2022-23 & 23-24 NAGAR PIMPRALA,
02.08.2022
JALGAON JALGAON-
425001
Bhusawal (Zonal Railway Training Institute):- Proposed Phytoride
M/s Ecologique
Based Sewage Treatment Plant of 400 KLD capacity in ZRTI
Science Technik India
premises Bhusawal.(Environmental related work using 1% provision
Pvt. Ltd,
of sanctioned estimates )
CR/BSL/Civil/2020 39, Agne Layout, New
23 ₹ 17,768,931.26 29.01.2020 28.01.2021 3
/0021 dt 01.7.2020 Khamla Road,
Nagpur
Mob. No.7888017985
Details of ongoing Contractual Works under Bhusawal Headquarter section of Bhusawal Division
Date of Extended
Sr. Date of Nos.of Labours
Name of work/contract. C.A.No.& Date. Name of Contractor. Cost of work/ Contract. Rs. Commence- Date of
No. completion Engaged
ment. Compl.
1) Bhusawal(ELW)-Provision of garden in Work shop area inside and
M/s Raveena
outside. (2)Bhusawal(ELW):- Provision of Bore well for Garden work
watertech,
in ELW Bhusawal. (3)Bhusawal(ELW):- Supply, Erection,
G-17, Neha Industrial
commissioning and testing of 30KL/Day Sewage Treatment Plant
Estate,
in ELW Bhusawal
CR/BSL/Civil/2020 Opp. Tata SSL
24 ₹ 4,506,095.25 20.02.2020 19.11.2020
/0020 dt 09.7.2020 Dattapada Road,
Borivali (East)
Mumbai
Mob. No.9820132119

Bhusawal: Repairs to existing water supply system with recharge of


borewell in DRM office campus, Kandari area colony, ROH & MOH M/s Kavitesh
premises. (ZBB-19-20). Solution Pvt. Ltd
Plot No.69/70/71/A,
Thoke Nagar,
CR/BSL/Civil/2020
25 Hari Vihar, Near ₹ 1,411,830.17 13.02.2020 12.8.2020 5
/0015 dt 28.7.2020
Shantinath Nagar,
Bhusawal
Mob. No.9588667375

Bhusawal: Repairs to Railway Colonies road and circulating area by


asphalting work.
M/s Yograj
Construction,
Railway Contractor,
CR/BSL/Civil/2020 At/Post Khamkheda,
26 ₹ 12,320,408.45 09.3.2020 08.9.2020 9
/0019 dt 09.7.2020 Taluka=Muktainagar,
Dist=Jalgaon
Mob. No.9049233999
Details of ongoing Contractual Works under Bhusawal Headquarter section of Bhusawal Division
Date of Extended
Sr. Date of Nos.of Labours
Name of work/contract. C.A.No.& Date. Name of Contractor. Cost of work/ Contract. Rs. Commence- Date of
No. completion Engaged
ment. Compl.
(A) Bhusawal(ELS)- Industrial Flooring of ELS Bhusawal. (B)
Bhusawal (ELW):Filling and concreting of manipulator area and M/s SRS
repairing of floor of Administrative office building. (C) Bhusawal Infrastructures, Plot
(ELW): Installation of covered polycarbonate shed at entry gate of No.9, S.No.147 4B 5A
CR/BSL/Civil/2020
27 Electric Loco workshop. (D) Bhusawal(ELW): Provision of fountain at 5B, NH6, Varangaon ₹ 19,520,221.72 20.7.2020 19.01.2021 5
/0057 dt 28.9.2020
ELW workshop for Qty=02 Nos. fountain. Road, Opp. Golani
Complex, Bhusawal.
Mob. No.7977272026

1)Bhusawal- Urgent Repair and maintenance of AC sheets by PPGI


roof repair to avoid leakage and other related repairing work in AC
loco shed(ELS) and ROH shed BSL) 2 ). Bhusawal- Provision of M/s SJS
inspection pit (600 m long full rack ) in connection with Bhusawal Infrastructures,
yard remodelling for Augumentation of facilities in Bhusawal A/2020-21/C/02 dt H.No.5/2521/1,
28 ₹ 84,722,092.42 22.7.2020 21.01.2021 9
Coaching complex. 3 ). Bhusawal:- Repairs to Existing Store shed, 30.7.2020 Adjacent to Biyani
Godown,material stacking area base,Circulating area,road House, Bhusawal.
compound wall and misc.repairing works of Divisional P Way store Mob. No.9765554205
depot for utilisation of Zonal P Way store depot.

