Observation Recommended Action

S.No. Location Inspection Date Target Date Observation Photograph Compliance Photograph UA/UC Observed By Status Action By Remark
Fill the unwanted barricade Close the unwanted opening near pile
boards opening. cap excavation area with A-frame.

Mr. Cheyan
624 MUL SP 05 07.11.22 08.11.22 UC Mr. Vignesh K Open
Ibrahim

auanwanted openings of Close the unwanted openings.


barricade boards

646 P-456 LHS 13.11.22 14.11.22 UC Mr. Vignesh K Open Mr. Manish

Oil sp[illing from the pile cap. Clear the oil spillage from Pile cap

664 P472 16.11.22 17.11.22 UC Mr. Irfan Open Mr. Manish

Excess soil was stacked over on Remove the unwanted soil from the
the hoarding board workplace.

683 P-478 20.11.22 21.11.22 UC Mr. Sathish Open Mr. Thiyagu

2nails available out of 6, High risk Provide adequate nailing for Board
of falling

688 Viaduct 21.11.22 22.11.22 UC Mr. Thangaraj Open Mr. Ngaraju

Without completing the joining Don’t allow for work until joining
formality worker working at the formalities done
site

718 POO 23.11.22 24.11.22 UC Mr. Sathish Open Mr. Anand

Diesel storage in PVC drums at Stop storing diesel at the site, which
the site. may lead to untoward incidents.

725 P452 24.11.22 25.11.22 UC Mr. Sathish Open Mr. Thulasidoss

Damaged sleepers are used Provide support below the hanging


below the pier shutter base portion at Mul P2 to avoid shutter
plates collapse.

736 MUL P4 25.11.22 26.11.22 UC Mr. Irfan Open Mr. Gokul


Barricade board stacking Barricade board stacking
haphazardly haphazardly

746 MUL SP-06 26.11.22 27.11.22 UC Mr. Vignesh Open Mr. Manish