Professional Documents
Culture Documents
Copy of Daily Observation Report-12.12.22 (1)_
Copy of Daily Observation Report-12.12.22 (1)_
S.No. Location Inspection Date Target Date Observation Photograph Compliance Photograph UA/UC Observed By Status Action By Remark
Fill the unwanted barricade Close the unwanted opening near pile
boards opening. cap excavation area with A-frame.
Mr. Cheyan
624 MUL SP 05 07.11.22 08.11.22 UC Mr. Vignesh K Open
Ibrahim
646 P-456 LHS 13.11.22 14.11.22 UC Mr. Vignesh K Open Mr. Manish
Oil sp[illing from the pile cap. Clear the oil spillage from Pile cap
Excess soil was stacked over on Remove the unwanted soil from the
the hoarding board workplace.
2nails available out of 6, High risk Provide adequate nailing for Board
of falling
Without completing the joining Don’t allow for work until joining
formality worker working at the formalities done
site
Diesel storage in PVC drums at Stop storing diesel at the site, which
the site. may lead to untoward incidents.
746 MUL SP-06 26.11.22 27.11.22 UC Mr. Vignesh Open Mr. Manish