Professional Documents
Culture Documents
SOF Template
SOF Template
SOF Template
Start-Up Brief details on if start of the Train/Unit will be done in sections hence a
Strategy: SoF for each of the section start-up.
State the identification and mitigation strategy to capture areas of
conflict as we go for start-up of each section, knowing the potential for
continuing jobs (Cold / Hot work) in other sections.
Units/Equipment
Exempted from
MC/PSSR/CSU
It is confirmed that the following criteria have been met as a minimum requirement necessary
for the facility to reintroduce hydrocarbons.
Applicable
Statement of Fitness requirements specified in AI-PSM Application manual item
Yes No
7.1 have been met where applicable (refer to SoF pre start-up checklist for
applicability):
a Process Safety risks have been identified and documented and are
managed to ALARP
c HSSE critical equipment meets its Technical Integrity requirements
d All outstanding punch list items are captured in PSSR checklist, and
categorized accordingly. Asset is aware of all open B and C items.
h Modifications are complete and have been authorized as specified in the
Management of Change procedure:
STATEMENT OF FITNESS TEMPLATE
In case the TA1 does not sign personally, delegate can sign according to the Manual of
Technical Authority.
Supported by TA 1 Name Sign Date