Technical Schedule PKG-12 23022023
Technical Schedule PKG-12 23022023
G-5 & G-6, Sector – 10, Dwarka, New Delhi – 110 075
January 2023
National Highways Authority of India Request for Proposal – Bid Documents
SCHEDULE – A
(See Clause 10.1)
1 The Site
1.1 Site of the Project Highway shall include the land, buildings, structures and road works as
described in Annex-I of this Schedule-A.
1.2 An inventory of the Site including the land, buildings, structures, road works, trees and any
other immovable property on, or attached to, the Site shall be prepared jointly by the
Authority Representative and the Concessionaire, and such inventory shall form part of the
memorandum referred to in Clause 10.3.1 of the Agreement.
1.3 Additional land required for Toll Plazas, Traffic Aid Posts, Medical Aid Posts and vehicle
rescue posts or for construction of works specified in the Change of Scope Order issued under
Clause 16.2.3 of this Agreement shall be acquired in accordance with the provisions of Clause
10.3.6 of this Agreement. Upon acquisition, such land shall form part of the Site and vest in
the Authority.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar A-1
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana
in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Annex – I
(Schedule-A)
SITE FOR THE PROJECT
1. The Site
1.2 Alignment
The Project Highway starts from Km. 325+500 in Bongabar village and ends at Km.
358+500 in Lepo village in Ramgarh and Bokaro districts in Jharkhand.
This Section of the project highway is a Greenfield alignment passing through Villages of
Bongabar, Digwar, Karma, Harwe, Chotkidundi, Hesapora, Lipia, Rakua, Honhe, Tirla,
Baridari, Hardagadha, Mahuatand, Chhotki Punnu, Badki Punnu, Koh, Munga Sarla alias
Budhangoda, Lepo under Rangarh and Bokaro districts.
Latitude and longitude of this package of project corridor lie between 23° 42.181'N, 85°
31.909'E and 23° 36.816'N, 85° 49.255'E.An index map of the Project Highway is given at
Appendix A-I.
The Proposed center line coordinates are given in Annex II and the alignment plan and profile
is given in Annex III of this schedule.
2. Land
The Site of the Project Highway comprises the land described below:
Chainage(km)
S. No. ROW(m) Remarks
From To
Since the project is a Green field alignment, there
NIL is no Existing ROW. The details of PROW has
been given in Schedule B.
3. Carriageway
Since the project is a Green field alignment, there is no existing Carriageway.
4. Major Bridges
The Site includes the following Major Bridges:
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar A-2
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana
in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
6. Grade separators
The Site includes the following grade separators:
S. Chainage Type of Structure No. of Spans with span
Width(m)
No. (km) Foundation Superstructure length(m)
NIL
7. Minor bridges
The Site includes the following minor bridges:
Type of Structure No. of
S. Chainage Spans with Width(m
Sub- Superstruct
No. (km) Foundation span )
structure ure
length(m)
NIL
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar A-3
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana
in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
12. Utilities
(i) Electrical Utilities
The Site includes the following Electrical Utilities:
Note: 220 KV D/C DVC line is crossing main stretch from Ch. 357+800 to Ch. 358+200, this
line is also affecting the Junction & loop chainage portion.
TC – Triple circuit, DC – Double circuit, SC – Single circuit, U/G – Underground
Sr
. Design Ch. Transformers (KVA)
Length (in Km.)
N No. of Crossings
o.
33 11 LT 33
From To 11 KV LT No Capacity (KVA)
KV KV Line KV
1 325+500 326+000 0 0.2 0 1
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar A-4
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana
in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
ELECTRIC TRANSFORMER
DESIGN CHAINAGE LAMP (NOS.)
SL.NO. POLE (NOS.) (NOS.)
From To LHS RHS LHS RHS LHS RHS
1 325+500 326+000 2 0 0 0 0 0
2 326+000 327+000 2 3 0 0 0 0
3 327+000 328+000 0 1 1 0 0 0
4 328+000 329+000 0 0 0 0 0 0
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar A-5
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana
in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
ELECTRIC TRANSFORMER
DESIGN CHAINAGE LAMP (NOS.)
SL.NO. POLE (NOS.) (NOS.)
From To LHS RHS LHS RHS LHS RHS
5 329+000 330+000 0 0 0 0 0 0
6 330+000 331+000 0 0 1 0 0 0
7 331+000 332+000 0 0 0 0 0 0
8 332+000 333+000 0 0 0 0 0 0
9 333+000 334+000 1 1 1 0 0 0
10 334+000 335+000 0 0 0 0 0 0
11 335+000 336+000 0 0 0 0 0 0
12 336+000 337+000 0 0 0 0 0 0
13 337+000 338+000 0 0 0 0 0 0
14 338+000 339+000 0 0 0 0 0 0
15 339+000 340+000 0 0 0 0 0 0
16 340+000 341+000 0 0 0 0 0 0
17 341+000 342+000 1 1 0 0 0 0
18 342+000 343+000 0 0 0 0 0 0
19 343+000 344+000 1 1 0 0 0 0
20 344+000 345+000 2 2 0 0 0 0
21 345+000 346+000 0 0 0 0 0 0
22 346+000 347+000 1 0 0 0 0 0
23 347+000 348+000 0 1 0 0 0 0
24 348+000 349+000 0 0 0 0 0 0
25 349+000 350+000 1 0 0 0 0 0
26 350+000 351+000 0 0 0 0 0 0
27 351+000 352+000 0 0 0 0 0 0
28 352+000 353+000 0 0 0 0 0 0
29 353+000 354+000 0 0 1 0 0 0
30 354+000 355+000 4 3 0 0 0 0
31 355+000 356+000 7 6 2 1 0 0
32 356+000 357+000 10 7 1 0 0 0
33 357+000 358+000 12 8 1 0 0 0
44 34 8 1 0 0
TOTAL
78 9
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar A-6
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana
in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar A-7
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana
in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Note:
1. One Mobile Tower is falling within loop & Existing road portion near Chain. 358+500.
2. The EHT transmission line crossings‟ & others utilities chainages/quantities details as mentioned
above may be varied & differ, it will be subjected to utility department final modifications & actual
ground/site data. Any quantities variations in the under/over ground utilities specified- in this
schedule A/B shall not constitute a Change of Scope. Utility Relocation Plan (URP) Drawing
enclosed. *Mostly under construction/Incomplete lines.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar A-8
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana
in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Appendix A-I
Index Map of Project Highway
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar A-9
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana
in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Annex – II
(Schedule-A)
COORDINATE SYSTEM- UNIVERSAL TRANSVERSE MERCATOR (UTM)-WGS84
(Zone 45R)
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar A - 10
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana
in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar A - 11
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana
in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar A - 12
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana
in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar A - 13
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana
in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar A - 14
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana
in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar A - 15
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana
in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar A - 16
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana
in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar A - 17
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana
in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Annex – III
(Schedule-A)
Alignment Plans
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar A - 18
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana
in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
SCHEDULE – B
(See Clause 2.1)
2. Project Highway
2.1 Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-
20 in Bongabar village to Junction with NH-320 in Lepo village from km 325.500 to km
358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode
(Package 12) as described in Annex-I of of Schedule-B and in Schedule-C.
2.2 The Project Highway shall be designed and constructed in conformity with the Specifications
and Standards specified in Schedule-D.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar B-1
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana
in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Annex – I
(Schedule – B)
DESCRIPTION OF DEVELOPMENT
1. Width of Carriageway
1.1 Main Carriageway: The Paved Carriageway for main carriageway shall be as indicated in
Appendix B-I (A) of this Schedule B.
1.2 Loops/Ramps: The Paved Carriageway for loops and ramps at interchanges shall be as
indicated in Appendix B-I (B) of this Schedule B.
1.3 Cross road (Vehicular Overpass): The Paved Carriageway shall be as indicated in Appendix
B-I (C) of this Schedule B.
1.4 The entire cross-sectional elements shall be accommodated in the available/ proposed ROW.
If required, suitable retaining structures shall be provided to accommodate the highway cross
section within the available/proposed ROW and the same shall not constitute a Change of
Scope.
1.5 Except, as otherwise provided in this Agreement, the width of the paved carriageway and
cross-sectional features shall conform to above clauses.
Note:
2. Project Facilities
The Project shall be constructed in conformity with the Specifications and Standards specified
in Schedule-D.
Geometric design and general features of the Project Highway shall be in accordance with the
provisions of the IRC Manual as specified in Schedule D.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar B-2
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana
in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
The existing geometry of the crossroads at Vehicular overpass location and cross roads at
Interchange location shall be improved as specified in this schedule and Schedule D.
Details of the Right of Way are given in Appendix B-IV of this schedule.
The lateral and vertical clearances of all flyover/ Underpasses shall be as given in this
schedule.
The lateral and vertical clearances of all Overpasses shall be as given in this schedule.
ii) In the case of grade separated structures, the type of structure and the level of the
Project Highway and the cross roads shall be as specified in Appendixes given above
and Appendix B-II of this schedule.
ii) Overpasses shall be constructed at locations as given in Appendix B- III (B) and
structures as given in Appendix B- VIII (B).
iii) The cross road for Vehicular Overpass shall be constructed as indicated in Appendix
B-III (B).
