KEMENTERIAN PERUMAHAN DAN KERAJAAN

TEMPATAN

JABATAN PENGURUSAN SISA PEPEJAL NEGARA

TAKLIMAT TENDER

PROJEK PENUTUPAN SELAMAT TAPAK


PELUPUSAN SISA PEPEJAL KOK FOH, JEMPOL
NEGERI SEMBILAN

JANUARI 2022
1. PENGENALAN
PENUTUPAN SELAMAT TAPAK PELUPUSAN

SEBELUM SELEPAS
CONTOH GAMBAR KERJA PEMBINAAN
2. PASUKAN PROJEK
PASUKAN PROJEK

AGENSI PELAKSANA
JABATAN PENGURUSAN SISA PEPEJAL NEGARA (JPSPN)
ARAS 23,24 DAN 34, KEMENTERIAN PERUMAHAN DAN KERAJAAN
TEMPATAN, NO.51, PERSIARAN PERDANA, PRESINT 4, 62100, PUTRAJAYA.

PERUNDING KEJURUTERAAN AWAM DAN STRUKTUR (LEAD


CONSULTANT)
PERUNDING SSE
2-2, JALAN IMPIAN PERDANA 1,
SAUJANA IMPIAN ,43000, KAJANG, SELANGOR
3. LOKASI TAPAK
LOKASI TAPAK
1. Tapak pelupusan Ladang Kok Foh terletak kira-kira 27 km dari pekan
Jempol dan bersempadan dengan ladang kelapa sawit.
PELAN KUNCI DAN PELAN SEDIA ADA

PELAN KUNCI PELAN TAPAK


4. GAMBAR DI TAPAK
PANDANGAN KESELURUHAN TAPAK PROJEK DAN LOT
BERSEBELAHAN
PANDANGAN KESELURUHAN PELBAGAI ARAH
KEADAAN SEMASA DI TAPAK

Slope Failure – settlement and Gabion Wall near entrance


slippage
KEADAAN SEMASA DI TAPAK

Leachate and Stormwater


Leachate drain
Drain combined together
KEADAAN SEMASA DI TAPAK

Top View – Expose waste


KEADAAN SEMASA DI TAPAK

Leachate Pond Leachate Pond Overflow


KEADAAN SEMASA DI TAPAK

Access Road To The Top Covered By Access Road Covered by Bushes and
Bushes Waste
5. SKOP PROJEK
SKOP PROJEK
• Memastikan menutup selamat tapak pelupusan sisa pepejal.
• Mengurus air hujan bagi kawasan tadahan tidak bercampur dengan air sisa pepejal (Leachate)
• Mengurus air sisa pepejal agar tidak melimpah ke kawasan sekitar dan dikeluarkan dengan cara yang
selamat mengikut kehendak Jabatan Alam Sekitar
• Kerja-kerja yang terlibat dalam projek ini adalah:
i. Kerja awalan & keperluan kontrak
ii. Pembersihan tapak
iii. Kerja tanah
iv. Saliran dan perparitan
v. Kolam tadahan air hujan (OSD)
vi. Jalan masuk & jalan servis
vii. Paip air sisa pepejal (Leachate Pipe)
viii. Kolam air sisa (Leachate Pond 1 and 2)
ix. Wetland
x. Jalan masuk & jalan servis
xi. Pagar utama & perimeter
xii. Penanaman rumput
xiii. Kerja penyelenggaraan
xiv. Kerja-Kerja Wang Peruntukan Sementara
6. REKABENTUK PROJEK
LUKISAN UKUR TANAH
REKABENTUK
REKABENTUK EARTHWORK
PLATFORM SECTION
REKABENTUK

CROSS SECTION PLAN


PLATFORM A (1)
REKABENTUK

CROSS SECTION PLAN


PLATFORM A (2)
REKABENTUK

CROSS SECTION PLATFORM B


REKABENTUK

CROSS SECTION PLATFORM C (1)


REKABENTUK

CROSS SECTION PLATFORM C (2)


REKABENTUK

CROSS SECTION PLATFORM D (1)


REKABENTUK

CROSS SECTION PLATFORM D (2)


REKABENTUK
- DRAINAGE
REKABENTUK
- LEACHATE PIPE
REKABENTUK – LEACHATE POND 2
REKABENTUK – SISTEM PELEPASAN GAS
(LEACHATE MANHOLE)
7. IKLAN TENDER
IKLAN TENDER
MAKLUMAT BERKAITAN TENDER

1. KELAS KONTRAKTOR: GRED G7 SAHAJA

2. KATEGORI: CE

3. PENGKHUSUSAN: CE21(PEMBINAAN KEJURUTERAAN AWAM), dan


CE36 (KERJA-KERJA TANAH)

