Professional Documents
Culture Documents
Nrc Mac Xx Xx CA x 0005 With Comments
Nrc Mac Xx Xx CA x 0005 With Comments
CONTENTS
INTRODUCTION ............................................................................................................................................................................ 2
1 MODEL PARAMETERS AND SET-UP ....................................................................................................................................... 2
2 BRACKET FIXINGS CAPACITY CHECK .................................................................................................................................... 3
3 TOP HAT BRACKET CHECK ..................................................................................................................................................... 7
3.1 STRESS ............................................................................................................................................................................... 8
3.2 STRAIN................................................................................................................................................................................. 8
4.2 STRAIN............................................................................................................................................................................... 12
APPENDIX…………………………………………………………………………………………………………………………….…16
59291-MAC-XX-SK-S-0007_P01…………………………………………………………………..…………………………...…...17
TAPCON_ xtrem LT HFL min. anchorage 8x70/25-5…….…………….………………………………………………………..…18
Document Ref: 59319-MAC-XX-CA-S-DN08_P01
Project: National Rehabilitation Centre – North and South Job No. 59319
Pavilions
Description: DESIGN NOTE 08 – Parapet Capping Page./rev: 2 /P01
Address: Unit 1, Tel: 0151 346 2670 Calculations
Lumina Business Park, Fax: 0151 334 0796
Bromborough, Wirral, email: admin@macroofing.com
CH62 3PT Director: Terry Cavanagh Calc. by: AC Date: 27/03/2024 Chk'd by: JB Date: 27/03/2024
INTRODUCTION
This design note aims to provide a calculation for the parapet capping sheet, capping support bracket, and associated
fixings. It is recommended to read this report in conjunction with the following documents:
The capping and the bracket will be analysed using RFEM analysis software, using non-linear finite element analysis and
the relevant Eurocodes.
The fixing loads will be calculated using a Robot stick model and iExpert Spit software to account for eccentrically applied
loadings and checked in accordance with relevant Eurocodes and associated National Annexes and manufacturers
published data.
The worst-case wind Cpe value for the parapets was found to be 2.1. The highest wind load on the parapets will be:
W = cpe x qp
W = 2.1 x 0.886kN/m2 = 1.86 kN/m2
The outline of the parapet, capping and fixings can be seen in the diagram below:
Document Ref: 59319-MAC-XX-CA-S-DN08_P01
Project: National Rehabilitation Centre – North and South Job No. 59319
Pavilions
Description: DESIGN NOTE 08 – Parapet Capping Page./rev: 3 /P01
Address: Unit 1, Tel: 0151 346 2670 Calculations
Lumina Business Park, Fax: 0151 334 0796
Bromborough, Wirral, email: admin@macroofing.com
CH62 3PT Director: Terry Cavanagh Calc. by: AC Date: 27/03/2024 Chk'd by: JB Date: 27/03/2024
TAPCON xtrem LT HFL min. anchorage 8x70/25-5, 1.5mm DX51D Galv Steel top hat bracket at 600cc to concrete.
The fixings reactions were calculated using a stick model in ROBOT to account for eccentricity.
Project: National Rehabilitation Centre – North and South Job No. 59319
Pavilions
Description: DESIGN NOTE 08 – Parapet Capping Page./rev: 4 /P01
Address: Unit 1, Tel: 0151 346 2670 Calculations
Lumina Business Park, Fax: 0151 334 0796
Bromborough, Wirral, email: admin@macroofing.com
CH62 3PT Director: Terry Cavanagh Calc. by: AC Date: 27/03/2024 Chk'd by: JB Date: 27/03/2024
Multiple load cases were taken into account, however, it was found that the reaction forces for 1.35DL + 0.75W2 + 1.5LL2
was governing for pull out forces on the fixing, which can be seen below:
Document Ref: 59319-MAC-XX-CA-S-DN08_P01
Project: National Rehabilitation Centre – North and South Job No. 59319
Pavilions
Description: DESIGN NOTE 08 – Parapet Capping Page./rev: 5 /P01
Address: Unit 1, Tel: 0151 346 2670 Calculations
Lumina Business Park, Fax: 0151 334 0796
Bromborough, Wirral, email: admin@macroofing.com
CH62 3PT Director: Terry Cavanagh Calc. by: AC Date: 27/03/2024 Chk'd by: JB Date: 27/03/2024
Reactions obtained from the Robot software were applied to iExpert software. Results for the TAPCON xtrem LT HFL min.
anchorage 8x70/25-5 are shown in the diagram below:
Should Nz be positive?