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar B-3
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana
in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
i) The Project Highway shall be constructed to 6 lane access controlled configuration and
with or without connecting Roads. Typical cross sections for different segments of the
project Highway shall be as Appendix B-I (A).
ii) The Loops/Ramps of Interchanges shall be constructed with the lane configuration
including paved shoulders except toll plaza as given in Appendix B-I (B). At toll plaza
location, the lane width shall be as per lane requirement and taper.
iii) The cross road at vehicular overpass locations shall be constructed with lane
configuration as given in Appendix B-1(C).
An alignment plan and vertical profile of complete project highway including interchanges
along with their ramps & loops is given at Appendix B-II in soft copy.
The plan and profile of project highway as given in Appendix B-II is tentative and same shall
be treated as an approximate assessment and cannot be considered as design plan & profile.
The actual design of plan and profile shall be carried out by concessionaire following IRC-
SP-99 (as specified in Schedule D) and adopted vertical profile shall be designed for ISD and
horizontal geometry shall be within the land (ROW) provided by the authority as per approval
of IE. However, in any case, the finished road level of the project highway shall not be less
than those indicated in the alignment plan and profile specified in Appendix B-II of Schedule
B.
All intersections and grade separators shall be as per Section 3 of the IRC Manual (as
specified in Schedule D) and as given in Appendix B- V, Appendix B- VI of this Schedule.
The Project Highway shall be constructed as fully access controlled highway configuration
and no at grade intersection will be permissible with highway. Interchanges shall be
constructed at locations and as per layouts given in Appendix B-V and structures for
interchange shall be constructed as given in Appendix B- VI of this Schedule.
The cross roads underneath the Flyovers, Underpasses shall be treated as at grade
intersection. These junctions of the crossroads shall be developed as at grade intersection as
per IRC Manual (as specified in Schedule D) requirement, layouts given in Appendix B-II
and typical layout drawings as per MoRT&H type Design.
Pavement design shall be carried out in accordance with Section 5 of IRC: SP: 87-2019, IRC
37-2018 & IRC 58-2015.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar B-4
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana
in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
a) The pavement shall be perpetual flexible pavement for the main carriageway including
loops/ramps at interchange locations and access roads to wayside amenities for the entire
length of project highway.
c) Rigid pavement shall be provided at Toll Plaza locations including the tapered section.
a) Perpetual Flexible pavement shall be constructed for the main carriageway including
paved shoulders, loops/ramps/ Slip road at interchange locations and slip roads for access
to wayside amenities for the entire length of project highway. Perpetual Flexible
pavement is long life pavement typically designed for a minimum design period of
50 years.
c) Rigid pavement shall be provided at all proposed toll plazas/toll booths. Rigid pavement
shall be designed for a design period of 30 years.
Notwithstanding anything to the contrary contained in this Agreement or the IRC: SP: 87-
2019, the Concessionaire shall design the pavement of main carriageway including paved
shoulders, edge strips, loop/ramps at interchange locations and slip roads for access to
wayside amenities as long life perpetual flexible pavement. The pavement for
connecting/service road shall be designed for minimum design traffic of 10 MSA. While the
pavement for improvement of crosses roads beneath the interchange locations shall be
designed for minimum 50MSA traffic.
The pavement at Toll Plaza locations shall be designed by the Concessionaire as Rigid
Pavement.
In order to meet the intended functional requirement of respective pavement layers as well
as compaction of heavy bituminous layers on main carriageway, the minimum thickness of
respective pavement layers for main carriageway, Toll Plaza/Toll booth and connecting/
service/slip roads shall, however, in no case be less than as given below:-
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar B-5
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana
in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Toll Plaza
In addition to the provisions given in TCS, adequate Drainage system including surface and
subsurface drains and median drainage system in super elevation section for the Project
Highway shall be provided as per Schedule D.
Unlined / lined drains shall be provided in the entire project length as per the Drainage Plan
enclosed.
4.17.1 General
i) All bridges, culverts and structures shall be designed and constructed in accordance with
Section 7 of the IRC Manual (as specified in Schedule D) and shall conform to the cross-
sectional features and details specified in Appendix B-VI, Appendix B-VII, Appendix
B-VIII (A), Appendix B-VIII (B), Appendix B-IX (A), Appendix B-IX (B),Appendix
B-X (A), Appendix B-X (B), Appendix B-XI, Appendix B-XII (A), Appendix B-XII
(B), Appendix B-XII (C), Appendix B-XIII, Appendix B-XIV, Appendix B-XV,
Appendix B-XVI, Appendix B-XVII, Appendix B-XVIII and Appendix B-XIX in
this schedule.
ii) Width of the carriageway of bridges and structures shall be as specified in appendixes
given above.
4.17.2 Culverts
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar B-6
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana
in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
i) The minimum overall width of all culverts shall be equal to the roadway width of the
approaches.
ii) All culverts shall be designed and constructed in accordance with Section 7 of the IRC
Manual (as specified in Schedule D) and shall conform to the cross-sectional features and
details specified in Appendix B-XIV, Appendix B-XV, Appendix B-XVI, Appendix
B-XVII, Appendix B-XVIII and Appendix B-XIX in this schedule.
iii) Floor protection works shall be as specified in the relevant IRC Codes and Specifications.
4.17.3 Bridges
i. The existing bridges at the following locations shall be re-constructed as new Structures
Adequacy or otherwise of
Bridge Salient details of
Sl. No. the existing waterway, Remarks
location (km) existing bridge
vertical clearance, etc.
NIL
Cross-section at
Existing width Extent of
Sl. No. Location (km) deck level for
(m) widening (m)
widening
NIL
C. The railings of existing bridges shall be replaced by crash barriers at the following
locations:
An effective drainage system for bridge decks shall be provided as specified in paragraph 6.8
of the Manual (as specified in Schedule D).
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar B-7
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana
in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
4.17.4 ROB/RUB
i. The proposed span arrangements of the ROBs are tentative and subject to change as
per availability of railway boundaries/ requirement of the railways.
ii. ROBs shall be designed, constructed and maintained as per the requirements of
Railway authorities. The construction plans shall be prepared in consultation with the
concerned railway authority.
iii. The ROBs shall be constructed and maintained by the Concessionaire under
supervision of the Railways.
iv. All expenditure related to construction, maintenance and supervision of ROBs
(except P&E charges) shall be borne by the Concessionaire.
The grade separated structures shall be provided at the locations and of the type and length
specified in this Schedule.
The existing bridges and structures to be repaired/ strengthened, and the nature and extent of
repairs /strengthening required are given below:
A. Bridges
B. ROB / RUB
The list of Bridges, structures, Flyovers, Underpasses and Overpasses are as given above and
in Appendixes in this Schedule.
Special Structures with Extradosed PSC Box Girder & PSC Box Balanced Cantilever type
Super structures are given in Appendix B-XI.
The side slopes shall be protected by using suitable slope protection measures wherever
required in accordance with Schedule – D. In addition to Schedule –D following slope
protection measures (specified as minimum requirement) shall be followed by concessioner:-
1- At locations where Embankment height is <=6m- Geocell/Geotextile/Coir Blanket or
other similar system along with turfing shall be provided in side slopes of the project
highway in accordance with IRC guidelines.
2- At locations where Embankment height is >6m- Boulder pitching/stone pitching/PCC
block pitching shall be provided over side slopes of the project highway in accordance
with IRC guidelines and with approval from IE/NHAI.
3- Adequate Continuous Surface Precast Concrete drain (Except Structures having approach
slabs) shall be provided on both sides Hard Granular Shoulder including precast concrete
Chutes at designed intervals (maximum spacing c/c 20m) with energy dissipation basin
irrespective of any Height of Embankment.
4- At isolated locations, such as at valley curve portions/ start and end of approaches of
ROB/Flyover/VUP/Underpasses locations, where accumulation of rain water are
observed, extra width RCC chute drain (having minimum width of 1m) with energy
dissipation basin shall be provided at site in consultation and approval with IE/NHAI.
5- Cut slopes should be designed in such a manner as to keep the cutting within available
RoW and protection measures like rock bolting/ soil nailing/ reinforcing, as appropriate,
shall be applied to ensure both stability and protection from erosion/ withering.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar B-9
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana
in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
The minor nallah/drain and canals shall be realigned and constructed as given in Appendix
B-XXI.
Ground Improvement, wherever required, shall be done as per Schedule D and the same shall
not constitute a Change of Scope.
RCC boundary wall shall be provided along the entire length on either side (including
transverse requirements at structure locations) as per layout drawing as mentioned in
Schedule C.
4.30 Utilities
A minimum 2m wide strip of land at the extreme edge of ROW shall be kept for
accommodating utilities. Utility duct shall be provided as shown in TCS and mentioned in
Schedule B & Schedule D.
In addition to the list given in Appendix B-XXII, signs shall be provided per Schedule D.