Bhusawal: Proposal for the work of cleaning of aqua type and septic
chambers, manholes and underground drain and storm water drain M/s Kavitesh
in staff colonies and premisses. Solution Pvt. Ltd
Plot No.69/70/71/A,
Thoke Nagar,
CR/BSL/Civil/2020
29 Hari Vihar, Near ₹ 1,990,351.59 10.9.2020 10.9.2021 9
/0098 dt 09.11.2020
Shantinath Nagar,
Bhusawal
Mob. No.9588667375
Details of ongoing Contractual Works under Bhusawal Headquarter section of Bhusawal Division
Date of Extended
Sr. Date of Nos.of Labours
Name of work/contract. C.A.No.& Date. Name of Contractor. Cost of work/ Contract. Rs. Commence- Date of
No. completion Engaged
ment. Compl.
Construction of- (1)Electronic laboratory.(i)Ground Floor(2) Electronic laboratory.(ii)First Floor(3) Battery Room(4)Store Room for Bearing(5)Oil Room(6)Auxiliary sec.storeRoom(7)DG Set Room(8)Gents Toilet(9)Com
M/s Vinodkumar
Mohanlal Jadwani,
4/363/1, Timber
Market, Opp,
CR/BSL/Civil/2020
30 Bhagwati Saw Mill, ₹ 74,684,836.83 18.9.2020 17.9.2021 7
/0096 dt 29.10.2020
pittru Chhaya Datta
Dham, Jamner Road,
Bhusawal. Mob.
No.9823300505
Bhusawal(Filter Plant):Operation and Maintenance of 4 MLD Sewage Treatment Plant on comprehensive basis for four years.
M/s Sanroz
Technologies, Plot
No.9, Infront of
CR/BSL/Civil/2020 project Gate, Near
31 /0110 dt Hotel trimurti, ₹ 5,926,051.76 01.10.2020 01.10.2024 4
31.12.2020 Nimbhora,
Deepnagar. Tal-
Bhusawal. Mob.
No.9422278859
Bhusawal (CZ): Proposed construction of Badminton Hall at Sports M/s Phoenix India
Complex in Central Zone area. Enterprises, 03
Manthan Avenue,
CR/BSL/Civil/2020
32 Kishor Suryavanshi ₹ 2,145,672.57 09.10.2020 09.4.2021 8
/0109 Dtd. 15.12.20
marg, RTO Corner,
Nashik-422004.
Mob.9404984134
(1)Bhusawal(40 Blocks)- Heavy repairs to drainage system in 40
Blocks staff quarters colony at Bhusawal.(ZBB-2020-
21),(2)Bhusawal(CZ)-Repairs to Doors, Windows, celling & roof
leakage work of various sections in Sr.DFM & Sr.DAuO's office
Bhusawal.(Rev-2020-21),(3)Civil Engg Portion for metering room for
M/s Vilas Patil &
High tension supply at Yamnotri and Panel Room, Site Engineer CR/BSL/Civil/2021
33 Associates of ₹ 11,731,294.55 09.02.2021 09.02.2022 7
room etc.at Gangorti Sub-station in connection with Bhusawal (GS):- /0023 dt 05.8.2021
Bhusawal
Fire preventation and reliability of power supply arrangement with
associate infrastructure at Yamnorti & Gangorti (NRSS &ORSS at
Bhusawal. (LB-18-19 Project ID No. 01013618315001 /DRF-
213662).
Details of ongoing Contractual Works under Bhusawal Headquarter section of Bhusawal Division
Date of Extended
Sr. Date of Nos.of Labours
Name of work/contract. C.A.No.& Date. Name of Contractor. Cost of work/ Contract. Rs. Commence- Date of
No. completion Engaged
ment. Compl.
Bhusawal Division: Various heavy repairs in Staff quarter colony
CR/BSL/Civil/2021
like open drain, U/G drain, drainage system, court yard doors, WC, Shri Surendrakumar
34 /0049 dtd - ₹ 27,042,178.79 15.7.2021 15.4.2022 9
bath door, old AC sheet, Pathway etc. under SSE(Works)40 block Agrawal ofBhusawal
23.11.2021
jurisdiction at Bhusawal.
Bhusawal: Heavy repairs to drainage system in Kandari area CR/BSL/Civil/2021
M/s Siddique
35 Bhusawal. (ZBB-2021-22). /0087 dtd - ₹ 15,054,664.39 02.11.21 01.08.22 7
Brothers of Nagpur
24.02.2022
Bhusawal (ZRTI):- Repairs to floor, doors, windows, sanitation,
Shri Shekhar
water supply, etc of Administrative buildings and hostel, model
Prabhakar Kasar,Shri
rooms, simulator etc. (ZBB-2020-21)
CR/BSL/Civil/2022 Shani Road, Savda,
36 ₹ 5,594,393.83 24.12.21 23.09.22 5
/0007 dtd - Tal=Raver,
Dist=Jalgaon. Mob.
No.9423491677
Phase-II- (1)Construction of BTC building.(2SSE Rooms 2x7x8M
+2Class rooms 9x8 +10x8 + Toilet 3x8 +Corridore 2.5x40+Stair case
4x8m=Approx area - 420m2). (2)Construction of Bay No.1 Shed
(137x14m=1918m2)(3)Inspection pit (RCC Work)(50x2m-
100m2(Excl. Raising of track work with formation/staging) (4)
CR/BSL/Civil/2022 M/s R V Agarwal of
37 Dismantling work. In Connection with Bhusawal (TRS) :- ₹ 49,554,751.05 23.12.21 22.12.22
/0008 dtd - Jalgaon
Augmentation of shed from176 to 200 locos & creation of facilities
for homing of 3 phase locomotive at ELS/BSL.(PH:42/ CAP,UMB-
2019-20,N.Rly PB No.954/2019-20 &C.Rly PBNo.652b).

