MATERIAL REQUIRMENT AVAILABLE AT SITE REQUIRED

SNO BR NO MATERIAL DESCRIPTION NOS


1 PLYWOOD BOARD (1.2X2.4) 210
CUPLOCK (1) 360
LEADGER PIPE(1m) 2000
LEADGER PIPE(1.5m) 1000
Bina kakri Br no-
U-JACK 360
48A+49A
Base Jack 360
MS CHANNEL (0.1X0.05X6)m 360
MS Pipe (6m) 150
TIE ROD(1.50m) 400
2 PLYWOOD BOARD (1.2X2.4) 280
CUPLOCK (1) 630
LEADGER PIPE(1m) 2100
LEADGER PIPE(1.5m) 2940
New box pushing U-JACK 630
Base Jack 630
MS CHANNEL (0.1X0.05X6)m 324
MS Pipe (6m) 150
TIE ROD(1.50m) 540
PLYWOOD BOARD (1.2X2.4) 490 97 322
CUPLOCK (1.0m) 990 27 963
CUPLOCK (1.5m) 0 532 0
CUPLOCK (2.0m) 0 341 0
CUPLOCK (2.5m) 0 54 0
TOTAL QTY LEADGER PIPE(1m) 4100 3205 895
LEADGER PIPE(1.5m) 3940 0 3940
U-JACK 990 314 676
Base Jack 990 99 891
MS CHANNEL (0.1X0.05X6)m 684 82 602
MS Pipe (6m) 300 117 183
MS Pipe (1.5m) 0 77 0
MS Pipe (0.5m) 0 54 0
TIE ROD(1.0m) 0 100 0
TIE ROD(2.0m) 940 128 712
TIE ROD(3.0m) 0 0 0
Propsjack(2.0m) 0 54 0
Shuttering material 0 205Sqm 0