Copy of utility relocation plan is enclosed. The Specifications are to be as per the
specifications of utility owning department. Brief details of shifting of utilities are given in
Appendix B-XXIII.
Utilization of Fly ash shall be as per notifications under Environment Protection Act, 1986,
Ministry of Environment & Forest, Govt. of India Fly Ash Notifications S.O. 763(E) dated 14
Sept 1999, its amendment notification on S.O 979(E) dated 27 Aug 2003 and notification S.O
2804(E) dated 3 Nov 2009 and 25-01-2016 and Ministry of Power letter no – 9/7/2011-S-
Th.(Vol. IV) dated 22.09.2021 and Ministry of Power OM no – 9/7/2011-St. Th. (Vol. V)
dated 22.10.2021 and Ministry of Road Transport & Highways (S&R(P&B)Section) Letter
No. RW/NH-33044/01/2019-S&R(P&B)RSCE-Pt.1 dated 18.04.2022 and as and when
amended.
The length of structures and bridges specified hereinabove, except for structures over existing
water bodies like ponds, lakes etc. shall be treated as an approximate assessment and
minimum requirement. The proposed span arrangement of structures may be changed based
on innovative design of structure, latest construction techniques and aesthetics of structures
subjected to minimum length of structure specified in Schedule B. Actual lengths of structures
and bridges as required on the basis of detailed investigations shall be determined by the
Concessionaire in accordance with the Specifications and Standards. Existing water bodies
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar B - 10
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana
in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
like ponds, lakes etc., which are to be preserved from environment impact mitigation point of
view, shall be bridged to the extent of full ponding level at peak rainy season as per
requirement of EMP submitted to MoEF at the time of Environmental Clearance. Any
increase in the structure length specified in this Schedule B shall not constitute a Change of
Scope, save and except any variations in the length arising out of a Change of Scope
expressly undertaken in accordance with the provisions of Article 16.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar B - 11
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana
in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Note:
The lane configuration and width of all structures shall be as per respective paragraph
appendices of this schedule.
If the paved carriageway width of structure is more than the carriageway width of
approaches/ embankment section of project highway, then proper pavement tapering (as per
IRC Manual (as specified in Schedule D)) shall be provided.
TCS schedule as given above shall be treated as an approximate assessment. Actual length of
the TCS schedule shall be prepared by the Concessionaire based on detailed investigations
and site requirements.
Any variation in length of respective TCS specified in Schedule B shall not constitute a
change of scope, save and except any variations in the design length arising out of a change
of scope expressly undertaken in accordance with the provisions of Article 16.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar B - 20
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana
in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Minimum lane configurations of Loops / Ramps for each interchange are as follows:
Interchange Ramp
Lane
& Chainage /Loop/Road Description TCS Type
Configuration
(Km) No
Exit from Project Highway
Road - 1 2 lane
(From Varanasi to Gola) Refer drawings
Interchange Entry on Project Highway attached below
CH:- Road - 2 2 lane for Interchange
(From Gola to Varanasi)
357+200 Layout and
(Single Exit from Project Highway applicable
Road - 3 2 lane
Trumpet) (From Kolkata to Peterbar) Typical Cross
Sections.
Entry on Project Highway
Road - 4 2 lane
(From Peterbar to Kolkata)
Note:
The width of Paved Carriageway shall be minimum as given in TCS. However, where toll
plaza has to be constructed on Loop/Ramp, the width of Paved Carriageway shall be as
per the width of toll plaza lane configuration given in Schedule C including taper length
as per IRC Manual (as specified in Schedule D).
The lane configuration and width of all structures shall be as per respective paragraph of
this schedule.
The loops and Ramps shall be provided with proper acceleration and deceleration lane
with tapering as per Schedule D and site requirements. Any change as per site
requirement may not constitute change of scope, save and except any variation arising
out of change of scope expressly undertaken in accordance with the provisions of Article
16.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar B - 21
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana
in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
The cross road at vehicular overpass locations shall be constructed to the lane configuration as given
below:-
Location of VOP
Sr.No. Description Length (Km) Proposed Lane Configuration
(Km)
1 344+675 Village Road 0.30 2 lane
2 347+100 Village Road 0.30 2 lane
Note:
The width of structures shall be constructed as per respective clauses / appendices mentioned
in this schedule.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar B - 22
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana
in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km B - 23
325.500 to km 358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km B - 24
325.500 to km 358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km B - 25
325.500 to km 358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km B - 26
325.500 to km 358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km B - 27
325.500 to km 358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km B - 28
325.500 to km 358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km B - 29
325.500 to km 358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km B - 30
325.500 to km 358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km B - 31
325.500 to km 358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km B - 32
325.500 to km 358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Interchange at Km - 357+200
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km B - 33
325.500 to km 358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km B - 34
325.500 to km 358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km B - 35
325.500 to km 358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Appendix B-II
Note:
a) The above lengths are indicative and minimum specified. The actual length of the connecting
roads shall be determined by the Concessionaire in accordance with IRC: SP: 87-2019 and actual
site requirements with approval from the Independent Engineer. Any variations in the length
specified in this Clause of Schedule-B shall not constitute a Change of Scope, save and except
any variations in the length arising out of a Change of Scope expressly undertaken in accordance
with the provisions of Article 16.
b) The width of Paved Carriageway of slip roads, given in above table and in TCS is minimum
specified. However, where toll plaza has to be constructed on slip roads, the width of Paved
Carriageway shall be as per the width of toll plaza lane configuration given in Schedule C
including taper length as per manual (as specified in Schedule D).
c) The realignment of existing track to the SVUP/LVUP/VUP/Flyover outside the PROW and
connecting roads between consecutive underpasses wherever required as per plan & profile
uploaded with bid document and specified in this schedule shall be constructed by the
Concessionaire as per site requirement in consultation with Independent Engineer. Any
variations in the length specified in this Clause of Schedule-B shall not constitute a Change of
Scope, save and except any variations in the length arising out of a Change of Scope expressly
undertaken in accordance with the provisions of Article 16.
d) Length of roads given in above table excludes length across the Project Highway for proper
connectivity of cross roads on either side of Project Highway as given in the alignment plan
enclosed in this Schedule which shall be deemed to be included in the scope of work.
e) Entry and exit approaches with slip road shall be provided for all way side amenities/ truck
parking (mentioned in Schedule C) with proper acceleration / deceleration lane. The structures
falling within this stretches shall also be constructed and the same shall not constitute a Change
of Scope.
f) Width of connecting road shall not be less than the width of the existing road subject to
minimum width specified in paragraph 2.12.3 of IRC: SP: 87-2019.
g) Bituminous/gravel roads shall be connected by bituminous roads while the diverted earthen roads
to be connected by CC paver Block of minimum compressive strength of M30.
Carriageway Width
Sl. VOP Location Length
Type of Crossing Including Paved
No. (Km) ( in Km)
Shoulder (in m)
1 344+675 Village Road 0.30 5.5
2 347+100 Village Road 0.30 5.5
Proper tapering/ matching shall be made with the existing road on both ends. The length of
approaches specified herein above shall be treated as approximate assessment. Any variations in the
length specified in this Clause of Schedule-B shall not constitute a Change of Scope, save and except
any variations in the length arising out of a Change of Scope expressly undertaken in accordance with
the provisions of Article 16.Structures shall be constructed as per respective appendix given in this
schedule.
Appendix B-IV
DETAILS OF PROPOSED ROW
Wherever required, Additional Land at interchanges, service road and toll plaza/booths locations shall
be provided by the Authority as per approved drawings within 150 days of the appointed date as per
Agreement.
Appendix B-V
MAJOR INTERSECTIONS (INTERCHANGES)
Note:
a) Detailed design of all interchanges shall be done in accordance with this Schedule-B,
IRC Manual (IRC SP: 99, as specified in Schedule D) and MoRT&H type design.
b) Any other structure falling within acceleration/deceleration lane and taper portion
shall be constructed to the required width. These changes shall not be treated as
change of scope.
c) Crash barriers shall be provided on abutments side and on sides of pier as a protection
barrier in accordance with IRC SP: 87-2019.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km 325.500 to km B - 42
358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Appendix B-VI
DETAILS OF STRUCTURES ON INTERCHANGES/LOOP and RAMP
Note:
Proposed span arrangement of structure is tentative; same shall be finalized on the basis of detailed investigations by the Concessionaire in
accordance with the IRC Manual (as specified in Schedule D) and in consultation with Independent Engineer /NHAI. However the total length of
structure cannot be less than as specified above in any case. Any increase in span arrangement and change in location shall not be considered as
change of scope.
At Km 358+400, Vehicular Overpass and its approaches shall be designed and finalized on the basis of detailed investigations by the Concessionaire
in accordance with the IRC Manual (as specified in Schedule D) and in consultation with Independent Engineer /NHAI. However the total length of
structure cannot be less than as specified above in any case. Any increase in span arrangement and change in location shall not be considered as
change of scope.
The Deck level of the Bridges should be governed by HFL of stream/FSL of canal and Clearance as per the guidelines of concerned authority.
No. of expansion joints may be reduced by provision of continuous spans, in consultation with IE/NHAI. It shall also be ensured that distance
between two consecutive expansions joints shall not be less than 100m.
