A&A consultants

LETTER
TO: FROM:

Eng: Project Manager A&A


DATE:
COMPANY:
ORASCOM & ROWAD JOINT VENTURE 16/05/2024
PROJECT:
High SPEED RAILWAY PROJECT-MAIN
DEPOT
SUBJECT:
Inspection of foundation Level – main workshop-
Building -B13-1
Dear Sirs,

Reference is made to the above-mentioned subject, and the site visit carried
out on 07-05-2024, to inspect the excavation bottom at level (+96.20) to
(+95.60) from axis (13.1-01 to 13.1-09).

Please note that, the existing formation at the excavation levels consists of
limestone which is in agreement with the geotechnical report.

Accordingly, the replacement layer can be placed till reaching the slab on
grade level.
The site preparation guidelines can be followed as mentioned in the related
geotechnical report.

Regards
Dr/ Mohamed Abdel Hamid.

Attachment:
Attachment (1): site pictures

39 Mohamed Fahmy El-Mohdar St. - Seventh District - Nasr City - Cairo - Egypt. Tel/Fax.: 202 226141198 – 226141178
E-mail: mail@a-aconsultants.com
A&A consultants

Attachment (1)
site pictures

39 Mohamed Fahmy El-Mohdar St. - Seventh District - Nasr City - Cairo - Egypt. Tel/Fax.: 202 226141198 – 226141178
E-mail: mail@a-aconsultants.com

You might also like