Project: National Rehabilitation Centre – North and South Job No. 59319
Pavilions
Description: DESIGN NOTE 08 – Parapet Capping Page./rev: 6 /P01
Address: Unit 1, Tel: 0151 346 2670 Calculations
Lumina Business Park, Fax: 0151 334 0796
Bromborough, Wirral, email: admin@macroofing.com
CH62 3PT Director: Terry Cavanagh Calc. by: AC Date: 27/03/2024 Chk'd by: JB Date: 27/03/2024
Figure 5 - iExpert Spit Fixing Layout and Utilisation for TAPCON xtrem LT HFL min. anchorage 8x70/25-5
Project: National Rehabilitation Centre – North and South Job No. 59319
Pavilions
Description: DESIGN NOTE 08 – Parapet Capping Page./rev: 7 /P01
Address: Unit 1, Tel: 0151 346 2670 Calculations
Lumina Business Park, Fax: 0151 334 0796
Bromborough, Wirral, email: admin@macroofing.com
CH62 3PT Director: Terry Cavanagh Calc. by: AC Date: 27/03/2024 Chk'd by: JB Date: 27/03/2024
Project: National Rehabilitation Centre – North and South Job No. 59319
Pavilions
Description: DESIGN NOTE 08 – Parapet Capping Page./rev: 8 /P01
Address: Unit 1, Tel: 0151 346 2670 Calculations
Lumina Business Park, Fax: 0151 334 0796
Bromborough, Wirral, email: admin@macroofing.com
CH62 3PT Director: Terry Cavanagh Calc. by: AC Date: 27/03/2024 Chk'd by: JB Date: 27/03/2024
3.1 STRESS
Althougth there is a slight upward slope to the stress-strain curve for the material after the elastic yield point, in reality the
governing criteria after this are always limited to the strain limit, therefore no stress evaluation against the Von-Misses
failure criterion is necessary.
3.2 STRAIN
Since we are using non-linear material properties, we need to check the maximum strain is within the requirements of BS
EN 1993-1-5:2006, Clause C.8(1) recommended maximum strain for non-linear FE analysis is 5%
Document Ref: 59319-MAC-XX-CA-S-DN08_P01
Project: National Rehabilitation Centre – North and South Job No. 59319
Pavilions
Description: DESIGN NOTE 08 – Parapet Capping Page./rev: 9 /P01
Address: Unit 1, Tel: 0151 346 2670 Calculations
Lumina Business Park, Fax: 0151 334 0796
Bromborough, Wirral, email: admin@macroofing.com
CH62 3PT Director: Terry Cavanagh Calc. by: AC Date: 27/03/2024 Chk'd by: JB Date: 27/03/2024
As shown above, the equivalent total strain is 19.6‰ or 1.96% which is less than the allowable 5% strain limit, hence OK.
Document Ref: 59319-MAC-XX-CA-S-DN08_P01
Project: National Rehabilitation Centre – North and South Job No. 59319
Pavilions
Description: DESIGN NOTE 08 – Parapet Capping Page./rev: 10 /P01
Address: Unit 1, Tel: 0151 346 2670 Calculations
Lumina Business Park, Fax: 0151 334 0796
Bromborough, Wirral, email: admin@macroofing.com
CH62 3PT Director: Terry Cavanagh Calc. by: AC Date: 27/03/2024 Chk'd by: JB Date: 27/03/2024
3.3 DEFLECTION
The worst-case deflection at the serviceability limit state is given below:
540mm
The allowable deflection limit may be taken as span/200 (span/100 for cantilervers) = 540/100 = 5.4mm which is greater
than 3.05mm, hence OK.
