Download as pdf or txt
Download as pdf or txt
You are on page 1of 32

BALING PRESS

KNL 100
WITH OPTIONAL
FEATURES
Tipping device
Tropical motor

BETRIEBSANLEITUNG
OPERATING INSTRUCTIONS
INSTRUCTION DE SERVICE

ERSATZTEILLISTE
SPARE PARTS LIST
LISTE DE PIECES DE RECHANGE

Edition: 01 / 2013
program version 1.2
CONTENT
KNL 100
1 Introduction ...................................................................................................................... 4
1.1 General ....................................................................................................................... 4
1.2 Vehicle identification plate......................................................................................... 4
1.3 Guarantee ................................................................................................................... 4

2 Safety ................................................................................................................................. 5
2.1 General ....................................................................................................................... 5
2.2 Use .............................................................................................................................. 5
2.3 Manual ....................................................................................................................... 5
2.4 Regulations and norms ............................................................................................... 6
2.5 Electric ....................................................................................................................... 6
2.6 Control and maintenance ........................................................................................... 6

3 Installation ........................................................................................................................ 7
3.1 Place of installation ................................................................................................... 7
3.2 Install .......................................................................................................................... 7

4 Technical data ................................................................................................................... 8

5 Start Up ............................................................................................................................. 9
5.1 Keys and buttons ........................................................................................................ 9
5.2 Test the emergency stop function ............................................................................. 10

6 Configuration menu ....................................................................................................... 11


6.1 General ..................................................................................................................... 11
6.2 Menu points .............................................................................................................. 11

7 Status display .................................................................................................................. 13


7.1 General ..................................................................................................................... 13
7.2 Displays .................................................................................................................... 13

8 Messages .......................................................................................................................... 14

9 Operation ........................................................................................................................ 16
9.1 Binding rope ............................................................................................................. 16
9.2 Filling and compressing ........................................................................................... 18
9.3 Binding bale with rope ............................................................................................. 19
9.4 Ejection..................................................................................................................... 19

baling press 2
CONTENT
KNL 100

10 Maintenance .................................................................................................................... 20
10.1 After first 10 hours of operation ............................................................................... 20
10.2 Daily maintenance.................................................................................................... 20
10.3 Monthly maintenance ............................................................................................... 20
10.4 Annual maintenance ................................................................................................. 20
10.4.1 Lubricating nipples .......................................................................................... 21
10.4.2 Sliding surfaces ................................................................................................ 21

11 Hydraulic......................................................................................................................... 22
11.1 Hydraulic plan.......................................................................................................... 22
11.2 Hydraulic equipment ................................................................................................ 23

12 Cylinder ........................................................................................................................... 25
12.1 Main cylinder ........................................................................................................... 25
12.2 Tipping device .......................................................................................................... 26

13 Electric............................................................................................................................. 27
13.1 Circuit diagram ........................................................................................................ 27
13.2 Electric equipment.................................................................................................... 29

14 Spare Parts ...................................................................................................................... 30

15 Please consider ................................................................................................................ 31


15.1 Our address .............................................................................................................. 31

baling press 3
INTRODUCTION
KNL 100
1 Introduction
1.1 General
With your purchase of a baling press KNL 100 (with tipping device) you have acquired a high quality
waste disposal machine.

This operating manual contains the latest product information. It must be read and observed by every
person who uses, maintains, services or checks the baling press.

Safety and warning comments are indicated separately. They must be taken
into account particularly before starting the machine, and during operation!

Keep the operating manual in easily obtainable place that is known to the operating,
maintenance and cleaning personnel.

Consequences arising from the regulations and instructions appearing in this operating manual being
disregarded releases the manufacturer from any liability. Subject to technical changes without notice. All
data is without obligation.

1.2 Vehicle identification plate


Enter the machine number into the blank spaces provided on the documents and on the title page of the
operating manual.

Guarantee claims and enquiries will not be processed without the machine number being provided.