(i)Bhusawal (Station):- Heavy repairs to damaged road South side


DRMWBSL012022t1 M/s KASAT STONE
from Railway Museum Bhusawal (ZBB 2021-22) (ii) Bhusawal (15
38 / INDUSTRIES ₹ 8,618,583.20 11.03.2022 11.09.2022 9
Block)- Heavy repairs to Railway colony Road by Asphalting in 15th
01465920051012 JALGAON
block area Bhusawal. (Rev-2021-22)
Details of ongoing Contractual Works under Bhusawal Headquarter section of Bhusawal Division
Date of Extended
Sr. Date of Nos.of Labours
Name of work/contract. C.A.No.& Date. Name of Contractor. Cost of work/ Contract. Rs. Commence- Date of
No. completion Engaged
ment. Compl.
Bhusawal(ZRTI)- Heavy repairs to road "C" cabin along the track DRMWBSL052022t1 M/s YOGRAJ
39 towards ZRTI Bhusawal.(Rev-2021-22) / CONSTRUCTION ₹ 7,111,007.55 29.03.2022 29.09.2022 9
01404110051825 JALGAON
Installation and commissioning of Electronic rail lubrication
machine on sharp curves Total 30 Nos. in BHUSAWAL Division. 10 DRMWBSL042022t2 M/s SVA RIKKON
40 nos. in IGATPURI-PACHORA section, 10 nos. in PACHORA- / LUBES PRIVATE ₹ 10,579,212.00 29.03.2022 29.09.2022 3
BHUSAWAL-KHANDWA section and 10 nos. in 01514270051823 LIMITED-CHENNAI.
BHUSAWALBADNERA section.
Bhusawal Division :- (i) Repairs of Staff quarters (315Nos) and
Service Building (13 Nos) in Central Zone area at Bhusawal (Left
over work). (ii) Bhusawal (Central Zone)- Heavy repairs to store shed
of SSE(Wks)CZ Bhusawal along with steel member, roof and misc.
M/s JAIPRAKASH
repairing in Central Zone area Bhusawal.(Rev-2021-22) (iii) CR/BSL/Civil/2022
SURAJBHAN
41 Bhusawal (Central Zone)- Repairs to Open drain and under ground /0019 dt. ₹ 37,800,592.05 01.04.2022 01.01.2023
AGRAWAL-
drain in central zone area/premises Bhusawal (ZBB-2021-22) (iv) 05.05.2022
BHUSAWAL
Bhusawal:- Up gradation of Coach Care Centre for SS-1
maintenance of LHB coaches of Coaching Complex Bhusawal.
(Project ID No. 01.01.42.20.3.16.002)

