Download as pdf
Download as pdf
You are on page 1of 1
161 | Watchkeepers rested as per STCW; records of hours of work/rest for each crew member comply with STCW requirements and tally with vessel’ operation logs 162 | Navigation charts and passage plan properly maintained, eg, navigation charts for ‘Australian ports available, , navigation charts for intended voyage available, navigation, x charts up-to-date, passage plans and navigation charts berth to berth 163 | GMDSS radio installation properly maintained; radio battery in satisfactory condi Deck Officers familiar with the operation of GMDSS installations including testing of x radio equipment with reserve source of energy, e.g, DC24v batteries, etc. 16.4 | Lifeboats properly maintained, e.g. on-load release gear in satisfactory condition (e.g ‘maintained in fully reset condition and can be released as per manufacturer's : instructions, operating instructions available, crew familiar with its operation); engines start without difficulty (with primary & secondary means of starting in good condition) 16.5 | Rescue boat, propulsion engine and launching appliance are properly maintained; crew | x familiar with the operation. 16.6 | Emergency fire pump (incl. associated priming pump, valves & piping) properly maintained without leakage; emergency fire pump can maintain sufficient discharge x pressure for at least 2 fire hoses simultaneously; fire lines, hydrants and fire hoses in good condition without leakage; crew familiar with the operation 16.7 | Emergency generator properly maintained, eg, primary and secondary means of starting in good condition; auto-start, auto-connect and power supply to emergency x switchboard in good condition: insulation resistance in good condition [368 [Engine room ventilation fans and their fire dampers properly maintained; furnnel laps | properly maintained; ventilators and their fire dampers for cargo holds properly m3 maintained = oe [169 | The general condition and functionality of sewage treatment plant in satisfactory | | condition; overboard discharge valves shut off as appropriate; operating instructions x properly posted; engineers familiar with the operating procedures | 1610 | Fuel oil tank and L.O. tanks quick-closing valves not blocked in open position; drain valves not gagged in open position ‘Air pipes (or air vents) properly maintained, coamings and heads in good condition, | floats inside air pipe heads in good condition; natural ventilators (eg. gooseneck ee ventilators) properly maintained, coamings and heads in good condition, closing appliances for weather-tightness in order, gaskets and clamping devices in order. | x6a1 | Safety Management System implemented effectively, eg, records of work/rest for crew, | critical shipboard operations, maintenance of ship. emergency drills, corrective action x ‘of non-conformities. etc. ‘tem 16 (Any item above marked with "NO? please give a brief explanation and propose a corrective action plan below) 17. General Observation and Comments of Ship Master (To be completed by Ship Master) 33 CFR check ( 48 hrs prior & 24 hrs prior arrival ) will be carried out on 28 Mar 24 2000-2200 LT__ -VDR data transfer procedures training with deck officers carried out by practically extracting and playing thy i are for better understanding of the bridge team. _ BWTS tried out in USCG mode for operations _ Signature of Master : Date : i A Signature of C/Engineer (Ashish Sipgh) Date 27 Mar 24 = PSC Inspection Checklist -12-

You might also like