MEC653 Design Project - Mac 2024
MEC653 Design Project - Mac 2024
HVAC SYSTEMS
DESIGN PROJECT:
OFFICE BUILDING
FLOOR PLAN
BUILDING INFO/SURVEY
PROCEDURE
Cooling load
estimation (RoT)
Cost estimation
and system
selection
Cooling load
estimation
(detailed)
5 – 45 for VRV
2. Methodology
- Method for calculation (e.g. E20 method for cooling load estimation, equal friction
method for duct design etc)
- Assumption (No of window, type, no of pax, equipment etc)
3. Calculation
- Cooling load estimation (Rule of Thumb)
- Propose few systems and costing (refer to recommended pricing)
- System selection → Select the best system among the options and justification (attach
manufacturer catalogue)
- Detailed cooling load estimation → Use Excel spreadsheet
- Ducting design (if ducted system is chosen) → Both manual method (friction chart),
ductulator or software (screenshot) can be used
- Piping design and pump sizing (if water-cooled/indirect expansion system is chosen)
5. Conclusion
6. Reference
SAMPLE – EXCEL SPREADSHEET
TOTAL
SAMPLE – SCREENSHOT FOR DUCT DESIGN
SAMPLE – DUCTULATOR SOFTWARE & RESULT
Hardcopy
Example:
Example:
Same Room YY
Different indoor unit → Ceiling
concealed
(1 x A5CC 38C) or
(2 x A5CC 20C)
SAMPLE – CATALOGUE
DESIGN CHECK FIGURE
VRV + AHU
WC VRV
FCU (to
AHU (to
supply
supply Ducting Ducting
‘supply air’ Space
‘fresh air’
to the
to FCU)
space)
AHU (to
provide
‘pre-
cooling’)
Ducting
Space
FCU (to
provide
cooling)