As can be seen from the above figure, the lowest [+ve] critical coefficient is 6.66 meaning that the applied can can be
multiplied by 7.057 times before reaching the critical buckling load, hence OK
Document Ref: 59319-MAC-XX-CA-S-DN08_P01
Project: National Rehabilitation Centre – North and South Job No. 59319
Pavilions
Description: DESIGN NOTE 08 – Parapet Capping Page./rev: 11 /P01
Address: Unit 1, Tel: 0151 346 2670 Calculations
Lumina Business Park, Fax: 0151 334 0796
Bromborough, Wirral, email: admin@macroofing.com
CH62 3PT Director: Terry Cavanagh Calc. by: AC Date: 27/03/2024 Chk'd by: JB Date: 27/03/2024
Project: National Rehabilitation Centre – North and South Job No. 59319
Pavilions
Description: DESIGN NOTE 08 – Parapet Capping Page./rev: 12 /P01
Address: Unit 1, Tel: 0151 346 2670 Calculations
Lumina Business Park, Fax: 0151 334 0796
Bromborough, Wirral, email: admin@macroofing.com
CH62 3PT Director: Terry Cavanagh Calc. by: AC Date: 27/03/2024 Chk'd by: JB Date: 27/03/2024
=0.9kN over
200x200mm square
4.1 STRESS
Althougth there is a slight upward slope to the stress-strain curve for the material after the elastic yield point, in reality the
governing criteria after this are always limited to the strain limit, therefore no stress evaluation against the Von-misses
failure criterion is necessary.
4.2 STRAIN
Since we are using non-linear material properties, we need to check what the maximum strain is within the requirements.
According to BS EN 1999-1-5 Section 6.1.4 For design purposes, an ultimate plastic strain value equal to 10(fo/E) can be
assumed.
For aluminium 1050-H14:
X elimit = 10 x (105/70000) = 0.015 or 1.5%
Document Ref: 59319-MAC-XX-CA-S-DN08_P01
Project: National Rehabilitation Centre – North and South Job No. 59319
Pavilions
Description: DESIGN NOTE 08 – Parapet Capping Page./rev: 13 /P01
Address: Unit 1, Tel: 0151 346 2670 Calculations
Lumina Business Park, Fax: 0151 334 0796
Bromborough, Wirral, email: admin@macroofing.com
CH62 3PT Director: Terry Cavanagh Calc. by: AC Date: 27/03/2024 Chk'd by: JB Date: 27/03/2024
As shown above, the equivalent total strain is 1.30 ‰ or 0.13% which is below the allowable 1.5% strain limit, hence OK.
4.3 DEFLECTION
The worst case deflection at the serviceability state is given below:
The allowable deflection limit may be taken as span/90 = 600mm / 90 = 6.6mm which is greater than 4.79 mm, hence OK.
Document Ref: 59319-MAC-XX-CA-S-DN08_P01
Project: National Rehabilitation Centre – North and South Job No. 59319
Pavilions
Description: DESIGN NOTE 08 – Parapet Capping Page./rev: 14 /P01
Address: Unit 1, Tel: 0151 346 2670 Calculations
Lumina Business Park, Fax: 0151 334 0796
Bromborough, Wirral, email: admin@macroofing.com
CH62 3PT Director: Terry Cavanagh Calc. by: AC Date: 27/03/2024 Chk'd by: JB Date: 27/03/2024
The strength of 3M’s VHB tape from the 4910 range is 690kN/m2 for tension and 480kN/m2 for shear, under dynamic loads
(See 3M’s data sheet). The tapes are typically dispensed in 25mm wide rolls.