Wherever liquefaction is observed below Open foundation and Raft Structures, Ground improvement shall be done to improve compaction of the soil
and to increase its penetration resistance and satisfy clause 8.4.4 (v) of IRC114.
Special vehicle loading is to be considered in Design of structures.
Any Change in skew angle as per site requirement shall not be treated as change of scope.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km 325.500 to B - 43
km 358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Any other structure falling within acceleration/deceleration lane and taper portion shall be constructed to the required width. These changes shall not
be treated as change of scope.
Crash barriers shall be provided on abutments side and on sides of pier as a protection barrier in accordance with IRC SP: 87-2019.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km 325.500 to B - 44
km 358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Appendix B-VII
DETAILS OF FLYOVERS/ ELEVATED STRUCTURES /VIADUCTS
DETAILS OF FLYOVERS
Note:
Proposed span arrangement of structure is tentative; same shall be finalized on the basis of detailed investigations by the Contractor/Concessionaire in
accordance with the IRC Manual (as specified in Schedule D) and in consultation with concerned Forest/Wildlife Authority if required and with
Independent Engineer /NHAI. However the total length of structure cannot be less than as specified above in any case. Any increase in span
arrangement and change in location shall not be considered as change of scope.
Wherever liquefaction is observed below Open foundation and Raft Structures, Ground improvement shall be done to improve compaction of the soil
and to increase its penetration resistance and satisfy clause 8.4.4 (v) of IRC114.
Special vehicle loading is to be considered in Design of structures.
Any superstructure coming in longitudinal gradient/slope has to be designed to resist the possible dislodgement from bearing level.
Any Change in skew angle as per site requirement shall not be treated as change of scope.
Crash barriers shall be provided on abutments side and on sides of pier as a protection barrier in accordance with IRC SP: 87-2019.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km 325.500 to B - 45
km 358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
The bearings shall be of such type which does not require replacement for at least 50 years for major bridges, vehicular underpasses and rail road
structures and 25 years for other structures.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km 325.500 to B - 46
km 358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Clear
Design Skew
S. Span/Opening Deck Width of Open
Chainage Type of Crossing Type of Structure angle
No. in square Configuration (m) Median (m)
(km) (degree)
direction (m)
1 334+615 - RCC I GIRDER 1x20 10 2 X 16 3
2 349+580 - RCC BOX 2x10 0 2 X 16 3
Note:
The minimum vertical clearance from cross road in case of all VUP structures shall be 5.5m.
Wherever liquefaction is observed below Open foundation and Raft Structures, Ground improvement shall be done to improve compaction of the soil
and to increase its penetration resistance and satisfy clause 8.4.4 (v) of IRC114.
Special vehicle loading is to be considered in Design of structures.
Any Change in skew angle as per site requirement shall not be treated as change of scope.
The bearings shall be of such type which does not require replacement for at least 50 years for major bridges, vehicular underpasses and rail road
structures and 25 years for other structures
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km 325.500 to B - 47
km 358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Note:
The span arrangements and vertical clearance specified above are minimum and mandatory. However the same shall be finalized on the basis of
detailed investigations by the Concessionaire in accordance with the IRC Manual (as specified in Schedule D) and in consultation and approval by the
NHAI/ IE. Any change shall not be treated as change in scope of work.
Wherever liquefaction is observed below Open foundation and Raft Structures, Ground improvement shall be done to improve compaction of
the soil and to increase its penetration resistance and satisfy clause 8.4.4 (v) of IRC114.
Special vehicle loading is to be considered in Design of structures.
Any Change in skew angle as per site requirement shall not be treated as change of scope.
Note:
The span arrangements and vertical clearance specified above are minimum and mandatory. However the location of the same shall be finalized on
the basis of detailed investigations by the Concessionaire in accordance with the IRC Manual (as specified in Schedule D) and in consultation with
the concern Forest/Wildlife Authority and after approval by the NHAI/ IE. Any change shall not be treated as change in scope of work.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km 325.500 to B - 48
km 358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Wherever liquefaction is observed below Open foundation and Raft Structures, Ground improvement shall be done to improve compaction of the soil
and to increase its penetration resistance and satisfy clause 8.4.4 (v) of IRC114.
Special vehicle loading is to be considered in Design of structures.
Suitable fertile filler materials and provision of drainage layers shall be provided over top slab in Wildlife Overpasses after consultation with Forest
Department/IE/Authority.
Any Change in skew angle as per site requirement shall not be treated as change of scope.
The bearings shall be of such type which does not require replacement for at least 50 years for major bridges, vehicular underpasses and rail road
structures and 25 years for other structures.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km 325.500 to B - 49
km 358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Clear
Design Skew Deck Width of
S. Type of Opening in
Chainage angle Configuratio Open Median
No. Structure square
(km) (degree) n (m) (m)
direction (m)
1 326+045 RCC Box 1 X 12 0 2 X 16 3
2 327+380 RCC Box 1 X 12 30 2 X 16 3
3 327+975 RCC Box 1 X 12 4 2 X 16 3
4 331+600 RCC Box 1 X 12 0 2 X 16 3
5 333+200 RCC Box 1 X 12 0 2 X 16 3
6 339+625 RCC Box 1 X 12 0 2 X 16 3
7 340+150 RCC Box 1 X 12 18 2 X 16 3
8 340+540 RCC Box 1 X 12 0 2 X 16 3
9 341+200 RCC Box 1 X 12 0 2 X 16 3
10 342+360 RCC Box 1 X 12 0 2 X 16 3
11 351+250 RCC Box 1 X 12 0 2 X 16 3
12 352+940 RCC Box 1 X 12 0 2 X 16 3
13 357+560 RCC Box 1 X 12 0 2 X 16 3
Note:
The minimum vertical clearance from Cross road in case of all LVUP structures shall be
4.0m.
Wherever liquefaction is observed below Open foundation and Raft Structures, Ground
improvement shall be done to improve compaction of the soil and to increase its penetration
resistance and satisfy clause 8.4.4 (v) of IRC114.
Special vehicle loading is to be considered in Design of structures.
Any Change in skew angle as per site requirement shall not be treated as change of scope.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village B - 50
to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana in the State
of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Clear
Design Skew Deck Width of
S. Type of Opening in
Chainage angle Configuration Open
No. Structure square
(km) (degree) (m) Median (m)
direction (m)
1 332+520 RCC Box 1X7 0 2 X 16 3
2 337+250 RCC Box 1X7 0 2 X 16 3
3 354+310 RCC Box 1X7 0 2 X 16 3
Note:
The minimum vertical clearance from Cross road in case of all SVUP structures shall be
4.0m.
Wherever liquefaction is observed below Open foundation and Raft Structures, Ground
improvement shall be done to improve compaction of the soil and to increase its penetration
resistance and satisfy clause 8.4.4 (v) of IRC114.
Special vehicle loading is to be considered in Design of structures.
Any Change in skew angle as per site requirement shall not be treated as change of scope.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village B - 51
to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana in the State
of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Note:
Proposed span arrangement of structure is tentative; same shall be finalized on the basis of detailed investigations by the Concessionaire in
accordance with the IRC Manual (as specified in Schedule D) and in consultation with Independent Engineer /NHAI. However the total length of
structure cannot be less than as specified above in any case. Any increase in span arrangement and change in location shall not be considered as
change of scope.
The Deck level of the Bridges should be governed by HFL of stream/Navigational HFL and Clearance as per guidelines of Inland Waterways
Authority of India.
It shall be ensured that distance between two consecutive expansions joints shall not be less than 90m and structure shall be designed accordingly.
Wherever liquefaction is observed below Open foundation and Raft Structures, Ground improvement shall be done to improve compaction of the soil
and to increase its penetration resistance and satisfy clause 8.4.4 (v) of IRC114.
Special vehicle loading is to be considered in Design of structures.
Any Change in skew angle as per site requirement shall not be treated as change of scope.
Any superstructure coming in longitudinal gradient/slope has to be designed to resist the possible dislodgement from bearing level.
The bearings shall be of such type which does not require replacement for at least 50 years for major bridges, vehicular underpasses and
rail road structures and 25 years for other structures.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km B - 52
325.500 to km 358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Span
Design Name Arrangement c/c Deck Width of
Skew angle Type of
Sl. No. Chainage (Irrigation Expansion joint in Configuration Open Median
(degree) Structure
(in Km) Canals) Square direction (m) (m)
(m)
NIL
Note:
The Deck level of the Bridges should be governed by Full supply level of Canal.
The span arrangements and vertical clearance are tentative and the same shall be followed as per approved GAD by the concern Irrigation Authority
and any change shall not be treated as change in scope of work.
Wherever liquefaction is observed below Open foundation and Raft Structures, Ground improvement shall be done to improve compaction of the soil
and to increase its penetration resistance and satisfy clause 8.4.4 (v) of IRC114.
Special vehicle loading is to be considered in Design of structures.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km B - 53
325.500 to km 358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Sl. Design Chainage Span Arrangement c/c Expansion joint Skew Deck Configuration Width of Open
Type of Structure
No. (in Km) in Square direction (m) angle (m) Median (m)
NIL
Note:
The minimum vertical clearance from Cross road in case of all Major Bridge Cum Underpass structures shall be 4.0m.