Updating, reconciling, certification and computerisation of land M/s RANE


plans for Station area, Railway colony area & mid section including DRMWBSL062022t2 MANAGEMENT
42 mutation of lands in favour of Railways of Bhusawal Division, / CONSULTANT PVT ₹ 15,416,942.36 20.04.2022 20.04.2023
Central Railway. 00908940053056 LTD-NAVI
MUMBAI
Bhusawal Division - Fabrication & assembly of 60Kg/52 Kg in Situ DRMWBSL222022t3
M/s CREATIVE
43 Glued Joints 1100 Nos. / ₹ 17,361,073.40 06.07.2022 06.07.2023 4
ENGINEERS-KOTA.
00887320057558
Annual Sectional Contract Zone No.1 for ADEN (HQ) Bhusawal for
DRMWBSL232022t1 Vijaykumar
Repairs and maintenance with white washing etc for Central Zone,
44 / Mallikarjun Angadi - ₹ 43,731,295.50 11.07.2022 30.06.2024 8
Officers Colony,40Blocks, Kandari & POH, MOH, ROH Sheds
00798710057869 Nagpur
Details of ongoing Contractual Works under Bhusawal Headquarter section of Bhusawal Division
Date of Extended
Sr. Date of Nos.of Labours
Name of work/contract. C.A.No.& Date. Name of Contractor. Cost of work/ Contract. Rs. Commence- Date of
No. completion Engaged
ment. Compl.
Annual Sectional Contract Zone No.2 for ADEN(HQ) Bhusawal for DRMWBSL232022t2
Dinesh S Munot -
45 Repairs and maintenance with white washing etc for Station, Filter / ₹ 41,117,316.10 11.07.2022 30.06.2024 5
Nashik
Plant, Hospital, ZRTI & Loco. 00862150057870
Annual Sectional Contract Zone No.3 for ADEN (HQ) Bhusawal for DRMWBSL232022t3
SRS Infratech -
46 Repairs and maintenance with white washing etc for15 Blocks. / ₹ 14,217,753.70 22.07.2022 30.06.2024 5
Jalgaon
00868270058587
BHUSAWAL Division - Fabrication of RH girders-18m - 2set &
00837200059365 Aditya Construction -
47 10 m -2 set. (1 set= one road) (OOT LB 21-22) PID No. ₹ 10,345,663.33 02.08.2022 01.02.2023
dtd. 02.08.2022 Kalyan
01.01.32.21.6.50.001
Bhusawal Division:-Improvement of roof leakage, plastering,
flooring, doors, fencing, drainage system and water pipe line at
various locations on Bhusawal Division. I. Pachora - Maheji section-
Heavy repairs to leaky roof, plastering, flooring, fencing and
drainage system of staff quarters 132 units. Bhadali - Masawad
Section-Heavy repairs to leaky roof, plastering, flooring, drainage
10530360060443
48 system and fencing of staff quarters at ADEN L/BSL N S Manwani - BSL ₹ 39,017,643.16 23.08.2022 22.11.2023 8
dtd. 23.08.2022
Jurisdiction.(Total=206 units). II. Bhusawal CZ- Repairs to leaky
roof, plastering and flooring of over age quarters to improve living
condition. (Total=107 units). III.ZRTI BSL- Repairs to flooring,
doors, sun sheds of staff quarters RB-II 39 nos, RB-III 30 nos and
RB-I 86 units, (Total=155 units)