4. KELAYAKAN: MEMPUNYAI SIJIL PPK, SPKK (CIDB) YANG MASIH SAH & SIJIL TARAF BUMIPUTERA
(STB)

5. HARGA TENDER: RM450.00

6. TARIKH JUAL:

WAKTU PERKHIDMATAN KAUNTER


LOKASI PEJABAT WAKTU REHAT / SOLAT JUMAAT
(ISNIN HINGGA KHAMIS
9.00 AM – 1.OO PM
SEMENANJUNG 12.15 PM – 2.45 PM
2.00 PM – 4.00 PM

7. TEMPAT BELI: ARAS 24, JPSPN, KPKT

8. KAEDAH PEMBAYARAN: WANG KIRIMAN POS & BANK DERAF ATAS NAMA KETUA SETIAUSAHA, KPKT
(BAYARAN TUNAI ATAU CEK TIDAK AKAN DITERIMA)

9. TARIKH TUTUP TENDER: 14 MAC 2022, 12.00 TENGAH HARI

10. PENGHANTARAN: DIMASUKKAN DALAM SAMPUL SURAT BERLAKRI, DITANDAKAN DENGAN TAJUK
DAN NOMBOR TENDER DI ATAS SAMPUL SURAT
8. MAKLUMAT TAMBAHAN
MAKLUMAT TAMBAHAN

1. PEGAWAI PENGUASA PROJEK: KETUA PENGARAH JPSPN;

2. TEMPOH SIAP KERJA MAKSIMA: TIDAK MELEBIHI 65 MINGGU;

3. KESELURUHAN KERJA ADALAH BERDASARKAN KUANTITI SEMENTARA

(PROVISIONAL QUANTITY);

4. BORANG TENDER (JKR 203B – PIND.5/2008);

5. SYARAT – SYARAT KONTRAK JKR 203A (REV.1/2010)

a. Borang Kontrak JKR 203A (Rev. 1/2010)

b. Addenda Kepada Syarat-Syarat Kontrak

c. Peruntukan Khas Kepada Syarat-Syarat Kontrak


MAKLUMAT TAMBAHAN

6. PETENDER AKAN MENERIMA 1 SET DOKUMEN TENDER & 1 SET

LUKISAN TENDER;

 PETENDER ADALAH BERTANGGUNGJAWAB MEMASTIKAN

SETIAP DOKUMEN TENDER YANG DIBELINYA ADALAH

LENGKAP.

 SEKIRANYA TERDAPAT KOMPONEN DOKUMEN ATAU HELAIAN

YANG TIADA /HILANG, PETENDER WAJIB MEMBERITAHU

KEPADA PIHAK JPSPN DENGAN SEGERA;


MAKLUMAT TAMBAHAN

7. PETENDER DIINGATKAN UNTUK MEMBACA ARAHAN KEPADA PETENDER

TERUTAMANYA TATACARA PENYERAHAN DOKUMEN TENDER YANG

SEMPURNA SEMASA PROSES TUTUP TENDER.

 SILA TELITI SETIAP MUKA SURAT DOKUMEN TENDER SUPAYA

TIADA MAKLUMAT YANG TERTINGGAL BERKENAAN PROJEK.

 SILA TELITI DAN SEMAK SENARAI SEMAKAN YANG

DISEDIAKAN DALAM DOKUMEN TENDER

 SILA LENGKAPKAN DAN TANDATANGAN BORANG-BORANG

YANG BERKENAAN DALAM DOKUMEN TENDER;


DOKUMEN WAJIB DITANDATANGAN

BORANG TENDER (JKR203B – PIND. 5/2008)

RINGKASAN TENDER

SURAT AKUAN PEMBIDA

SURAT AKUAN PEMBIDA UNTUK MELAKSANAKAN

PROGRAM PROTEGE

BORANG - BORANG MAKLUMAT PETENDER


9. SENARAI KUANTITI
SENARAI KUANTITI

1. PRELIMINARIES AND GENERAL WORKS

2. MAIN INFRASTRUCTURE WORKS (ALL PROVISIONAL)

 SITE CLEARANCES AND DEMOLITION WORKS

 EARTHWORKS WORKS

 SURFACE WATER DRAINAGE

 ON-SITE DETENTION POND

 LEACHATE COLLECTION PIPE

 LEACHATE POND 1 AND 2

 WETLAND

 ROADWORKS

 FENCING AND GATES

 TURFING WORKS

 MAINTENANCE WORKS

3. PROVISIONAL SUM