Project Schedule Installation of a new Filter skid at Q manifold rev01
Project Schedule Installation of a new Filter skid at Q manifold rev01
26
27 n
28 n
29 n
30 n
22
10
11 l.
12 l.
13 l.
14 l.
15 l.
16 l.
17 l.
18 l.
19 l.
20 l.
→
5-
1-
2-
3-
4-
5-
6-
7-
8-
9-
N° Task Name
-ju
-ju
-ju
-ju
ju
-
-ju
-ju
-ju
-ju
-ju
-ju
-ju
-ju
-ju
-ju
-ju
ju
ju
ju
ju
ju
ju
ju
ju
ju
ju
m
ID
in
il.
il.
il.
il.
il.
il.
il.
il.
il.
i
in
ai
il.
Fabrication piping, Fit-up
1
and welding 31 Days
Remouving of existing
2
Skid and Foundation 05 Days
Installing of new skid and
3
foundation 16 Days
Inspection of welding NDT
4 07 Days
Preparing and performing
5
hydrostatic test 04 Days
Peinting and Coating of
6
pipes 10 Days
Commissioning (clean-up
7 02 Days
site)
Hand over (As built and
8
demobilisation) 02 Days
EZAR APPROVAL