Bhusawal - Improvement to PF surface by providing Tactile paving


to facilitated Divyangjan on PF No.1 to 8 , seamless movement of
differently abled passengers by providing slander
ramps with railing for barrier free entry, non slippery tactiles paving
Jaiprakash
using Braille tiles. Bhusawal- Improvement of water booth, toilets 00863010061449
49 Surajbhan Agrawal of ₹ 59,618,474.97 07.09.2022 07.03.2024 9
for facilitated Divyangjan at PF No. 1 to 8. dtd. 07.09.2022
Bhusawal
BHUSAWAL STATION:-Repair to damaged valley gutter on PF No.
5,3 and replacement of broken A.C sheet by PPGI sheets on PF No.
3,4,5,6 middle portion of COP.
Details of ongoing Contractual Works under Bhusawal Headquarter section of Bhusawal Division
Date of Extended
Sr. Date of Nos.of Labours
Name of work/contract. C.A.No.& Date. Name of Contractor. Cost of work/ Contract. Rs. Commence- Date of
No. completion Engaged
ment. Compl.
Preparation of plan and L-section of existing UP ML & DN ML of
Igatpuri-Bhusawal-Badnera section in connection with raising of M/s AERIAL DATA
speed upto 130 kmph in Igatpuri-Bhusawal-Badnera section APPLICATIONS
00957370061802
50 and investigation of Soil at bad formation patches under Bhusawal AND MAPPING ₹ 5,839,609.20 13.09.2022 13.03.2023
dtd. 13.09.2022
Division of Central Railway. SERVICESSECUNDE
RABAD

(i)Bhusawal(ELS)- Shifting of pipe line running through pits in


ELS BSL.(ii) Bhusawal (DRM Office) -Provision of two wheeler
parking Shed in front of H-471 in DRM Office Bhusawal
(Rev-2021-22).(iii) Bhusawal (DRM Office) Heavy repairs to general
toilets of Officers, Ladies and Gents staff including branch officers
attached toilets DRM Office building
(Rev.2021-22)(iv)Bhusawal(C&W)-Provision of ladies staff room with
M/s
attached toilet in connection with BSL division:-Upgradation 00844830062563
51 SURENDRAKUMAR ₹ 25,389,853.33 26.09.2022 26.07.2023
of coaching pit line examination facilities at various coaching dtd. 26.09.2022
AGRAWALJALGAON
depots.(LB-2019-20/PH- 42/DF-III) ID No.01.01.42.19.3.00.003 (v)
Bhusawal (Kandari)- Repairs to over head tanks and pipe line and
water distribution pipe line system in staff quarters in Railway
colony of Kandari.

Provision of rubberized pad at Level Crossings -11 nos. in 882020063908 dt. M/s N K RATHOD-
52 ₹ 22,296,777.26 17.10.2022 17.10.2023 6
BHUSAWAL division. 17.10.2022 JABALPUR
Picking up of released rail and MBC sleepers with crane mounted 10253380066760 dt. M/s Bhagwati
53 on BFR laying in the Bhusawal division. 29.11.2022 Associates of ₹ 13,251,714.71 29.11.2022 29.11.2023
Bhusawal
A. Bhusawal (DRM office & Railway Hospital):- Repairs to roof
leakage, false ceiling, doors and windows, Flooring, water supply
and sanitation pipes etc in GeM office, TRO office, personal section,
Canteen Drg. Office in DRM office, Railway school & OPD ward,
indoor ward, Auditorium, Operation Theatre, ICU, Medical store,
00868270067691 M/s SRS Infratech
54 kitchen , dormitory, casualty etc. in Railway Hospital Bhusawal. ₹ 13,478,519.26 13.12.2022 13.09.2023
dtd. 13.12.2022 BHUSAWAL
(ZBB-22-23) B. Bhusawal (Station)- Out side exterior colouring
BHUSAWAL station north/south side with platforms outside and
inside colouring, silver painting of COP, FOB and service building at
BHUSAWAL station. (Rev-2022-23)
Details of ongoing Contractual Works under Bhusawal Headquarter section of Bhusawal Division
Date of Extended
Sr. Date of Nos.of Labours
Name of work/contract. C.A.No.& Date. Name of Contractor. Cost of work/ Contract. Rs. Commence- Date of
No. completion Engaged
ment. Compl.
Bhusawal (DRH) -Sch(i)-Providing and fixing of
Firefightingequipment in compliance of Fire audit carried out at M/s MAMTA
Divisional Railway Hospital Bhusawal. Sch(ii) Bhusawal (DRH):- 10798400068700 ENGINEERING-
55 ₹ 3,739,361.62 28.12.2022 28.8.2023
Provision of Electrical booster, sprinkler & Jockey pump including dt. 28.12.2022 THANE
pipe line network in connection with compliance of Fire audit
carried out at Divisional Railway
1. Bhusawal (CZ) -Repairs to store of Micro/Tele office, OHE Office
Bhusawal(Rev.2022-23) 2. Heavy repairs to damaged and settle
M/s VINODKUMAR
down flooring of PF No.7/8. 3. Repairs to quick watering pipeline
00907370069376 MOHANLAL
56 connecting NAGPUR End from PF No.1 to 8. 4. Bhusawal(Station) ₹ 18,867,537.55 07.01.2023 07.10.2023
dtd. 07.01.2023 JADWANI-
Repairs to
BHUSAWAL
pathway on PF No.4,5,6 &7 at Bhusawal station