1.3 Guarantee
Fill in the enclosed commissioning certificate and send it back (yellow form).

Guarantee can only be ensured if the quoted points have been checked in accordance with the obligations of
product liability and if the commissioning certificate has been filled in, signed and sent back to the
manufacturer.

baling press 4
SAFETY
KNL 100
2 Safety
2.1 General
Attention: Danger of crushing and injuring

All guidelines and instructions for set-up, start-up and operation of the baling press must be complied with
according to the manual in order to guarantee the greatest possible safety.

Check the pressing chamber before starting!


Be aware of other persons. Do not reach into the cylinder stroke area!

It is forbidden that the machine is started by unauthorized persons, in particular children!

Attach all removed safety devices properly before switching on.

Provide good lighting and keep the working area in order. Disorder gives rise to the danger of accidents.
Keep the baling press clean to ensure better and safer operation.

The baling press may be operated only in the presence, under the supervision and with the approval of two
trained operators authorized for operation.
Operating staff have to know the place of all available emergency-stop keys and make sure of their perfect
functioning.

Knowledge of operational procedures is a requirement for any operators working on the machine in order
to recognize any irregularity of operating performance and be able to rectify defects that endanger safety.

2.2 Use
For compression of any type of cardboard and papers, fruit crates, foil, etc.
Any other materials must not be compressed with this baling press!

Be sure that there are no metallic parts or residues inside the press because these parts as well as hard
objects can cause damage (deformation) to the press, inexpert working and safety faults.

Do not compress potentially explosive waste!


Comply with Hazardous Waste Law and Waste Disposal Law!

2.3 Manual
The operating manual must be read and observed by all persons authorized to use, maintain, service or
check the machine so that danger can be averted.

Understanding and knowledge of the manual as well as knowledge of any possible dangers, especially in
connection with operational procedures, is a requirement for any work carried out in connection with the
machine.

Operating staff and any staff who carry out work in connection with the baling press, have to undergo a
training with main emphasis on safety engineering within this manual and confirm their participation,
understanding and knowledge by their signature.

baling press 5
SAFETY
KNL 100
2.4 Regulations and norms
The baling press KNL 100 (with tipping device) is constructed in accordance with accident prevention
about protection regulations, as well as the generally recognized rules concerning safety regulations and
industrial medicine.

Norms: Appendix I of EC Machinery Directive 2006/42/EC in its current version. And, therefore,
Appendix I of the Machine Safety Regulation (MSV); BGBI II 2008-282 in its current version.

EN ISO 12100-1, EN ISO 12100-2, EN ISO 13849-1, EN ISO 13850, EN ISO 13857, EN ISO 4413,
EN 349, EN 953, EN 1088, EN 60204-1/07 (Pkt. 5,6,7,10)

2.5 Electric
Attention: Check voltage!

Lay the cable so that it cannot be tripped over!


The baling press may only be connected to E-mains with a neutral conductor (TN) or protective earth (TT)!
Power connection, electrical fitting and electrical maintenance should be carried out only by appropriately
trained specialists.

The switch box must be locked during normal operation. Keep the switch box key in a safe place.

Handle electric cable carefully. Protect it against heat, oil and sharp edges.

2.6 Control and maintenance


Check the baling press regularly for damages. Check that al moving parts are functioning properly, if parts
are broken, if all parts are fitted correctly an perfectly, and all other operations which influence the baling
press function are in order.

Never carry out any adjustments, checks, repairs, maintenance and cleaning work while the motor is
switched on.

Defects, irregularities, etc. must be discovered immediately and corrected once the machine has been
switched off (before work continues) and all safety guidelines and instructions must be complied with
(notify the manufacturer!).

Before changing the position, repairing and working on the machine which is not in connection with the
operation, switch off the machine and unplug.

Attention: Only use AUSTROPRESSEN – spare parts.


The manufacturer accepts no responsibility for damages caused through the
use of non-genuine parts and accessories.

The press must undergo an annual safety inspection in accordance with the national law, which is to be
carried out by Austropressen or proficient personnel.

baling press 6
INSTALLATION
KNL 100
3 Installation
3.1 Place of installation
Loading throat
Without dismantling Width mm 1200
Height mm 2000

Space required
Width mm 2200
Height mm 2150
Length mm 3800 + bale outlet

Power connection
Voltage V 400V
Frequency Hz 50
Fuse protection A 16
Socket connecting poles Stk 3x400V + N + PE

Ambient temperature
-5°C to +30°C, protection against atmospheric influence

Composition of ground
Flat, level industrial ground.

