Professional Documents
Culture Documents
Rules_Operation_Dual Shaker
Rules_Operation_Dual Shaker
Always LIFT the Shaker with dedicated & certified lifting points
Always ensure the Shaker Skid is equal from ground level to be checked using spirit /
bubble level
Always Try to Hook up Shaker and Augers to Rig power supply to avoid any issues from
our side
Clean screens periodically while receiving flow to minimize blinding and solids buildup &
Maintain basket angles close to 0 degrees or minimum to reduce damage to our screen
Never use screens with near particle size of materials used in mud which will blind our
screens and increase consumption
Any water usage for cleaning shaker / screens / to push cuttings should be authorized by
Rig Foreman & Tool pusher
Inform the Foreman in case of no Augers installed and if the cuttings are not conveying
from Rig Chute to our Shakers, never do anything on your own.
Use the Mud in our Recovery Tank to Flush the cuttings specially in cases where there is
no Auger Installed from Rig Shakers to MI Shakers
No one should climb to grease the bearing; we have zero tolerance towards HSE non
compliance
Request the screens ahead and ensure you have proper inventory
Grease the Shaker Motor Bearings & Auger Bearings as per schedule on regular basis-
Follow up with JDL / Coach
Whenever we have Fluid recovery it’s mandatory to have retort data on Daily Reports
Ensure all Augers at height should have extension grease Hose from bearings
SLB-Private