Key Plan-NCL-Dudhichua May-12-2024

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

TO

SR

JAY
J,

A N
CH
:3

T/N
BR.N

/9
27

TPC
.0
FOB,CH:m

O.14,

m
F/C

B
SRJ,CH:4941m
SRJ,CH:5037m

S
R
CH:4
FOB,CH:4810m

B.NO
LINE No.1,CAL- 1165M LINE No.1A,CAL- 900M

OLD SILO,CH:4874.0m

059m

.13
,
BR.NO.15,CH:4217m F/CSB
BR.NO.16,CH:4550m F/CSB
BR.NO.17,CH:4790m F/CSB

WB,CH:4/538m
WB,CH:4/538m

C
LINE No.2,CAL- 740M LINE No.2A,CAL- 900M

BR
H:
SRJ,CH:4/120.0m F/CSB

.N
3
F/CS
LINE No.3A,CAL- 880M

SRJ,CH:4/113.59m F/CSB
EXISTING LINE No.2,CAL- 690M DUDHICHUA TO SHAKTINAGAR

O
SRJ,CH:4/106.56m F/CSB

.1
SRJ,CH:4/189.0m F/CSB

01

2,
CONTINUED LINE No.4, CONTINUED LINE No.4, CAL-730M LINE No.4B,CAL- 526M

C
H
:
F/
CONTINUED LINE No.5, CAL-730M

3
LINE No.6A,CSL-760M,CAL-767M

81
8
LINE No.4A,CAL- 725M

SB
LINE No.7A,CSL-750M,CAL-757M

m
F
LINE No.5A,CAL- 725M

/C
S
SR
C

B
LINE No.5B,CAL- 725M

J,
LE H:3

CH
VE /8
WHARF WALL COAL STOCK YARD

:4
R 25.
1I
N

/0
684mX30/40m (APPROX)
30 0

TO
42

51
1. 4
C R

.1
45

LE
LE H:3 0

JAY
3R

6m
VE
D

L
VE /7

2ND SILO,CH:5164.0m

LE

F/
SIL R 85.

ANT
V
O,C 30 0

CS
EL

B
H:3 1. 1 IN
/80 45
FOR 5.04F 0 41
,CH:3

1 IN
765.0
M

SHUNTING NECK 120M


CH:3/640.0

NO STABLING LINE 120M


LEVER 301.100

R
DE,CH:4/800.0m F/CSB
BR.NO.11(RUB),CH:3618m F/CSB

SRJ,CH:4/653.21m F/CSB
SRJ,CH:4/659.50m F/CSB
SRJ,CH:4/748.28m F/CSB

6m
6m
12m
BR.NO.10,CH:3558m F/CSB
CH:3/600.0
SRJ,CH:3/550.0m F/CSB
LEVER 301.10

414LEVEL LEVEL1 IN
SRJ,CH:3/475.0m F/CSB

404F
DE,CH:3/465.0m F/CSB
SRJ,CH:3/462.0m F/CSB
SHUNTING NECK 120M
SRJ,CH:3/419.12.0m F/CSB
SRJ,CH:3/387.0m F/CSB
NO STABLING LINE 120M F/CSB
SRJ,CH:3/374.0m
SRJ,CH:3/345.0m F/CSB
SRJ,CH:3/332.0m F/CSB
BR.NO.09,CH:3313m F/CSB

WB,CH:3234.0m F/CSB
FOB,CH:3223.0m F/CSB

CH:3200.0m F/CSB

NCL JAYNAT TRACK


S&T BUILDING
SRJ,CH:3/093.27m F/CSB

BV SIDING CSL 133M,CAL-140M


BR.NO.08,CH:3075m F/CSB

BR.NO.07,CH:2997m F/CSB

6m

12m

9.89m
6.16m
6m LINE No.6 CSL 763M,CAL 770M
LINE No.7 CSL 927M,CAL 934M
6m LINE No.8 CSL 750M,CAL 757M
LINE No.9 CSL 750M,CAL 757M
SRJ,CH:2/424.27
SRJ,CH:2/411.27
KEY PLAN

SRJ,CH:2/336.27

NO STABLING LINE 120M

SHUNTING NECK 120M


SRJ,CH:2/235.84 F/CSB
Total Length: 4.5 Rkm / 11 Tkm

CH:2/185.0
LEVER 299.50
DE,CH:2/171.27
SRJ,CH:2/132.04 F/CSB

NO STABLING LINE 120M 1 IN 4041RIN 219R


SRJ,CH:2/054.96 F/CSB
DUDHICHUA RAILWAY SIDING OF N.C.L

SRJ,CH:2/041.96 F/CSB

SRJ,CH:1/953.42 F/CSB SHUNTING NECK 120M


FUTURE TRACK -

SRJ,CH:1/940.42 F/CSB
EXISTING TRACK -

BR.NO.06,CH:1916m F/CSB
TRACK COMPLETED -

SRJ,CH:1/875.10 F/CSB
1 IN

CH:1/768
LEVER 299.50
219F
LEVEL

EXISTING JAYNAT-SKTN TRACK


EXISTING DCH-SKTN TRACK

BR.NO.05,CH:1652m F/CSB
CH:1/520.0
LEVER 299.50
PROP. DCH - SKTN TRACK
LEVEL1 IN

BR.NO.04,CH:1414m F/CSB
TO BE COMPLETED UPTO 30.04.24

521F

7.5m
4.68m

BR.NO.03,CH:1278m F/CSB
BR.NO.02,CH:1152m F/CSB
SRJ,CH:1/103.90 F/CSB

SRJ,CH:969m F/CSB
BR.NO.01,CH:0/950.440 F/CSB
SRJ,CH:850m F/CSB CH:0/900.0
1 IN 52

LEVER 298.310
1R

SRJ,CH:783m F/CSB
AS P
E

SRJ,CH:762m F/CSB
SRJ,CH:692m F/CSB
R EX

SRJ,CH:672.10m F/CSB

SRJ,CH:635m F/CSB
IST.TR

DE,CH:629m F/CSB SRJ,CH:610.81m F/CSB


SRJ,CH:596m F/CSB
ACK

SRJ,CH:563m F/CSB

SRJ,CH:504m F/CSB
RAKE MOVEMENT DURING PM INAUGURATION 29.02.2024

TAKE OFF/SRJ/TAKE OFF,CH:490.0m F/CSB


F/CSB
SRJ,CH:475m
SRJ/TAKE OFF,CH:466.74m F/CSB
To be completed beyond May' 24 during Pre-NI & NI of SKTN St. -
N

STN. KRSL STATION

C/L OF SHAKTI NAGAR STN. BLDG.


THE INFRASTRUCTURE PEOPLE

You might also like