Load per surface unit


Weight of machine and material.

3.2 Install
Transport
Transport with lifting truck or appropriate lifting device.
ATTENTION: Machine top heavy!!

Store lifting devices appropriately!


Have them regularly tested by TÜV!
(Technical Inspection Association)
Operation only by specially trained personnel!
Prepare unloading area before lifting!
Secure load in accordance with regulations!
Guarantee a free path of travel before lifting!
Choose a free path of travel!
Do not displace loads above persons!
Do not walk under suspended loads!
Wear suitable clothes: industrial clothing work overalls, work gloves and nonslip shoes!

Packaging
Remove and carry out disposal of packaging material!

Connection
Connect the feeder (CEE). Engine rotates clockwise, if not change rotating field!
Attention: Changes must only be carried out by an electrician!!

Working place
Machine face and back!!

baling press 7
TECHNICAL DATA
KNL 100
4 Technical data

External measurements A mm 3800


B mm 1050
C mm 1030
D mm 1880
E mm 2200
F mm 2150
Loading size mm 750
Loading size front mm 1000 x 700
Press cylinder mm Ø80/60x1600
Machine weight Kg 1188
Motor Power KW 4
Voltage V 400
Frequency Hz 50
Fuse protection, max. A 16
Connecting poles pieces 3x400 + PE + N
Noise emission dBA <75
Compression pressure kN 100
Compression Time sec. 40
Output per Hour bales 3-6
Bales Width mm 700
Height mm 550
Length mm 1200

baling press 8
START UP
KNL 100
5 Start Up
5.1 Keys and buttons

option tipping device

option tipping device

Main switch HS
• To switch off and on the voltage of the press.

Emergency-Stop Key (NOT-AUS)


• Stops the press immediately. Press key in case of danger immediately. The motor is switched off
and all cylinders stop. Turn the key to unlock emergency stop.

ON
• To switch on the machine after f.ex. using the emergency-stop or after opening of the filling door

START
• Starts the automatic pressing cycle.
• To start manual functions (see below)

STOP
• Stops the automatic pressing cycle.
• To show the status display (press button for 5 seconds)

BALE (BALLEN)
• To scroll in the text display in the configuration menu and in the status menu

baling press 9
START UP
KNL 100
KEYS FOR MANUAL OPERATION:
The buttons for a manual operation of the machine must be pressed simultaneously with the START button.
(Beidhandfunktion, 2-hand-mechanism)

FORWARD
• For manually moving the press plate forwards when counter door is closed and locked (pressing
bales)
• For manually moving the press plate forwards when counter door is open (ejecting bales)

Note: Only possible if filling door is closed!

REVERSE
• For manually moving the press plate backwards when filling door is closed
• For manually moving the press plate backwards for 2 seconds when filling door is open (for
emergency retract of the machine)

Caution! Filling door is open!

Note: When the filling door is open, the press plate will only move backwards for 2 seconds and will stop
automatically. To repeat the process release and press the ‘reverse’-key again.

OPTION: For models with tipping device, there are following additional buttons:

UP (tipping device)
• For manually moving up the tipping device.

Note: Only possible if filling door is open, the press plate is at the rear and the safety bar of the tipping
device is closed.

DOWN (tipping device)


• For manually moving down the tipping device.

Note: Only possible if filling door is open and the safety bar of the tipping device is closed.

5.2 Test the emergency stop function


• Switch on main switch
• Waiting for message No. 3
• Press button “ON” (Emergency stop is acknowledged).
• Press button “START” (press plate moves forward).
• Press “Emergency stop” key – Machine stops – message no.1 is indicated.
• Unlock “Emergency stop”.
• Press button “ON” (Emergency stop is acknowledged).
• With button „START“ the press plate moves back

baling press 10
MENUES AND DISPLAYS
KNL 100
6 Configuration menu
6.1 General
Start
• Switch off main switch, switch on main switch.
• Press the buttons “START”, “STOP” and “BALE” simultaneously during the start message
(Austropressen KNL 100 V1.2 or KNL 100-dump V1.2) is indicated.

