NOTES

S.NO MATERIAL QTY GRADE CEMENT SAND METAL STEEL (KG)


(m3) (bags) (m3) (m3)

1% 1.50% 2% 2.50%
M20
1 RCC 1 (1:1.5:3) 8.2 0.4281 0.8563
80 120 160 200
2 RCC 1 M25 (1:1:2) 11.304 0.3925 0.785

3 PCC 1 PCC 1:3:6 4.52 0.471 0.942

TMT Bars weight per meter No of bars in steel bundle & total wt per bundle
size (mm) wt/m Size (mm) No of bars Bundle wt (kg)
8 0.395 8 10 47.41
10 0.617 10 7 51.85
12 0.89 12 5 53.33
16 1.58 16 3 56.89

Covering Mix ratio & Strength


Footing 50mm grade/ratio mpa Psi
Column 40mm M5 (1:5:10) 5 725
Rcc slab 25mm M7.5 (1:4:8) 7.5 1067
Stair case 15mm M10 (1:3:6) 10 1450
M15 (1:2:4) 15 2175
M20 (1:1.5:3) 20 2900

Amount of brick and mortar required for 1m3 of brick work @1:6

Brick type Brick size No of bricks Vol of mortar req Cement (bag) Sand M3
M3
Red brick 19*9*9 500 0.77dry 0.23wet 1.34 0.283
Solid cement brick 30*20*15 100 0.1
Solid cement brick 38*20*15 77 0.122

Density of steel = 7850kg/m3


Density of cement = 1440kg/m3

Bar bending shedule


Weight of bar per length (kg/m) = D^2/162
(kg/ft) = D^2/533
Cutting length of main reinforcement bar with length of hook = 9d
Length of main bar = L+9d+9d
Cutting length of main bar with bend
Length of bend = 10d-6d
Length of main bar = L+12d+12d
Overlaping
Neck column to footing overlaping = 40d-50d
Column to column or beam overlaping = 50d
Development length for dowel bars = 16d
General overlaping on completion of 12m bar = 50d