50'-7"

4"x6" GUTTER(ALL) 4" PVC DOWNSPOUT(ALL) 4" PVC DOWNSPOUT


CONNECTED WITH
4" PVC FLANGE(ALL)

4" TO 6" COUPLER


25'-0"

20'-0"

24" CATCH BASIN WITH


90 deg. DOWN ELBOW
DOOR

30" STORM DRAIN

10'-0"
6" PVC PIPE VERTICAL 90 deg. WYE
4" 45 deg. PVC WYE WITH
REMOVABLE INSPECTION CAP. 23'-6" 20'-0"
INSTALLED ON ALL DOWNSPOUTS

NOTE: REQUIRED SLOPE WILL BE MAINTAINED ON ALL BURIED PIPE.


EASTERN PIPE WILL BE DEEPER THAN WESTERN PIPE TO
ALLOW SLOPE FOR SOUTH END CROSSOVER PIPE CONNECTION.
DOWNSPOUTS WILL BE EQUIPPED WITH REMOVABLE CAPS FOR
EAST ELEVATION PIPE INSPECTION AND CLEAN OUT. GUTTER IS 4"x6" GALVINIZED
STEEL. BURRIED PIPE IS 6" PVC. DOWNSPOUTS ARE 4" PVC.
ALL PVC IS SCH40.
RIVERWAY GOLF COURSE AND DRIVING RANGE RIVERWAY GOLF COURSE MAINTENANCE YARD
April 2, 2024 SCALE 1/8"-1' A 3
9001 BILL FOX WAY, BURNABY, BC, V5J 5J3 NEW EQUIPMENT STORAGE BUILDING
4"x6" GUTTER

4" PVC DOWNSPOUT


CONNECTED WITH
4" PVC FLANGE(ALL)
25'- 0"

20'-0"

4" 45 deg WYE WITH


REMOVABLE CAP ON
ALL DOWNSPOUTS

24" CATCH BASIN WITH


90 deg. DOWN ELBOW

30" STORM DRAIN

40'- 4"
4" TO 6" COUPLER

42'- 3"

8'- 0"

NOTE: REQUIRED SLOPE WILL BE MAINTAINED ON ALL BURIED PIPE.


EASTERN PIPE WILL BE DEEPER THAN WESTERN PIPE TO
ALLOW SLOPE FOR SOUTH END CROSSOVER PIPE CONNECTION.
DOWNSPOUTS WILL BE EQUIPPED WITH REMOVABLE CAPS FOR
NORTH ELEVATION PIPE INSPECTION AND CLEAN OUT. GUTTER IS 4"x6" GALVINIZED
STEEL. BURRIED PIPE IS 6" PVC. DOWNSPOUTS ARE 4" PVC.
ALL PVC IS SCH40.
RIVERWAY GOLF COURSE AND DRIVING RANGE RIVERWAY GOLF COURSE MAINTENANCE YARD
April 2, 2024 SCALE 1/8"-1' A 3
9001 BILL FOX WAY, BURNABY, BC, V5J 5J3 NEW EQUIPMENT STORAGE BUILDING
50'-7"

4" PVC DOWNSPOUT DOWNSPOUT GUTTER


CONNECTED WITH
4" PVC FLANGE(ALL)

24" CATCH BASIN WITH

25'-0"
90 deg.DOWN ELBOW

20'-0"
DOOR

30" STORM
DRAIN

4" 45 deg. PVC WYE WITH


VERTICAL 90 deg. WYE 6" PVC PIPE REMOVABLE INSPECTION CAP.
INSTALLED ON ALL DOWNSPOUTS
20'-0" 23'-6"
4"x6" COUPLER NOTE: REQUIRED SLOPE WILL BE MAINTAINED ON ALL BURIED PIPE.
EASTERN PIPE WILL BE DEEPER THAN WESTERN PIPE TO
ALLOW SLOPE FOR SOUTH END CROSSOVER PIPE CONNECTION.
DOWNSPOUTS WILL BE EQUIPPED WITH REMOVABLE CAPS FOR
WEST ELEVATION PIPE INSPECTION AND CLEAN OUT. GUTTER IS 4"x6" GALVINIZED
STEEL. BURRIED PIPE IS 6" PVC. DOWNSPOUTS ARE 4" PVC.
ALL PVC IS SCH40.
RIVERWAY GOLF COURSE AND DRIVING RANGE RIVERWAY GOLF COURSE MAINTENANCE YARD
April 2, 2024 SCALE 1/8"-1' A 3
9001 BILL FOX WAY, BURNABY, BC, V5J 5J3 NEW EQUIPMENT STORAGE BUILDING
N

40'-4"

DOOR

GUTTER
4"x6"(ALL) GUTTER
10'-0"
10'-0"

DOWNSPOUT
50'-7"

4" PVC(ALL) DOWNSPOUT


10'-0"

6" PVC PIPE

23'-6"
10'-0"

DOWNSPOUT DOWNSPOUT
20'-0"

24" CATCH BASIN WITH


90 deg. DOWN ELBOW

42'-3"

8'-0"

STORM DRAIN

NOTE: REQUIRED SLOPE WILL BE MAINTAINED ON ALL BURIED PIPE.


EASTERN PIPE WILL BE DEEPER THAN WESTERN PIPE TO
ALLOW SLOPE FOR SOUTH END CROSSOVER PIPE CONNECTION.
DOWNSPOUTS WILL BE EQUIPPED WITH REMOVABLE CAPS FOR
PIPE INSPECTION AND CLEAN OUT. GUTTER IS 4"x6" GALVINIZED
STEEL. BURRIED PIPE IS 6" PVC. DOWNSPOUTS ARE 4" PVC.
ALL PVC IS SCH40.
March 12, RIVERWAY GOLF COURSE AND DRIVING RANGE RIVERWAY GOLF COURSE MAINTENANCE YARD SCALE
A 1
2024 9001 BILL FOX WAY, BURNABY, BC, V5J 5J3 NEW EQUIPMENT STORAGE BUILDING 1"-10'