To come to the next menu point you have to press the button “BALE”.

6.2 Menu points


Password
The password is a four digit combination of numbers and it is needed for some points in the
configuration menu.
• Press button “START” - first digit of the password is raised by 1.
• Press button “STOP” - Change to the next digit.

After the fourth digit you have to press the button “STOP” again and the password is checked. Either
the message “password wrong” or “password correct” is indicated. Press the button “START” to change
the first digit of the password if it is necessary. With the bale button you can skip to the next menu item.
If a correct password was entered, all configuration parameters can be viewed or changed, otherwise
only the disassembly mode menu is displayed.

Display: configuration menu


Pass word: 0000

Language
It is necessary to enter the password to come into this menu.
This menu point is to change the language of the messages of the PLC.
• Press button “START” or “STOP” - another language is selected.

Languages: German, English, French, Italian

Display: Configuration menu


Language=English

Press time
It is necessary to enter the password to come into this menu.
The time in seconds how long the press plate is moving forwards.
• Press button “START” - Value is raised by 1.
• Press button “STOP” - Value is reduced by 1.

Display: Press time


[1s] 25

Ejection time
It is necessary to enter the password to come into this menu.
The time in seconds how long the press plate is moving forwards.
• Press button “START” - Value is raised by 1.
• Press button “STOP” - Value is reduced by 1.

Display: Eject time


[1s] 35

baling press 11
MENUES AND DISPLAYS
KNL 100
Contrast
It is necessary to enter the password to come into this menu.
To value the contrast of the PLC.
• Press button “START” - Value is raised by 1.
• Press button “STOP” - Value is reduced by 1.

Value can be between 0 and 100.

Display: Configuration menu


Contrast 50

Parameter
It is necessary to enter the password to come into this menu.
Parameter can be reset to their standard values.
• Press button “START” and “STOP” together - Parameter are reset.

Attention: The bale counter, the press cycle counter and the working hour counter are
reset as well.

Display: Configuration menu


Reset Parameter?

Exit
To exit configuration menu
• Press button “STOP” You exit configuration menu and all values are
stored.

Display: Configuration menu


End with Stop

baling press 12
MENUES AND DISPLAYS
KNL 100
7 Status display
7.1 General
Start
• Press button “STOP” for 5 seconds.

To come to the next status display you have to press the button “BALE”.

The counters can be reset in configuration menu.

7.2 Displays
Bale
Display: STATUS DISPLAY
Bales : 108

Indicates ready bales.

Working hours
Display: Working hours
78:52:08

Indicates the achieved working hours of the motor (78 hours; 52 minutes; 8 seconds).

Press cycles
Display: Press cycles
405

Indicates the achieved press cycles.

Inputs and Outputs


Display: 10011100000 I 01..11
00000000 O 01..08

Shows whether the inputs (01 – 11), or the outputs are free or not. On the left hand side is input or
output no. 01