1. Heavy Repairs to Leakages of W.C, Bathroom floors, flooring,


plastering, Courtyard wall, doors, Windows, fencing of RB-I & RB-II
S/S, D/S staff quarters in kandari area under SSE (Wks) Kandari
Jurisdiction at BHUSAWAL. (272 Nos) 2. Heavy Repairs to Roof
Leakages, W.C & Bathroom floors, Toilet Seats, flooring, plastering,
Courtyard wall, fencing, doors & Windows, Pathway, drainage &
M/s VINODKUMAR
water supply arrangements of staff quarters in 15 Block area under
00907370069611 MOHANLAL
57 SSE (Wks) 15 Block Jurisdiction at BHUSAWAL. (Total - 227Nos) 3. ₹ 45,484,056.10 11.01.2023 11.01.2024
dtd. 11.01.2023 JADWANI-
Heavy Repairs to Roof Leakages, W.C & Bathroom floors, flooring,
BHUSAWAL
plastering, Courtyard wall, fencing, doors & Windows, drainage &
water supply arrangements of staff quarters in Loco area under SSE
(Wks) Loco Jurisdiction at BHUSAWAL. (Total - 259 Nos)

Bhusaval:- Maintenance of general cleaning of 1) DRM office, 2)


Officer rest house, 3) Khandesh rest house, 4) Tapti club & 5) GEM- M/s DAGOR
58 swimming pool premises, 6) Sr. DFM office & premises, 7) ADEN 511687767405296- SERVICES ₹ 4,957,157.07 01.02.2023 31.01.2025
office, 8) Railway Court premises, 9) SSE (WS)office and 10) Filter dtd. 23.01.2023 BHUSAWAL
plant for two Years (ZBB-2022-23)
Details of ongoing Contractual Works under Bhusawal Headquarter section of Bhusawal Division
Date of Extended
Sr. Date of Nos.of Labours
Name of work/contract. C.A.No.& Date. Name of Contractor. Cost of work/ Contract. Rs. Commence- Date of
No. completion Engaged
ment. Compl.
1.) Proposed closure of LC no. 84AUP at kms 172/02-04 between
Lahvit-Devlali station by provision of subway (RCC Box of sizes
5.0x4.5) by Push through method with RH Girder on IGP-BSL
section. (Umbrella 2020-21,PB No-219,Project ID:-
01.01.30.21.1.11.005) 2.) Proposed closure of LC no. 93 at kms
197/17-19 between Nashik Road- Odha station by provision of
subway (RCC Box of sizes 5.0x4.5) by Push through method with
RH Girder on IGP-BSL section. (Umbrella 2020-21,PB No-
219,Project ID:- 01.01.30.21.1.11.005) 3.)Proposed closure of LC no.
115A at kms 295/14-16 between Nandgaon-Pimperkhed station by
provision of subway (RCC Box of sizes 5.0x4.5) by Push through
method with RH Girder on IGP-BSL section.(Umbrella 2020-21,PB LOA M/s Shree Anukul -
59 No-219,Project ID:- 01.01.30.21.1.11.005) 4.) Proposed closure of 01326340073030 Deep JV ₹ 250,705,049.52 08.03.2023 07.09.2024
LC no. 129 at kms 368/04-06 between Galan-Pachora station by dtd. 08.03.2023
provision of subway (RCC Box of sizes 5.0x4.5) by Push through
method with RH Girder on IGP-BSL section.(Umbrella 2020-21,PB
No-219,Project ID:- 01.01.30.21.1.11.005) 5.) Proposed closure of
LC no. 134 at kms 377/23-25 between Pachora-Pardhade station
by provision of subway (RCC Box of sizes 5.0x4.5) by Push through
method with RH Girder on IGP-BSL section.(Umbrella 2020-21,PB
No-219,Project ID:- 01.01.30.21.1.11.002) 6.) Proposed closure of
LC no. 136 at kms 3386/25-27 between Pardhade-Maheji station by
provision of subway (RCC Box of sizes 5.0x4.5) by Push through
method with RH Girder on IGP-BSL section.(Umbrella 2020-21,PB
No-219,Project ID:- 01.01.30.21.1.11.002)