The span arrangements and vertical clearance are tentative and the same shall be followed as per approved GAD by the concerned Irrigation
Authority. However the total length of structure cannot be less than as specified above in any case. Any increase in span arrangement and
change in location shall not be considered as change of scope.
Wherever liquefaction is observed below Open foundation and Raft Structures, Ground improvement shall be done to improve compaction of the soil
and to increase its penetration resistance and satisfy clause 8.4.4 (v) of IRC114.
Special vehicle loading is to be considered in Design of structures.
Any Change in skew angle as per site requirement shall not be treated as change of scope.
The bearings shall be of such type which does not require replacement for at least 50 years for major bridges, vehicular underpasses and rail road
structures and 25 years for other structures.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km 325.500 to km B - 54
358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Note:
The span arrangements and vertical clearance are tentative; same shall be finalized on the basis of detailed investigations by the Concessionaire in
accordance with the IRC Manual (as specified in Schedule D) and in consultation with the concern Forest/Wildlife Authority and after approval by
the NHAI/ IE. However the total length of structure cannot be less than as specified above in any case. Any increase in span arrangement and change
in location shall not be considered as change of scope.
Wherever liquefaction is observed below Open foundation and Raft Structures, Ground improvement shall be done to improve compaction of the soil
and to increase its penetration resistance and satisfy clause 8.4.4 (v) of IRC114.
Special vehicle loading is to be considered in Design of structures.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km 325.500 to km B - 55
358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Span
Design Name Total length Deck Width of
Arrangement c/c Type of
Sl. No. Chainage (Irrigation C/C of Exp. Skew angle Configuration Open Median
Expansion Joint Structure
(in Km) Canal/Crossing) Joint (m) (m) (m)
(m)
NIL
Note:
The minimum vertical clearance from Cross road in case of all Major Bridge Cum SVUP structures shall be 4.0 m.
The span arrangements and vertical clearance are tentative and the same shall be followed as per approved GAD by the concern Irrigation Authority
and any change shall not be treated as change in scope of work.
Wherever liquefaction is observed below Open foundation and Raft Structures, Ground improvement shall be done to improve compaction of the soil
and to increase its penetration resistance and satisfy clause 8.4.4 (v) of IRC114.
Special vehicle loading is to be considered in Design of structures.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km 325.500 to km B - 56
358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Appendix B-XI
Note:
The Deck level of the Bridges should be governed by Navigational HFL and Clearance as per guidelines of Inland Waterways Authority of India.
Wherever liquefaction is observed below Open foundation and Raft Structures, Ground improvement shall be done to improve compaction of the soil
and to increase its penetration resistance and satisfy clause 8.4.4 (v) of IRC114.
Special vehicle loading is to be considered in Design of structures.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km 325.500 to km B - 57
358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Note:
Proposed span arrangement of structure is tentative; same shall be finalized on the basis of detailed investigations by the Concessionaire in
accordance with the IRC Manual (as specified in Schedule D) and in consultation with Independent Engineer /NHAI. However the total length of
structure cannot be less than as specified above in any case. Any increase in span arrangement and change in location shall not be considered as
change of scope.
The Deck level of the Bridges should be governed by HFL of stream/Navigational HFL and Clearance as per guidelines of Inland Waterways
Authority of India.
Wherever liquefaction is observed below Open foundation and Raft Structures, Ground improvement shall be done to improve compaction of the soil
and to increase its penetration resistance and satisfy clause 8.4.4 (v) of IRC114.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km 325.500 to km B - 58
358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km 325.500 to km B - 59
358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Note:
The Deck level of the Bridges should be governed by Full supply level of Canal.
The span arrangements and vertical clearance are tentative and the same shall be followed as per approved GAD by the concern Irrigation Authority
and any change shall not be treated as change in scope of work.
Wherever liquefaction is observed below Open foundation and Raft Structures, Ground improvement shall be done to improve compaction of the soil
and to increase its penetration resistance and satisfy clause 8.4.4 (v) of IRC114.
Special vehicle loading is to be considered in Design of structures.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km B - 60
325.500 to km 358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Note:
The span arrangements and vertical clearance are tentative and the same shall be followed as per approved GAD by the concerned Irrigation
Authority. However the total length of structure cannot be less than as specified above in any case. Any increase in span arrangement and change in
location shall not be considered as change of scope.
Wherever liquefaction is observed below Open foundation and Raft Structures, Ground improvement shall be done to improve compaction of the soil
and to increase its penetration resistance and satisfy clause 8.4.4 (v) of IRC114.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km B - 61
325.500 to km 358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Note:
Proposed span arrangement of structure is tentative; same shall be finalized on the basis of detailed investigations by the Concessionaire in
accordance with the IRC Manual (as specified in Schedule D) and in consultation with Independent Engineer /NHAI. However the total length of
structure cannot be less than as specified above in any case. Any increase in span arrangement and location shall not be considered as change of
scope.
Wherever liquefaction is observed below Open foundation and Raft Structures, Ground improvement shall be done to improve compaction of the soil
and to increase its penetration resistance and satisfy clause 8.4.4 (v) of IRC114.
Special vehicle loading is to be considered in Design of structures.
Any Change in skew angle as per site requirement shall not be treated as change of scope.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km B - 62
325.500 to km 358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Span Arrangement
c/c Expansion
Deck Width of Minimum
Sl. Design joint/clear opening in Type of
Skew Angle Configuration Open vertical
No. Chainage (Km) Square direction Structure
(m) Median (m) clearance (m)
(Nos. x Span length)
(m)
1 334+780 2x 30 0 RCC I GIRDER 2 X 16 3 7.0
2 338+960 2x 30 0 PSC I GIRDER 2 X 16 3 7.0
3 340+900 2x20 0 RCC I GIRDER 2 X 16 3 7.0
4 343+370 1x30 0 PSC I GIRDER 2 X 16 3 7.0
Note:
The span arrangements and vertical clearance specified above are minimum and mandatory. However the location of the same shall be finalized on
the basis of detailed investigations by the Concessionaire in accordance with the IRC Manual (as specified in Schedule D) and in consultation with
the concern Forest/Wildlife Authority and after approval by the NHAI/ IE. Any change shall not be treated as change in scope of work.
Wherever liquefaction is observed below Open foundation and Raft Structures, Ground improvement shall be done to improve compaction of the soil
and to increase its penetration resistance and satisfy clause 8.4.4 (v) of IRC114.
Special vehicle loading is to be considered in Design of structures.
Any Change in skew angle as per site requirement shall not be treated as change of scope.
Any superstructure coming in longitudinal gradient has to be designed to resist the possible dislodgement from bearing level.
The bearings shall be of such type which does not require replacement for at least 50 years for major bridges, vehicular underpasses and rail road
structures and 25 years for other structures.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km B - 63
325.500 to km 358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
WILDLIFE UNDERPASS
Span Arrangement
c/c Expansion
Deck Width of Minimum
Sl. Design joint/clear opening in Type of
Skew Angle Configuration Open vertical
No. Chainage (Km) Square direction Structure
(m) Median (m) clearance (m)
(Nos. x Span length)
(m)
1 327+760 1x20 0 RCC I GIRDER 2 X 16 3 7.0
2 329+025 1x20 0 RCC I GIRDER 2 X 16 3 7.0
3 337+110 1x20 0 RCC I GIRDER 2 X 16 3 7.0
4 337+320 1x20 0 RCC I GIRDER 2 X 16 3 7.0
5 340+390 1x30 0 PSC I Girder 2 X 16 3 7.0
6 342+560 1x30 0 PSC I Girder 2 X 16 3 7.0
7 348+980 1x20 0 RCC I GIRDER 2 X 16 3 7.0
Note:
The span arrangements and vertical clearance specified above are minimum and mandatory. However the location of the same shall be finalized on
the basis of detailed investigations by the Concessionaire in accordance with the IRC Manual (as specified in Schedule D) and in consultation with
the concern Forest/Wildlife Authority and after approval by the NHAI/ IE. Any change shall not be treated as change in scope of work.
Wherever liquefaction is observed below Open foundation and Raft Structures, Ground improvement shall be done to improve compaction of the soil
and to increase its penetration resistance and satisfy clause 8.4.4 (v) of IRC114.
Special vehicle loading is to be considered in Design of structures.
Any Change in skew angle as per site requirement shall not be treated as change of scope.
Any superstructure coming in longitudinal gradient has to be designed to resist the possible dislodgement from bearing level.
The bearings shall be of such type which does not require replacement for at least 50 years for major bridges, vehicular underpasses and rail road
structures and 25 years for other structures.
.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km B - 64
325.500 to km 358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Appendix B-XIII
Note:
The span arrangements, vertical clearance and Deck Configuration are tentative and the same shall be followed as per approved GAD by the concern
Railway Authority and any change shall not be treated as change in scope of work.
Wherever liquefaction is observed below Open foundation and Raft Structures, Ground improvement shall be done to improve compaction of the soil
and to increase its penetration resistance and satisfy clause 8.4.4 (v) of IRC114.