Exit
Display: STATUS DISPLAY
End with Stop

• Press button “STOP” - Exit the status display

baling press 13
MENUES AND DISPLAYS
KNL 100
8 Messages

Nr.: Function Text Display Text English


OPERATOR NOTES
Start display after switching on the Press Austropressen
0
KNL 100 V1.2
Start display after switching on the Press Austropressen
0
KNL 100 – dump V1.2
Operator note: (Press switched off) 1 unlock stop
1 Emergency stop active. Switch on the Press, unlock emergency press ON button
stop button and press the start button.
Filling door is open 2 filling door open
Operator can use 2 hand mechanism for moving tipping device
2
upwards / downwards (Note: press plate must be at the rear and the
safety bar must be closed)
Operator note: Press is switched off after opening and closing the 3 press ON button
3 filling door.
Switch on the press with „ON“ button
Operator note: press is at rear and ready for the start 4 press at rear
The operator is requested to press the start button to start the press
cycle.
4
or
Operator can control the press or the locking of the counter gate
manually with 2 hand mechanism
Operator note: press is not at rear 5 press not at rear
The operator is requested to press the start button to start the Press
5 cycle. (press automatically moves back).
or
Operator can control the press manually with 2 hand mechanism
Status display: 6 press moves forward
6
Press moves forward
Status display: 7 press moves back
7
Press moves backwards
Status display: 8 brake press at front
8 Brake press at front, during change of direction in automatic press
cycle.
Operator note: counter gate is closed and the locking is open 14 closing open
Operator can open the counter gate
14 or
Operator can close the locking of the counter gate manually with
2 hand mechanism
Operator note: counter gate is open 15 counter gate open
15
Operator can control the press manually with 2 hand mechanism
Status display: 16 closing is open
16
The locking of the counter gate is open
Status display: 17 closing is closing
17
The locking of the counter gate is closing
Status display: 18 press moves
18 Press moves forward eject forward eject
Press “START” button longer than 3 seconds
Status display: 26 Dump moves up
26
Dump attachment moves upwards
Status display: 26 Dump moves down
Dump attachment moves downwards
27

baling press 14
MENUES AND DISPLAYS
KNL 100
ERROR MESSAGES
Error message: (Timeout Press) 30 fault cycle too long
The Press was stopped because the Press cycle took too long.
Cause:
• end switch „press rear“ – is not reached
• end switch is adjusted wrong – broken switch or cable
30
• hydraulic motor does not work (Motor protection switch
dropped down);
• hydraulic motor gives no pressure
• hydraulic valves don´t work
• press sticks
Error message: (Press forward) 31 fault press forw.
Press does not move forward Rotation motor?
Cause:
• direction of rotation is false (no pressure is built up);
• hydraulic motor does not work (Motor protection switch
dropped down);
31
• hydraulic motor gives no pressure
• hydraulic valves don´t work
• end switch „press rear“ is not left
• end switch plugged in wrong – broken, foreign actuated
or broken cable
• press sticks
Error message: (closing) 32 fault closing both
Both end switches of locking mechanism actuated switches active
Cause:
32
• locking is not open or closed totally (open or close
closing manual)
• end switch plugged in wrong – broken, foreign actuated
Notice for operator mistake: 33 counter gate not
Will be fade in if 2 hand „press forward“ is pressed and counter open!
33 gate not opened.
Adjustment: Open the counter gate so that you can complete the 2-
hand-function
Notice for operator mistake: 34 press not at rear
Will be fade in if Up/Down of the tipping device is pressed, and
the press plate is not at the rear.
or
34
Will be fade in if Open/Close of the counter door is pressed, and
the press plate is not at the rear.
Adjustment: The press has to move to the rear position, so that you
can complete the 2-hand-function.
Notice for operator mistake: 35 counter gate open!
Will be fade in if buttons to close locking of counter door are
35 pressed and the counter door is not closed. .
Adjustment: Close the counter gate, so that you can complete 2
hand mechanism.
Error message: (Software crashed) 36 Software crashed
36 An unknown software error has occurred. Switch off machine and start machine again
switch it on again.
Notice for operator mistake: 37 filling door not
Will be fade in if Up/Down of the tipping device is pressed and the open!
37
filling door is not open.
Adjustment: Open the door.
Notice for operator mistake: 38 safety bar
Will be fade in if Up/Down of the tipping device is pressed and the not closed
38
safety bar is not closed.
Adjustment: Close the safety bar.

baling press 15
OPERATION
KNL 100
9 Operation
9.1 Binding rope

9.1.1 Article
Binding rope WG 40, 13mm (Art.-No.: 05-0004) for carton
Binding rope WG 45, 13mm (Art.-No.: 05-0005) for foil

9.1.2 Positioning of binding rope

a) Insert the rolls (1) on the back side of the machine (2).
b) Acknowledge “EMERGENCY STOP” (push “ON” button).
c) Open the locking from the counter gate.
d) Raise the counter gate.
e) Move press plate approx. 20 cm forward (push „START“ and open the filling door after 3-5
seconds).
f) Open brake of ropes (put lever outside the closure).
g) Put end of ropes (1) through the brake (3).
h) Put end of ropes through the pipes into the press chamber.

