Professional Documents
Culture Documents
Martin GSB Gr-I
Martin GSB Gr-I
Martin GSB Gr-I
Name of the work:- Martin Burn Road from 0.00 Kmp to 4.20 Kmp, strengthening Work including both sides PCC Sauccer drain
Agency: Mallick Brothers.
under Barasat Highway Division No. I in the District of North 24 Parganas.
Deviation
Standard
Sieve
gm Total Weight
gm Total Weight
gm Total Weight
gm Total Weight
gm Total Weight
37.5 mm
22.4 mm
11.2 mm
5.6 mm
Maximum
Sand
size
Minimum
Wt of % of Wt of % of Wt of % of Wt of % of Wt of % of
Average
retained passing retained passing retained passing retained passing retained passing
mm
25
23
10
10
32
gm % gm % gm % gm % gm %
75 100 100 100 0 100 0 100 0 100 0 100 0 100 100 0
53 80 100 90.00 1972 80.72 0 100 0 100 0 100 0 100 95.18 -5.18
26.5 55 90 72.50 8249 0.06 0 100.00 0 100.00 0 100.00 0 100.00 75.01 -2.51
9.5
10227
10426
6403
4664
35 65 50.00 0 0.10 10082 3.30 2743 57.20 0 100.00 0 100.00 48.50 1.50
2567
4.75 25 55 40.00 0 0.10 178 1.60 3609 0.80 3717 20.30 18 99.30 34.28 5.72
2.360 20 40 30.00 0 0.10 98 0.70 33 0.30 761 4.00 26 98.30 32.07 -2.07
0.425 10 15 12.50 0 0.10 56 0.10 0 0.30 174 0.30 1554 37.70 12.17 0.33
0.075 0 5 2.50 0 0.10 5 0.10 12 0.10 10 0.00 903 2.60 0.89 1.61
Total Wt. Retained [ gm ] 10221 10419 6397 4662 2501 Sd = -0.61
Proposed proportion for WMM 37.5 mm: 22.4 mm :11.2 mm: 5.6 mm : Sand = 25%:23%:10:10%:32%
IRC Max
120
IRC A v.
100
Propo sed Gradia tion
80
% Passing
60
40
20
0
Sieve in mm
75 53 26.5 9.5 4.75 2.360 0.425 0.075