Certificate of Physical Inspection

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

CERTIFICATE OF PHYSICAL INSPECTION

Name of the Work: “Snow Clearance from km 143.000 to Km 235.000 on Batote-


Kishtwar-Chatroo-Sinthanpass-Khanabal road of NH-244, to make road stretch traffic
worthy during winter season, in the UT of Jammu & Kashmir for a period of 05 years”
IPC-11- reg.

Certified that I have physically inspected and verified the quality & quantity
for the work in the project “Snow Clearance from km 143.000 to Km 235.000 on
Batote-Kishtwar-Chatroo-Sinthanpass-Khanabal road of NH-244, to make road
stretch traffic worthy during winter season, in the UT of Jammu & Kashmir for a
period of 05 years” for the period from 28-03-2024 to 07-05-2024. During the
inspection dated 18 May 2024 & 13 Jun 2024 it’s found that the Manpower &
Machineries as specified in the contract agreement were deployed by the contractor
on site corresponding to the quantum for which the bill has been recommended for
payment to the contractor.

Gursewak Singh Sangha)


GE, NHIDCL General Manager (P),
SO-Chatroo NHIDCL, PMU-Kishtwar

You might also like