B
Brrraaakkkeeeooofffrrrooopppeeesssooopppeeennn
B

i) Pull binding tape forward along the guides inside the machine.
j) Pull the rope hooks out of the press plate.
k) Put rope through the hole of the hook (5) – and turn it back into the press plate.

baling press 16
OPERATION
KNL 100
l) Bind a loop at the end of the rope and fix the knot at the pin (8).

m) Pull rope to the front of the counter gate and turn it at the upper pin (7).
n) Pull rope to the bottom of the machine and turn in at the lower pin (6).

77

66

o) Stretch the rope.


p) Turn lever of the brake 270 ° clockwise and fix it (9).

B
Brrraaakkkeeeooofffrrrooopppeeesssccclllooossseeeddd
B

q) Close the filling door.


r) Move press plate backwards (push „START“ and “Reverse” within 0,2 seconds together).
s) Close the counter gate.
t) Close the locking of the counter gate.
u) Open the filling door.

baling press 17
OPERATION
KNL 100

rope hook

9.2 Filling and compressing

• Put material into the press chamber


• Close filling door
• Acknowledge “Emergency stop” (push “ON” button)
• Start automatic press cycle (push ON button)

Or for a model with a tipping device:

• Move container into the tipping device


• Close safety guard
• Move tipping device up with buttons START + DUMP. UP
• Move tipping device down with buttons START + DUMP. DOWN
• Attention: all functions are only possible if safety guard is down, filling door is open and press
plate is in back position.

Comply with Hazardous Waste Law and Waste Disposal Law!


Open sheet metal case, dispose of content properly!

baling press 18
OPERATION
KNL 100
9.3 Binding bale with rope
• Repeat filling and compressing until required bale size is reached. (approx. 600 mm)
• Stop machine at the highest pressing point in front (push „STOP“ button)
• Open lever of brake of ropes.
• Open filling door
• Put the rope hooks out of the press plate
• Cut the rope
• Tie the two ends of the rope
• Close filling door

9.4 Ejection
• Acknowledge “Emergency stop” (push “ON” button)
• Press plate moves back (push ON button)
• Open locking of counter gate
• Raise counter gate
• Automatic bale eject (push “START” button for more than 3 seconds)
• Remove the bale of the press.
• Put press plate in the middle of the filling door (push „START“ button and “Reverse” within 0,2
seconds together)
• Open filling door
• Start with position of ropes i)

baling press 19
MAINTENANCE
KNL 100
10 Maintenance
ATTENTION DANGER TO LIFE!
Always switch off the main switch and protect it by means of a padlock during any maintenance and repair
work.

All removed safety devices must be attached immediately after carrying out these works. It is forbidden to
operate the machine with removed safety devices. It is strictly forbidden to walk on the conveyor and the
pressing installation when the main switch or the control unit are not switched off.

10.1 After first 10 hours of operation


Remove cover plates and check if all hydraulic screw fittings are tight. In case of leakage tighten the screw
fitting. The oil filter may be choked with dust at the beginning – remove oil filter and wash it with
petroleum.

10.2 Daily maintenance


Clean the front, back area and below the press thoroughly.

10.3 Monthly maintenance


• Check oil level at oil tank when the press-ram is in its final position at the back, refill oil and remove
leakage if necessary.
• Visual control of hydraulic elements and cylinders. In case of leaks, pack appropriately by tightening of
screws (only use O-rings with a hardness of 90 shore)
Attention: Do not misadjust valves and control devices!
• Grease greasing nipples on press-ram

10.4 Annual maintenance


• Remove metal plates from the baling press and clean inside.
• Clean air admission openings of the electric motors.
• Check all tube carriers and tighten loose screws.
• Check if cylinder cover and flange screws fit well and tighten them if necessary!
• Grease or lubrify pins and links of the coupling hooks, keep pins and links clean (in maintenance
schedule marked with an Sand F)
• Check fixation of the piston rod with the pressure plate.
• Check and correct limit stop switch fixations and limit stop switch points.
• Clean filter of control box ventilator
• Check oil condition and replace if necessary. Also replace oil filters.
• Clean or replace oil filters

Permanent use: all 1000 hours of operation replace the filter!


all 5000 hours of operation replace oil and filter!
all 15000 hours of operation clean oil tank!