M/s SRINIVASA
LOA CONSTRUCTION AND
Bhusawal Division - Recoupment of shoulder & crib ballast and
60 00894470073377 SUPPLIERS- ₹ 21,273,253.55 14.03.2023 13.03.2024
ancillary work for FRM in BSL Division ( Total = 210 Kms.).
dtd. 14.03.2023 AHMEDNAGAR

Through Quotation:- DEN(SW)’s Jurisdiction - Bhusawal - Annual LOA :-


M/s Ramsumer
Maintenance of gantry rails in ELW, ELS,ROH, Unification shed, BSL/W/165/W/SW
61 Badriparsad Chapre ₹ 482,258.95 10.03.2023 09.03.2024
Track Machine shed & Coaching complex through quotation.(Rev- /Quotation/G Rail
of Bhusawal
2022-23). dtd. 10.03.2023
Details of ongoing Contractual Works under Bhusawal Headquarter section of Bhusawal Division
Date of Extended
Sr. Date of Nos.of Labours
Name of work/contract. C.A.No.& Date. Name of Contractor. Cost of work/ Contract. Rs. Commence- Date of
No. completion Engaged
ment. Compl.

1.) Elimination of manned LCs by providing subway of size 5.0x4.50


M by push through method in lieu of LC no. 159 @ Kms 454/20-22
( DSK-SAV) on BSL-KNW section.. (Umbrella 2020-21,PB No-
217,Project ID:- 01.01.30.21.1.11.007) 2.) Elimination of manned
LCs by providing subway of size 5.0x4.50 M by push through
method in lieu of LC no. 161 @ Kms 457/14-16 (DSK-SAV) on BSL-
KNW section. (Umbrella 2020-21,PB No-217,Project ID:-
01.01.30.21.1.11.007) 3 .) Elimination of manned LCs by providing
subway of size 5.0x4.50 M by push through method in lieu of LC
no. 167 @ Kms 467/06-08 (SAV-NB) on BSL-KNW section..
LOA No:-
(Umbrella 2020-21,PB No-217,Project ID:- 01.01.30.21.1.11.007) 4 ISC Projects Pvt Ltd. –
62 00800250075778 ₹ 278,629,644.28 25.04.23 25.04.24
Elimination of manned LCs by providing subway of size 5.0x4.50 M Pune
dtd. 25.04.2023
by push through method in lieu of LC no. 160 @ Kms 456/08-10 (
DSK-SAV) on BSL-KNW section. (Umbrella 2020- 21,PB No-
217,Project ID:- 01.01.30.21.1.11.008) 5.) Elimination of manned
LCs by providing subway of size 5.0x4.50 M by push through
method in lieu of LC no. 178 @ Kms 558/20-22( BMA- BRGJ) on
BSL-KNW section. (Umbrella 2020-21,PB No-217,Project ID:-
01.01.30.21.1.11.008) 6.) Elimination of manned LCs by providing
subway of size 5.0x4.50 M by push through method in lieu of LC
no. 180 @ Kms 564/ 6-8 ( BRGJ- KNW) on BSLKNW section..
(Umbrella 2020-21,PB No-217,Project ID:- 01.01.30.21.1.11.008)

