Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

SCHEDULE OF ZONING/LOCATIONAL CLEARANCE FEE

TYPE OF OCCUPANCY SCHEDULE OF FEES


A. Single Residential Structure attached or detached
1. For Project Cost Php 100,000.00 and below Php 288.00
2. More than Php 100,000 to Php 200,000.00 Php 576.00
3. Over Php 200,000.00 Php 720 + (1/10 of 1% in excess of Php
200,000.00)
B. Apartment/Townhouses
1. For Project Cost Php 500,000.00 Php 1,440.00
2. Over Php 500,000.00 to Php 2,000,000.00 Php 2,160.00
3. Over Php 2,000,000.00 Php 3,600.00 + (1/10 of 1% of cost in excess
of Php 2,000,000.00 regardless of the
number of floors)
C. Dormitories
1. Project Cost Php 2,000,000.00 and below Php 3,600.00
2. Over Php 2,000,000.00 Php 3,600.00 + (1/10 of 1% of cost in excess
of Php 2,000,000.00 regardless of the
number of floors)
D. Institutional
1. Project Cost below Php 2,000,000.00 Php 2,880.00
2. Over Php 2,000,000.00 Php 2,880.00 + (1/10 of 1% of cost in excess
of Php 2M)
E. Commercial, Industrial and Agro-Industrial
1. Project Cost below Php 100,000.00 Php 1,440.00
2. Over Php 100,000.00- Php 500,000.00 Php 2,160.00
3. Over Php 500,000.00 – Php 1,000,000.00 Php 2,880.00
4. Over Pup 1,000,000.00 – Php 2,000,000.00 Php 4,320.00
5. Over Php 2,000,000.00 Php 7,200.00 + (1/10 of 1% of Cost in excess
of Php 2,000,000.00)

F. Special Uses/Special Projects (Gasoline Station, Cell Site, Slaughter House, Treatment Plants, etc)
1. Project Cost below Php 2,000,000.00 Php 7,200.00
2. Over Php 2,000,000.00 Php 7,200.00 + (1/10 of 1% of Cost in excess
of Php 2M)
G. Alteration/Expansion (affected areas / cost only) Same as the original application

You might also like