Attention: If the filter contains impurities and excessive dirt, immediately inform the
manufacturer of the press!

Equivalent hydraulic oils: CASTROL AWS 32


BP ENERGOL SHF 32
SHELL TELLUS T 32

baling press 20
MAINTENANCE
KNL 100
• Check and tighten screws in general
• Check, clean and re-grease guide plates and wearing bars.
• Check if electric supplies and cables fit well and tighten them if necessary.

We would be very pleased to service and maintain your machine in order to guarantee a long life of your
baling press.

10.4.1 Lubricating nipples


In maintenance schedule marked with an F

Grease every 200 hours of operation


Lubricant: Blasolube 302

10.4.2 Sliding surfaces


In maintenance schedule marked with an S

every 30 hours of operation with MOS2 spray or chain spray

baling press 21
HYDRAULIC
KNL 100
11 Hydraulic
11.1 Hydraulic plan

baling press 22
HYDRAULIC
KNL 100
11.2 Hydraulic equipment

baling press 23
HYDRAULIC
KNL 100

baling press 24
CYLINDER
KNL 100
12 Cylinder
12.1 Main cylinder

Flange cylinder Ø 80/60x1689mm


22-10-6-0010

Pos. Quantity Item N° Description


1 1 22-10-4-0011 Cylinder tube
2 1 22-98-3-0016 Cylinder plunger Ø 60
3 1 22-93-3-0015 Cylinder piston Ø 80
4 1 22-90-3-0003i Piston rod guidance Ø 80/60
5 1 22-94-3-0008 Cylinder head cover Ø 80-60-M8
6 8 02-0222 Socket head screw M8x16 DIN912
7 1 02-0127 Hexagon head screw M20x40 DIN933
8-15 1 22-85-6-0004 Set of gaskets Ø 80/60

baling press 25
CYLINDER
KNL 100
12.2 Tipping device

Cylinder for tipping device

Cylinder Ø63/40x268mm
22-30-6-0006

Pos. Quantity Item N° Description


1 1 22-30-4-0006 Cylinder tube
2 1 22-98-3-0046 Cylinder plunger Ø 40
4 1 22-93-3-0004i Cylinder piston Ø 63
5 1 02-0107 Hexagon head screw M12x30 DIN933
7 1 22-90-3-0019i Piston rod guidance Ø 63/40
12 1 22-94-3-0016 Cylinder head cover Ø 63-40
14 8 02-0557 Hexagon head screw M8x25 DIN933
15 1 02-0411 Rod end Ø 40
3,6,8-11,13 1 22-85-6-0001 Set of gaskets Ø 63/40

baling press 26
ELECTRIC
KNL 100
13 Electric
13.1 Circuit diagram

baling press 27
ELECTRIC
KNL 100

baling press 28
ELECTRIC
KNL 100
13.2 Electric equipment

baling press 29
SPARE PARTS
KNL 100
14 Spare Parts

Position Quantity Item N° Description


1 1 02-0448 Bow shaped handle
2 1 02-0422 Rubber stop
3 1 11-40-3-0001 Wear parts guidance press plate
4 1 02-0449 Tube handle
5 2 02-0433 Springs
6 2 02-0451 Plastic ball ø 45
7 1 02-0450 Plastic ball ø 25
2 02-0435 Spring for tipping device
11-40-4-0001 Binding hooks

baling press 30
PLEASE CONSIDER
KNL 100
15 Please consider
Only use original AUSTROPRESSEN – spare parts!

Quote your exact address, and zip code and railroad station.
Please write legibly!

Quote type, year of construction and machine number.


The machine number is located on the identification plate.

The client is responsible for any wrong deliveries due to incomplete details.
Please prepare your order carefully.

15.1 Our address

Postal address AUSTROPRESSEN Entsorgungstechnik


Roither Maschinenbau GesmbH
Industriegebiet 11
A-4863 Seewalchen

Phone (+43)7662/8218
Telefax (+43)7662/8218-21

E-mail office@austropressen.com
sale@austropressen.com

Website www.austropressen.com

baling press 31

You might also like