Hence the maximum allowable dynamic resistance per bracket will be:
Hence the maximum allowable dynamic resistance per bracket will be:
Tension (Factored): 1.5 x 1.86kN/m2 x 0.821m x 0.6m = 1.37kN < 14.16kN, Hence OK
Shear (Factored): 1.5 x 1.86kN/m2 x 0.1m x 0.6m = 0.17kN < 9.85kN, Hence OK
Document Ref: 59319-MAC-XX-CA-S-DN08_P01
Project: National Rehabilitation Centre – North and South Job No. 59319
Pavilions
Description: DESIGN NOTE 08 – Parapet Capping Page./rev: 15 /P01
Address: Unit 1, Tel: 0151 346 2670 Calculations
Lumina Business Park, Fax: 0151 334 0796
Bromborough, Wirral, email: admin@macroofing.com
CH62 3PT Director: Terry Cavanagh Calc. by: AC Date: 27/03/2024 Chk'd by: JB Date: 27/03/2024
CONCLUSION
Parapet Bracket
Strain: applied strain / allowable strain = 1.96 / 5 x 100 = 39.2% < 100%, Hence OK
Deflection: applied deflection / allowable deflection = 3.05mm / 5.4mm x 100 = 56.5% <100%, Hence OK
The overall utilisation against buckling was:
Allowable critical coefficient / Applied critical coefficient = 1 / 6.66 x 100 = 15.0% < 100% hence OK
Capping Sheet
Strain: applied strain / allowable strain = 0.13 / 1.5 x 100 = 8.7% < 100%, hence OK
Deflection: applied deflection / allowable deflection = 4.79mm / 6.6mm x 100 = 72.6% < 100%, hence OK
Fixings
The overall utilisation of the TAPCON HFL min. anchorage 6x50/15 fixings is 90.0% < 100%, hence OK
VHB Tape
Tension: 1.37 / 14.16 x 100 = 9.7% < 100%, Hence OK
Shear: 0.17 / 9.85 x 100 = 1.7% < 100%, Hence OK
Document Ref: 59319-MAC-XX-CA-S-DN08_P01
Project: National Rehabilitation Centre – North and South Job No. 59319
Pavilions
Description: DESIGN NOTE 08 – Parapet Capping Page./rev: 16 /P01
Address: Unit 1, Tel: 0151 346 2670 Calculations
Lumina Business Park, Fax: 0151 334 0796
Bromborough, Wirral, email: admin@macroofing.com
CH62 3PT Director: Terry Cavanagh Calc. by: AC Date: 27/03/2024 Chk'd by: JB Date: 27/03/2024
APPENDIX
30x50x80x1.5mm
1 continuous length of 3M VHB DX51D galv. steel
4910 25mm wide tape between top hat bracket
capping sheet and bracket 30x50x80x1.5mm DX51D
galv. steel top hat bracket
A at 600cc
A
TAPCON xtrem LT
HFL min. anchorage
8x70/25-5
Ref : 3/26/2024 - 1:26:51 PM / Version 2023.12.07
Date : 3/26/2024
Page : 1/4
Comment :
Recommended anchors
TAPCON XTREM LT HFL-A4 min. anchorage 8x70/25-5 Product Code: 058655
Effective embedment : 32 mm
ETA-22/0364 issued 2022/11/28
Base material
Concrete resistance : C25/30 - fck,cyl = 25 N/mm²
Cracking of concrete : Cracked concrete
Thickness of concrete : 200 mm
Reinforcement type : Wide concrete reinforcement
Edge reinforcement : No edge reinforcement
Conditions
Installation conditions : Dry concrete
Short term temperature : 40 °C
Long term temperature : 24 °C
Anchor plate
Thickness of part to be fixed : 2 mm
Recommended plate thickness : The base plate thickness has not been checked
Clearance diameter : 12 mm
Profile :
Profile position : Ex = 0 mm ; Ey = 0 mm
Stand-off : None
Specifications :
Static
Sustained Load : False
Ref : 3/26/2024 - 1:26:51 PM / Version 2023.12.07
Date : 3/26/2024
Page : 2/4
Geometry :
Calculation Hypothesis :
- The anchoring plate is assumed to be sufficient to resist deformation imposed by the load actions.
- Connection between profile and base plate has not been checked
- The calculation is done acc. to expert judgement, based on EN 1992-4
- SPIT can only be held responsible if the calculation examples exactly reflect the application and if the installation is carried out
according to the instruction given in the SPIT specifications. The calculation is correct for SPIT anchors only. The
contractor or specifier should make sure that the base material is able to support the loads especially in the case of a group of
anchors. SPIT cannot be held responsible if this software package is modified without its written approval.
Ref : 3/26/2024 - 1:26:51 PM / Version 2023.12.07
Date : 3/26/2024
Page : 3/4
Loads on anchors
4 0.11 kN 0 kN 0.02 kN
0.09 0.02
Utilization
INSTALLATION DATA