Special vehicle loading is to be considered in Design of structures.
The bearings shall be of such type which does not require replacement for at least 50 years for major bridges, vehicular underpasses and rail road
structures and 25 years for other structures.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km 325.500 to B - 65
km 358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Appendix B-XIV
Note:
Locations of the above culverts are indicative. Exact location of these culverts shall be
decided in consultation with Independent Engineer.
The minimum width of the above culverts shall be equal to Roadway width (including
median) In case of connecting road culvert also to be provided in the gap between main
carriageways& connecting road. In cases of the culverts with fill culvert to be provided
though out Roadway width and median width. Any additional length required as per site
conditions shall not constitute a Change of Scope.
Ventway/Span arrangements are minimum specified. The actual vent way/span arrangements
of culverts shall be determined on the basis of detailed investigations by the Concessionaire in
accordance with the Specifications and Standards. Any variations in vent way/span
arrangements specified above shall not constitute a Change of Scope.
Only Precast Box Culvert shall be provided. If unavoidable, the approval of the Authority
shall be obtained for specific construction of in-situ Box culvert. However such number shall
not exceed 20%.
Invert level of box culverts (without defined channel or flow) shall not be lower than the
existing Ground level, so that these culverts can be used in dry season for pedestrian, light
vehicle and cattle crossing by providing necessary flooring.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar B - 67
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala
Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Appendix B-XV
Size
Design
S.No Type of Crossing Type Of Culvert No x Width (m) x Height
Chainage
(m)
NIL
Note:
Locations of the above culverts are indicative. Exact location of these culverts shall be
decided in consultation with Independent Engineer.
The minimum width of the above culverts shall be equal to Roadway width only (including
median).In case of connecting road culvert also to be provided in the gap between main
carriageway & connecting road and connecting road. In cases of the culverts with fill culvert
to be provided though out Roadway width and median width. Any additional length required
as per site conditions shall not constitute a Change of Scope.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar B - 68
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala
Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Appendix B-XVI
Size
Sl. Chainage
Type of Crossing Type of Culvert No x Width (m)
No. (Km)
x Height (m)
NIL
Note:
Locations of the above culverts are indicative. Exact location of these culverts shall be
decided in consultation with Independent Engineer.
The overall width of the above culverts shall be equal to Roadway width only (including
median).In case of connecting road culvert also to be provided in the gap between main
carriageway & connecting road and connecting road. In cases of the culverts with fill culvert
to be provided though out Roadway width and median width. Any additional length required
as per site conditions shall not constitute a Change of Scope.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar B - 69
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala
Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Appendix B-XVII
Sl. Size
Chainage (Km) Type of Culvert
No. No x Width (m) x Height (m)
CULVERTS at INTERCHANGE at Km 357+200
1 0+036 RCC Box 1x6x4
2 0+550 RCC Box 1x6x4
3 0+800 RCC Box 1x6x4
4 3+200 RCC Box 1x6x4
5 3+525 RCC Box 1x6x4
6 3+845 RCC Box 1x3x3
7 5+310 RCC Box 1x3x3
Note:
Locations of the above culverts are indicative. Exact location of these culverts shall be
decided in consultation with Independent Engineer.
The overall width of the above culverts shall be equal to Roadway width only (including
median).In case of connecting road culvert also to be provided in the gap between main
carriageway & connecting road and connecting road. In cases of the culverts with
fill culvert to be provided though out Roadway width and median width. Any additional
length required as per site conditions shall not constitute a Change of Scope.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar B - 70
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala
Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Appendix B-XVIII
Size
Sl. No. Design Chainage (Km) Type Remarks
No x Width (m) x Height (m)
NIL
Note:
Locations of the above culverts are indicative. Exact location of these culverts shall be
decided in consultation with Independent Engineer.
The overall width of the above culverts shall be equal to Roadway width only (including
median). In case of connecting road culvert also to be provided in the gap between main
carriageway & connecting road and connecting road. In cases of the culverts with fill culvert
to be provided though out Roadway width and median width. Any additional length required
as per site conditions shall not constitute a Change of Scope.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar B - 71
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala
Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Appendix B-XIX
Additional 30 (thirty) no. of box culverts of size 1x3x3m shall be provided across the Highway for
local canal/ field canal/ utility crossings as per the site requirement. Location for such culverts shall be
finalized in consultation with Independent Engineer and NHAI.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar B - 72
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala
Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Appendix B-XX
Stretches for Provision of Reinforced Earth Wall and RCC Retaining wall/RCC Toe
wall and Breast Wall
Chainage (Km)
S No. Length (m) Side
From To
1 326+471 326+700 229 Both Side
2 327+180 327+280 100 Both Side
3 327+440 327+540 100 Both Side
4 327+982 328+055 73 Both Side
5 328+145 329+015 870 Both Side
6 329+035 329+140 105 Both Side
7 331+606 331+980 374 Both Side
8 332+080 332+340 260 Both Side
9 332+720 332+940 220 Both Side
10 333+300 333+638 338 Both Side
11 333+663 333+730 67 Both Side
12 334+625 334+750 125 Both Side
13 334+810 334+940 130 Both Side
14 338+740 338+930 190 Both Side
15 338+990 339+280 290 Both Side
16 339+720 339+900 180 Both Side
17 339+990 340+144 154 Both Side
18 340+920 340+980 60 Both Side
19 341+360 341+460 100 Both Side
20 341+600 341+680 80 Both Side
21 342+440 342+545 105 Both Side
22 342+575 342+660 85 Both Side
23 343+280 343+355 75 Both Side
24 343+385 343+440 55 Both Side
25 349+900 350+000 100 Both Side
26 350+120 350+195 75 Both Side
27 350+205 350+380 175 Both Side
28 351+380 351+475 95 Both Side
29 351+485 351+600 115 Both Side
30 351+700 351+800 100 Both Side
31 352+100 352+220 120 Both Side
32 352+946 353+055 109 Both Side
33 353+065 353+160 95 Both Side
34 357+660 357+675 15 Both Side
35 357+685 357+820 135 Both Side
36 357+980 358+220 240 Both Side
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar B - 73
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala
Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Chainage (Km)
S No. Length (m) Side
From To
1 330+120 330+200 80 Both Side
2 330+340 330+920 580 Both Side
3 330+920 331+100 180 Both Side
4 331+100 331+197 97 Both Side
5 331+204 331+500 296 Both Side
6 335+220 335+740 520 Both Side
7 335+740 336+260 520 Both Side
8 336+260 336+920 660 Both Side
9 340+660 340+800 140 Both Side
10 343+660 344+940 1280 Both Side
11 345+980 346+660 680 Both Side
12 346+785 347+380 595 Both Side
13 347+540 347+660 120 Both Side
14 347+740 347+865 125 Both Side
15 347+900 348+180 280 Both Side
16 348+240 348+460 220 Both Side
17 348+520 348+720 200 Both Side
18 351+960 352+020 60 Both Side
19 352+760 352+800 40 Both Side
20 353+560 353+660 100 Both Side
21 354+530 354+620 90 Both Side
22 355+520 355+600 80 Both Side
RCC Retaining wall/RCC Toe wall of suitable height (as per site requirement) shall be
provided to accommodate the highway cross section within the available/proposed ROW and
the same shall not constitute a Change of Scope.
Note:
The location of RE wall / retaining wall along main carriageway shall be placed in such a way
that lane addition could be done without recasting/ reconstruction. The design and
construction of partial RE wall/ retaining wall shall be done for full height considering future
widening.
In addition to above RE wall/ retaining wall mentioned above, cross wall shall be provided
behind each abutment.
In addition to above, RE wall/Retaining wall shall be provided at toll plaza and other
locations to restrict the embankment slope within the right of way.
increase in the lengths specified in this Schedule-B shall not constitute a Change of Scope,
save and except any variations arising out of a Change of Scope expressly undertaken in
accordance with the provisions of Article 16.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar B - 75
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala
Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Appendix B-XXI
Concessionaire shall shift the existing irrigation canal/ nallah at the locations for construction of
project highway. The typical sizes of the existing canal/ nallah are given for reference. The actual
cross-section to be shifted and length shall be as per the site requirement and approval of concerned
irrigation authority.
The nallah/ drain and canals shall be realigned constructed at locations listed below:
Note:
In addition to above stretches, the stretches marked in drawings (Appendix B-II) shall be
realigned within the scope of work.
The realignment shall be done within the right of way in consultation/approval with
concerned department. To restrict within right of way, PCC structure shall be provided.
The length and size specified hereinabove shall be treated as an approximate assessment and
minimum. The actual requirement shall be investigated and determined by the Concessionaire
in accordance with the Specifications and Standards. Any increase in the lengths and cross-
sections specified shall not constitute a Change of Scope, save and except any variations
arising out of a Change of Scope expressly undertaken in accordance with the provisions of
Article 16.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar B - 76
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala
Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Appendix B-XXII
OVERHEAD SIGNS
Traffic Signs (excluding overhead signs at Toll Plaza): Traffic sign boards as per details given below
and indicated in the traffic signage plan mentioned in Appendix B-II of this Schedule shall be
provided in the project highway in accordance to manual (as specified in Schedule D). The traffic
signage plan mentioned in Appendix B-II shall be deemed to be part of this Schedule-B.