LOA No:- M/s AE TELELINK


Supply, Installation and commissioning of protective warning
63 00816290076287 SYSTEMS LIMITED- ₹ 54,259,530.84 03.05.23 03.05.24
system (Rakshak ) - 61 Nos.
dtd. 03.05.2023 ROORKEE
LAO No:- M/s KRISHNA
Bhusawal Division -Outsourcing of Man (Worker) from contractor
64 00896930076612 CONSTRUCTION CO.- ₹ 51,945,805.48 09.05.23 09.05.25
forUSFD testing of rails and welds for 2 years.
dtd. 09.05.2023 BHAVNAGAR
LAO No:- M/s AJAY
Deployment of companion tonight patrolman through outsourcing
65 00857500076618 KISANPRASAD MISAR- ₹ 13,883,258.50 09.05.23 09.05.24
inBHUSAWAL Division.
dtd. 09.05.2023 JALGAON
(i)Bhusawal - Proposed Renovation of Divisional stores depot &
M/s JAIPRAKASH
Wagon Depot at Bhusawal. (ID No.01.01.42.22.3.50.002) (ii) LOA No:-
SURAJBHAN
66 Bhusawal (Sr.DMM Office):- Sr.DMM office on first floor of New 00863010078596 ₹ 25,534,128.72 06.06.23 06.06.24
AGRAWAL-
Control office at DRM office campus Bhusawal. DSR-2021 dtd. 06.06.2023
BHUSAWAL
(ID.No.01.01.64.22.3.50.013)
Bhusawal Division:-Construction of Boundary wall/ Compound wall
LOA No:-
At vulnerable location on Golden Quadrilateral/ diagonals /High PMP Infrastructure
67 00848460078617 ₹ 463,617,775.43 06.06.23 06.12.24
density routes and on approaches of major cities vulnerable for Pvt Ltd – Ahmedabad
dtd. 06.06.2023
encroachment/ trespassing
Details of ongoing Contractual Works under Bhusawal Headquarter section of Bhusawal Division
Date of Extended
Sr. Date of Nos.of Labours
Name of work/contract. C.A.No.& Date. Name of Contractor. Cost of work/ Contract. Rs. Commence- Date of
No. completion Engaged
ment. Compl.
Transportation of P.Way material from variouslocations of Bhusawal LOA No. M/s NEHA
68 Division and from other division toBhusawal division at various 00837060082094 ENTERPRISES- ₹ 21,285,754.70 20.07.23 19.07.25
location. dtd. 20.07.2023 DHANBAD
JAIN METAL AND
Bhusawal Filter house Supplying and installing of chlorine gas GEMC-
MATERIAL SUPPLY
69 cylinder installation and maintenance of gravity feed Vaccum type 511687778280197 ₹ 4,856,361.51 28.07.23 27.07.25
CORPORATION of
chlorinator for two years. dtd. 21.07.2023
Jalgaon
Bhusawal(Loco)- Replacement of old corroded steelOverhead tanks
JAIN METAL AND
of capacity of 8.0 & 6.30 Lakhs litres capacityby Two numbers of LOA No.
MATERIAL SUPPLY
70 RCC HS tank of 5 Lakhs litres capacityeach in loco area Bhusawal. ( 00855990082248 ₹ 23,879,382.60 21.07.23 20.07.24
CORPORATION of
Umbrella work 2022-23, PB-1143/NR, PH-51,DF-2) (ID dtd. 21.07.2023
Jalgaon
No.01.01.51.22.3.50.001)
LOA:- SYED ZUBER ANWAR-
71 Standardization of 67 nos. of Dead End in BHUSAWAL Division. 10605100084728 BEED ₹ 3,828,222.81 17.08.23 16.08.24
dtd. 17.08.2023
GEMC- CENTAAC
Bhusaval Filter Plant Supplying generating and dosing of chlorine
72 511687753639344 CORPORATION ₹ 2,850,000.00 28.08.23 27.08.25
diaoxide for water filteration plant at Bhusaval For TWO Years
dtd. 21.08.2023
GEMC- MEGA
Bhusawal Up keep and maintenance of AOfficers rest house Tapti
511687742492993 CONSTRUCTIONS
73 rest house and Khandesh rest house B Sr Subordinate and Group ₹ 4,562,844.77 07.09.23 06.09.25
dtd. 23.08.2023
D rest house and New Transit rest house for 24 months
LOA No:- M/s S J S
Bhusawaldivision:- Construction of Rest house for officers at Tapti
74 10131580085665 INFRASTRUCTURE- ₹ 37,152,103.68 30.08.23 29.08.24
club & DRM meeting hallin DRM building at Bhusawal.
dtd. 30.08.2023 BHUSAWAL
Total Contract Cost of Works under Bhusawa station HQ ₹ 2,602,295,016.64 295
Grant Total of Ongoing Contracts under Engg.Dept.of BSL Divison as on date ₹ 13,842,128,634.69 1950

You might also like