Minimum 03 nos. (LHS+RHS) of “Cantilever Gantry type Sign Boards” (such as Advance
Direction/ Rest Area Sign Boards/ fee Plaza sign boards/ sign boards before junction etc.) shall be
provided as per Traffic Signage Plan (Appendix B-II).
The type, numbers and location of Traffic Signages shown in Traffic Signage Plan (Appendix B-II)
are tentative and minimum specified. The actual numbers and location of Traffic Signages shall be
determined by the Concessionaire in accordance with the IRC: SP: 87-2019 requirements with
approval from the Independent Engineer. Any increase in the number and type of road sign shall not
constitute a Change of Scope, save and except any variations arising out of a Change of Scope
expressly undertaken in accordance with the provisions of Article 16. Adequate signs for toll plaza
shall be provided as given in this schedule and manual (as specified in Schedule D).
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar B - 77
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana in
the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Appendix B-XXIII
Utility Shifting
B.
The supervision charges at the rates/charges applicable of the Utility owning Department shall be
paid directly by the Authority to the Utility owning Department as and when Concessionaire
furnished demand of Utility Owning Department along with a copy of estimated cost given by the
latter.
C.
The dismantled material/scrap of existing Utility to be shifted/dismantled shall belong to the
Concessionaire who would be free to dispose-off the dismantled material as deemed fit by them
unless the Concessionaire is required to deposit the dismantled material to Utility Owning
Department as per the norms and practice and, in that case the amount of credit for dismantled
material may be availed by the Concessionaire as per the estimate agreed between them.
D.
The utilities shall be handed over after shifting work is completed to Utility Owning Department
to their entire satisfaction. The maintenance liability shall rest with the Utility Owning
Department after handing over process is complete as far as utility shifting works are concerned.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar B - 78
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala Pariyojana in
the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
SCHEDULE – C
(See Clause 2.1)
PROJECT FACILITIES
1 Project Facilities
1.1 The Concessionaire shall construct the Project Facilities in accordance with the
provisions of this Agreement. Such Project Facilities shall include.
a) Toll plazas
b) Road side furniture
c) Operation and Maintenance Centers
d) Way side amenities / Service Areas
e) Smaller Parking Places with Toilet Facilities Service Area
f) Truck Parking Areas
g) Pedestrian Facilities/ Cattle Crossings/SVUP
h) Lighting
i) Environmental Management Plan
j) Land Scaping and Tree Plantation
k) Noise Barriers
l) Utilities
m) Rain water harvesting
1.2 Project Facilities to be completed on or before project completion date have been
described in Annex-I of this Schedule-C.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in C-1
Bongabar village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under
Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Annex - I
(Schedule-C)
1 Project Facilities
The Concessionaire shall construct the Project Facilities described in this Annex-I to
form part of the Project Highway. The Project Facilities shall include:
a) Toll plazas
b) Road side furniture
c) Operation and Maintenance Centers
d) Way side amenities / Service Areas
e) Smaller Parking Places with Toilet Facilities Service Area
f) Truck Parking Areas
g) Pedestrian Facilities/ Cattle Crossings/SVUP
h) Lighting
i) Environmental Management Plan
j) Land Scaping and Tree Plantation
k) Noise Barriers
l) Utilities
m) Rain water harvesting
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in C-2
Bongabar village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under
Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
constructed over canopy (with adequate clearance) including all facilities and
accessories.
Based on the minimum toll lane requirement as given above, toll booths, toll plaza
complex, weigh bridges, electrical systems, Toilet facility, toll plaza and all other
facilities required/mentioned in manual shall be provided as per Schedule D and as per
NHAI Policy Guidelines specified in Policy Circular No. 17.5.82 dated 24th May 2021
with approval from IE and NHAI. Toll buildings shall be constructed at each ramps of
interchange and both sides of main carriageway along with public toilet and drinking
water facility at each location. All the structures shall be RCC framed structure as per
schedule D.
Area specified for building in above mentioned circular is minimum. Static weigh
bridges shall be installed at toll plaza of all entry ramps and main carriageway.
Toll Booths shall be constructed on every toll lane.
In addition to this, separate toilet facilities for the commuters (with minimum capacity
to accommodate 20 people at a time on Main Plaza and 10 people at ramp plaza) to be
developed on each side at the location of toll plaza/ramp plaza with specifications
mentioned in Schedule- D.
Apart from the above-mentioned facilities, Traffic Aid Booths (plinth area 25 sqm.) and
Medical Aid Booths (including an aid post building and 2 (two) residential quarters of
minimum 100 sqm. each) shall be considered as Mandatory facilities over and above the
plinth area mentioned. Traffic Aid Booth and Medical Aid Booths shall be constructed
with the type designs prescribed for such buildings by the State Government or a
substitute thereof within the site premises with easy accessibility and shall vest with the
Authority at toll plaza locations.
All other facilities at toll plaza location such as firefighting, water supply etc. shall be as
per IRC: SP:87-2019 / Schedule-D.
No. of toll lanes specified above are minimum indicative. The Concessionaire shall
design and provide toll lane as per IRC: SP: 87-2019 & as per NHAI Policy Guidelines
specified in Policy Circular No. 17.5.82 dated 24th May 2021, subject to minimum
specified above. Any increase in no. of toll lane shall not be treated as change of scope,
save and except any variations in the length arising out of a Change of Scope expressly
undertaken in accordance with the provisions of Article16.
RE wall/Retaining wall shall be provided at toll plaza locations to restrict the
embankment slope within the right of way.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in C-4
Bongabar village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under
Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Location
S. No. Side Area Length & Width (m)
Start (Km) End (Km)
1 353+500 353+700 RHS 3 Hac. 200x150m
2 353+900 354+100 LHS 3 Hac. 200x150m
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in C-5
Bongabar village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under
Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
f. Buffer Zone
g. Service Road (outside the premises) / Exit Road / Existing
Service Roads including necessary crash barriers as per
codes
I b. Services:-
1. Kiosks for misc. items – Minimum 10 nos. of Kiosks with carpet area of
each Kiosk (15 feet x 12 feet) shall be developed.
2. Toilet Blocks
Toilet Block Ladies Toilet:
- Toilet Block of minimum carpet area (50
feet x 40feet) shall be developed for IWC
minimum capacity of Gents-30 nos. EWC
and ladies -30 nos.
Trough
PC Toilet
Gents Toilet:
Urinals
IWC
EWC
Trough
PC Toilet
3. Parking: - Parking of minimum carpet area of 2500 Sqf. shall be
developed for minimum 100 nos. of vehicles.
a) Car
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in C-6
Bongabar village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under
Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
b) Car – PC
2.6 Lighting
The Concessionaire shall provide LED based lighting along the entire length of the
project highway, including loop/ramps of the interchanges. In addition to the above,
LED based lighting shall be provided at locations as specified in Section 12.5.3 of the
Manual and as per Schedule - D and also at following locations of the Project Highway.
(i) Toll Plazas area
(ii) Operation and maintenance centers
(iii) Way side amenities / Service Areas
(iv) Interchanges and Intersections of Cross Roads
(v) Bridges and ROB
(vi) Flyovers, VUPs/ LVUPs (Both on Project Highway and for Cross Road)
(vii) Underpasses and Overpasses
(viii) Traffic aid posts, vehicle rescue posts, medical aid posts and all other facility &
service buildings.
(ix) Interior illuminated signs
(x) Yellow flashing lights to alert drivers
Minimum level illumination on locations of the Project Highway, Slip Roads, Cross Roads
below VUP and Flyovers, at grade intersections with Cross roads, where exterior lighting
is provided shall be 40 lux. In general ‘code of practice for lighting of public
thoroughfare IS 1944 shall be followed. All facility buildings shall be illuminated
adequately.
In addition to street lighting, High mast lights shall be provided at Toll plaza (Height
30m), Flyover and Interchange locations as per clause 3.4.2 of IS 1944(Part-V) 1981.
The lighting fittings (with LED features) shall be powered by solar system with back up
facilities (power and battery both) at all locations.
The solar system with Lithium ion batteries shall be used for the entire highway. The
solar panel system of minimum 300 KW capacity shall be provided at interchange, toll
plazas and bridges and shall be grid connected. The solar panel system shall have
minimum 80% battery backup of total design load or 300 KW whichever is higher.
Additional battery backup shall be provided for lighting at all other locations. The
electrical connection with all its infrastructures shall be done by the contractor.
Connection shall be taken from the industrial feeder.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in C-7
Bongabar village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under
Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Sl. Types of
Location (Km) Remarks
No. Plantation
Shrubs In median except Structures Ornamental type plantation
1
shall be provided
Land Scaping All interchanges/ Service Areas / Ornamental type plantation
2
Toll plazas / O & M Centers shall be provided
Additional plantation in
available ROW shall be done
as per IRC SP 21 and The
3 Plantations Available open land within ROW
type of species of tree shall
be finalized in consultation
with IE/Authority.
The planting of number of trees/shrubs in avenue and median including their maintenance will
be guided by the IRC-SP: 21 provisions subject to the availability of ROW making allowance
for recovery area.
The minimum 35472 number of tress are required in addition to above as compensatory
afforestation as per provision of IRC SP 21.
Drip irrigation system for median plantation by gravity/pressure sources with all necessary
components / systems and emitting devices at plants shall be provided.
The Concessionaire shall maintain the trees and shrubs in good condition during maintenance
period as per the maintenance schedule.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in C-8
Bongabar village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under
Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in C-9
Bongabar village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under
Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Appendix C-1
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km C - 10
325.500 to km 358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Appendix C-2
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar village to Junction with NH-320 in Lepo village from km C - 11
325.500 to km 358.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
SCHEDULE – D
(See Clause 2.1)
SPECIFICATIONS AND STANDARDS
1. Construction
The Concessionaire shall comply with the Specifications and Standards set forth in Annex-I
of this Schedule-D for construction of the Project Highway.
2. Design Standards
The Project Highway including Project Facilities shall conform to design requirements set
out in the following documents.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar D-1
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala
Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Annex - I
(Schedule-D)
(i) Six laning of the Project Highway shall conform to the ‘Manual of Specifications and
Standards for Highway’ published as IRC: SP: 87-2019 and with all amendments
and additions up to Bid date (Referred to as “Manual” in this Schedule) and MORTH
Specifications for Road and Bridge Works (5th revision). Where the specification for
a work is not given, Good Industry Practice shall be adopted to the satisfaction of the
Independent Engineer.
(ii) As regards, the work of utility shifting, the relevant specifications, relevant rules,
regulations and acts of Utility Owning Department/Agencies shall be applicable
Sl.
Clause No. Details of Item Description of Deviation
No.
The median shall be as given in Schedule B (TCS).
Median shall include 0.5m wide edge strip on each side,
1 2.5.1 Median
which shall have same pavement configuration of Main
Carriageway as per Clause no. 2.5.3 of Manual.
Lateral & vertical
The lateral and vertical clearance of all underpasses shall
2 2.10.2 clearance at VUP
be as given in Schedule B.
/LVUP/SVUP
The typical cross section shall be as given in Schedule
3 2.17 Typical Cross Section
B.
Type of Pavement and The type of pavement and Design Requirements shall be
4 5.2 and 5.4.1
Design Requirements as specified in Schedule B.
5 2.2 Design Speed Design Speed of the highway shall be 120 km/hour.
Geometric Design of complete highway including main
6 2.9 Geometric Design carriageway and loop/ramps at interchange locations
shall be as per Clause 2.9 of IRC SP-99-2013.
Geometric design standards for interchanges (such as
Grade Separated
Ramp design speed, Ramp width and cross-section,
7 3.4 Intersections and
Acceleration/deceleration lanes etc.) shall be as per
Interchanges
clause 3.3 of IRC SP-99-2013.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar D-2
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala
Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Sl.
Clause No. Details of Item Description of Deviation
No.
4.5 m wide Hard Granular Shoulder on each side as
shown in TCS, Schedule B, shall be compacted with
200mm thick granular sub-base quality material at the
top duly stabilized with cement/suitable admixtures to
prevent erosion as well as to provide a stable platform
for occasional parking of errant vehicles. Hard granular
shoulders shall meet the following strength parameters:
(i) Unconfined Compressive Strength (UCS)
8 5.11 Earthen Shoulders
equivalent to the strength defined for the
bound sub-base layers as per IRC: 37.
(ii) CBR of laboratory mix at 97% MDD and 7
days cure+7 days soak: Minimum CBR 60.
In order to remove the possibility of choking of GSB
layer laid in 4.5 m wide earthen shoulder, a layer of
Geo-composite/Geotextile material shall be provided
between the layers of selected earth fill and GSB layer.
The Overall Deck Configuration of all structures shall be
Overall width of
9 7.3 as per Schedule B and all Road Over Bridges shall be as
structures
per the GAD approved by Railways Authority.
Lined/unlined Side Drains shall be provided throughout
10 6.2 Side Drains the Project as per typical cross section except at cross
drainage (River, nala, canal etc.).
Adequate Continuous Surface RCC drain (Except
Structures having approach slabs) shall be provided on
Drainage where both side Hard Granular Shoulder including RCC
11 6.4.2 Embankment Height Chutes at designed intervals with energy dissipation
is more than 6 meres basin irrespective of any Height of Embankment. The
drainage system shown in TCS shall be treated as
minimum.
Thrie-beam metal crash barriers as mentioned in
12 9.7.5 Median Barriers
Schedule B (TCS).
Thrie -beam metal crash barriers shall be provided in
entire length on outer side earthen shoulder of each main
Road side safety carriageway and Loops/ Ramps of interchanges as per
13 9.7.1
barriers TCS referred in Schedule-B but excluding stretches
covered by bridges and structures, where concrete
barriers to be provided.
In fill section the embankment side slope shall be
Embankment Fill Side
14 4.2.2 minimum 1.5 (H): 1 (V). The embankment height >6m
Slope
shall be designed in accordance with IRC: 75.
The project facilities and building structures shall be
15 Section 12 Project Facilities
constructed in accordance to Annex III of this Schedule.
Swaged steel tabular pole with swan neck shall be used
for roadside lighting conforming to IS 2713-1980
16 12.5 Street lighting controlled by suitable digital time switch and other
specifications shall be as per Clause no 12.5 of
IRC:SP:87-2019.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar D-3
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala
Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Sl.
Clause No. Details of Item Description of Deviation
No.
Width of service road shall be as per applicable TCS and
17 2.12.2 Width of service road
Schedule-B.
Boundary wall shall be provided as specified in
18 12.2 Road Boundary Walls
Schedule –C.
As specified in NHAI Policy Circular No. 17.5.82 dated
19 10.3 Land for Toll Plaza
24th May 2021.
Layout and Design of As specified in Schedule C & in NHAI Policy Circular
20 10.4
Toll Plaza No. 17.5.82 dated 24th May 2021.
Layout and Design of As specified in Schedule C & in NHAI Policy Circular
21 10.4.1
Toll Plaza No. 17.5.82 dated 24th May 2021.
Traffic Islands at the As specified in Schedule C & in NHAI Policy Circular
22 10.4.3
toll Plaza No. 17.5.82 dated 24th May 2021.
As specified in Schedule C & in NHAI Policy Circular
23 10.4.4 Toll Booths
No. 17.5.82 dated 24th May 2021.
As specified in NHAI Policy Circular No. 17.5.82 dated
24 10.4.5 Tunnels
24th May 2021.
As specified in NHAI Policy Circular No. 17.5.82 dated
25 10.4.6 Transition
24th May 2021.
As specified in NHAI Policy Circular No. 17.5.82 dated
26 10.4.7 Canopy
24th May 2021.
Service Time at Toll As specified in NHAI Policy Circular No. 17.5.82 dated
27 10.6.2
Plazas 24th May 2021.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar D-4
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala
Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Annex - II
(Schedule-D)
3. All relevant BIS Code of India for Civil, Electrical, Water Supply, Sanitary, HVAC and Solar
Panels.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar D-5
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala
Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
7. ASHRAE Standards.
10. CPWD - Specifications published by Director General (Works) CPWD, New Delhi including
subsequent amendments, upto date correction slips, revisions.
11. Specifications published by Director General (Works), MES, E-in-C branch, Kashmere House
New Delhi, including subsequent amendments, upto date correction slips, revisions
Note: Any reference to codes and standards shall be deemed to include all subsequent revisions,
upto date corrections slips, updates, amendments etc.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar D-6
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala
Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
Annex - III
(Schedule-D)
1) The provision of IRC-SP: 21 are to be followed except that the first row of Avenue
plantation should be 14m away from the center line of the extreme traffic lane to allow
recovery area for road safety concerns. Following guidelines are to be adhered to:
a. Provision of chain link fencing, barbed wire fencing, iron fencing, individual iron trees
guard fencing with wire mesh/cement/brick guard etc. as per the site requirement.
(v) Species-Matrix
(Annexure A to F of IRC-SP: 21)
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar D-7
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala
Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
i. 1st Row : 3m
ii. 2nd Row : 3m
iii. 3rd Row : 8-12m
(xi) Activities Schedule for Avenue and Median Plantation (As per IRC –SP:21, Table -5 at
page no -52&53)
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar D-8
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala
Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).
National Highways Authority of India Request for Proposal – Bid Documents
2) Any other activities/schedule of operations which are not covered in the annexure will
be carried out as per specifications in IRC-SP: 21.
a. Plantation and pruning of tress to be done in view of road safety as prescribed in IRC-SP:21
guidelines.
b. The concessionaire/contractor shall appoint a Plantation Manager with adequate
experience responsible for plantation. The CV of Plantation Manager shall be approved by
the concerned Project Director.
c. Plantation schedule and Species proposed on the alignment shall be approved by the IE/AE
in consultation with Project Director and Plantation Professionals engaged by NHAI.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-20 in Bongabar D-9
village to Junction with NH-320 in Lepo village from km 325.500 to km 358.500 under Bharatmala
Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 12).